Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS609165B2 - How to place drain material - Google Patents
[go: Go Back, main page]

JPS609165B2 - How to place drain material - Google Patents

How to place drain material

Info

Publication number
JPS609165B2
JPS609165B2 JP4164781A JP4164781A JPS609165B2 JP S609165 B2 JPS609165 B2 JP S609165B2 JP 4164781 A JP4164781 A JP 4164781A JP 4164781 A JP4164781 A JP 4164781A JP S609165 B2 JPS609165 B2 JP S609165B2
Authority
JP
Japan
Prior art keywords
drain material
switch
rod
lever
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP4164781A
Other languages
Japanese (ja)
Other versions
JPS57158416A (en
Inventor
直樹 陣内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aoki Construction Co Ltd
Original Assignee
Aoki Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aoki Construction Co Ltd filed Critical Aoki Construction Co Ltd
Priority to JP4164781A priority Critical patent/JPS609165B2/en
Publication of JPS57158416A publication Critical patent/JPS57158416A/en
Publication of JPS609165B2 publication Critical patent/JPS609165B2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/103Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by installing wick drains or sand bags

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 本発明は軟弱地盤を改良するためのドレン材の打設方法
に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for placing drain material for improving soft ground.

一般にカードボード状ドレン材の打段の打止り深度は、
地盤のボーリングやサウンディングによって平均的に、
打設区域毎に決められるのが通常である。
In general, the stopping depth of the step of cardboard-like drain material is
On average, by ground boring and sounding,
Usually, it is determined for each pouring area.

しかるに地層の複雑な打設区域では一律に打止り深度を
設定することが適当でない場合が少くない。
However, in pouring areas with complex strata, it is often inappropriate to set a uniform pouring depth.

例えば7凧附近に排水層としての砂層があり、この層と
地表に施すサンドマット層とからの2面排水するような
設定に対し、ボーリング調査では打設区域全体を網羅し
されないので判らなかったが、実際には打設区域のかな
りの部分で砂層が7.5mの位置にあるような場合、僅
かな本数のボーリング調査の結果に基づく設定どおりに
7のでドレン材を打設区内一律に打止めると、設計強度
まで地盤が改良されるに要する時間が大中に長くかかる
ことになる。
For example, there is a sand layer as a drainage layer near the 7th kite, and the setting is to drain water from two sides, from this layer and a sand mat layer applied to the ground surface, but this could not be determined because the boring survey did not cover the entire pouring area. However, in reality, in a case where the sand layer is 7.5 m deep in a considerable part of the pouring area, the drainage material must be applied uniformly within the pouring area, as set based on the results of a small number of boring surveys. If the construction is stopped, it will take a long time for the ground to improve to the design strength.

又逆に実際の砂層が6.5の附近にあり、これが非常に
硬くてこれ以后の打設が不可能な場合検収上の問題が生
じかねない。
On the other hand, if the actual sand layer is around 6.5 and is so hard that further pouring is impossible, problems may arise during acceptance inspection.

すなわち、設計上で7机打設のところ6.5のまでしか
打穀されていないので、これを出来高として認めてもら
えない場合や、或は本当に打設出来なかったという証明
を得るため、打設不能となった深度に打設樟をいまら〈
とどめ、深度記録紙上に時間軸方向の進行にも拘らず深
度軸方向の進行がなされていない状況を描き出さねばな
らないという無駄な時間をついやす場合が生じてくる。
In other words, in the design, the grain was pounded only up to 6.5 when seven machines were poured, so this may not be recognized as the production volume, or the grain may be pounded to obtain proof that it really could not be poured. I am now pouring camphor at a depth that is no longer possible.
This may result in wasted time having to depict on the depth recording paper a situation in which no progress has been made in the depth axis direction despite progress in the time axis direction.

又この砂層が硬くない場合には砂層に到達したにも拘ら
ずト打設機の貫入力が大きく〜抵抗を感じないため、不
要の長さを打設していたという無駄がこれまで行なわれ
てきた。本発明は以上のような不合理を是正するため打
設中の抵抗を連続的に測定しつつ非常に抵抗の少ない改
良対象層から、比較的抵抗の大きな砂層への変化を数値
的に捕える手段を提供し、施工管理の有力な手段とする
ことを第1の目的とするものである。
In addition, if this sand layer is not hard, the penetration force of the driving machine is large even when it reaches the sand layer, and no resistance is felt, so it has been a waste of driving to an unnecessary length. It's here. In order to correct the above-mentioned unreasonableness, the present invention provides a means to continuously measure the resistance during pouring and numerically capture the change from the layer to be improved with very low resistance to the sand layer with relatively high resistance. The primary objective is to provide a powerful means of construction management.

更に以上のような手段で運転の自動化を図り省力化を図
ることをも本発明の目的とするものである。
Furthermore, it is another object of the present invention to automate operation and save labor through the above-described means.

本発明は以上のような目的を達するために次のような手
段を採用するものである。
The present invention employs the following means to achieve the above objects.

すなわち、第1の発明はドレン材打設樽の先端に貫入抵
抗を受ける貫入コーン部材を設け、この貫入コーン部材
の。
That is, the first invention provides a penetration cone member that receives penetration resistance at the tip of a drain material casting barrel, and the penetration cone member receives penetration resistance.

ッドから圧力を受けて信号を発するロードセルで貫入抵
抗を電気量に変えこれを増中して記録器又はメーター上
に表示してドレン材打設抵抗を検知し、これによって打
設工程から引き抜き工程に切替えるところのドレン材を
打談する方法である。第2の発明は前記方法においてロ
ードセルで貫入抵抗を検知したドレン材打設抵抗値に或
る値を設定し、その値にドレン材打設抵抗値が達すると
、その電気信号を受けてリレー等でクラッチレバー及び
トランスミッションンレバーを動作せしめ、アクチェー
タを制御して打設中のドレン材打設樺を引き抜き方向に
逆転動作せしめ、引き抜きが所定の高さまで行なわれた
ことを検知すると引き抜き動作を停止せしめるようにド
レン材打設樟を制御する方法である。
A load cell that receives pressure from the lead and emits a signal converts the penetration resistance into an electrical quantity, increases this and displays it on a recorder or meter to detect the drain material placement resistance. This is a method of discussing the drain material that will be switched to the process. The second invention is that in the above method, a certain value is set for the drain material placement resistance value when the penetration resistance is detected by the load cell, and when the drain material placement resistance value reaches that value, a relay, etc. The clutch lever and transmission lever are operated, and the actuator is controlled to reversely move the drain material pouring birch in the direction of pulling out, and when it is detected that the drain material has been pulled out to a predetermined height, the pulling operation is stopped. This is a method of controlling the drain material pouring so as to force the drain material to be placed.

本発明方法を現在多用されているレール走行型打込機に
採用すると、この方式の打談機は通常簡易軽量を特徴と
しており、打設樺はオープンロッドが用いられていてこ
の方式の運転には運転手1名、ドレン材装着1名その他
の作業員2〜3名、合計4〜5名の編成を必要とすると
ころ運転手にドレン材装着員を兼ねさせることができる
ので人件費を大中に節約できて、運転の自動化を図るこ
とができるのである。
When the method of the present invention is applied to a rail driving type driving machine that is currently widely used, this type of driving machine is usually characterized by being simple and lightweight, and the driving birch uses an open rod. 1 driver, 1 drain material installer, and 2 to 3 other workers, totaling 4 to 5 people. However, the driver can also serve as the drain material installer, which greatly reduces personnel costs. This means that you can save money and automate your driving.

以下本発明を図面に基づいて説明する。The present invention will be explained below based on the drawings.

実施例のものはオープンロッド式のペーパードレン打設
機について説明するが、本発明のものはクローズドマン
ドレル方式のものにも容易に適用できることはいうまで
もない。
Although the embodiment will be described with reference to an open rod type paper drain driving machine, it goes without saying that the present invention can be easily applied to a closed mandrel type machine.

第!図はレール走行型オープンロッド式ペーパードレン
打設機を示すものであって、台車18上には打設樺保持
用プ−ム19が搭載されており、その打設樟12は打設
樟駆動用フリクションローラ11,11,11,11で
駆動されて昇降するようになっている。
No.! The figure shows a rail-running open rod type paper drain pouring machine, in which a pouring birch holding pool 19 is mounted on a cart 18, and the pouring camphor 12 is driven by a pouring camphor. It is driven by friction rollers 11, 11, 11, 11 to move up and down.

フリクシヨン。Frixion.

