JPS6146611B2
JPS6146611B2 JP7254583A JP7254583A JPS6146611B2 JP S6146611 B2 JPS6146611 B2 JP S6146611B2 JP 7254583 A JP7254583 A JP 7254583A JP 7254583 A JP7254583 A JP 7254583A JP S6146611 B2 JPS6146611 B2 JP S6146611B2
Authority
JP
Japan
Prior art keywords
pile
vertical hole
end plate
frame
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7254583A
Other languages
Japanese (ja)
Other versions
JPS59199914A (en
Inventor
Yasuo Nakajima
Satoshi Tomimatsu
Yukimasa Nomura
Nobukazu Okaji
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haseko Corp
Original Assignee
Hasegawa Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hasegawa Komuten Co Ltd filed Critical Hasegawa Komuten Co Ltd
Priority to JP7254583A priority Critical patent/JPS59199914A/en
Publication of JPS59199914A publication Critical patent/JPS59199914A/en
Publication of JPS6146611B2 publication Critical patent/JPS6146611B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 本発明は、PC杭(プレストレスの導入された
中空円形の既製コンクリート杭)の継足し建込み
方法に関するもので、その目的は、上、下杭を同
芯状に精度良く継ぎ足すこと、ならびに、継ぎ足
された上、下杭の鉛直性確保が容易で、所謂高止
りの防止に極めて有効であり、また、杭建込み用
重機の効率良い使用が可能になる新規かつ有用な
方法を提案するにある。
[Detailed description of the invention] The present invention relates to a method for adding and erecting PC piles (hollow circular ready-made concrete piles with prestress introduced), and its purpose is to arrange upper and lower piles concentrically. This is a new method that makes it easy to add accurately and ensure the verticality of the added top and bottom piles, which is extremely effective in preventing so-called high piles, and also enables efficient use of heavy machinery for pile erection. and propose a useful method.

従来、セメントミルク注入工法において、PC
杭を継ぎ足し、長尺の杭として建込むにあたつて
は、第1図に示すように、PC杭下杭aをワイヤ
ーb掛けして、走伴重機cにより、縦孔dに所望
深さまで挿入した状態で、別の重機により、PC
杭上杭eをワイヤーf掛けして前記PC杭下杭a
の上方に吊り下げ、これら上、下杭e,aのエン
ドプレート同士を溶接した後、PC杭下杭aのワ
イヤーbを外し、上、下杭e,aを縦孔d内へと
下降させていた。
Conventionally, in the cement milk injection method, PC
When adding piles and erecting them as long piles, as shown in Figure 1, the PC pile lower pile a is hung with a wire b, and then moved into the vertical hole d to the desired depth using a traveling heavy machine c. While it was inserted, another heavy machine was used to remove the PC.
Hang the upper pile e with the wire f and attach the PC pile lower pile a
After suspending the PC pile above and welding the end plates of the upper and lower piles e and a, remove the wire b of the lower PC pile a and lower the upper and lower piles e and a into the vertical hole d. was.

ところが、図示のように、PC杭下杭aをワイ
ヤーbで横方向へ引張つて、所望深さに保持した
状態では、PC杭下杭aが鉛直線に対して傾斜す
るため、その上方に、PC杭上杭eを同芯状に連
結することが難しく、応々にして、くの字状に折
れ曲つて連結されることがあり、これが所謂高止
り現象の原因になることがあつた。また、たとえ
上、下杭e,aを同芯状に精度良く連結できて
も、ワイヤーfを巻き付けて吊り下げた状態にお
いては、偏心荷重となるため、杭全体が鉛直線に
対して若干傾斜することを免れ得ず、これが高止
りの原因になることもあつた。
However, as shown in the figure, when the PC pile lower pile a is pulled laterally with the wire b and held at the desired depth, the PC pile lower pile a is inclined with respect to the vertical line. It was difficult to connect the PC pile top piles e in a concentric manner, and in some cases, they were bent in a dogleg shape and connected, which caused the so-called high-stacking phenomenon. In addition, even if the upper and lower piles e and a can be connected concentrically and accurately, when the wire f is wrapped around them and suspended, an eccentric load will be applied, so the entire pile will be slightly inclined with respect to the vertical line. In some cases, this caused the prices to remain high.

