JPS6132684B2 - - Google Patents
Info
- Publication number
- JPS6132684B2 JPS6132684B2 JP494576A JP494576A JPS6132684B2 JP S6132684 B2 JPS6132684 B2 JP S6132684B2 JP 494576 A JP494576 A JP 494576A JP 494576 A JP494576 A JP 494576A JP S6132684 B2 JPS6132684 B2 JP S6132684B2
- Authority
- JP
- Japan
- Prior art keywords
- pumps
- curve
- amount
- route
- pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 claims description 17
- 230000001186 cumulative effect Effects 0.000 claims description 11
- 238000011156 evaluation Methods 0.000 claims description 7
- 239000012530 fluid Substances 0.000 claims 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 32
- 238000010586 diagram Methods 0.000 description 7
- 238000004364 calculation method Methods 0.000 description 4
- 238000003973 irrigation Methods 0.000 description 3
- 230000002262 irrigation Effects 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000001595 flow curve Methods 0.000 description 1
- 239000003621 irrigation water Substances 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
Landscapes
- Control Of Positive-Displacement Pumps (AREA)
- Feedback Control In General (AREA)
Description
【発明の詳細な説明】
この発明は上水道、下水道、潅漑、排水などの
ポンプ設備に使用される。複数台ポンプの運転台
数制御方法に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention is used in pump equipment for water supply, sewerage, irrigation, drainage, etc. This invention relates to a method for controlling the number of operating pumps.
以下説明を簡略にするために潅漑のポンプ設備
を例にとつて説明する。 In order to simplify the explanation below, an example of an irrigation pump facility will be explained.
従来、田畑等の水使用端へ潅漑用水を送る場
合、一たんポンプで貯水池へ送水してから使用端
へ送水することが行なわれている。このとき、問
題となるのは、ポンプの制御である。特にポンプ
が複数台あるときいかに経済的にしかも簡単な装
置でこれらのポンプを制御して揚水量を調節する
かは重要な問題となる。 Conventionally, when sending irrigation water to a water use end such as a field, the water is first sent to a reservoir using a pump, and then the water is sent to the use end. At this time, the problem is the control of the pump. In particular, when there are multiple pumps, it is an important problem to control these pumps economically and with a simple device to adjust the amount of water pumped.
これを解決する従来方式としては、下記の2方
式があげられる。 As conventional methods for solving this problem, there are the following two methods.
その一つは貯水池水位による方式で水位に応じ
てポンプの運転台数を増減して流量制御を行なう
方式である。たとえば第1図に示すように、台数
切替はポンプの台数分だけ設けた水位の上限、下
限設定値にてポンプを起動・停止させる。すなわ
ちポンプPが3台(n=3)であるこの例では2
00201,202は1号、2号、3号のポンプ
停止水位であり、200′,201′,202′は
1号、2号、3号のポンプ起動水位というように
する。なお205は水位計、206は揚水ポン
プ、207はポンプ井である。 One method is based on the reservoir water level, which controls the flow rate by increasing or decreasing the number of pumps in operation according to the water level. For example, as shown in FIG. 1, when switching the number of pumps, the pumps are started and stopped at the upper and lower water level set values set for the number of pumps. In other words, in this example where there are 3 pumps P (n=3), 2
00201 and 202 are pump stop water levels of No. 1, No. 2, and No. 3 pumps, 200', 201', and 202' are pump start water levels of No. 1, No. 2, and No. 3 pumps, and so on. Note that 205 is a water level gauge, 206 is a pump, and 207 is a pump well.
他の方式は、切替回数をできるだけ少なくし、
運転効率を向上させることを目的として、第2図
に示すように予め予測した負荷流量曲線に応じて
ポンプ台数を増減するプログラム制御方式であ
る。この方式では、プログラム制御による揚水量
と実際の負荷流量のずれを貯水池の容量で吸収で
きる。 Other methods minimize the number of switching times,
This is a program control method in which the number of pumps is increased or decreased according to a pre-predicted load flow curve, as shown in FIG. 2, with the aim of improving operational efficiency. With this method, the discrepancy between the amount of water pumped under program control and the actual load flow rate can be absorbed by the capacity of the reservoir.