ーラ11,11,11,11は、これと同軸のスプロケ
ツト10,10,10,10で駆動されるが、之等スプ
ロケットにはタイトナーとしてのスプロケツト9と共に
チェーン8が張架されウオームギア出力軸のスブロケッ
ト7で駆動される。ウオームギア出力軸はウオームギア
減速機6に軸架されていてウオームギア減速機6は軸嬢
手5を介してトランスコミッション3につながり、トラ
ンスミッション3は同じく台車18上に搭載された原動
機1からクラッチ2を介して駆動される。クラッチ2は
そのクラッチレバー40で操作され「トランスミッショ
ン3はそのトランスミッションレバー1 17で正逆転
するように操作される。そしてドレン材14はリール1
6に巻かれておりこれから引き出されたドレン材141
ま打設樺12先端のドレン材打談シュ−13に雛止めさ
れている。
The rollers 11, 11, 11, 11 are driven by sprockets 10, 10, 10, 10 coaxial with these sprockets, and a chain 8 is stretched over these sprockets together with a sprocket 9 as a tightener, which connects the worm gear output shaft. Driven by subrocket 7. The worm gear output shaft is mounted on a worm gear reducer 6, and the worm gear reducer 6 is connected to a transcommission 3 via a shaft droplet 5, and the transmission 3 is connected to a motor 1 mounted on a truck 18 via a clutch 2. It is driven by The clutch 2 is operated by its clutch lever 40, and the transmission 3 is operated by its transmission lever 117 to rotate in forward and reverse directions.
Drain material 141 wrapped around 6 and pulled out from it
It is held in place by a drain shoe 13 at the tip of the pouring birch 12.

なお、17は台車18の車輪を示す。したがってクラッ
チレバー40によってクラッチ2が入ると原動機1から
の動力は軸接手6を介してウオームギア減速機6に伝達
され、チェン8とスプロケツト7,9,10によりフリ
クシヨンローラ11が駆動されて打設樟12は駆動され
、トランスミッションンレバー117によって正転逆転
せしめられ、打談樺12は昇降し、その下降時リール1
6からドレン材14は引き出され打込シュ−13でドレ
ン材は打込されるようになっている。以上のような動力
伝達系統の何処かにピックアップを設置して測定する場
合、ドレン材打込シュ−13の先端に取りつける以外は
、土層を貫入する抵抗の他にドレン材や打設樺が土層と
接触する際の摩擦力或いは粘性低抗が含まれてしまうし
、原動機からフリクションローラまでに設置する場合は
、更に動力伝達機素の損失抵抗が入ってきてしまう。
In addition, 17 shows the wheel of the trolley|bogie 18. Therefore, when the clutch 2 is engaged by the clutch lever 40, the power from the prime mover 1 is transmitted to the worm gear reducer 6 via the shaft joint 6, and the friction roller 11 is driven by the chain 8 and sprockets 7, 9, 10 to drive the driving. The camphor tree 12 is driven and rotated forward and backward by the transmission lever 117, and the discussion tree 12 moves up and down, and when it descends, the reel 1
Drain material 14 is pulled out from 6 and driven in by a driving shoe 13. When measuring by installing a pickup somewhere in the power transmission system as described above, unless it is attached to the tip of the drain material pouring shoe 13, there will be resistance to the drain material and the poured birch in addition to the resistance penetrating the soil layer. This includes frictional force or viscous resistance when coming into contact with the soil layer, and if it is installed from the prime mover to the friction roller, the loss resistance of the power transmission element will also be included.

すなわち、土層の貫入抵抗のみを測定するためには貫入
時に最も先に土層と接触するドレン材打込シュー13部
分に貫入抵抗を測定する検知装置を設けることが望まれ
る。
That is, in order to measure only the penetration resistance of the soil layer, it is desirable to provide a detection device for measuring the penetration resistance at the portion of the drain material driving shoe 13 that comes into contact with the soil layer first during penetration.

そこで、本発明にあっては第2図に示すような貫入抵抗
を測定するロードセルを内部に備えたドレン材打込シュ
ーを提案するものである。
Therefore, the present invention proposes a drain material driving shoe equipped with a load cell for measuring penetration resistance as shown in FIG.

第2図に示すものは打設樺12の下端にドレン材打込シ
ュー13がネジ63で取付けられたものを示すもので、
打談樺12の下端にネジ63で直接取付けられる接続用
ソケット61の下方に剛に取付けられたドレン材折返し
板60の両側部に支持筒52が装着され、支持筒52の
上部には上蓋57がビス68で取付けられている。
The one shown in FIG. 2 shows a drain material driving shoe 13 attached to the lower end of the pouring birch 12 with a screw 63.
A support tube 52 is attached to both sides of a drain material folding plate 60 that is rigidly attached below a connection socket 61 that is directly attached to the lower end of the discussion birch 12 with a screw 63. is attached with screw 68.

支持筒52の頭部は折返し板60より下方に突出してい
るので打設時にドレン材14が横方向にズレることを防
止する役目をも果す。
Since the head of the support tube 52 projects downward from the folding plate 60, it also serves to prevent the drain material 14 from shifting laterally during pouring.

支持筒52の内壁は下部において小型となっておりその
狭まった内壁にパッキン53を封入してあり、支持筒5
2の上部閥口部より上蓋57を外ずしてネジ69を有す
る円形鍔67を内壁内に挿入し、支持筒52の下端開口
より前記ネジ69に螺合するロッド64が三角錐体状の
貫入コーン51に設けられ「ロッド64がパッキング5
3に密着することにより、下端開口部よりの泥土の侵入
を防止するようになっている。
The inner wall of the support tube 52 is smaller at the lower part, and a packing 53 is enclosed in the narrow inner wall.
Remove the upper lid 57 from the upper opening of the support tube 52, insert the circular collar 67 with the screw 69 into the inner wall, and insert the rod 64 screwed into the screw 69 from the lower end opening of the support tube 52 into a triangular pyramid shape. A rod 64 is provided in the penetrating cone 51 and the packing 5
3 prevents mud from entering through the lower end opening.

そして上蓋57と円形鍔67との間にロードセル56が
封入してあり、貫入コーン51が上方に押し上げられる
際にロードセル56が円形鍔67と上蓋57の下端とで
挟まれるようになっている。
A load cell 56 is enclosed between the upper lid 57 and the circular collar 67, and the load cell 56 is sandwiched between the circular collar 67 and the lower end of the upper lid 57 when the penetration cone 51 is pushed upward.

ロードセル56にはストレィンゲージ55を例えば第6
図のようにホイストーンブリッジに組んで貼布されてお
り、これでドレン材14の打設時にコーン51にかかる
抵抗を検出するようになっている。
For example, a sixth strain gauge 55 is attached to the load cell 56.
As shown in the figure, the cone 51 is attached to the whiststone bridge, and the resistance applied to the cone 51 during pouring of the drain material 14 is detected.

前記したストレインゲージ55からの信号を取り出すた
めに打設樟12は小孔65を有する中空ロッドとし、接
続用ソケット61には前記小孔65と蓮適する小孔62
を設け、折返し板60と支持筒52の上方部及び上蓋5
7には4・孔59を設け、之等小孔を通じて送電線58
を配設し、打設棒12の最頂部から外部に送電線58を
取出すものである。
In order to take out the signal from the strain gauge 55 described above, the caster 12 is a hollow rod having a small hole 65, and the connection socket 61 has a small hole 62 that fits in with the small hole 65.
The upper part of the folding plate 60 and the support tube 52 and the upper cover 5 are provided.
7 is provided with a hole 59, and the power transmission line 58 is inserted through the small hole.
The power transmission line 58 is taken out from the top of the driving rod 12 to the outside.

このときロードセル56に貼布するストレイゲージ55
の4枚の抵抗値R,=R2:R3=R4 なる同じ値のものを用いると出力は e=学k、寄生‐‐‐‐‐仙 ここにE:ロードセルのヤング率 。
At this time, the stray gauge 55 attached to the load cell 56
Using the same resistance values of the four sheets R, = R2: R3 = R4, the output is e = k, parasitic --- E: Young's modulus of the load cell.

:ロードセルのポアソン比S:ロードセルの断面積 W:加わる力 K:ゲージ率 となる(T応用計測通論 啓学出版 P29)。: Poisson's ratio S of the load cell: Cross-sectional area of the load cell W: Applied force K: Gauge factor (General Theory of Applied Measurement, Keigaku Publishing, p. 29).

この出力をペンレコーダ等に、ェンコーダ等による深度
記録と併記させることにより、深度−抵抗の関係を知る
ことができる。第5図において20はストレンゲージか
らなる抵抗検知部−変換部、21は増中器、22は記録
器80はム−タ兼A/○変換装置、23はシーケンス制
御袋層、24はクラッチ操作電磁シリンダ25はトラン
スミッション操作電磁シリンダである。
By recording this output on a pen recorder or the like together with depth recording by an encoder or the like, it is possible to know the relationship between depth and resistance. In FIG. 5, 20 is a resistance detection unit/conversion unit consisting of a strain gauge, 21 is an intensifier, 22 is a recorder 80 which also functions as a muter/A/○ conversion device, 23 is a sequence control bag layer, and 24 is a clutch operation. The electromagnetic cylinder 25 is a transmission operation electromagnetic cylinder.

次にこの貫入抵抗の出力を利用して自動的にドレン材1
4の打設、引き抜きを自動的に行なわせる方方法につい
て述べる。
Next, using the output of this penetration resistance, the drain material 1 is automatically
A method for automatically performing pouring and pulling out in step 4 will be described.