しかも、上記の従来方法では、上、下杭e,a
の吊下げに別々の重機が必要であり、重機の使用
効率が悪く、施工コストが嵩む欠点があつた。
Moreover, in the above conventional method, the upper and lower piles e, a
Separate heavy machinery was required to suspend the pipes, which resulted in poor efficiency in the use of heavy machinery and increased construction costs.

本発明方法は、これらの従来欠点を一掃するも
のであり、縦孔の掘削完了後、縦孔周囲の地上に
架台を設置し、PC杭下杭を吊り下げて縦孔に所
望深さまで挿入すると共に、その杭頭近傍部を前
記架台に、杭頭近傍部の外周に配置したリング状
金物を介して、略同一水平面内で互いに直交する
軸芯周りで回動自在に支持させて自重によりPC
杭下杭の鉛直性を確保し、次に、PC杭上杭を、
その上端側エンドプレートに形成されたねじ孔に
螺合させたボルトと該ボルトの頭部に係止させた
紐状体とを介して鉛直姿勢に吊り下げて、PC杭
上杭の下端側エンドプレートとPC杭下杭の上端
側エンドプレートとを溶接することにより、PC
杭上杭及びPC杭下杭を同芯状に連結し、しかる
後、前記架台によるPC杭下杭の支持状態を解く
と共に、前記ボルト及び紐状体を介して、PC杭
上杭及びPC杭下杭を縦孔に所望深さまで挿入す
ることを特徴としている。
The method of the present invention eliminates these conventional drawbacks, and after completing the excavation of the vertical hole, a frame is installed on the ground around the vertical hole, and the PC pile lower pile is suspended and inserted into the vertical hole to the desired depth. At the same time, the area near the pile head is supported on the frame via a ring-shaped metal fitting placed around the outer periphery of the area near the pile head, so as to be rotatable around mutually orthogonal axes in approximately the same horizontal plane, and the PC is loaded by its own weight.
Ensure the verticality of the lower pile, then install the upper PC pile,
The lower end of the PC pile is suspended in a vertical position via a bolt screwed into a screw hole formed in the upper end plate and a string-like body secured to the head of the bolt. By welding the plate and the upper end plate of the PC pile lower pile, the PC
The upper pile and the lower PC pile are connected concentrically, and then the supported state of the lower PC pile by the mount is released, and the upper PC pile and the lower PC pile are connected via the bolt and string-like body. The feature is that the lower pile is inserted into the vertical hole to the desired depth.

以下、本発明の実施例を図面に基づいて説明す
る。
Embodiments of the present invention will be described below based on the drawings.

先ず、本発明のPC杭の継足し建込み方法に用
いる装置類から説明する。
First, the devices used in the method for adding and erecting PC piles of the present invention will be explained.