これらの2方式は、マイナーに見れば貯水池の
容量を有効に利用しながら切替回数を少なくする
ように工夫されてはいるが水系全体から眺めた場
合、かならずしも最適運転とは言えないという欠
点がある。 From a minor point of view, these two systems are devised to reduce the number of switching operations while making effective use of the capacity of the reservoir, but when viewed from the perspective of the water system as a whole, they have the disadvantage that they cannot necessarily be called optimal operation. .
この欠点を除去するために、負荷の予測流量累
積値をもとに、最適なポンプ運転方法を決定する
方法の一つとして、本出願人が先に提案した「運
用計画に基づく複数台のポンプ制御方法」(特願
昭50−95867)がある。 In order to eliminate this drawback, the applicant previously proposed a method for determining the optimal pump operation method based on the cumulative predicted flow rate of the load. There is a "control method" (Japanese Patent Application No. 1983-95867).
この制御方法は次のような特徴を持つ。 This control method has the following characteristics.
(a) 予測負荷量累積値曲線と、これに貯水池容量
をプラスした曲線との間を通る最適なポンプ場
水量累積値曲線(以下、ポンプ運転曲線と略
す)をダイナミツク・プログラミング(以下
DPと略す)により探している。(a) Dynamic programming (hereinafter referred to as "pump operation curve") to determine the optimal pumping station water volume cumulative value curve (hereinafter referred to as pump operation curve) that passes between the predicted load volume cumulative value curve and the curve obtained by adding the reservoir capacity to the predicted load volume cumulative value curve.
(abbreviated as DP)).
(b) DPのステージとしては、時間ステツプをと
つている。(b) The stages of DP are time steps.
(c) ある時間ステツプから次の時間ステツプへと
運転を移すときの運転台数変化の種類に対し、
目的に応じたベナルテイを与えて、DPの評価
基準にしている。(c) Regarding the type of change in the number of operating units when moving operation from one time step to the next time step,
Benartei is given according to the purpose and is used as the evaluation standard for DP.
この方法を用いれば確実に目的に応じた最適な
ポンプの運転方法を得ることができる。しかし、
ステージとして時間ステツプをとつているため
に、時間の刻みを小さくした場合大きな記憶容量
が必要となり、計算装置が大形、又は高価になる
という欠点をもつ。 By using this method, it is possible to reliably obtain the optimum pump operating method according to the purpose. but,
Since time steps are used as stages, if the time increments are made small, a large storage capacity is required, resulting in a large or expensive computing device.
このペナルテイ付ダイナミツク・プログラミン
グ法(PDP法)に必要な記憶容量Xは、
X≧T×N2 〔個〕
(ただし、T:時間ステツプ数、N:ポンプ台
数)たとえば、N=10台、5分刻みで24時間分を
計算した場合、
X≧28.8×103 〔個〕となる。 The storage capacity X required for this dynamic programming method with penalty (PDP method) is: When calculating 24 hours in minutes, it becomes X≧28.8×10 3 [pieces].
本発明の目的は、上記従来技術の欠点を除去す
るためになされたものであり、簡便な装置でしか
も経済的な複数台ポンプ運転を可能にするポンプ
制御装置を提供するものである。 SUMMARY OF THE INVENTION An object of the present invention is to eliminate the drawbacks of the prior art described above, and to provide a pump control device that is simple and allows economical operation of a plurality of pumps.