改良対象層は障害物等のない限り抵抗が小さいのに対し
、これと比較して砂層、磯層、硬い粘性士層等の改良の
対象とならない層は明らかに大きな貫入抵抗をもち、施
工前にサゥソディング等で之等各土層の抵抗値との比較
を行なっておき、抵抗出力が改良士層の抵抗値以上のあ
る設定値を越えたら信号を発し、この信号を受けて打談
を終了し、自動的に引き抜き工程に入るようにしようと
する方法である。
The layers targeted for improvement have low resistance unless there are obstacles, whereas in comparison, layers that are not targeted for improvement, such as sand layers, rocky shore layers, and hard viscous layers, have clearly large penetration resistance, and Compare the resistance value of each soil layer by soiling, etc., and when the resistance output exceeds a certain set value that is higher than the resistance value of the improver layer, a signal will be issued, and upon receiving this signal, the discussion will end. This method attempts to automatically enter the drawing process.

但し、通常の打設工程の施工に際しては「予めサンドマ
ットを地表に敷設する場合が多くここでは明らかに改良
士層より抵抗値が大きい、又改良士層の中間に抵抗値の
大きな挟み層を含み、この挟み層を打ち抜いて下部まで
打診する必要のある場合もままあることである。
However, when performing the normal pouring process, sand mats are often laid on the ground surface in advance, and in this case, the resistance value is clearly higher than that of the improvement layer, and a sandwiching layer with a high resistance value is placed between the improvement layers. In some cases, it may be necessary to punch out this sandwich layer and percusse the lower part.

之等サンドマットや挟み層を含むような場合には、打止
り層以外の大きな抵抗値をもつ土層では信号を発しない
ようにしなければならない。この手段として深度計でサ
ンドマット底部又は中間挟み層底部までの深度を監視し
、これらの深度より大きな深度のある値を設定し、打設
時にドレン材打込シュー13がこの深度に達したことを
知らせる深度設定信号を発せしめたのちにおいて、大き
な抵抗値を示す値に至った信号をうけて、始めて打止り
層とするようにすればよい。
In cases where sand mats or sandwiched layers are included, it is necessary to prevent signals from being emitted from soil layers with large resistance values other than the stop layer. As a means of this, a depth gauge is used to monitor the depth to the bottom of the sand mat or the bottom of the intermediate sandwich layer, and a value greater than these depths is set, so that the drain material driving shoe 13 reaches this depth during pouring. After issuing a depth setting signal to inform the depth setting signal, the stop layer may be established only after receiving a signal indicating a large resistance value.

さてペーパードレン打設作業を経時的に追うと、先ず打
設地点へ打設機を移動する。次にドレン材を装設してか
ら打設作業に移る。
Now, if we follow the paper drain pouring work over time, first we move the pouring machine to the pouring point. Next, install the drain material and move on to the pouring work.

この打談作業に入るには先ずクラッチレバーを踏み込み
、次にトランスミッションレバーを正転側へ倒してから
クラッチレバーを離す。かくして打談作業が行なわれ打
込シュ−13は下降する。打設作業終了后打込シュー1
3を引き抜くがこの場合クラッチレバーを踏み込み、次
いでトランスミッションレバーを逆転側へ倒してからク
ラッチレバーを離す。かくして打込シュー13は引き抜
かれ、所定の位置で引き抜きを停止する。引き抜きが停
止したら次の打設地点へ打設機を移動する。したがって
本発明方法を実施する装置はドレン材装着から引き抜き
停止までの間作動すればよい。
To begin this discussion, first depress the clutch lever, then move the transmission lever toward forward rotation, and then release the clutch lever. The discussion operation is thus completed and the driving shoe 13 is lowered. After finishing the pouring work, pouring shoe 1
3, but in this case, depress the clutch lever, then tilt the transmission lever to the reverse direction, and then release the clutch lever. The driving shoe 13 is thus pulled out and stopped at a predetermined position. When the extraction stops, move the pouring machine to the next pouring point. Therefore, the apparatus for carrying out the method of the present invention only needs to operate from the time when the drain material is attached until the time when the withdrawal is stopped.

そこで従来の運転手の労作を省くためにドレン材装着員
としての運転手が装着終了時にスイッチを押して作動開
始の信号を発せしめると自動的に打設禅12が土中に降
りて行き、途中深度計による設定深度の信号をうけての
ち打込シュー13に装置した前述に貫入抵抗測定装置か
らの設定層に達した信号をうけてクラッチレバ−踏み込
み、トランスミッション逆転をアクチュェータに行なわ
せる。
Therefore, in order to save the labor of the conventional driver, when the driver who installs the drain material presses a switch to issue a signal to start operation when the drain material installation is completed, the pouring Zen 12 will automatically descend into the soil, and on the way. After receiving a signal indicating the set depth from the depth gauge and then receiving a signal indicating that the set depth has been reached from the penetration resistance measuring device installed in the driving shoe 13, the clutch lever is depressed to cause the actuator to reverse the transmission.

更に引き抜きによる打設梓12の上昇に伴なう深度計上
の深度値が減少して引き抜き終了に近ずし・たことを警
告するランプ又はブザーを設けて停止をスムーズならし
めるよう減速スイッチを深度計内に組み込み信号を発せ
しめるようにしておく。減速されて打設樟12が引き抜
かれてしまうと該打設樟の一部に設けた後述する突起が
スイッチに触れて信号を発し、クラッチレバー踏み込み
、トランスミッションレバーを正転させるという動作を
アクチュヱータに行なわせる。
In addition, a lamp or buzzer is installed to warn that the depth value on the depth gauge is decreasing as the pouring platform 12 rises due to pulling out, and that pulling out is nearing the end. It is built into the meter so that it can emit a signal. When the concrete is decelerated and the concrete 12 is pulled out, a protrusion, which will be described later, provided on a part of the concrete makes contact with a switch and issues a signal, which causes the actuator to depress the clutch lever and rotate the transmission lever in the forward direction. Let them do it.

以上のような動作を自動的に行なわしめることはすなわ
ち、第7図のようなシーケンスを行なうことである。
Automatically performing the above operations means performing a sequence as shown in FIG. 7.

次に以上のような動作を行なわせるアクチュェータ類と
スイッチ類との関係を説明する。
Next, the relationship between the actuators and switches that perform the above operations will be explained.

第1段階 ドレン材装着者がドレン材14をドレン材打込シュ−1
3に掛止したならば、第10図に示す起動スイッチAを
ONする。
In the first stage, the drain material wearer places the drain material 14 into the drain material driving shoe 1.
3, turn on the start switch A shown in FIG.

するとこれまで切れていたクラッチ2がつながり、打談
樟12が貫入を始める。第0段階 予めサンドマット厚さ以後の深さ‘こ設定した深度をド
レン材打込シュー13が越えるとき深度計内に設けた第
8,9図に示す深度設定スイッチCが信号を発し、次の
第m段階でアクチュェータが作動するための記憶回路が
作動する。
Then, the clutch 2, which had been disconnected until now, is connected, and the baton 12 begins to penetrate. 0th stage Depth after the sand mat thickness When the drain material driving shoe 13 exceeds the previously set depth, the depth setting switch C shown in Figs. 8 and 9 provided in the depth gauge emits a signal, and the next A memory circuit for actuating the actuator is activated at the m-th stage.

第m段階 ドレン材打込シュー13が更に深度を増して下方に進み
、予め設定した値以上の抵抗値を貫入コーン51が検知
したならば、第6図に示すメーター兼A/D変換装置8
0の貫入抵抗スイッチEがONされて信号を発し、クラ
ッチ2が切れ、トランスミッションレバー117を後述
する機構で正転側から逆転側へ倒す。
When the m-th stage drain material driving shoe 13 further increases the depth and advances downward, and the penetration cone 51 detects a resistance value greater than a preset value, the meter/A/D converter 8 shown in FIG.
The penetration resistance switch E of 0 is turned on and issues a signal, the clutch 2 is disengaged, and the transmission lever 117 is tilted from the forward rotation side to the reverse rotation side by a mechanism to be described later.

第W段階 前段階の動作によりトランスミッションレバー117が
逆転側に入り完全に議しバーがとまるまでの過程で第1
1図に示すトランスミッションンスイツチDがONされ
る。
Due to the operation before the W stage, the transmission lever 117 enters the reverse direction and is completely shifted until the bar stops.
Transmission switch D shown in FIG. 1 is turned on.

このスイッチによる信号でクラッチ2が再びつながりト
ランスミッションン3はすでに逆転に入っているので打
設梶12は引き抜かれ始める。第V段階 打設樟12が上昇し、引き抜き終了の少し前の設定深度
をドレン材打込シュー13が通過するとき深度計内に設
けた第9図に示す減速スイッチFがONされ、この信号
により警告回路に通電されて、第亀3図に示すパイロッ
トランプPAやブザーBUが警告を発する。
The clutch 2 is connected again by the signal from this switch, and the transmission 3 is already in reverse rotation, so the pouring cage 12 begins to be pulled out. When the V stage pouring rod 12 rises and the drain material pouring shoe 13 passes the set depth slightly before the end of extraction, the deceleration switch F shown in FIG. 9 provided in the depth gauge is turned on, and this signal is As a result, the warning circuit is energized, and the pilot lamp PA and buzzer BU shown in Fig. 3 issue a warning.

ドレン材装着員はこれをうけてスロットルをいまり減速
する。第の段階 打設樟12の先端に取付けてあるドレン材打込シュー1
3が地上に抜けて上ってくると、打込シュー13の直上
に設けてある第10図に示す環状突起121がレバー1
25の先端にあるローラ122に触れて復帰スイッチG
が作動する。
In response to this, the drain material installer releases the throttle and decelerates. Drain material driving shoe 1 attached to the tip of the pouring camphor 12 in the first stage
3 passes through the ground and rises, the annular protrusion 121 shown in FIG.
Touch the roller 122 at the tip of 25 and press the return switch G.
is activated.

