- JPS6156729B2 JPS6156729B2 JP6596782A JP6596782A JPS6156729B2 JP S6156729 B2 JPS6156729 B2 JP S6156729B2 JP 6596782 A JP6596782 A JP 6596782A JP 6596782 A JP6596782 A JP 6596782A JP S6156729 B2 JPS6156729 B2 JP S6156729B2
- Authority
- JP
- Japan
- Prior art keywords
- mortar
- packer
- tube
- gas
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004570 mortar (masonry) Substances 0.000 claims description 20
- 238000012360 testing method Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 9
- 238000009412 basement excavation Methods 0.000 claims description 8
- 239000011083 cement mortar Substances 0.000 claims description 7
- 239000012530 fluid Substances 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 4
- 239000013013 elastic material Substances 0.000 claims description 2
- 230000002093 peripheral effect Effects 0.000 claims description 2
- 239000007789 gas Substances 0.000 description 15
- 238000010276 construction Methods 0.000 description 7
- 238000012856 packing Methods 0.000 description 5
- 238000005259 measurement Methods 0.000 description 4
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- JOYRKODLDBILNP-UHFFFAOYSA-N Ethyl urethane Chemical compound CCOC(N)=O JOYRKODLDBILNP-UHFFFAOYSA-N 0.000 description 1
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 229910001873 dinitrogen Inorganic materials 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- QJGQUHMNIGDVPM-UHFFFAOYSA-N nitrogen group Chemical group [N] QJGQUHMNIGDVPM-UHFFFAOYSA-N 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【発明の詳細な説明】
本発明は、載荷試験等を行なうための場所打ち
試験杭に於けるフリクシヨンカツト工法の改良と
それに用いるモルタルシール装置に関するもので
ある。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an improvement in the friction cut construction method for cast-in-place test piles for carrying out loading tests, etc., and a mortar seal device used therein.
一般に、基礎杭等の支持力を調査するための載
荷試験に於いては、所謂フリクシヨンカツトを行
なつた場所打ち杭が多く用いられている。第1図
及び第2図は、そのフリクシヨンカツト工法の代
表例を示すものであり、先ず一定深さの地下掘削
面Hまで所望外径例えば外径800mmφ〜1600mmφ
位いの外管1を挿入する。次に外管1と略同じ長
さ外径が600mmφ〜1400mmφ位いの内管2を外管
1内へ挿入し、外管1の内面側に突設したリング
パツキン3と内管2の外面側へ突設したリングパ
ツキン4とを密着させ、内・外管下端部のフリク
シヨンカツト空間Gのシールを行なう。その後、
地下掘削面Hの下の支持層Sを内管2と略同外径
で所定深さだけ掘削し、掘削空間P内へ内管2の
上方より鉄筋を挿入組立すると共にセメントモル
タルを注入して、所謂場所打ちによる試験杭Bを
形成している。 Generally, in loading tests to investigate the bearing capacity of foundation piles, etc., cast-in-place piles with so-called friction cuts are often used. Figures 1 and 2 show a typical example of the friction cut method. First, a desired outer diameter, for example an outer diameter of 800 mmφ to 1600 mmφ, is
Insert the outer tube 1. Next, the inner tube 2, which has approximately the same length as the outer tube 1 and an outer diameter of 600 mmφ to 1400 mmφ, is inserted into the outer tube 1, and the ring packing 3 protruding from the inner surface of the outer tube 1 and the outer surface of the inner tube 2 are inserted into the outer tube 1. The friction cut spaces G at the lower ends of the inner and outer tubes are sealed by bringing the ring packings 4 protruding toward the sides into close contact. after that,
A support layer S under the underground excavation surface H is excavated to a predetermined depth with approximately the same outer diameter as the inner pipe 2, reinforcing bars are inserted and assembled into the excavated space P from above the inner pipe 2, and cement mortar is injected. , forming a so-called cast-in-place test pile B.
然し乍ら、前記工法にあつては、リングパツキ
ン3及び4を密着することによりフリクシヨンカ
ツト空間Gのシールを行なう様にしているため、
第2図に示す如く、外管1と内管2との相互位置
関係、特に縦方向の間隙Tを相当厳密に規制する
必要があり、外管1が僅かに沈下しただけでもモ
ルタルの漏出が起り、フリクシヨンカツト空間G
の下方がセメントモルタルによつて充填されてし
まうという欠点がある。 However, in the above construction method, since the friction cut space G is sealed by bringing the ring packings 3 and 4 into close contact,
As shown in Fig. 2, it is necessary to control the mutual positional relationship between the outer tube 1 and the inner tube 2, especially the vertical gap T, quite strictly, and even if the outer tube 1 sinks even slightly, the mortar will leak. Arise, friction cut space G
The disadvantage is that the lower part of the wall is filled with cement mortar.