上記目的を達成するために本発明は予測負荷量
累積値曲線とこれに貯水池容量を加えた曲線との
間をポンプ運転曲線が通るようにし、この運転曲
線が上記両曲線にぶつかる前に、傾きを変える
(ポンプ台数を切替える)、すなわち途中切替点を
設けるという規則で、しかも、ポンプ運転の評価
関数を最適とするように複数台のポンプを運転す
るものである。 In order to achieve the above object, the present invention allows the pump operation curve to pass between the predicted load amount cumulative value curve and the curve obtained by adding the reservoir capacity to this curve, and before the operation curve collides with both of the above curves, the slope The rule is to change the number of pumps (switch the number of pumps), that is, to provide a switching point midway, and moreover, multiple pumps are operated so as to optimize the pump operation evaluation function.
以下、本発明の原理を図により詳細に説明す
る。 Hereinafter, the principle of the present invention will be explained in detail with reference to the drawings.
まず対象とする水系のモデルを第3図に示す。
これは水系のモデルの8割以上を占めるという代
表的なパターンである。貯水池以後の水の需要
(負荷)を満たすために、一度ポンプで貯水池へ
揚水しており、上水道、下水道、農業潅漑などに
適用できるものである。 First, a model of the target water system is shown in Figure 3.
This is a typical pattern that accounts for more than 80% of water system models. In order to meet the water demand (load) after the reservoir, water is pumped to the reservoir once, and can be applied to water supply, sewerage, agricultural irrigation, etc.
ここでの目的は、この水系において、貯水池を
溢れさせず、且つ負荷に対して供給不足にならな
い範囲で評価関数を最適とするようにポンプを運
転することである。 The purpose here is to operate the pump in this water system so as to optimize the evaluation function within a range that does not overflow the reservoir and does not result in insufficient supply for the load.
このことを図示して考えると、第4図のように
なる。曲線1は、貯水池以降の予測負荷量の累積
値曲線、曲線2は曲線1に貯水池容量をプラスし
た曲線である。ポンプ揚水量の累積値曲線(ポン
プ運転曲線)3は、曲線1と2との間からはみ出
さない範囲で、最適運転をしなければならない。
曲線3が曲線1より下になれば負荷を満たすこと
ができず、曲線2より上になると、池が溢れるこ
とになるからである。 If you consider this diagrammatically, it will look like Figure 4. Curve 1 is a cumulative value curve of predicted loads after the reservoir, and curve 2 is a curve obtained by adding reservoir capacity to curve 1. The pump pumping amount cumulative value curve (pump operation curve) 3 must be operated optimally within a range that does not fall outside the range between curves 1 and 2.
This is because if curve 3 falls below curve 1, the load cannot be met, and if it falls above curve 2, the pond will overflow.
ここで「最適」とは、消費電力量(運転コス
ト)を最少にする等を言う。 Here, "optimal" refers to minimizing power consumption (operating cost), etc.
この時、ポンプ運転曲線3の傾きは、各台数で
運転した時の単位時間当り揚水量により規定され
るものである(第5図)。すなわち、傾きが変わ
るごとに運転台数が切替えられることになるの
で、切替回数最少で運転する時は、曲線3の傾き
の変更点の最小にしなければならない。 At this time, the slope of the pump operation curve 3 is determined by the amount of pumped water per unit time when each number of pumps is operated (FIG. 5). That is, since the number of vehicles in operation is switched every time the slope changes, when operating with the minimum number of switching, the change point of the slope of curve 3 must be minimized.
以上を整理して、たとえば問題を次のように設
定する。 Organizing the above, for example, the problem can be set as follows.
「傾きの変更点の数を可能な限り少なくして、
曲線1及び2の間をはみ出すことなく最適なポン
プ運転曲線3を通す。」
上記の問題の近似解答を以下に示す。 "By minimizing the number of slope changes,
The optimum pump operation curve 3 is passed through without going beyond the curves 1 and 2. ” An approximate answer to the above problem is shown below.