復帰スイッチGからの信号よりクラッチ2が切れ、トラ
ンスミッションレバー117が正転側に倒れるか、クラ
ッチ2が断に入り放しになるので、打設樟12は動かな
い。
The clutch 2 is disengaged by the signal from the return switch G, and the transmission lever 117 is tilted toward the forward rotation side, or the clutch 2 is disengaged and released, so the pouring camphor 12 does not move.

又この信号をうけて警告回路が切れる。Also, upon receiving this signal, the warning circuit is cut off.

次に之等のシーケンスをおこなわしめるアクチュェータ
につき説明する。
Next, the actuator that performs these sequences will be explained.

先ずクラッチ用電磁シリンダについて、 第12図において2は第1図に示すクラッチであり、該
クラッチは伝導系においてトランスミッション3より原
動機1の近くに配設されており、クラッチレバー112
を第12図時針方向側に押すと入力側の伝動軸4aから
出力側の伝動軸4bへの伝動がケーシング内の図示しな
いクラッチで切れ、逆に引くことにより伝動軸4aと4
bとがつながるようになつている。
First, regarding the clutch electromagnetic cylinder, in FIG. 12, 2 is the clutch shown in FIG.
When pushed in the direction of the hour hand in Fig. 12, the transmission from the input side transmission shaft 4a to the output side transmission shaft 4b is cut off by a clutch (not shown) inside the casing, and when pulled in the opposite direction, the transmission shaft 4a and 4
It is now connected to b.

レバー112はV字形に構成されその折曲れ部がブラケ
ット1 13に対しピン1 14で枢支されていてレバ
ー112の先端は電磁シリンダ106のピストン106
aの先端部に接続されている。
The lever 112 is configured in a V-shape, and its bent portion is pivoted to the bracket 113 by a pin 114, and the tip of the lever 112 is connected to the piston 106 of the electromagnetic cylinder 106.
It is connected to the tip of a.

そして第12図に示す115は押しバネであってレバー
112をクラッチ切方向に附勢している。電磁シリンダ
106は通電時にピストンを引くので伝動軸4a,4b
は接続され、通電を止めるとしバ一112は押しバネ1
16で復帰してクラッチは切れる。
Reference numeral 115 shown in FIG. 12 is a push spring that biases the lever 112 in the clutch disengagement direction. Since the electromagnetic cylinder 106 pulls the piston when energized, the transmission shafts 4a and 4b
is connected, and when the current is turned off, the spring 112 becomes the push spring 1.
It returns at 16 and the clutch disengages.

次にトランスミッション用電磁シリンダについて、第1
1図において3は第1図に示すトランスミッション、1
17はトランスミッション操作レバー、145はブラケ
ツト27とトランスミッション操作レバー117との間
に狼架された押しバネである。
Next, regarding the electromagnetic cylinder for transmission, the first
In Figure 1, 3 is the transmission shown in Figure 1;
17 is a transmission operating lever, and 145 is a push spring suspended between the bracket 27 and the transmission operating lever 117.

トランスミッション3の入力側の伝動鞄4bと出力軸の
伝動軸4cの回転方向を同一にする。
The rotation direction of the transmission bag 4b on the input side of the transmission 3 and the transmission shaft 4c of the output shaft are made the same.

正転時には、押しバネ145でレバー117が正転側に
押されているが、逆転時には電磁シリンダI07に通電
されピストン107aが押し出されてレバー117が逆
転側に倒れるような構造としている。次に警告信号につ
いて、運転手すなわちドレン材装着員が第13図に示す
警告信号PA,BUを受けて打設樺12の引き抜き終了
の接近を知って引き抜き速度を落すように操作するが、
パイロットランプとブザの両方又は片方をドレン材装着
のためのスペース近くに設ける。
During forward rotation, the lever 117 is pushed toward the forward rotation side by a push spring 145, but during reverse rotation, the electromagnetic cylinder I07 is energized, the piston 107a is pushed out, and the lever 117 is tilted toward the reverse rotation side. Next, regarding the warning signal, the driver, that is, the person installing the drain material, receives the warning signals PA and BU shown in FIG. 13, knows that the end of pulling out the poured birch 12 is approaching, and operates to reduce the pulling speed.
Install a pilot lamp and/or a buzzer near the space for installing drain material.

次に以上のようなアクチュェータ類を後述するような制
御方法で制御して第7図のようなシーケンスを行なわせ
るための信号を発するスイッチ類について述べる。
Next, a description will be given of switches that emit signals for controlling the above-mentioned actuators using the control method described later to cause the sequence shown in FIG. 7 to be performed.

先ず起動スイッチAと復帰スイッチGについて、之等起
動スイッチAと復帰スイッチGは第10図に示す如く装
置されているもので、前述した如く打設サイクルを開始
する信号を発せしめる起動スイッチAはドレン材装着者
がドレン材14をドレン材打込シュー13に掛止してか
ら自ら押すのでドレン材を装着する台車18の作業スペ
ースに設ける必要があり、ここでは後述する復帰スイッ
チGを作動させるためのレバー125側面に敬付けるこ
ととし2接点の押しボタンスイッチを用いた。
First, regarding the start switch A and the return switch G, the start switch A and the return switch G are arranged as shown in FIG. Since the drain material attacher hooks the drain material 14 to the drain material driving shoe 13 and then pushes it himself, it is necessary to provide it in the work space of the cart 18 where the drain material is attached, and here, a return switch G, which will be described later, is activated. A two-contact push button switch was used to place the lever 125 on the side.

復帰スイッチGは引き抜き工程の終了のための信号を発
するもので、第10図のように打設樺12が引き抜かれ
、ドレン材打込シュ−13の先端が地表面Sを離れてや
や上部にきた位置で作動する必要がある。
The return switch G issues a signal to end the pulling process, and as shown in Fig. 10, the pouring birch 12 is pulled out and the tip of the drain material pouring shoe 13 leaves the ground surface S and rises slightly above it. It is necessary to operate in the position where it is.

そこで打設樟12のドレン材打込シュー13の取付部の
少し上部に環状をなす小さな突起、すなわち環状突起1
21を設けておき、打設樟12が引き抜かれたとき、該
環状突起121が触れるローラ122をレバー125の
先端に設け、レバー125はブラケツト128にピン1
23で枢支されている。
Therefore, a small annular projection 1 is formed slightly above the attachment part of the drain material driving shoe 13 of the pouring camphor 12, that is, an annular projection 1.
21 is provided at the tip of a lever 125, and a roller 122 that touches the annular protrusion 121 when the caster 12 is pulled out is provided at the tip of a lever 125.
It is supported by 23.

このブラケツト128は、台車18の一部に取付けたプ
ラケット126に対し長さ調整ねじ127を介して取付
けられている。
This bracket 128 is attached to a bracket 126 attached to a part of the truck 18 via a length adjusting screw 127.

そして支点ピン123よりローラ122側のレバー12
5は中間にクレビス134を設けて長さを調整できるよ
うにしたバネ124で吊設されている。
And the lever 12 on the roller 122 side from the fulcrum pin 123
5 is suspended by a spring 124 having a clevis 134 in the middle so that the length can be adjusted.

又レバー125のローラ122側とは反対側の端には切
欠125aが設けられ、この切欠125aの近くにピン
135で枢支された小さなレバー131をレバー本体に
対し突設しトレバ−125本体からの突出部125bと
、前記レバー131とはボルト132で結合され、ボル
ト132に螺合されるストッパーを兼ねるナット132
aでレバー131の位置調整ができる。
Further, a notch 125a is provided at the end of the lever 125 opposite to the roller 122 side, and a small lever 131 pivotally supported by a pin 135 is provided near this notch 125a and projects from the lever body. The protrusion 125b and the lever 131 are connected by a bolt 132, and a nut 132 that also serves as a stopper is screwed onto the bolt 132.
The position of the lever 131 can be adjusted with a.

更に突出部125bとしバ一131とは又押バネ133
で結ばれ、これによってレバー131をナット132a
に押しつけるように構成してある。打設樟12が引き上
げられ所定の位置にきた時点で環状突起121がローラ
122に触れてレバー125が図上で時針方向に回転し
「これによって前述したレバ−131が移動し、このレ
バー131が触れてスイッチが入るように台車18に取
付けたブラケット129に復帰スイッチGを設ける。
Furthermore, the protruding portion 125b and the push spring 131 are not the same as the push spring 133.
This connects the lever 131 to the nut 132a.
It is configured to be pressed against the When the casting camphor 12 is pulled up and reaches a predetermined position, the annular protrusion 121 touches the roller 122, and the lever 125 rotates in the direction of the hour hand in the diagram. A return switch G is provided on a bracket 129 attached to the trolley 18 so that it can be turned on by touching it.

この復帰スイッチGには3接点のリミットスイッチを用
いる。
This return switch G uses a three-contact limit switch.

その作動位鷹の調整はクレビス134、ねじ127、ナ
ット132aで行なう。
The operating position is adjusted using a clevis 134, a screw 127, and a nut 132a.

