JPS6160926B2 - - Google Patents
[go: Go Back, main page]

JPS6160926B2 - - Google Patents

Info

Publication number
JPS6160926B2
JPS6160926B2 JP17485880A JP17485880A JPS6160926B2 JP S6160926 B2 JPS6160926 B2 JP S6160926B2 JP 17485880 A JP17485880 A JP 17485880A JP 17485880 A JP17485880 A JP 17485880A JP S6160926 B2 JPS6160926 B2 JP S6160926B2
Authority
JP
Japan
Prior art keywords
pile
tip
pile body
soil
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP17485880A
Other languages
Japanese (ja)
Other versions
JPS57100219A (en
Inventor
Hiroshi Takamori
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP17485880A priority Critical patent/JPS57100219A/en
Publication of JPS57100219A publication Critical patent/JPS57100219A/en
Publication of JPS6160926B2 publication Critical patent/JPS6160926B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は建築土木等で用いる杭固定工法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a pile fixing method used in construction and civil engineering.

(従来の技術および問題点) 建築土木等で用いる杭の種類としては支持杭と
摩擦杭とがある。摩擦杭の固定工法は、従来、第
1図A〜Cに示すように行なわれている。1はコ
ンクリート製の杭本体で、2は地面である。杭本
体1には節状に突起部3…が形成されている。こ
のように節状の突起部を形成した摩擦孔を所定深
さまで土中に入れて固定するには、一節打ち込む
ごとに凹部に砂4を入れ、地盤と杭本体との隙間
をなくして杭と地盤とをなじませる必要があつ
た。また、節状の突起部3の横断面積が大きい
程、打設に大きな力が必要で、大型の打設機械を
用いなくてはならなかつた。打設による方法を避
けて埋設工法を採ると、突起部3を入り込ませる
大きな径の縦孔を必要とし、この孔を掘削する機
械を用いなくてはならなかつた。いずれにしても
従来の摩擦杭固定工法は大型の機械を必要とする
ため工費が大となる欠点があつた。加えて、凹部
に砂を入れたりする手間が要つた。また、砂を介
して杭と地盤との隙間をなくしているため、地盤
との摩擦は十分に得られ難かつた。更に、杭先端
部が打ち込み易いように尖つているため支持杭と
しての安定性はなかつた。
(Prior Art and Problems) Types of piles used in construction and civil engineering include support piles and friction piles. The method of fixing friction piles has conventionally been carried out as shown in FIGS. 1A to 1C. 1 is the concrete pile body, and 2 is the ground. The pile body 1 is formed with knot-shaped protrusions 3. In order to fix a friction hole formed with a knot-shaped protrusion into the soil to a predetermined depth, pour sand 4 into the recess each time a knot is driven, and remove the gap between the ground and the pile body. It was necessary to blend it in with the ground. Furthermore, the larger the cross-sectional area of the knot-like protrusions 3, the greater the force required for pouring, necessitating the use of a large-sized pouring machine. If a buried construction method is adopted instead of a method of pouring, a large diameter vertical hole into which the protrusion 3 is inserted is required, and a machine must be used to excavate this hole. In any case, the conventional method of fixing friction piles has the drawback of requiring large machinery, resulting in high construction costs. In addition, it took time and effort to fill the recesses with sand. Furthermore, because the gap between the pile and the ground was eliminated through the sand, it was difficult to obtain sufficient friction with the ground. Furthermore, since the tip of the pile was sharp to make it easier to drive, it was not stable as a support pile.

(問題点を解決するための手段) 本発明杭固定工法は、杭は先端及び中程の周部
数箇所に複数個のスリツトを形成してなる中空状
杭本体と該中空状杭本体の先端開口部を閉塞する
杭先金具とからなり、杭本体の先端開口部を杭先
金具で閉塞した後、この杭先金具の方から杭本体
を土中の目的の深さまで打設し、しかる後、杭本
体内に膨脹剤を入れ、時間の経過によつて、杭先
及び杭本体の中程に形成した前記スリツト部分を
複数箇所拡大させるものである。
(Means for Solving the Problems) The pile fixing method of the present invention consists of a hollow pile body formed by forming a plurality of slits at several points around the tip and the middle, and an opening at the tip of the hollow pile body. After closing the opening at the end of the pile body with the pile tip metal fitting, the pile body is driven into the soil from the pile tip metal fitting to the desired depth, and then, An expansion agent is put into the pile body, and as time passes, the slit portions formed at the pile tip and in the middle of the pile body are expanded at multiple locations.