まず、予測負荷量累積値曲線1と曲線1に貯水
池容量をプラスした曲線2を任意の区間で曲線あ
るいは線形近似する。(第6図の曲線21,2
2)
この時次のような制限条件があれば、その分だ
け21,22を上下させることにある。 First, a predicted load cumulative value curve 1 and a curve 2 obtained by adding the reservoir capacity to the curve 1 are curved or linearly approximated in an arbitrary section. (Curves 21 and 2 in Figure 6
2) At this time, if there are any of the following limiting conditions, 21 and 22 should be raised or lowered by that amount.
池水位一定以上を保つ(→曲線21を上げる)
予測負荷量の誤差を考慮する(→曲線21と22
の巾をせばめる)
こうして決めた曲線21と22の間で次のルー
ルに従つてポンプ運転曲線のルートを探してゆ
く。 Keep the pond water level above a certain level (→ Raise curve 21)
Consider the error in the predicted load (→Curves 21 and 22)
The route of the pump operation curve is searched between the curves 21 and 22 thus determined according to the following rules.
第7図にそのフローチヤートを示した。図中
( )内の符号は、以下の符号と対応している。 Figure 7 shows the flowchart. The symbols in parentheses in the figure correspond to the symbols below.
(A) まず、出発点(初期貯水量の値)5からスタ
ートして、曲線21,22と交わるまで、各台
数でポンプを運転した時のルートを探す。この
図では0台運転の時5→6、1台運転の時5→
7、2台運転の時5→8となる。(A) First, start from the starting point (value of initial water storage amount) 5 and find the route when each number of pumps is operated until it intersects curves 21 and 22. In this figure, when 0 units are in operation, 5→6, and when 1 unit is in operation, 5→
7. When operating two machines, the number becomes 5 → 8.
(B) 次に、長時間運転台数の切替えのない運転が
できるよう直線5−6や5−7上の点を途中切
替点として運転台数を切替える。図中33,3
4等とがそれになつているが、この途中切替点
を見つけるには、例えば、次の(i)または(ii)のよ
うにすればよい。(B) Next, the number of operating vehicles is switched using points on straight lines 5-6 and 5-7 as intermediate switching points so that operation can be performed without switching the number of operating vehicles for a long time. 33,3 in the figure
4, etc., but to find this intermediate switching point, for example, the following (i) or (ii) can be used.
(i) 曲線21と22の間で、それぞれの台数で
の長時間運転可能なルートを探し、それと直
線5−6,5−7との交点を求め、これを途
中切替点とする。この場合、曲線21や22
に対しては接線となるような直線30,32
やその間の直線31が長時間運転可能なルー
トである。 (i) Find a route between curves 21 and 22 that can be operated for a long time with each number of vehicles, find the intersections of this route with straight lines 5-6 and 5-7, and use these as intermediate switching points. In this case, curves 21 and 22
Straight lines 30, 32 that are tangent to
and the straight line 31 between them is a route that can be driven for a long time.
(ii) 1回めのポンプ運転直線5−6や5−7を
ある時間ステツプで刻み、それぞれの刻み点
から各台数運転のルートを伸ばしてみて、そ
のうちから長時間運転の可能なものを選ぶ。 (ii) Divide the first pump operation line 5-6 or 5-7 in certain time steps, extend the route for each number of pumps from each increment point, and choose one that can be operated for a long time. .
(C) こうして求めたポンプ運転曲線が最終時刻ま
で到達すれば、これでポンプ運転曲線は完成で
ある。もし到達しなければ、2回めのポンプ運
転直線をあらためて1回めの運転直線とみな
し、前と同様に途中切替点を作つて運転台数を
切替え、さらに運転ルートを探索すればよい。(C) If the pump operation curve thus obtained reaches the final time, the pump operation curve is now complete. If it is not reached, the second pump operation straight line can be regarded as the first pump operation straight line, a switching point can be created midway as before, the number of pumps can be changed, and the driving route can be further searched.