第2図、第3図は、PC杭下杭Aを鉛直に保持
する保持装置を示し、1は上枠1aと下枠1bと
脚部1c……とを備えた架台で、上枠1aの対向
2辺の上縁には、位置決め用の凹部1d……が形
成されている。2は、二つ割可能に構成された、
具体的にはボルト・ナツト3を外すことにより、
ヒンジ4周りで揺動開閉自在に構成された二つの
半円形状部分よりなるリング状金物であり、その
外面には相対向する位置に一対の軸体5……が互
いに同芯状に突設されている。これらの軸体5…
…は、前記凹部1d……に対して挿抜自在であ
り、かつ、凹部1d……内に嵌入した状態におい
て、その軸芯周りに回動自在である。尚、図示の
実施例においては、軸体5……に雄ねじが形成さ
れ、これに螺合するナツト6……を上枠1aの外
面に当てがつて、架台1に対するリング状金物2
の前記軸体5……軸芯方向での位置決めを行なわ
れるように構成されている。また、リング状金物
2の上縁には、前記両軸体5……からリング状金
物2の円周方向に90度位相の異なる位置に位置決
め用凹部7……が形成されている。一方、PC杭
下杭Aの杭頭近傍部には、直径方向の2位置に杭
芯に対して直角な雌ねじ体8……が予め同芯状に
埋設されている。そして、これら雌ねじ体8……
に螺合した一対のねじ軸9……を前記凹部7……
に挿抜自在ならびに回動自在に嵌入し得るように
構成してある。9aは……リング状の回転操作
部、10……はリング状金物2の外面に当てがつ
て、PC杭下杭Aに対するリング状金物2のねじ
軸9……軸芯方向での位置決めを行なうナツトで
ある。11はPC杭下杭Aの上端側エンドプレー
ト、12はPC杭製造時に、図外の杭内に埋設さ
れるPC鋼材に張力を付与するのに用いられたね
じ孔である。
Figures 2 and 3 show a holding device that vertically holds the PC pile lower pile A. Reference numeral 1 denotes a frame comprising an upper frame 1a, a lower frame 1b, and legs 1c. Recesses 1d for positioning are formed on the upper edges of the two opposing sides. 2 is configured so that it can be divided into two,
Specifically, by removing bolts and nuts 3,
It is a ring-shaped hardware consisting of two semicircular parts that can swing open and close around a hinge 4, and a pair of shaft bodies 5 protrude concentrically from each other at opposite positions on the outer surface. has been done. These shaft bodies 5...
... can be inserted into and removed from the recess 1d, and can rotate about its axis when fitted into the recess 1d. In the illustrated embodiment, a male thread is formed on the shaft body 5, and the ring-shaped hardware 2 is attached to the frame 1 by applying the nut 6, which is screwed to the male thread, to the outer surface of the upper frame 1a.
The shaft body 5 is configured to be positioned in the axial direction. Further, on the upper edge of the ring-shaped hardware 2, positioning recesses 7 are formed at positions that are 90 degrees out of phase with the shafts 5 in the circumferential direction of the ring-shaped hardware 2. On the other hand, in the vicinity of the pile head of the PC pile lower pile A, female screw bodies 8 perpendicular to the pile core are concentrically buried in advance at two positions in the diametrical direction. And these female screw bodies 8...
A pair of screw shafts 9 screwed into the recess 7...
It is constructed so that it can be freely inserted into and removed from and rotatably inserted into. 9a is...a ring-shaped rotation operation part, and 10... is applied to the outer surface of the ring-shaped hardware 2 to position the ring-shaped hardware 2 in the screw shaft 9...axial direction with respect to the PC pile lower pile A. It's Natsuto. 11 is an end plate on the upper end side of the PC pile lower pile A, and 12 is a screw hole used to apply tension to the PC steel material buried in the pile (not shown) during the manufacture of the PC pile.

第4図は、PC杭上杭Bの吊り治具を示す。こ
の治具は、上端側エンドプレート13に形成され
たねじ孔(これは、前記ねじ孔12と同様に、
PC鋼材に張力を与えるのに用いられたものであ
る。)14……に螺合するボルト15……と該ボ
ルト15……のリング状頭部15a……に係止さ
せたフツク付きワイヤー、フツク付きチエーン等
の紐状体16とによつて構成され、紐状体16を
重機の吊下げ用フツク17で吊り下げたとき、
PC杭上杭Bが自重によつて鉛直姿勢となるよう
に構成されている。
Figure 4 shows the hanging jig for PC pile top pile B. This jig has a screw hole formed in the upper end plate 13 (similar to the screw hole 12 described above).
It was used to apply tension to prestressing steel. ) 14... and a string-like body 16, such as a wire with a hook or a chain with a hook, which is engaged with the ring-shaped head 15a of the bolt 15... , when the string-like body 16 is suspended by the hanging hook 17 of heavy machinery,
The PC pile top pile B is configured so that it assumes a vertical posture due to its own weight.