(実施例) 5は金属或いは合成樹脂材等からなる中空状の
杭本体で、この杭本体5の先端5a及び中程5b
の周部にスリツト6a,6b,6cを複数箇所形
成しておく。これらスリツトは軸方向に沿つて形
成するか、軸方向に対して傾斜状に形成するのが
よいが、中程のスリツト6b,6c等は軸方向に
対して略直角状に形成してもよい。
(Example) Reference numeral 5 denotes a hollow pile body made of metal or synthetic resin material, and the tip 5a and the middle 5b of this pile body 5.
A plurality of slits 6a, 6b, and 6c are formed around the periphery. These slits are preferably formed along the axial direction or at an angle with respect to the axial direction, but the middle slits 6b, 6c, etc. may be formed approximately at right angles to the axial direction. .

スリツト6a,6b,6cはそれぞれ杭本体5
の周部に2本以上形成しておくことが望ましい。
スリツトの長さ及び数は後述する膨脹剤の膨脹性
能等に応じて設定する。7は杭先金具で、杭本体
5の先端開口部に嵌めて閉塞する。杭先金具7は
先の尖つた砲弾形の金具であることが望ましい。
なんとなれば、杭本体5を土中に打ち込むとき、
杭本体内に土が入り込まないこと及び打込み易い
ことが重要だからである。
The slits 6a, 6b, and 6c are respectively attached to the pile body 5.
It is desirable to form two or more of them around the circumference.
The length and number of slits are determined depending on the expansion performance of the expansion agent, which will be described later. Reference numeral 7 denotes a pile tip metal fitting, which is fitted into the tip opening of the pile body 5 to close it. It is desirable that the pile tip metal fitting 7 is a bullet-shaped metal fitting with a pointed tip.
Why, when driving the pile body 5 into the soil,
This is because it is important that soil does not enter the pile body and that it is easy to drive.

杭先金具7の後面7aには杭本体5の先端開口
部に嵌入する小軸体7bが突設されている。従つ
て、杭本体5の先端に杭先金具7を取付けるに
は、該小軸体7bを杭本体5の先端開口部内に嵌
入すればよい。このような構成から、杭本体5の
先端は杭先金具7の後面7aで受け止められるこ
とになる。なお、杭先金具7と杭本体5の外径は
同じに形成している。
A small shaft body 7b that fits into the opening at the tip of the pile body 5 projects from the rear surface 7a of the pile tip metal fitting 7. Therefore, in order to attach the pile tip fitting 7 to the tip of the pile body 5, it is sufficient to fit the small shaft body 7b into the tip opening of the pile body 5. With this configuration, the tip of the pile main body 5 is received by the rear surface 7a of the pile tip fitting 7. In addition, the outer diameters of the pile tip fitting 7 and the pile body 5 are formed to be the same.

このように杭本体5及び杭先金具7を形成し、
杭本体5の先端開口部に杭先金具7を嵌めた後、
この杭本体5を土中に打設する。
In this way, the pile body 5 and the pile tip fitting 7 are formed,
After fitting the pile tip fitting 7 into the tip opening of the pile body 5,
This pile body 5 is driven into the soil.

杭本体5を目的の深さの土中に入れた後、杭内
部に膨脹剤8を注入する。膨脹剤8とは、水を練
りまぜて目的の孔や筒内に充填しておけば、硬
化、膨脹して計画的に目的物に亀裂膨脹を生じさ
せるもので、例えば小野田セメント株式会社の商
品名ブライスター等である。
After the pile body 5 is placed in the soil at a desired depth, an expansion agent 8 is injected into the inside of the pile. Expanding agent 8 is an agent that, when mixed with water and filled into a target hole or cylinder, hardens and expands to cause planned cracking and expansion in the target object.For example, a product manufactured by Onoda Cement Co., Ltd. The name is Bleister etc.

このように杭内部に膨脹剤8を注入した後、約
15〜24時間経過すると、第6図に示すように、杭
本体5の先端及び中程に設けたスリツト部分が膨
脹剤の硬化、膨脹によつて拡大されるのである。
膨脹剤8は杭内にて2〜3倍に膨脹する。杭先及
び中程が複数箇所節状に膨脹拡大するため、引抜
き抵抗が大となると共に先端支持力も増大する。
杭を拡大させるためにスリツト6a…を形成して
いる部分以外には膨脹剤でなくて、コンクリート
等を充填してもよい。つまり、膨脹剤が高価であ
るため、膨脹拡大させようとする部分以外の所に
は安価なコンクリート等を充填するとよい。ま
た、膨脹剤とコンクリートとをミツクスして杭内
に注入することも考えられる。
After injecting the swelling agent 8 into the inside of the pile in this way, approximately
After 15 to 24 hours have elapsed, as shown in FIG. 6, the slit portions provided at the tip and middle of the pile body 5 are enlarged by the hardening and expansion of the expanding agent.
The expansion agent 8 expands 2 to 3 times within the pile. Since the tip and middle part of the pile expands and expands in a knot-like manner at multiple locations, the pull-out resistance becomes large and the supporting force at the tip also increases.
In order to expand the pile, the parts other than those forming the slits 6a may be filled with concrete or the like instead of the expanding agent. In other words, since the expansion agent is expensive, it is preferable to fill the area other than the area to be expanded with inexpensive concrete or the like. It is also conceivable to mix the expanding agent and concrete and inject it into the pile.