(D) 最後の1回は最終時刻から逆向きに探索した
ルートを考えてもよい。この時、もし目標貯水
量があれば、その値から逆向きに各台数運転の
時のルートを探せばよいことになる。図では、
11が目標貯水量の値で、0台運転の時11→
12、1台運転の時11→13等が、この回に
探索したルートとなつている。こうすると、直
線11−12,12−13と、出発点から探し
てきたルートとの交点(例えば35,36
etc)を求めて、最終的に目標貯水量になるよ
うポンプ運転曲線を完成させることができる。(D) For the last time, you may consider searching the route backwards from the last time. At this time, if there is a target water storage amount, the route for each vehicle operation can be found in the opposite direction based on that value. In the diagram,
11 is the target water storage amount value, and when 0 units are operating, 11→
12, when driving one car, 11 → 13, etc. is the route explored this time. In this way, the intersections of straight lines 11-12, 12-13 and the route searched from the starting point (for example, 35, 36
etc), it is possible to complete the pump operation curve to finally reach the target water storage volume.
(E) 完成した運転曲線のルートとしては、第6図
では例えば、5→33→39,5→33→36
→11,5→34→37→11etcなどであ
る。こうして探索したルートはすべて記憶して
おき、最終的にはこれらのルートのうちから、
評価関数により、最適な運転曲線を決定する。(E) The route of the completed driving curve is, for example, 5→33→39, 5→33→36 in Figure 6.
→11, 5 → 34 → 37 → 11 etc. All the routes explored in this way are memorized, and eventually from among these routes,
Determine the optimal operating curve using the evaluation function.
例えば、評価関数として消費電力量最小化をと
つたとすると、記憶しておいたルートのそれぞれ
の消費電力量を運転継続時間と運転台数とから計
算し、その中から最小のものを選択するのであ
る。 For example, if the evaluation function is to minimize power consumption, the power consumption of each memorized route is calculated from the operation duration and the number of vehicles in operation, and the minimum one is selected from among them. be.
この決定方法では、運転時間を任意の長さにと
れるために、最大切替回数が小さいときは、DP
よりもかなり計算に必要な記憶容量を減らすこと
ができる。 With this determination method, since the operation time can be set to any length, when the maximum number of switching times is small, the DP
The storage capacity required for calculations can be significantly reduced.
この計算に必要な記憶容量X′は、
X′=α×N′f 〔個〕
N′<N
N:ポンプ台数
f:切替回数最大値
α:条件のつけ方により変わる定数、ふつうは5
〜6程度
N=10台、f=3回の時
X′<5〜6×103 〔個〕
となる。 The storage capacity X' required for this calculation is:
~about 6 When N = 10 units and f = 3 times, X'< 5 to 6 x 10 3 [pieces].
したがつて、この例の場合、DPの用いたとき
の記憶容量X28.8×103と比較すれば、本発明
における記憶容量は1/6程度なることがわかる。 Therefore, in this example, it can be seen that the storage capacity according to the present invention is about 1/6 compared to the storage capacity X28.8×10 3 when DP is used.
以下、本発明を実施例によつて詳細に説明する
(第8図)。運用計画を立てる時間帯(たとえば24
時間分)の貯水池以後の予測負荷量を予測負荷量
入力装置101に外部より入力する。これを予測
負荷量曲線近似装置102により、任意の区間に
わけて曲線近似する。次に、ポンプ特性入力装置
103に、各台数毎のポンプ揚水量を与える。ま
た、初期条件入力装置104、制限条件入力装置
105にもそれぞれ初期貯水量・制限条件(目標
貯水量、常時の最低貯水量、切替回数の最大値
等)を入力する。 Hereinafter, the present invention will be explained in detail with reference to Examples (FIG. 8). The time period for planning operations (for example, 24
The predicted load amount after the reservoir (time) is externally input to the predicted load input device 101. The predicted load curve approximation device 102 divides this into arbitrary sections and approximates the curve. Next, the amount of pumped water for each number of pumps is given to the pump characteristic input device 103. Further, the initial water storage amount/restriction conditions (target water storage amount, constant minimum water storage amount, maximum number of switching times, etc.) are input into the initial condition input device 104 and the restriction condition input device 105, respectively.