次に、上記保持装置及び吊り治具を用いたPC
杭の継足し建込み方法を第5図イ〜ニに基づいて
説明する。
Next, the PC using the above holding device and hanging jig
The method of adding and erecting piles will be explained based on Fig. 5 A to D.

第5図イに示すように、縦孔18の掘削完了
後、縦孔18周囲の地上に、架台1を設置する。
次に、PC杭下杭Aにワイヤー19を巻回して、
重機により吊り下げ、PC杭下杭Aを縦孔18に
挿入する。この場合、図示のように、PC杭下杭
Aの前記雌ねじ体8……にねじ軸9……を螺装し
ておくことにより、ねじ軸9……をワイヤー19
の滑り止め部材として利用できる。リング状金物
2は、PC杭下杭Aを縦孔18に挿入した後、PC
杭下杭Aの周囲に配置して架台1に枢支させても
よく、ワイヤー19の邪魔にならない場合は、図
示のように、予め架台1に枢支させておいてもよ
い。
As shown in FIG. 5A, after the excavation of the vertical hole 18 is completed, the pedestal 1 is installed on the ground around the vertical hole 18.
Next, wind the wire 19 around the PC pile lower pile A,
Suspend it with heavy machinery and insert the PC pile lower pile A into the vertical hole 18. In this case, as shown in the figure, by screwing the screw shaft 9 into the female threaded body 8 of the PC pile lower pile A, the screw shaft 9 can be connected to the wire 19.
Can be used as a non-slip member. After inserting the PC pile lower pile A into the vertical hole 18, the ring-shaped hardware 2
It may be placed around the lower pile A and pivotally supported by the pedestal 1, or if it does not get in the way of the wire 19, it may be pivotally supported by the pedestal 1 in advance as shown.

PC杭下杭Aが所望深さまで挿入されたら、第
5図ロに示すように、ねじ軸9……をリング状金
物2の前記凹部7……に嵌め込む。この状態にお
いては、杭頭近傍部がリング状金物2にねじ軸9
……軸芯周りで回動自在に枢支され、リング状金
物2は架台1に前記軸体5……の軸芯周りで回動
自在に枢支されるから、PC杭下杭Aの下端側は
いずれの方向にも揺動が自由であり、自重により
PC杭下杭Aの鉛直性が確保されている。尚、縦
孔18には、セメントミルクあるいはソイルセメ
ント(セメントミルクと掘削土との混合物)が存
在し、PC杭下杭Aに浮力が作用するので、前記
軸体5……、ねじ軸9……の径をあまり大きく設
定しなくても、PC杭下杭Aの重量によつて折損
する虞れはない。
When the lower PC pile A is inserted to the desired depth, the screw shaft 9 is fitted into the recess 7 of the ring-shaped hardware 2, as shown in FIG. In this state, the vicinity of the pile head is attached to the ring-shaped hardware 2 by the screw shaft 9.
Since the ring-shaped hardware 2 is rotatably supported around the axis of the shaft 5 on the frame 1, the lower end of the PC pile lower pile A The sides can swing freely in any direction, and due to their own weight
The verticality of the PC pile lower pile A is ensured. Note that cement milk or soil cement (a mixture of cement milk and excavated soil) exists in the vertical hole 18, and buoyancy acts on the PC pile lower pile A, so that the shaft body 5..., the screw shaft 9... Even if the diameter of ... is not set too large, there is no risk of it breaking due to the weight of PC pile lower pile A.