又、載荷試験に於いて内管2に荷重をかけたと
き、パツキンリング3,4を介して荷重応力が外
管1へも伝達されることになり、正確な杭Bの支
持力即ち支持層Sのみに於ける杭Bの支持力を測
定することが出来ない。特に、内管2と外管1の
間隔Tがパツキンリング3,4を変形させてしま
うまでに近接している様な場合には、外管1によ
る支持力が相当大きく測定値に含まれることにな
り、当該間隔Tの規制誤差が、杭支持力の測定精
度に大きな悪影響を与えるという難点がある。 Furthermore, when a load is applied to the inner pipe 2 in a loading test, the load stress is also transmitted to the outer pipe 1 via the packing rings 3 and 4, which increases the accuracy of the supporting force of the pile B, that is, the support layer. It is not possible to measure the bearing capacity of pile B only at S. In particular, if the distance T between the inner tube 2 and outer tube 1 is close enough to deform the packing rings 3 and 4, the supporting force due to the outer tube 1 will be considerably large and included in the measured value. Therefore, there is a problem that the regulation error of the interval T has a large adverse effect on the measurement accuracy of the pile bearing capacity.
上述の如き困難点を避けるため、内・外管の下
端部に発泡ウレタンを充填したり、或いはウエス
等にシール材を含浸せしめたものを充填する方法
が開発され、且つ使用されている。しかし、これ
等の方法に於いても、モルタル充填時に於けるモ
ルタルの漏出を完全に防止することが出来ず、特
に前記地下掘削面Hが相当に深く且つ大口径管の
場合には、モルタルの漏出事故が屡々発生すると
いう欠点がある。 In order to avoid the above-mentioned difficulties, methods have been developed and used in which the lower ends of the inner and outer tubes are filled with foamed urethane or a cloth or the like impregnated with a sealing material. However, even with these methods, leakage of mortar during filling with mortar cannot be completely prevented, and especially when the underground excavation surface H is considerably deep and has a large diameter pipe, mortar leakage cannot be completely prevented. The disadvantage is that leakage accidents often occur.
本発明は、この種場所打ち試験杭のフリクシヨ
ンカツト工法に於ける上述の如き問題の解決を課
題とするものであり、地下掘削面Hが70〜90mと
相当に深く且つ外径が1500mmφ〜2000mmφもの大
口径試験杭の場合でも、簡単且つ確実にフリクシ
ヨンカツト空間Gのシールが出来、更に、載荷試
験に於いても測定誤差を生ずる虞れが全くなく、
極めて高精度な杭支持力の測定をできる様にした
場所打ち試験杭に於けるフリクシヨンカツト方法
と、これに使用するモルタルシール装置の提供を
目的とするものである。 The present invention aims to solve the above-mentioned problems in the friction cut construction method of this type of cast-in-place test pile. Even in the case of large-diameter test piles as large as 2000mmφ, the friction cut space G can be easily and reliably sealed, and there is no risk of measurement errors during loading tests.
The object of the present invention is to provide a friction cutting method for cast-in-place test piles that enables extremely high-precision measurement of pile bearing capacity, and a mortar seal device used therein.
以下、第3図乃至第5図に示す本発明の一実施
に基づいてその詳細を説明する。 Hereinafter, the details will be explained based on one implementation of the present invention shown in FIGS. 3 to 5.
第3図は本願方法発明の実施に用いるモルタル
シール装置の断面図であり、図に於いて5はパツ
カー支持枠、6はパツカー、7は膨張用ガスの注
入口である。前記パツカー支持枠5は、外管1の
内径よりやや小径の鍔状の上部支持板5aと下部
支持板5bとを、適宜の間隔Lをもつて平行に内
管2の下端部へ取付固着することにより形成され
ており、上部支持板5aにはガス圧入口7の取出
し孔5cが穿設されている。 FIG. 3 is a cross-sectional view of a mortar seal device used in carrying out the method of the present invention. In the figure, 5 is a packer support frame, 6 is a packer, and 7 is an inlet for inflating gas. The packer support frame 5 has a brim-shaped upper support plate 5a and a lower support plate 5b, each having a diameter slightly smaller than the inner diameter of the outer tube 1, which are attached and fixed to the lower end of the inner tube 2 in parallel with an appropriate interval L. The upper support plate 5a is provided with an extraction hole 5c for the gas pressure inlet 7.