これらの情報をもとに、まず、第6図の曲線2
1,22のようなポンプ運転曲線の通れる範囲を
最終的に設定し、これまでに述べてきたルールに
従つて、運転台数の切替回数が少なくてすむ途中
切替点を探すというやり方でポンプ運転曲線の全
てのルートを探してゆく。これは、106の運転
ルート探索装置で行なう。その後107の最適運
転台数決定装置で選択可能なルートのうち評価関
数を最適にするものを選んで、各時刻におけるポ
ンプ運転台数を決定するが、この時の評価関数は
評価関数入力装置108により与えられる。 Based on this information, first, curve 2 in Figure 6
1 and 22, and then follow the rules described so far to find a midway switching point that requires fewer switchings of the number of pumps in operation. Search for all routes. This is done by the driving route search device 106. Thereafter, the optimal operating number determining device 107 selects the route that optimizes the evaluation function from among the selectable routes, and determines the number of pumps operating at each time. It will be done.
結果は、表示装置109へ出力され、ポンプ起
動指令装置110によつて各ポンプ111へ運転
の指令が出される。 The results are output to the display device 109, and the pump start command device 110 issues an operation command to each pump 111.
なお、上記実施例においては、最適ルートの探
索を出発点から求めたが、最終点から求めるよう
にしてもよいことはいうまでもない。 In the above embodiment, the optimal route is searched from the starting point, but it goes without saying that the search may be performed from the final point.
以上説明したように、本発明は準最適なポンプ
運転台数を決定しポンプを制御する方法である
が、その計算に必要な記憶容量を少なくしたた
め、装置を小形化できたことに特徴がある。また
この台数決定のアルゴリズムは、原理が単純であ
るのでわかりやすく、もし計算の途中で装置が動
かなくなつたような場合でも、人間により代行す
ることが可能である。 As explained above, the present invention is a method of determining the quasi-optimal number of pumps to be operated and controlling the pumps, and is characterized in that the storage capacity required for the calculation is reduced, so that the device can be made smaller. Furthermore, the principle of this algorithm for determining the number of devices is simple and easy to understand, and even if the device stops working during the calculation, it can be replaced by a human.
第1図は、貯水池水位によるポンプ台数制御の
説明図、第2図はプログラムによるポンプ台数制
御の説明図、第3図は水系のモデル図、第4図
は、ポンプ運転曲線と予測負荷流量累積値曲線の
関係を表わす図、第5図は、ポンプ運転台数と、
単位時間当りの揚水量の図、第6図は、運転曲線
のルートの探し方説明図、第7図は、運転曲線の
ルート探索のフローチヤート、第8図は、ポンプ
台数制御装置図。
Figure 1 is an explanatory diagram of pump number control based on reservoir water level, Figure 2 is an explanatory diagram of pump number control using a program, Figure 3 is a water system model diagram, and Figure 4 is a pump operation curve and predicted cumulative load flow rate. Figure 5, a diagram showing the relationship between the value curves, shows the number of pumps in operation and
FIG. 6 is an explanatory diagram of how to search for the route of the operating curve; FIG. 7 is a flowchart of searching for the route of the operating curve; and FIG. 8 is a diagram of the pump number control device.