膨脹剤は杭本体の内部で時間を経てある程度固
化するとともに膨脹する。従つて、各スリツトの
部分から外部へ流出する量は少なく、膨脹剤が団
塊となつて各スリツトの部分で杭本体の径を拡大
することになる。
The expansion agent solidifies to some extent and expands inside the pile body over time. Therefore, the amount of the expanding agent flowing out from each slit is small, and the expanding agent forms a lump and expands the diameter of the pile body at each slit.

(発明の効果) 上記の如くなる本発明工法は、次の各効果を奏
する。
(Effects of the Invention) The construction method of the present invention as described above has the following effects.

(1) 従来の摩擦杭では打込み易さを考えて先端部
を尖らせていたため支持杭としての安定性に欠
けるところがあつたが、本発明工法によつて生
じた杭は、杭本体の先端部も拡大して支持杭と
しての安定性が極めて大である。加えて摩擦杭
としての特性も有する杭となる。
(1) Conventional friction piles lacked stability as support piles because their tips were sharpened for ease of driving, but the piles produced using the method of the present invention The stability of the support pile is extremely high due to its expansion. In addition, the pile also has characteristics as a friction pile.

(2) 従来の摩擦杭は杭本体の中程の数箇所に節が
あるため打込みに強大な力を必要とし強力な打
設機械を必要としていたが、本発明工法による
と、直管を打込むため、打込みがスムーズで小
さい力で迅速に作業を行なうことができる。
(2) Conventional friction piles have knots in several places in the middle of the pile body, so driving requires a huge force and a powerful driving machine, but with the method of the present invention, it is possible to drive straight pipes. Because of this, driving is smooth and the work can be done quickly with little force.

(3) 中空状杭本体の先端開口部に先の尖つた砲弾
形の杭先金具を嵌めているため、杭本体の土中
への打設作業を迅速に行うことができるととも
に、杭本体の製造が容易である。また杭先金具
の後面に突設した小軸部が杭本体内部へ嵌入さ
れ、しかも後面で杭本体の先端を受けるように
成されているから、土中への打設に際しても杭
本体が土の抵抗によつて破壊されるということ
はない。
(3) Since a pointed bullet-shaped pile tip fitting is fitted into the opening at the end of the hollow pile body, it is possible to quickly drive the pile body into the soil, and the pile body Easy to manufacture. In addition, the small shaft protruding from the rear of the pile tip fitting is inserted into the pile body, and the rear face receives the tip of the pile body, so even when driving into the soil, the pile body does not touch the soil. It cannot be destroyed by resistance.

(4) 打込みによつて杭本体を土中の目的の深さま
で入れた後に、膨脹剤にて所定の位置を拡大さ
せるため、杭本体と土とが緊密になじみ、確実
なる支持と摩擦とが得られる。
(4) After the pile body is driven into the soil to the desired depth, the specified position is expanded using an expanding agent, which allows the pile body to fit closely with the soil, providing reliable support and friction. can get.

(5) でき上がつたコンクリート杭を運搬したり打
設したりする場合、その重量によつて大きな運
搬装置や打設設備が必要であつたが、本発明工
法によつて金属或いは樹脂材製の中空パイプを
杭本体として用いるため、軽く運搬や打設作業
がやり易く、作業性がよい。
(5) When transporting and placing completed concrete piles, large transport equipment and driving equipment were required due to their weight, but with the construction method of the present invention, concrete piles made of metal or resin can be Since a hollow pipe is used as the main body of the pile, it is light and easy to carry and drive, and has good workability.