次に深度設定スイッチCと減速スイッチF‘こついて述
べるとこれは第8、9図に示されている。
Next, referring to the depth setting switch C and the deceleration switch F', these are shown in FIGS. 8 and 9.

深度設定スイッチCは所定の深度以上に打設されていて
引き抜きをおこなわせるための条件を設定するためのも
のでt この深度設定スイッチCと引き抜き終了の接近
を警告する減速スイッチFは深度に関係があるので通常
打設機に設けられているェンコーダ等で電気信号に変換
させたり、或いは機械的にスクリューで直線運動をする
ペンコーダにこのスイッチを組み込むことができ、ここ
ではその一例につき説明する。もし深度計を用いなけれ
ば、打設樺12の頂部附近よりワイヤロープを取付けて
その動き等を利用することも可能である。
The depth setting switch C is used to set the conditions for pulling out when the concrete has been poured to a predetermined depth or above.The depth setting switch C and the deceleration switch F, which warns when the end of pulling is approaching, are related to the depth. Therefore, this switch can be converted into an electrical signal by an encoder or the like normally installed in a pouring machine, or it can be incorporated into a pen coder that mechanically moves in a straight line with a screw.Here, we will explain one example. If a depth gauge is not used, it is also possible to attach a wire rope near the top of the poured birch 12 and utilize its movement.

第8図はペンコーダに深度設定スイッチCと減速スイッ
チFを組み込んだ例を示すもので第9図はその部分拡大
図である。
FIG. 8 shows an example in which a depth setting switch C and a deceleration switch F are incorporated into a pen coder, and FIG. 9 is a partially enlarged view thereof.

すなわち、ベンガイド122をガイドとしてペン124
を取付けたペン台123がドレン材打込シュー13の深
度位置に対応して深度を増す打設時の場合には右へ、減
ずる場合の引き抜き時には、左へそれぞれ動くようにな
っており「この動きを図示しない紙送りモータで図上で
下方へ動かされるチャ−ト紙121の上に記録するよう
になつている。
That is, the pen 124 is guided by the Ben guide 122.
The pen stand 123 to which the drain material driving shoe 13 is attached moves to the right when pouring to increase the depth, and to the left when pulling out to decrease the depth, corresponding to the depth position of the drain material pouring shoe 13. The movement is recorded on a chart paper 121 that is moved downward in the figure by a paper feed motor (not shown).

深度設定信号は打設時のみに、又減速信号は引き抜き時
のみに発せねばならないのでペン124が左右に動くど
ちらか一方の動きのみをキャッチするようにする必要が
ある。
Since the depth setting signal must be issued only when placing, and the deceleration signal must be issued only when pulling out, it is necessary to make sure that the pen 124 catches only one of the left and right movements.

ペン台123にペン124を取付けたと反対側に突起2
8を設けておく。
When the pen 124 is attached to the pen stand 123, there is a protrusion 2 on the opposite side.
Set 8.

そしてペンガイド122と平行にペン124と反対側に
おいてやや中広の取付台126を設ける。
A somewhat medium-sized mounting base 126 is provided parallel to the pen guide 122 on the opposite side of the pen 124.

取付台126上に取付けることが可能な磁石板36には
ピン30を支点として回転可能にレバー29を設け、磁
石板36に一端を固定した押しバネ31の池端はしバー
29に対し、ベン台123を反対側に取付けてある。
A lever 29 is provided on the magnet plate 36 that can be mounted on the mounting base 126 so as to be rotatable about the pin 30. 123 is attached on the opposite side.

又取付台126上におかれたペン台123が図上で右か
ら左へ動くとき、すなわち、深度を減ずる引き抜き時に
突起28がレバー29の先端に触れるように配設する。
点線で示した位置ハで触れ始め押しバネ31に抗してレ
バー先端部が左へ寄り、実線で示した位置口でレバー他
端部が磁石板36上に設けたマイクロスイッチFのレバ
ーに触れてONとなし、更にペン台123が左へ動けば
突起28がレバー端から離れてしまうように構成したス
イッチユニット37を設ける。該スイッチユニット37
をそのスイッチFがONされる作動点で所定の減速警報
を発せしめることができるような位置に合せて取付台1
26もこ磁石力で貼りつけておけば、このスイッチFは
減速スイッチとなる。
Further, when the pen stand 123 placed on the mounting stand 126 moves from right to left in the drawing, that is, when the pen stand 123 is pulled out to reduce the depth, the protrusion 28 is arranged so as to touch the tip of the lever 29.
The lever tip begins to touch at position C shown by the dotted line and moves to the left against the push spring 31, and the other end of the lever touches the lever of the microswitch F provided on the magnet plate 36 at the position shown by the solid line. A switch unit 37 is provided so that the protrusion 28 separates from the lever end when the pen stand 123 moves to the left. The switch unit 37
Mounting base 1 is positioned so that a predetermined deceleration alarm can be issued at the operating point where switch F is turned on.
If 26 is attached using magnetic force, this switch F will become a deceleration switch.

予め磁石板36の端部からスイッチFの作動点までの長
さそを定めておき、磁石板36上にチャート線上の深度
目盛に合わせた目盛を附しておけば所定深度Lの場合磁
石板端部をL−そに合せればよい。
If the length from the end of the magnet plate 36 to the operating point of the switch F is determined in advance, and a scale corresponding to the depth scale on the chart line is marked on the magnet plate 36, the end of the magnet plate can be set at a predetermined depth L. All you have to do is match the part to the L-side.

ペン台123の動きが逆に左から右へ向う場合イの位置
でレバー29端と突起28が接触し、レバー29が左側
に傾くに伴ないしバー他端部はスイッチFから離れ位置
ハで突起28より離脱するのでスイッチFが作動するこ
とはない。
When the movement of the pen stand 123 is reversed from left to right, the end of the lever 29 and the protrusion 28 come into contact at position A, and as the lever 29 tilts to the left, the other end of the bar moves away from switch F and protrudes at position C. 28, so switch F will not operate.

深度設定スイッチCは前記した減速スイッチユニット3
7と左右対称のユニット38に設ければよい。
The depth setting switch C is the deceleration switch unit 3 described above.
It may be provided in a unit 38 that is bilaterally symmetrical to 7.

図上で32は磁石板、33はしバー、34はピンである
In the figure, 32 is a magnet plate, 33 is a bar, and 34 is a pin.

そして深度設定ユニット38の端部はL′十そに合せて
取付ける。
Then, the end of the depth setting unit 38 is attached so as to be aligned with L'.

次に貫入抵抗スイッチEについて述べる。Next, the penetration resistance switch E will be described.

前述した如く貫入抵抗スイッチEは第6図に示されてお
り、これは打込シュ−13のロードセルが打止りとすべ
き大きな貫入抵抗を感知したならばクラッチ2のレバ〜
112を踏み込むクラッチ用電磁シリンダ106に通電
し、伝動軸4a,4b間の動力を切る働きをさせるスイ
ッチである。この貫入抵抗スイッチEは第6図に示すよ
うにメータ兼A/D変換装置すなわち電圧計80に組み
込まれており、指針81の近接体82がスイッチEを作
動させる。なお、第6図中84は電池、85は摺動低抗
器であり、以上のようなメータ兼A/○変換装置が第5
図に示す増中器21とシーケンス制御装置23との間に
組み込まれることは前述したとおりである。前述したよ
うにドレン材打込シュー13に組込んだ貫入コーン51
からロードセル56を介して検知された貫入抵抗値はロ
ードセル56に取付けたストレィンゲージ55を構成す
るブリッジにより1式のような電圧として取り出される
が「 この電圧値はきわめて小さいので第5図のように
増中器21により増中し、記録させると共に電圧計80
‘こ入力する。
As mentioned above, the penetration resistance switch E is shown in FIG.
112 is a switch that energizes the clutch electromagnetic cylinder 106 and cuts off the power between the transmission shafts 4a and 4b. As shown in FIG. 6, this penetration resistance switch E is incorporated in a meter/A/D converter, that is, a voltmeter 80, and a proximal body 82 of a pointer 81 operates the switch E. In Fig. 6, 84 is a battery, 85 is a sliding low resistance device, and the above-mentioned meter/A/○ conversion device is the fifth one.
As described above, it is installed between the intensifier 21 shown in the figure and the sequence control device 23. The penetration cone 51 incorporated into the drain material driving shoe 13 as described above
The penetration resistance value detected through the load cell 56 is extracted as a voltage as shown in Figure 5 by the bridge that constitutes the strain gauge 55 attached to the load cell 56. The voltage is increased by the intermediate device 21, and it is recorded and the voltmeter 80
'Enter this.

そして記録計22として2ペン式のものをもちい、−方
のペンに深度を他方のペンに貫入抵抗を入れると深度と
低抗が対比できて各打設毎に柱状図のように資料がえら
れることになり便利である。
Then, by using a two-pen type recorder 22 and inserting the depth into one pen and the penetration resistance into the other pen, the depth and low resistance can be compared, and the data can be displayed like a log diagram for each pour. This is convenient.