パツカー6はゴム等の弾性材により円形のチユ
ーブ状に形成されており、前記支持枠5の上・下
支持板間に挿着されている。又、当該パツカー6
には膨張用ガスを圧入するためのガス注入口7が
取付けられており、その先端部が前記上部支持板
5aの取出し孔5cを挿通して、上方へ突出され
ている。尚ガス注入口7は、自転車チユーブの空
気入れ口と同様の構造となつており、ホース(図
示省略)からの加圧を止めることにより、パツカ
ー内圧によつて自動的に注入孔が閉鎖される。 The packer 6 is formed into a circular tube shape from an elastic material such as rubber, and is inserted between the upper and lower support plates of the support frame 5. Also, the police car 6
A gas inlet 7 for pressurizing inflation gas is attached to the inlet 7, and the tip thereof passes through the outlet hole 5c of the upper support plate 5a and projects upward. The gas inlet 7 has a similar structure to the air inlet of a bicycle tube, and when the pressure from the hose (not shown) is stopped, the inlet is automatically closed by the internal pressure of the car. .
ガス注入口7より圧縮空気や圧縮窒素ガス等の
加圧流体を圧入すると、パツカー6は外方へ膨張
し、その外表面が上・下支持板5a,5bの端縁
より20〜50mm程度膨出し、外管1の内周面へ密圧
されることになる。 When pressurized fluid such as compressed air or compressed nitrogen gas is injected through the gas inlet 7, the packer 6 expands outward, and its outer surface expands by about 20 to 50 mm from the edges of the upper and lower support plates 5a and 5b. It is then brought out and tightly pressed against the inner circumferential surface of the outer tube 1.
尚、前記第3図に於いては、鍔状の上・下支持
板5a,5bを内管2の下端部へ直接固着する様
にしているが、第4図に示す如く、内管2を挿通
できる短管8の両端に上・下支持板5a,5bを
固着してパツカー支持枠5を別体として構成し、
これを内管2の下端部へ固着するようにしてもよ
いことは勿論である。 In FIG. 3, the brim-shaped upper and lower support plates 5a and 5b are fixed directly to the lower end of the inner tube 2, but as shown in FIG. Upper and lower support plates 5a and 5b are fixed to both ends of a short pipe 8 that can be inserted, and the packer support frame 5 is constructed as a separate body.
Of course, this may be fixed to the lower end of the inner tube 2.
次に、当該モルタルシール装置を用いた場所打
ち試験杭に於けるフリクシヨンカツト工法を説明
する。 Next, a friction cut construction method for cast-in-place test piles using the mortar seal device will be explained.
第5図を参照して、先ず、盛土や沖積層Cの厚
さに応じて決定した地下掘削面Hまで所要寸法の
鋼製外管1を挿入し、その内部の土砂類を排出す
る。尚、当該外管1の挿入は如何なる工法であつ
てもよいことは勿論である。 Referring to FIG. 5, first, a steel outer pipe 1 of a required size is inserted up to the underground excavation surface H determined according to the thickness of the embankment or alluvial layer C, and the earth and sand inside it is discharged. It goes without saying that the outer tube 1 may be inserted by any method.
次に、外管1の内部に挿入する所定外径の内管
2の先端に、前記パツカー支持枠5を溶接等によ
つて取付けてその上・下支持板5a,5b間にパ
ツカー6を挿着すると共に、ガス注入口7に送ガ
ス用のホース9を接続する。その後、該内管2を
外管1内へ挿入し、中心軸の位置決めと上下方向
の位置決めをしたうえ、内管2の上端部を適宜の
方法により地上に別設した支持体へ支持固定す
る。 Next, the packer support frame 5 is attached to the tip of the inner tube 2 of a predetermined outer diameter to be inserted into the outer pipe 1 by welding or the like, and the packer 6 is inserted between the upper and lower support plates 5a and 5b. At the same time, a gas supply hose 9 is connected to the gas inlet 7. After that, the inner tube 2 is inserted into the outer tube 1, the central axis is positioned, and the upper end of the inner tube 2 is fixed to a support provided separately on the ground by an appropriate method. .