Claims (1)
留手段の流体貯留量を該貯留手段に流入する流入
量で制御する予測制御方法において、(a)上記貯留
手段の容量と、初期貯留量と、上記貯留手段から
流出する流出流量を過去の実績から予測して求め
た負荷量累積予測値とにそれぞれ対応した信号を
発生させ、(b)上記負荷量累積予測信号から求め
た、下限予測曲線信号と上記予測値信号に上記容
量信号を加えた上限予測曲線とを発生させ(c)上記
初期貯留量信号にもとづき、上記上限および下現
予測曲線間を通り、上記初期貯留量を表わす点か
ら出発して上記上限および下限予測曲線と交わる
まで各台数でポンプを運転したときの個別運転ル
ートと該個別運転ルートと所定時間以上にわたり
運転台数の切換えを不要とする運転ルートとの交
点を途中切換え点とする信号にもとづいて上記運
転台数の変更がすくなくなるような運転ルートを
発生させ、(d)上記運転ルートのうちから、所定の
評価関数にもとづいてひとつの運転ルートを選択
し、(e)該選択された運転ルートに対応する信号に
もとづいて上記流体貯留量を制御することを特徴
とする予測制御方法。1. In a predictive control method for controlling the amount of fluid stored in a fluid storage means by the amount of inflow flowing into the storage means by switching the number of operating pumps of a plurality of pumps, (a) the capacity of the storage means and the initial storage amount; (b) a lower limit prediction curve signal obtained from the load amount cumulative prediction signal; and (b) a lower limit prediction curve signal obtained from the load amount cumulative prediction signal. (c) Based on the initial storage amount signal, pass between the upper and lower current prediction curves and start from a point representing the initial storage amount. An intermediate switching point is the intersection of the individual operation route when each number of pumps is operated until it intersects with the upper and lower limit predicted curves, and the individual operation route and the operation route that does not require switching the number of pumps for a predetermined period of time or more. (d) select one driving route from among the driving routes based on a predetermined evaluation function; (e) A predictive control method, characterized in that the fluid storage amount is controlled based on a signal corresponding to the selected driving route.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP494576A JPS5288801A (en) | 1976-01-21 | 1976-01-21 | Device for controlling number of plural pumps |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP494576A JPS5288801A (en) | 1976-01-21 | 1976-01-21 | Device for controlling number of plural pumps |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5288801A JPS5288801A (en) | 1977-07-25 |
| JPS6132684B2 true JPS6132684B2 (en) | 1986-07-29 |
Family
ID=11597700
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP494576A Granted JPS5288801A (en) | 1976-01-21 | 1976-01-21 | Device for controlling number of plural pumps |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5288801A (en) |
-
1976
- 1976-01-21 JP JP494576A patent/JPS5288801A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5288801A (en) | 1977-07-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS6132681B2 (en) | ||
| JPS6132684B2 (en) | ||
| JPH0614294B2 (en) | Control method for operating number of multiple pumps | |
| JPH05346807A (en) | Pump plant operation control device | |
| JP3906096B2 (en) | Drain pump operation support device and drain pump control device | |
| JPH05265513A (en) | Method for controlling, number of pumps in operation at place of drainage pump and device therefor | |
| JP3523489B2 (en) | Pump control method | |
| JPS6132683B2 (en) | ||
| CN118734511A (en) | A method for optimizing the dispatching of storage belts coupled with water environment simulation | |
| JPH05303407A (en) | Method and device for controlling the number of running pumps in drainage pump station | |
| JPH01175613A (en) | Pump controller | |
| JPH07145784A (en) | Number of rainwater pump operation controlling method | |
| JPS598022A (en) | Operation control method for multiple devices | |
| JP3283568B2 (en) | Optimal automatic operation control device and method for water supply device | |
| JPS6323391B2 (en) | ||
| JPH05303406A (en) | Qualitative reasoning predictive control method | |
| JP2001355222A (en) | Water reservoir operating system based on discharge function | |
| JP3278932B2 (en) | Rainwater pump controller | |
| JPH10103252A (en) | Pump control system | |
| JPS6228319B2 (en) | ||
| JP4905305B2 (en) | Pump control device | |
| JP2000029536A (en) | Dam control device | |
| JPH01177110A (en) | Water level controller | |
| JP2734698B2 (en) | Variable speed pump unit control device | |
| SU1560810A1 (en) | Method of controlling a pumping station |