‐又前述した如く電圧計80の指針81の裏側に近接
体82を取付け、文字盤上又は文字盤をくり抜いて該近
接体の接近を感知する近接スイッチを取付けておけばこ
れを貫入抵抗スイッチEとして用いることができるもの
で、かくすれば入力側に摺動抵抗器85を入れておくこ
とにより作動電圧、つまり作動抵抗力の調整が簡単にで
きる。
-Also, as mentioned above, if the proximity body 82 is attached to the back side of the pointer 81 of the voltmeter 80, and a proximity switch is installed on the dial or cut out of the dial to detect the approach of the proximity body, this can be used as the penetration resistance switch E. In this way, by inserting a sliding resistor 85 on the input side, the operating voltage, that is, the operating resistance force can be easily adjusted.

次にトランスミッションスイッチDについて説明する。
トランスミッションスイッチDは第11図に示されてお
り、前記した貫入抵抗スイッチEの信号をうけてクラッ
チ2が切れ、トランスミッション3が逆転側に替るが、
このままでは動力がクラッチで切れたままなので第12
図に示すクラッチ用電磁シリンダー06へ通電し、再び
クラッチかつながるようにするための信号を発せしめる
スイッチがトランスミッションスイッチ○である。
Next, the transmission switch D will be explained.
The transmission switch D is shown in FIG. 11, and upon receiving the signal from the penetration resistance switch E, the clutch 2 is disengaged and the transmission 3 is switched to the reverse direction.
If this continues, the power will still be cut off by the clutch, so the 12th
The transmission switch ○ is a switch that energizes the clutch electromagnetic cylinder 06 shown in the figure and issues a signal to reconnect the clutch.

第11図のようにトランスミッション3を操作するレバ
ー117の上部にピン146で回動自在にレバー142
を取付け、このレバー142の下方への回動をレバー1
17に形成したストッパー144で拘束できるようにす
ると共にレバー1 17としバー142との間に押しバ
ネ143を張設し、レバー142が絶えずストッパー1
44に押しつけられるようにしておく。正転倒、すなわ
ち図上で左側より逆転側すなわち、図上で右側にレバー
117が倒れる際にレバー142はストッパー144に
押しつけられつつ回転し、その先端部142aは、レバ
ー138の先端部138aを押し上げる。
As shown in FIG. 11, a lever 142 is rotatably attached to the upper part of the lever 117 for operating the transmission 3 with a pin 146.
is installed, and the downward rotation of this lever 142 is controlled by lever 1.
In addition, a push spring 143 is stretched between the lever 117 and the bar 142, so that the lever 142 is constantly pressed against the stopper 142.
44 so that it can be pressed. When the lever 117 falls forward, that is, from the left side in the figure to the reverse side, that is, to the right side in the figure, the lever 142 rotates while being pressed against the stopper 144, and its tip 142a pushes up the tip 138a of the lever 138. .

レバー138はピソ141で台車18に固定のブラケッ
ト140‘こ回動自在に取付けられ、この回転をバネ1
39で拘束するようにブラケツト140に吊設されてい
る。 「レバー138の他端部138
bは先端部138aがレバー142で押し上げられるこ
とにより下方に下げられ、これが別に台車18に設けら
れたところのブラケツト137に取付けられたマイクロ
スイッチDのレバーに触れて信号を発し、レバー138
の先端部138aはしバー142の先端部142aから
離れる。
The lever 138 is rotatably attached to the bracket 140' fixed to the trolley 18 with a pivot 141, and this rotation is controlled by a spring 1.
It is suspended from a bracket 140 so as to be restrained at 39. "The other end 138 of the lever 138
The tip part 138a of b is lowered downward by being pushed up by the lever 142, and this touches the lever of the micro switch D attached to the bracket 137 which is separately provided on the trolley 18, and issues a signal, causing the lever 138
The distal end 138a of is separated from the distal end 142a of the chopper bar 142.

逆にトランスミッション3のレバー117が逆転側より
正転側に向って倒れると先端部138aと142aが互
に触れ合うが、バネ143による回転力の先端142a
に於ける反力がバネ’39による回転力の先端138a
における反力より遂に小さく構成しておけば、先端14
2aは先端138aに押されてレバー142がレバー1
38によって押し倒されてスイッチ○を作動することは
ない。
Conversely, when the lever 117 of the transmission 3 falls from the reverse rotation side to the forward rotation side, the tips 138a and 142a touch each other, but the tip 142a due to the rotational force of the spring 143
The reaction force at the tip 138a of the rotational force by the spring '39
If the reaction force is made smaller than the reaction force at the tip 14,
2a is pushed by the tip 138a and lever 142 is moved to lever 1.
38 will not activate the switch ○.

以上のように作動するスイッチDをもってトランスミッ
ションスイッチとするものである。
The switch D that operates as described above is used as a transmission switch.

次に以上のようなスイッチ類をもってアクチュェータを
第7図のようなシーケンスを行なわせるための制御回路
を第13図をもとにして説明する。第13図において、
クラッチ用電磁シリンダ106のソレノイドをCLとし
、トランスミッション用電磁シリンダ107のソレノイ
ドを(T.M)とすると「 ブザ(BU)及びパイロッ
トランプ(PA)は交流回路V−V′により作動し、こ
れを制御するりし−R.,R2,R3、R4,R5は直
流回路V,一V,′により作動する。そして各リレー共
に2つのソレノィドを有し一方のソレノィドが一度通電
されると、制御接点は一方に倒れ、他のソレノィドが通
電されるまで他の接点へ切り替らない構造となっている
。又リレーR,,R4及びR5は2接点1組、リレーR
2及びR3はそれぞれ2接点3組である。
Next, a control circuit for causing the actuator to perform the sequence shown in FIG. 7 using the switches described above will be explained with reference to FIG. 13. In Figure 13,
If the solenoid of the clutch electromagnetic cylinder 106 is CL, and the solenoid of the transmission electromagnetic cylinder 107 is (TM), then the buzzer (BU) and pilot lamp (PA) are operated by the AC circuit V-V'; The controlling relays - R., R2, R3, R4, R5 are actuated by a DC circuit V, - V,' and each relay has two solenoids, and once one solenoid is energized, the control contacts is structured so that it falls to one side and does not switch to other contacts until the other solenoids are energized.Also, relays R, R4 and R5 have two contacts in one set, and relay R
2 and R3 each have three sets of two contacts.

さて以上のような制御回路を第7図に示すシーケンスの
各制御段階に分けてその作動を説明すると次のようであ
る。1 第1段階(起動スイッチON以降深度設定スイ
ッチON以前)起動スイッチAがONされると、リレー
R,がSOL,側に通電帯磁し、これまでS,‐2側に
継つてし、た接点がS.側に変り、クラッチ用電磁シリ
ンダ(CL)に通電されて第12図に示すクラッチ2が
つながる。
Now, the operation of the control circuit as described above will be explained by dividing it into each control step of the sequence shown in FIG. 7. 1 First stage (after the start switch is turned on and before the depth setting switch is turned on) When the start switch A is turned on, relay R is energized and magnetized to the SOL, side, and the contact that was previously connected to the S, -2 side is is S. The clutch electromagnetic cylinder (CL) is energized and the clutch 2 shown in FIG. 12 is connected.

一方起動スイッチAの他の接点を用いているリレーR3
のソレノィドSOL2が帯磁しこれまでS3−.,S3
‐3,S3‐5側に倒れていた接点がそれぞれS3‐2
,S3‐4,S3‐6側に変る。
On the other hand, relay R3 using the other contact of starting switch A
S3-. ,S3
The contacts that had fallen on the -3 and S3-5 sides are now S3-2, respectively.
, changes to S3-4, S3-6 side.

リレーR2,R4及びR5は前段階の接点のままでおり
、ブザ(BU)、パイロットランプ(PA)の回路は切
れている。
Relays R2, R4, and R5 remain in their previous contact state, and the buzzer (BU) and pilot lamp (PA) circuits are cut off.

そしてトランスミッション用電磁シリンダ107のソレ
ノィド(TM)は通電されず、正転側になっているので
打込みが開始される。
Then, since the solenoid (TM) of the transmission electromagnetic cylinder 107 is not energized and is on the forward rotation side, driving is started.

ロ 第D段階(深度設定スイッチON以降貫入抵抗スイ
ッチON以前)一定の深度に達すると、深度設定スイッ
チCがONされることによりこれまでS2‐2,S2‐
4,S2‐6側に倒れていたりし−R2の接点がS2−
,,S岬,S2‐5側に切り替る。
(b) Stage D (after the depth setting switch is turned on and before the penetration resistance switch is turned on) When a certain depth is reached, the depth setting switch C is turned on, and the steps S2-2 and S2-
4. It may have fallen to the S2-6 side and the R2 contact is S2-
,,Switch to Cape S, S2-5 side.

リレーR2の之等の接点はリレーR3の接点と直列につ
ながっているが、リレーR2の回路以外のどこのアクチ
ュェータ回路にも継つておらずアクチュェータの働きに
変化はない。
Although the contacts of relay R2 are connected in series with the contacts of relay R3, they are not connected to any actuator circuit other than the circuit of relay R2, so there is no change in the function of the actuator.