次に、地下掘削面H以下の支持層Sを内管2を
介して適宜の深さにまで掘削し、砂礫等を排出し
た場所打ち杭のための掘削空間Pを形成した後、
内管2及び前記掘削空間P内へ所定の鉄筋を挿入
組立する。 Next, the support layer S below the underground excavation surface H is excavated to an appropriate depth via the inner pipe 2, and after forming an excavated space P for the cast-in-place pile from which sand and gravel are discharged,
Predetermined reinforcing bars are inserted and assembled into the inner pipe 2 and the excavation space P.
セメントモルタルの注入準備が完了すれば、ボ
ンベ若しくはコンプレツサー等の加圧流体源10
からホース9を通して窒素や空気等を供給し、パ
ツカー6を膨張する。膨張したパツカー6は、そ
の外周縁が支持板5a,5bより外方へ膨出し、
外管1の内壁面に密着することによりフリクシヨ
ンカツト空間Gのシールが行なわれる。 When preparations for cement mortar injection are completed, pressurized fluid source 10 such as a cylinder or compressor is
Nitrogen, air, etc. are supplied from the tank through the hose 9 to inflate the pack car 6. The expanded pack car 6 has its outer peripheral edge bulging outward from the support plates 5a and 5b,
By coming into close contact with the inner wall surface of the outer tube 1, the friction cut space G is sealed.
空間Gのシールが終れば、内管2の上方よりセ
メントモルタルを流し込み、試験用の場所打ち杭
を完全する。 After sealing the space G, cement mortar is poured from above the inner pipe 2 to complete the cast-in-place pile for testing.
セメントモルタルが乾燥すると、リリーフ弁
(図示省略)を適宜の方法によつて開放し、パツ
カー6内の加圧ガスを放出すると共に、地上に於
ける内管2の支持を取り外す。これにより、場所
打ち杭は完全に空間Gを介してフリクシヨンカツ
トされたことになり、引き続き載荷試験が実施さ
れることになる。 When the cement mortar dries, a relief valve (not shown) is opened by an appropriate method to release the pressurized gas in the packer 6 and remove the support of the inner pipe 2 on the ground. As a result, the cast-in-place pile has been completely friction cut through the space G, and a loading test will be subsequently carried out.
尚、前記実施例にあつては、セメントモルタル
を充填する直前にパツカー6を膨張させる様にし
ているが、内管2を挿入した後、パツカー6を膨
張させ、それから支持層Sの掘削、鉄筋の組込
み、モルタルの流し込みの順序で場所打ち杭を形
成する様にしてもよい。 In the above embodiment, the packer 6 is expanded immediately before filling with cement mortar, but after inserting the inner pipe 2, the packer 6 is expanded, and then the support layer S is excavated and the reinforcing steel is The cast-in-place pile may be formed in the order of assembling the concrete and pouring the mortar.
本願発明は上述の通り、内管2の下端部外周に
モルタルシール装置Aを取付け、そのガスパツカ
ー6へ空気等を送るだけで簡単且つ確実にフリク
シヨンカツト空間Gをシールすることが出来、作
業能率が大幅に向上すると共にモルタルの漏出に
よるフリクシヨンカツトの失敗が全く無い。 As described above, the present invention can easily and reliably seal the friction cut space G by simply attaching the mortar seal device A to the outer periphery of the lower end of the inner tube 2 and sending air, etc. to the gas packer 6, thereby improving work efficiency. This greatly improves the performance and eliminates any friction cut failures due to mortar leakage.
又、ガスパツカー6内の膨張ガスを抜くことに
より、内管2即ち場所打ち杭Bは完全にフリクシ
ヨンカツトされることになり、載荷試験時に荷重
の一部が外管1へ伝達され、杭支持力の測定値が
不正確になるということは全くない。 In addition, by removing the expanding gas in the gas packer 6, the inner tube 2, that is, the cast-in-place pile B, is completely friction cut, and a part of the load is transferred to the outer tube 1 during the loading test, and the pile support There is no possibility that the force measurements will be inaccurate.