次に、第5図ハに示すように、PC杭上杭Bを
重機により前記ボルト15……及び紐状体16を
介して鉛直姿勢に吊り下げ、PC杭上杭Bの下端
側エンドプレートとPC杭下杭Aの上端側エンド
プレート11とを溶接し、上、下杭B,Aを同芯
状に連結する。この場合、PC杭下杭Aは予め鉛
直姿勢に保持されており、PC杭上杭Bも前記ボ
ルト15……及び紐状体16を使用するため、杭
外周にワイヤーを巻き付けて吊り下げる場合のよ
うな偏心荷重による傾斜がなく、自重により鉛直
姿勢を保つ。従つて、上、下杭B,Aを容易に同
芯状に連結できる。また、PC杭下杭Aを架台1
に支持させるため、該下杭Aの吊り下げに用いた
重機を、PC杭上杭Bの吊り下げに使用でき、重
機の相伴は不要である。
Next, as shown in FIG. The PC pile lower pile A is welded to the upper end side end plate 11, and the upper and lower piles B and A are concentrically connected. In this case, the PC pile lower pile A is held in a vertical position in advance, and the PC pile upper pile B also uses the bolts 15... and the string-like body 16. It does not tilt due to eccentric loads, and maintains a vertical posture due to its own weight. Therefore, the upper and lower piles B and A can be easily connected concentrically. In addition, place the PC pile lower pile A on the frame 1.
Therefore, the heavy machinery used to suspend the lower pile A can be used to suspend the upper PC pile B, and no heavy machinery is required.

しかる後、第5図ニに示すように、架台1によ
るPC杭下杭Aの支持状態を解き、PC杭上杭B及
びPC杭下杭Aを、自重により鉛直姿勢に保たせ
つつ、縦孔18に所望深さまで挿入する。
After that, as shown in Fig. 5 D, the supporting state of the PC pile lower pile A by the frame 1 is released, and the PC pile upper pile B and the PC pile lower pile A are maintained in a vertical position by their own weight, and the vertical hole is 18 to the desired depth.

第6図、第7図は別の実施例を示し、ねじ軸9
……をリング状金物2に形成したねじ孔(図示の
実施例では、リング状金物2に溶接したナツト2
aにより形成されている。)と螺合した状態に設
けると共に、ねじ軸9……の内端に、PC杭下杭
Aの外周面と面接触する弧状の当て板部20……
を相対回転自在に嵌着して、当て板部20……間
にPC杭下杭Aを抱持するようにした点に特徴が
ある。この実施例によれば、PC杭下杭Aの杭頭
近傍部に前記雌ねじ体8……を埋設しておく必要
がない。
6 and 7 show another embodiment, in which the screw shaft 9
... is formed in the ring-shaped metal fitting 2 (in the illustrated embodiment, the nut 2 welded to the ring-shaped metal fitting 2
It is formed by a. ) is provided in a screwed state, and at the inner end of the screw shaft 9..., an arc-shaped backing plate part 20... that makes surface contact with the outer peripheral surface of the PC pile lower pile A...
It is characterized in that the PC pile lower pile A is held between the backing plate part 20 and the backing plate part 20 by being fitted so as to be relatively rotatable. According to this embodiment, there is no need to bury the female screw body 8 in the vicinity of the pile head of the lower PC pile A.

以上の実施例からも明らかなように、本発明方
法によれば、PC杭下杭の杭頭近傍部を架台に、
リング状金物を介して、略同一水平面内で互いに
直交する軸芯周りで回動自在に支持させて、自重
によりPC杭下杭の鉛直性を確保する一方、PC杭
上杭を、その上端側エンドプレートに形成された
ねじ孔に螺合するボルトと該ボルトの頭部に係止
させた紐状体を介して、鉛直姿勢に吊り下げて、
両者の溶接による連結を行なうため、上、下杭を
容易かつ正確に同芯状に連結でき、連結後は、
上、下杭の全体を、鉛直姿勢のまま下降し得るの
で、高止りの防止に極めて有効である。
As is clear from the above examples, according to the method of the present invention, the vicinity of the pile cap of the PC pile lower pile is placed on the frame,
The PC pile is supported rotatably around mutually orthogonal axes in approximately the same horizontal plane via a ring-shaped hardware, and the verticality of the PC pile lower pile is ensured by its own weight, while the PC pile upper pile is supported at its upper end. Suspended in a vertical position via a bolt screwed into a screw hole formed in the end plate and a string-like body secured to the head of the bolt,
Since the two are connected by welding, the upper and lower piles can be easily and accurately connected concentrically.
Since the entire upper and lower piles can be lowered in a vertical position, this is extremely effective in preventing the piles from staying too high.