しかし次にリレーR3が作動すればアクチュェー夕が作
動変化するための記憶をすることになる。
However, the next time relay R3 operates, the actuator will memorize the change in operation.

m 第m段階(貫入抵抗スイッチON以降トランスミッ
ションスイッチ作動以前)貫入抵抗スイッチEがONと
なることからリレーR3の接点がS8−.,S3‐3,
S3‐5側に倒れ、これにより1つはラインV′→接点
S3−,→接点S2−,→クラッチ用電磁シリンダーの
ソレノィド(CL)→ラインVと通電されクラッチが切
れる。
m The m-th stage (after the penetration resistance switch is turned on and before the transmission switch is activated) Since the penetration resistance switch E is turned on, the contact point of relay R3 is set to S8-. ,S3-3,
It falls to the S3-5 side, thereby energizing one line V' → contact S3-, → contact S2-, → solenoid (CL) of the clutch electromagnetic cylinder → line V, and the clutch is disengaged.

又ラインV′,→接点S3‐3→接点S2‐8→リレー
R,のソレノィドSOL→ラインV,と通電されるので
リレーR,の接点はSr2側に倒れる。
Also, since the line V', → contact S3-3 → contact S2-8 → solenoid SOL of relay R → line V, is energized, the contact of relay R falls to the Sr2 side.

更にラインV,→接点S肺→接点S2‐5→リレーR4
のソレノイドSOL2→ラインV′,と通電されるので
リレーR4の接点はS4‐2側に倒れ、ラインV′→接
点S4‐2→トランスミッション用電磁シリンダのソレ
ノイド(TM)→ラインVと通電されてトランスミッシ
ョンレバー117は逆転側に倒れる。リレーR2,R5
は前段階のままなのでブザ(BU)パイロットランプ(
PA)への回路は通電されない。
Furthermore, line V, → contact S lung → contact S2-5 → relay R4
The solenoid SOL2 → line V' is energized, so the contact of relay R4 falls to the S4-2 side, and the line V' → contact S4-2 → transmission electromagnetic cylinder solenoid (TM) → line V is energized. The transmission lever 117 falls to the reverse rotation side. Relay R2, R5
remains at the previous stage, so the buzzer (BU) pilot lamp (
The circuit to PA) is not energized.

N 第N段階(トランスミッションスイッチON以降減
速スイッチON以前)前段階でトランスミッションレバ
ー117が逆転側に倒れると、第11図のようにトラン
スミッションスイッチDはONとなり、リレーR2のソ
レノィドSOLが通電されるので接点はS2‐2,S2
‐4,S2−6側へ切り替りリレーR2により制御され
る回路は開かれて通電が止まる。
N When the transmission lever 117 falls to the reverse direction in the previous stage (after the transmission switch is turned on and before the deceleration switch is turned on), the transmission switch D is turned on as shown in Fig. 11, and the solenoid SOL of relay R2 is energized. Contact points are S2-2, S2
-4, the circuit is switched to the S2-6 side and the circuit controlled by relay R2 is opened and energization is stopped.

同時にトランスミッションスイッチDのもう一つの接点
回路が閉じられリレーR,の接点がS,‐,に切り替り
、クラッチ用電磁シリンダ−106のソレノィド(CL
)が通電されてクラッチ2が継がり引き抜きが行なわれ
る。
At the same time, the other contact circuit of the transmission switch D is closed, the contact of the relay R is switched to S, -, and the solenoid (CL) of the clutch electromagnetic cylinder 106 is closed.
) is energized and the clutch 2 is engaged and pulled out.

V 第V段階(減速スイッチON以降復帰スイッチON
以前)減速スイッチFがONされると、リレーR5のソ
レノィドSOL,が帯磁し、制御接点S5−,に切り替
る。
V Stage V (return switch ON after deceleration switch ON)
Previously) When the deceleration switch F is turned on, the solenoid SOL of the relay R5 becomes magnetized and switches to the control contact S5-.

したがってパイロットランプ(PA)、ブザ(BU)の
回路が通電され、警告信号を発する。
Therefore, the pilot lamp (PA) and buzzer (BU) circuits are energized and issue a warning signal.

なお、ここには示されていないが、この回路のON「O
FFをうけてモータ或いはシリンダによりェンジンーの
スロットルレバーを切り替えて自動減速を行なうことも
可能である。その他の回路は前段階と同じで運転者のマ
ニュアルにより減速されて引き抜きが続けられる。
Although not shown here, the ON “O” of this circuit
It is also possible to perform automatic deceleration by switching the throttle lever of the engine using a motor or cylinder in response to FF. The other circuits are the same as in the previous stage, and the speed is reduced by the driver's manual to continue extraction.

W 第の段階(復帰スイッチON以降起動スイッチON
以前)引き抜きが終了し、自動的に復帰スイッチGがO
Nとなれば先ずリレーR,のソレノイドSOL2に帯磁
させ接点がS,‐2に切り替り、クラッチ用電磁シリン
ダ106のソレノイド(CL)への通電が止まり、クラ
ッチ2が切れて打談樺12の動きが停止する。
W Second stage (start switch ON after return switch ON)
Previously) When the removal is completed, the return switch G is automatically turned to O.
If N, the solenoid SOL2 of the relay R is magnetized and the contact is switched to S, -2, the energization to the solenoid (CL) of the clutch electromagnetic cylinder 106 is stopped, the clutch 2 is disengaged, and the communication switch 12 is turned off. Movement stops.

なお、通常クラッチを切っても伝導系に入っている第1
図に示すウオームギャ減速機6の作用で打設梓12が下
方に動くことはないが減速比の小さい場合や、ウオーム
ギャ減速機6を便はない場合、復帰スイッチGの信号を
うけて打設樺12をグリップするようなアクチュェータ
を作動させることは容易なことである。
Note that even if the clutch is disengaged, the first
The action of the worm gear reducer 6 shown in the figure prevents the pouring sill 12 from moving downwards, but if the reduction ratio is small or if the worm gear reducer 6 is not operated, the worm gear reducer 6 will not move downwards. Activating the actuator to grip 12 is a simple matter.

一方リレーR4のソレノィドSOL,が帯磁するので接
点がSHと切り替り、トランスミッション用電磁シリン
ダ1 07のソレノイド(TM)への通電が止まり、レ
バー117が正転側に倒れる。
On the other hand, since the solenoid SOL of relay R4 is magnetized, the contact switches to SH, the energization to the solenoid (TM) of the transmission electromagnetic cylinder 107 is stopped, and the lever 117 is tilted toward the normal rotation side.

しかしクラッチ2が切れているので打設樺12が打込ま
れることはない。復帰スイッチGのもう一つの接点がO
NとなったのでリレーR5のソレノイドSObに通電さ
れ、接点はSを2に切り替り、パイロットランプ(PA
)、ブザ(BU)の回路は開かれる。
However, since the clutch 2 is disengaged, the pouring birch 12 is not driven. The other contact of the return switch G is O.
Since it becomes N, solenoid SOb of relay R5 is energized, the contact switches S to 2, and the pilot lamp (PA
), the buzzer (BU) circuit is opened.

この状態でドレン材14が切断される台車18は次の打
設点に移動せられ次の打設をおこなうことになる。以上
詳述したように本発明方法による管理は省力化と施工を
確実にするための有効な手段である。
In this state, the cart 18 on which the drain material 14 is cut is moved to the next placement point to perform the next placement. As described in detail above, management by the method of the present invention is an effective means for saving labor and ensuring construction.

なお、一定深度で打ち止める自動打設も貫入抵抗スイッ
チEの代りに深度計に取付けた深度設定スイッチと同じ
ものを所定の位置に設けることにより簡単に行なうこと
ができるものであり、両スイッチの併用も容易である。
In addition, automatic pouring that stops at a fixed depth can be easily performed by replacing the penetration resistance switch E with a depth setting switch that is the same as the depth setting switch attached to the depth gauge at a predetermined position. It is also easy to use them together.

以上何れにしても本発明はドレン材打設樺の先端に貫入
抵抗を受ける貫入コーン部材を設け、この貫入コーン部
村のロッドから圧力を受けて信号を発するロードセルで
貫入抵抗を電気量に変えこれを増中して記録器又はメー
ター上に表示してドレン材打設抵抗を検知して打設作業
から引き抜き作業に切り替えることを特徴とするもので
あり、以上のような方法においてロードセルで貫入抵抗
を検知したドレン材打設抵抗値に或る値を設定し、その
値にドレン材打設抵抗値が達するとその電気信号を受け
て、リレー等でクラッチレバー及びトランスミッション
レバーを動作せしむるアクチュェータを制御して打設中
のドレン材打設梓を引き方向に逆転動作せしめ、引き抜
きが所望の高さまで行なわれたことを検知すると引き抜
き動作を停止せしめるようにしたことを特徴とするもの
である。本発明によれば、貫入抵抗の出力を利用して自
動的にドレン材の打穀、引き抜きを行なうことができる
ものであって±層の状態に合せて作業ができるので施工
が確実で省力化に大いに役立つという特徴を有するもの
である。
In any case, the present invention provides a penetration cone member that receives penetration resistance at the tip of the drain material pouring birch, and converts the penetration resistance into an electrical quantity using a load cell that receives pressure from the rod of the penetration cone and generates a signal. This is increased and displayed on a recorder or meter to detect the drain material placing resistance and switch from placing work to pulling out work. A certain value is set for the drain material placement resistance value when resistance is detected, and when the drain material placement resistance value reaches that value, the clutch lever and transmission lever are operated by a relay etc. upon receiving the electric signal. It is characterized by controlling an actuator to reversely operate the drain material pouring cassette in the pulling direction, and to stop the pulling operation when it is detected that the drain material has been pulled to a desired height. be. According to the present invention, it is possible to automatically thrash and pull out drain material using the output of penetration resistance, and work can be done according to the condition of the layers, making construction reliable and labor-saving. It has the characteristic that it is very useful.