(6) 杭製作のための型枠等は不要で、現場施工の
ため安価に製造することができる。
(6) There is no need for formwork, etc. to manufacture the piles, and they can be manufactured at low cost because they can be constructed on-site.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図A,B,Cは従来の摩擦杭固定工法を示
す説明図、第2図は本発明工法に用いる杭本体の
正面図、第3図は同底面図、第4図は杭先金具の
斜視図、第5図Aは杭本体の先端に杭先金具を嵌
めて土中に打込もうとしている図、同図Bは土中
の目的の深さに打込んだ杭本体に膨脹剤を入れる
図、第6図は膨脹剤によつて杭本体の数箇所が拡
大した図である。 5……杭本体、5a……杭本体先端、5b……
杭本体中程、6a,6b,6c……スリツト、7
……杭先金具、8……膨脹剤。
Figures 1A, B, and C are explanatory diagrams showing the conventional friction pile fixing method, Figure 2 is a front view of the pile body used in the method of the present invention, Figure 3 is a bottom view of the same, and Figure 4 is the pile tip metal fitting. Figure 5A is a perspective view of the pile body with the pile tip fitting attached to the tip of the pile body and is about to be driven into the soil, and Figure B is a diagram showing the pile body being driven into the soil at the desired depth with an expansion agent applied. Figure 6 shows several parts of the pile body enlarged by the expansion agent. 5...Pile body, 5a...Pile body tip, 5b...
Pile main body middle, 6a, 6b, 6c... slit, 7
... Pile tip metal fitting, 8... Expansion agent.

Claims (1)

【特許請求の範囲】[Claims] 1 杭は先端及び中程の周部数箇所に複数個のス
リツトを形成してなる中空状杭本体と該中空状杭
本体の先端開口部を閉塞する杭先金具とからな
り、杭本体の先端開口部を杭先金具で閉塞した
後、この杭先金具の方から杭本体を土中の目的の
深さまで打設し、しかる後、杭本体内に膨脹剤を
入れ、時間の経過によつて、杭先及び杭本体の中
程に形成した前記スリツト部分を複数箇所拡大さ
せることを特徴とする杭固定工法。
1. A pile consists of a hollow pile body with a plurality of slits formed at several points around the tip and middle, and a pile tip fitting that closes the tip opening of the hollow pile body. After blocking the section with a pile tip metal fitting, the pile body is driven into the soil from the pile tip metal fitting to the desired depth, and after that, an expansion agent is put into the pile body, and over time, A pile fixing method characterized in that the slit portion formed at the tip of the pile and in the middle of the pile body is enlarged at multiple locations.
JP17485880A 1980-12-10 1980-12-10 Fixing work for pile Granted JPS57100219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17485880A JPS57100219A (en) 1980-12-10 1980-12-10 Fixing work for pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17485880A JPS57100219A (en) 1980-12-10 1980-12-10 Fixing work for pile

Publications (2)

Publication Number Publication Date
JPS57100219A JPS57100219A (en) 1982-06-22
JPS6160926B2 true JPS6160926B2 (en) 1986-12-23

Family

ID=15985879

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17485880A Granted JPS57100219A (en) 1980-12-10 1980-12-10 Fixing work for pile

Country Status (1)

Country Link
JP (1) JPS57100219A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6325803B2 (en) * 2013-12-05 2018-05-16 株式会社技研製作所 Wall reinforcement structure, quay wall reinforcement structure, wall reinforcement method and quay wall reinforcement method
JP5892677B1 (en) * 2015-05-25 2016-03-23 樋口 雅久 Tip for friction pile

Also Published As

Publication number Publication date
JPS57100219A (en) 1982-06-22

Similar Documents

Publication Publication Date Title
JP2002220829A (en) Concrete threaded pile, and manufacturing device and using method thereof
JPS6160926B2 (en)
JP2004011343A (en) Buried steel-pipe pile
JPH0542524B2 (en)
JPS6160927B2 (en)
JPS6160928B2 (en)
JPS6221089B2 (en)
JPH0444517A (en) Reinforcing method of bedrock
JPH02304119A (en) Slope stabilization method
JPH0533558Y2 (en)
JPS6211126B2 (en)
JPS6251332B2 (en)
JPS6262209B2 (en)
JPS5820825A (en) Pile formation work and device therefor
JPH03275806A (en) Method of making knotting pile
JPH038922A (en) Executing method for hollow foundation pile and pile head filling-in stuff
JPS6221088B2 (en)
JPS6221090B2 (en)
JPS587024A (en) anchor rod
JPS6134525B2 (en)
JPS6037249B2 (en) How to build large long foundation piles
JPS6040683Y2 (en) Earth Auger
JPS61204417A (en) Method of forming pile increased in support force at pile tip by bagform substance
JPH02140323A (en) Formation of soil cement synthetic pile
JPS6337207B2 (en)