また、PC杭下杭を架台に支持させるため、該
下杭の吊下げに用いた重機をPC杭上杭の吊下げ
に使用でき、重機の走伴が不要であり、重機の使
用が効率よく行なえ、施工コストを軽減できる。
In addition, since the PC pile lower pile is supported on the frame, the heavy machinery used to hang the lower PC pile can be used to hang the PC pile upper pile, and there is no need for heavy machinery to accompany it, making the use of heavy machinery more efficient. construction costs can be reduced.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来例の説明図である。第2図以降が
本発明の実施例を示し、第2図は要部の縦断正面
図、第3図は要部の平面図、第4図は要部の一部
切欠正面図、第5図イ,ロ,ハ,ニは工程の説明
図、第6図と第7図は別の実施例を示す要部の縦
断正面図と要部の一部切欠平面図である。 A……PC杭下杭、B……PC杭上杭、1……架
台、2……リング状金物、13……エンドプレー
ト、14……ねじ孔、15……ボルト、15a…
…頭部、16……紐状体。
FIG. 1 is an explanatory diagram of a conventional example. Figure 2 and subsequent figures show embodiments of the present invention, where Figure 2 is a longitudinal sectional front view of the main part, Figure 3 is a plan view of the main part, Figure 4 is a partially cutaway front view of the main part, and Figure 5. A, B, C, and D are explanatory diagrams of the steps, and FIGS. 6 and 7 are a longitudinal sectional front view and a partially cutaway plan view of the main part showing another embodiment. A... PC pile lower pile, B... PC pile upper pile, 1... Frame, 2... Ring-shaped hardware, 13... End plate, 14... Screw hole, 15... Bolt, 15a...
...head, 16... string-like body.

Claims (1)

【特許請求の範囲】[Claims] 1 縦孔の掘削完了後、縦孔周囲の地上に架台を
設置し、PC杭下杭を吊り下げて縦孔に所望深さ
まで挿入すると共に、その杭頭近傍部を前記架台
に、杭頭近傍部の周囲に配置したりリング状金物
を介して、略同一水平面内で互いに直交する軸芯
周りで回動自在に支持させて、自重によりPC杭
下杭の鉛直性を確保し、次に、PC杭上杭を、そ
の上端側エンドプレートに形成されたねじ孔に螺
合させたボルトと該ボルトの頭部に係止させた紐
状体とを介して鉛直姿勢に吊り下げて、PC杭上
杭の下端側エンドプレートとPC杭下杭の上端側
エンドプレートとを溶接することにより、PC杭
上杭及びPC杭下杭を同芯状に連結し、しかる
後、前記架台によるPC杭下杭の支持状態を解く
と共に、前記ボルト及び紐状体を介して、PC杭
上杭及びPC杭下杭を縦孔に所望深さまで挿入す
ることを特徴とするPC杭の継足し建込み方法。
1 After completing the excavation of the vertical hole, install a frame on the ground around the vertical hole, suspend the PC pile lower pile and insert it into the vertical hole to the desired depth, and place the area near the pile cap on the frame. The verticality of the PC pile lower pile is ensured by its own weight by placing it around the PC pile or supporting it rotatably around mutually orthogonal axes in approximately the same horizontal plane through a ring-shaped hardware, and then A PC pile-top pile is suspended in a vertical position via a bolt screwed into a screw hole formed in the upper end plate and a string-like body secured to the head of the bolt. By welding the lower end plate of the upper pile and the upper end plate of the PC pile lower pile, the PC pile upper pile and the PC pile lower pile are connected concentrically, and then the PC pile is lowered by the mount. A method for adding and erecting a PC pile, which comprises loosening the supporting state of the pile and inserting a PC pile upper pile and a PC pile lower pile into a vertical hole to a desired depth via the bolt and string-like body.
JP7254583A 1983-04-25 1983-04-25 Connectional erection of pc pile Granted JPS59199914A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7254583A JPS59199914A (en) 1983-04-25 1983-04-25 Connectional erection of pc pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7254583A JPS59199914A (en) 1983-04-25 1983-04-25 Connectional erection of pc pile