更に、モルタルシール装置Aは、上・下支持板
5a,5bにより形成した支持空間内へリング状
のガスパツカー6を挿着した構成としているた
め、送気によつてガスパツカー6は外管1の半径
方向へ略均等に膨出し、外管内周面へ極めて緊密
に密着して高いシール性能を発揮する。特に、外
管1が内径1500mmφ〜2000mmφ以上の大口径管に
於いては、そのシール効果は他の工法に比較して
格段に秀れており、モルタル漏れを起して完全な
フリクシヨンカツトを行えなかつたという試験例
は一例も無い。 Furthermore, the mortar seal device A has a structure in which a ring-shaped gas packer 6 is inserted into the support space formed by the upper and lower support plates 5a and 5b. It bulges out almost uniformly in the direction, and adheres extremely tightly to the inner circumferential surface of the outer tube, demonstrating high sealing performance. In particular, for large-diameter pipes in which the outer pipe 1 has an inner diameter of 1500 mmφ to 2000 mmφ or more, its sealing effect is far superior compared to other construction methods, and it prevents mortar leakage and prevents complete friction cuts. There is not a single example of a test in which it was not possible.
そのうえ、外管1と内管2の軸心に多少のずれ
があつても、ガスパツカー6はその膨張変形によ
つて外管1の内周面へ完全に密着することにな
り、部分的に隙間が出来てモルタル漏れを生ずる
様なことは全くない。 Moreover, even if there is some misalignment between the axes of the outer tube 1 and the inner tube 2, the gas packer 6 will be in complete contact with the inner circumferential surface of the outer tube 1 due to its expansion and deformation, leaving a partial gap. There is no possibility that this will cause mortar leakage.
本発明は上述の通り、秀れた実用的効用を有す
るものである。 As mentioned above, the present invention has excellent practical utility.
第1図は従前のフリクシヨンカツト工法による
場所打ち杭の縦断面図であり、第2図は第1図の
A部の部分拡大図である。第3図は本発明に係る
モルタルシール装置の第1実施例を示す断面図で
あり、第4図はモルタルシール装置の第2実施例
を示す断面図である。第5図は本発明に係る工法
を採用した場所打ち杭の縦断面図である。
1……外管、2……内管、5……パツカー支持
枠、5a……上部支持枠、5b……下部支持枠、
6……ガスパツカー、7……注入口、8……短
管、9……ホース、10……加圧流体源、A……
モルタルシール装置、H……地下掘削面、G……
フリクシヨンカツト空間、S……支持層、P……
掘削空間、B……場所打ち試験杭、C……盛土及
び沖積層。
FIG. 1 is a vertical cross-sectional view of a cast-in-place pile using the conventional friction cut construction method, and FIG. 2 is a partially enlarged view of section A in FIG. 1. FIG. 3 is a sectional view showing a first embodiment of the mortar seal device according to the present invention, and FIG. 4 is a sectional view showing a second embodiment of the mortar seal device. FIG. 5 is a longitudinal sectional view of a cast-in-place pile using the construction method according to the present invention. 1...Outer pipe, 2...Inner pipe, 5...Patzker support frame, 5a...Upper support frame, 5b...Lower support frame,
6... Gas packer, 7... Inlet, 8... Short pipe, 9... Hose, 10... Pressurized fluid source, A...
Mortar seal device, H... Underground excavation surface, G...
Friction cut space, S... support layer, P...
Excavation space, B...cast-in-place test pile, C...embankment and alluvium.
Claims (1)
し、次に前記外管1の内方へ、その下端部にガス
パツカー6を有するモルタルツール装置Aを取付
けた内管2を挿入し、前記ガスパツカー6へ加圧
流体を圧入することによりこれを半径方向へ膨出
させ、外管1と内管2間に形成したフリクシヨン
カツト空間Gのシールを行なつたあと、内管2の
上方より、その下方の支持層S内に形成した掘削
空間Pと内管2内へセメントモルタルを充填する
ことを特徴とする場所打ち試験杭に於けるフリク
シヨンカツト方法。 2 内管2の下端部外周面へ直接又は間接に、一
定の間隔Lをおいて平行に配設固着した上部支持
板5aと下部支持板5bとから成るパツカー支持
枠5と;該パツカー支持枠5内へ挿着され、地上
の加圧流体源10からホース9を介して加圧流体
を圧入することにより膨張する弾性材より成るリ
ング状ガスパツカー6とより構成したモルタルシ
ール装置。[Claims] 1. An outer pipe 1 is inserted to an underground excavation surface H of a certain depth, and then a mortar tool device A having a gas packer 6 at its lower end is attached inside the outer pipe 1. After inserting the tube 2 and injecting pressurized fluid into the gas packer 6 to expand it in the radial direction and sealing the friction cut space G formed between the outer tube 1 and the inner tube 2. A friction cutting method for a cast-in-place test pile, characterized in that cement mortar is filled from above the inner pipe 2 into the excavated space P formed in the support layer S below it and into the inner pipe 2. 2. A packer support frame 5 consisting of an upper support plate 5a and a lower support plate 5b, which are arranged and fixed in parallel with each other at a constant interval L, directly or indirectly to the outer peripheral surface of the lower end of the inner tube 2; 5. A mortar seal device comprising a ring-shaped gas packer 6 made of an elastic material that is inserted into a mortar seal 5 and expands when pressurized fluid is injected from a ground-based pressurized fluid source 10 through a hose 9.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6596782A JPS5921814A (en) | 1982-04-19 | 1982-04-19 | Friction cutting method and mortar sealing device for on-site test pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6596782A JPS5921814A (en) | 1982-04-19 | 1982-04-19 | Friction cutting method and mortar sealing device for on-site test pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5921814A JPS5921814A (en) | 1984-02-03 |