図面の簡単な説明第1図はペーパードレン打設機の全体
を示す概略図、第2図は貫入抵抗検出用ドレン材打込シ
ュ−の一部を切欠いて示す側面図、第3図は同上正面図
、第4図は同上一部省略の平面図、第5図は自動運転ブ
ロックダイヤグラム、第6図はメー夕兼A/D変換装置
の設明図、第7図はァクチュヱータのシーケンス図、第
8,9図は深度設定スイッチユニットと減速スイッチユ
ニットの取付状態を示す平面図とその拡大図、第10図
は起動スイッチと復帰スイッチ取付部分の説明図、第1
1図はトランスミッションスイッチとトランスミッショ
ン用電磁シリンダとの相対関係を示す説明図、第12図
はクラッチとクラッチ用電磁シリンダとの相対関係を示
す説明図、第13図は制御回路図である。
Brief description of the drawings Figure 1 is a schematic diagram showing the entire paper drain driving machine, Figure 2 is a side view with a part of the drain material driving shoe for detecting penetration resistance cut away, and Figure 3 is the same as above. 4 is a partially omitted plan view of the same as above, FIG. 5 is an automatic operation block diagram, FIG. 6 is a construction diagram of the meter and A/D converter, and FIG. 7 is a sequence diagram of the actuator. Figures 8 and 9 are a plan view and an enlarged view showing the installation state of the depth setting switch unit and deceleration switch unit, Figure 10 is an explanatory diagram of the installation part of the start switch and return switch, and Figure 1
FIG. 1 is an explanatory diagram showing the relative relationship between a transmission switch and a transmission electromagnetic cylinder, FIG. 12 is an explanatory diagram showing a relative relationship between a clutch and a clutch electromagnetic cylinder, and FIG. 13 is a control circuit diagram.

12……打設樟、13……ドレン材打込シュー、14・
・・…ドレン材、51・・…・貫入コーン、55……ス
トレインゲージ、56……ロードセル、A・・・・・・
起動スイッチ、C・・・・・・深度設定スイッチ、E・
・・・・・貫入抵抗スイッチ、D・・・・・・トランス
ミッションスイッチ、F・・・・・・減速スイッチ、G
・・・・・・復帰スイツチ。
12...Creating camphor, 13...Drain material driving shoe, 14.
...Drain material, 51...Penetration cone, 55...Strain gauge, 56...Load cell, A...
Start switch, C... Depth setting switch, E.
...Penetration resistance switch, D...Transmission switch, F...Deceleration switch, G
...Return switch.

※1図 燐2図 舵3図 繁ム図 ※5図 豹6図 鱗7図 鍵8図 銘9図 簾10図 繁11 図 簾 12 図 鎌13 凶*Figure 1 Phosphorus 2 figure Rudder 3 diagram popular map *Figure 5 Leopard 6 Scales 7 key 8 diagram Inscription 9 10 blinds Figure 11 Blind 12 figure Sickle 13 evil

Claims (1)

【特許請求の範囲】 1 軟弱地盤改良用ドレン材打設桿の先端に貫入抵抗を
受ける貫入コーン部材を設け、この貫入コーン部材のロ
ツドから圧力を受けて信号を発するロードセルで貫入抵
抗を電気量に変えこれを増巾して記録器又はメーター上
に表示せしめてドレン材打設抵抗を検知して打設工程か
ら引き抜き工程に切り替えることを特徴とするドレン材
の打設方法。 2 軟弱地盤改良用ドレン材打設桿の先端に貫入抵抗を
受ける貫入コーン部材を設け、この貫入コーン部材のロ
ツドから圧力を受けるロードセルで貫入抵抗を検知した
ドレン材打設抵抗値に或る値を設定し、その値にドレン
材打設抵抗値が達すると、その電気信号を受けてリレー
等でクラツチレバー及びトランスミツシヨンレバーを動
作せしめるアクチエータを制御して打設中のドレン材打
設桿を引き抜き方向に逆転動作せしめ、引き抜きが所定
高さまで行なわれたことを検知すると引き抜き動作を停
止せしめるようにドレン材打設桿を制御することよりな
るドレン材の打設方法。 3 ある一定の深度を設定し、この深度以上にドレン材
の打込みがなされなければドレン材打設桿を引抜方向に
逆転動作すべき貫入抵抗が出力されてもドレン材打設桿
を引抜方向に逆転動作しないようにドレン材打設桿を制
御することよりなる特許請求の範囲第2項記載のドレン
材の打設方法。 4 ある一定の深度を設定し、この深度までドレン材打
設桿が引き抜かれてきたとき引き抜き終了の接近を運転
者に警報するようにドレン材打設桿を制御することより
なる特許請求の範囲第2項記載のドレン材の打設方法。
[Claims] 1. A penetration cone member that receives penetration resistance is provided at the tip of a rod for placing drain material for improving soft ground, and a load cell that receives pressure from the rod of this penetration cone member and generates a signal converts the penetration resistance into an electric quantity. A drain material placing method characterized in that the drain material placing resistance is detected by changing this to amplified and displayed on a recorder or meter, and switching from the placing process to the pulling process. 2 A penetration cone member that receives penetration resistance is provided at the tip of a drain material casting rod for improving soft ground, and a certain value is determined from the penetration resistance value detected by a load cell that receives pressure from the rod of this penetration cone member. is set, and when the drain material casting resistance value reaches that value, the actuator that receives the electrical signal and operates the clutch lever and transmission lever is controlled by a relay etc. A drain material placing method comprising controlling a drain material placing rod so as to cause the drain material to reversely move in the drawing direction, and to stop the drawing operation when it is detected that the drawing has been carried out to a predetermined height. 3 Set a certain depth, and if the drain material is not driven beyond this depth, the drain material placing rod should be moved in the reverse direction in the withdrawal direction.Even if penetration resistance is output, the drain material placing rod will not be moved in the withdrawal direction. 3. A method for placing drain material according to claim 2, which comprises controlling the drain material placing rod so as not to reversely operate. 4. Claims comprising setting a certain depth, and controlling the drain material casting rod so as to alert the driver that the end of drawing is approaching when the drain material casting rod has been pulled out to this depth. The method for placing drain material according to item 2.
JP4164781A 1981-03-24 1981-03-24 How to place drain material Expired JPS609165B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4164781A JPS609165B2 (en) 1981-03-24 1981-03-24 How to place drain material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4164781A JPS609165B2 (en) 1981-03-24 1981-03-24 How to place drain material

Publications (2)

Publication Number Publication Date
JPS57158416A JPS57158416A (en) 1982-09-30
JPS609165B2 true JPS609165B2 (en) 1985-03-08

Family

ID=12614132

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4164781A Expired JPS609165B2 (en) 1981-03-24 1981-03-24 How to place drain material

Country Status (1)

Country Link
JP (1) JPS609165B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59126819A (en) * 1983-01-12 1984-07-21 Tokyu Constr Co Ltd Offshore control and measurement administration system for drainage member driving work
JPS59134222A (en) * 1983-01-18 1984-08-01 Tokyu Constr Co Ltd System for control of work and management of measurement in driving work of drain material
JPH0141779Y2 (en) * 1984-09-25 1989-12-08

Also Published As

Publication number Publication date
JPS57158416A (en) 1982-09-30

Similar Documents

Publication Publication Date Title
US4875530A (en) Automatic drilling system
DE60131231T2 (en) Method for controlling the braking process of a crane
US4302979A (en) Means and techniques useful in stressing cable
JPS609165B2 (en) How to place drain material
US3053344A (en) Automatic control system for hoisting machine
JPH05286700A (en) Display device of fork lift cab
CN104458420B (en) Rock-soil body in-situ strength bearing plate test device and use method
JP2000199242A (en) Power machine and its control device and skid steerer
EP1182772A3 (en) Control method and device for stepping motor and motor driver for stepping motor
JP4372601B2 (en) Operation history storage device
JP4068987B2 (en) Construction management system
EP0452624B1 (en) Plumbline device to determine the height of charge in a shaftfurnace
CN205577953U (en) Beam -pumping unit loses and carries protection device
US11840918B2 (en) Manual/automatic non-electric-connection borehole clinometer and measurement method
CN219952062U (en) Device for judging interface positions of different media in hole
CN111912510A (en) Intelligent wagon balance overhauling and maintaining device and method
JPH06128957A (en) Measuring equipment for top end of placed concrete
JPH05280031A (en) Pile support layer detector
JPH053981U (en) Compaction degree measuring device
CN115388936A (en) Environmental protection supervision index management platform based on smart city
WO1989002973A1 (en) Automatic drilling system
JP2626667B2 (en) Loading weight detection device
JPH0894414A (en) Well-depth measuring apparatus
CN2240716Y (en) Variable detection fast pulley mechanism for vertical crane
CN109617549B (en) A control handle and control method thereof