Publications (2)

Publication Number Publication Date
JPS59199914A JPS59199914A (en) 1984-11-13
JPS6146611B2 true JPS6146611B2 (en) 1986-10-15

Family

ID=13492431

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7254583A Granted JPS59199914A (en) 1983-04-25 1983-04-25 Connectional erection of pc pile

Country Status (1)

Country Link
JP (1) JPS59199914A (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2525575Y2 (en) * 1992-07-31 1997-02-12 株式会社ホクコン Rotary buried pile holding device
JPH06245615A (en) * 1993-02-19 1994-09-06 Iseki & Co Ltd Rice transplanting machine
JP2525573Y2 (en) * 1993-05-12 1997-02-12 株式会社ホクコン Rotary buried pile holding device
JP2525574Y2 (en) * 1993-05-12 1997-02-12 株式会社ホクコン Rotary buried pile holding device
GB0204987D0 (en) * 2002-03-04 2002-04-17 Fast Frames Uk Ltd Pile driving
CN103726493B (en) * 2013-12-20 2016-03-30 中国三冶集团有限公司 During hammering method prestressing pipe pile construction to stake positioner and using method thereof
JP7698450B2 (en) * 2021-03-31 2025-06-25 積水化学工業株式会社 Earth retaining wall structural member, earth retaining wall construction method and underground cutting method
CN115450205B (en) * 2022-09-24 2024-01-26 贾龙国 Construction structure and construction process for inserting pre-stress pipe pile into triaxial stirring pile
GB202400090D0 (en) * 2024-01-04 2024-02-21 Keltbray Man Services Limited Pile construction

Also Published As

Publication number Publication date
JPS59199914A (en) 1984-11-13

Similar Documents

Publication Publication Date Title
US5060435A (en) Bracket for support of vertical pole
JPH022758Y2 (en)
JPS6146611B2 (en)
JP3079422B2 (en) Foundation block for water heater installation and its construction method
JPH08301573A (en) Hanging accessory for pile
JP3336367B2 (en) Steel column base structure and construction method of steel column base
JPS6124728A (en) Method of building manhole
JP3039326B2 (en) Screw joint pile structure and its construction method
JPS6033159Y2 (en) Ready-made concrete pile
JPS6242989Y2 (en)
JP2525575Y2 (en) Rotary buried pile holding device
JP6322057B2 (en) Rotary press-fit steel pipe pile connection fittings
JP2662362B2 (en) How to bury underground tanks
JPS58135230A (en) Repairing device for settling building
CN214118248U (en) Fixing support for temporary pipeline of shield tunnel
JPS63272815A (en) Penetration work of screw anchor
JP3263733B2 (en) Concrete pile sinking device
JPS5850227A (en) Method and apparatus for preventing settling of telegraph pole
JPH04119831U (en) Yatsutoko with pile holding fittings and its rotating jig
JPS5820669Y2 (en) Jig to prevent falling beams
JP2009185603A (en) Foundation reinforcing method for existing house
JPH02147724A (en) Under-bracing and pole erecting method therewith
JPS606707Y2 (en) Embedded fitting for hanging pipes
JPH0612054Y2 (en) Concrete block for manhole
JPS5828027Y2 (en) Earth retention brace