| JPS6156729B2 true JPS6156729B2 (en) | 1986-12-03 |
Family
ID=13302271
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6596782A Granted JPS5921814A (en) | 1982-04-19 | 1982-04-19 | Friction cutting method and mortar sealing device for on-site test pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5921814A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6387739U (en) * | 1986-11-27 | 1988-06-08 | ||
| JPS63145235U (en) * | 1987-03-13 | 1988-09-26 | ||
| JPH0660035U (en) * | 1993-01-27 | 1994-08-19 | 日本航空電子工業株式会社 | Panel switch key top |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4850490A (en) * | 1988-03-01 | 1989-07-25 | Barry Wright Corporation | Shock isolation device |
| JP5582627B2 (en) * | 2011-04-11 | 2014-09-03 | 大成建設株式会社 | Test pile construction method |
-
1982
- 1982-04-19 JP JP6596782A patent/JPS5921814A/en active Granted
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6387739U (en) * | 1986-11-27 | 1988-06-08 | ||
| JPS63145235U (en) * | 1987-03-13 | 1988-09-26 | ||
| JPH0660035U (en) * | 1993-01-27 | 1994-08-19 | 日本航空電子工業株式会社 | Panel switch key top |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5921814A (en) | 1984-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4614110A (en) | Device for testing the load-bearing capacity of concrete-filled earthen shafts | |
| BRPI0720423A2 (en) | METHOD AND APPARATUS FOR TESTING LOAD SUPPORT CAPACITY USING AN ANNULAR CELL | |
| CN107121342B (en) | An internal water pressure loading device for structural model tests of water tunnels | |
| US2903877A (en) | Storage tank structure | |
| CN115326582B (en) | A test device and test method for simulating the stress of support and lining under large deformation and fault dislocation of soft rock | |
| CN114704272A (en) | Construction method of first-built and then-excavated underground excavation tunnel | |
| JPS6156729B2 (en) | ||
| CN214738079U (en) | Sleeve valve pipe slip casting rifle | |
| CN111663554B (en) | A kind of bottom sealing system and sealing method of pile boot for post pile method construction | |
| JPS63536A (en) | Correcting work for ununiform settlement of buried pipe | |
| CN110700278A (en) | Inner support structure, foundation pit support system and construction method thereof | |
| JPH09209349A (en) | In-situ strength test method for bedrock | |
| CN206920249U (en) | Interior Water hydraulic static pressure loading equipment for water tunnel structural model test | |
| US4646559A (en) | Apparatus and method to test a single connection between a pipe coupling and a single pipe end connected therewith | |
| JP3276031B2 (en) | Bag filler | |
| CN105040694A (en) | Silicone grouting stopper for high-pressure grouting | |
| JPH01116424A (en) | Method and apparatus for loading test of pile | |
| CN113914875B (en) | Piston type water and soil pressure control steel sleeve for shield receiving and construction method | |
| CN213773424U (en) | Self-water-stop steel pipe pile foundation pit supporting earth retaining component | |
| JP2001280594A (en) | Storage facility in rock, construction method and leak inspection method | |
| JPS61250219A (en) | Load testing of pile | |
| CN116642718B (en) | Communication channel excavation test device, system and method | |
| CN115288729B (en) | Self-sealing segment structure, segment sealing ring and construction method | |
| Lum et al. | Behavior of a single gasket system for a precast concrete segmental liner subject to high external hydrostatic pressure | |
| Tattersall et al. | INVESTIGATIONS INTO THE DESIGN OF PRESSURE TUNNELS IN LONDON CLAY. |