JPS6228078B2 - - Google Patents
[go: Go Back, main page]

JPS6228078B2 - - Google Patents

Info

Publication number
JPS6228078B2
JPS6228078B2 JP57044274A JP4427482A JPS6228078B2 JP S6228078 B2 JPS6228078 B2 JP S6228078B2 JP 57044274 A JP57044274 A JP 57044274A JP 4427482 A JP4427482 A JP 4427482A JP S6228078 B2 JPS6228078 B2 JP S6228078B2
Authority
JP
Japan
Prior art keywords
mast
pin
crane
connection
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP57044274A
Other languages
Japanese (ja)
Other versions
JPS58162495A (en
Inventor
Norio Furumura
Atsuhiko Kashima
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP4427482A priority Critical patent/JPS58162495A/en
Publication of JPS58162495A publication Critical patent/JPS58162495A/en
Publication of JPS6228078B2 publication Critical patent/JPS6228078B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【発明の詳細な説明】 この発明は、最下部のマストの下がわに継ぎ足
しマストを連結する下がわ継ぎ足し式クライミン
グクレーンにおけるマストの連結方法に関するも
のである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for connecting a mast in a bottom-addition type climbing crane that connects a bottom-additional mast to the bottom of the lowest mast.

つぎに、従来の鉄塔建造用クライミングクレー
ンの一例を第1図ないし第6図により説明する。
Next, an example of a conventional climbing crane for constructing steel towers will be explained with reference to FIGS. 1 to 6.

架台(ベース)5にはクレーンマスト(以下マ
ストという)10の下端部が設置されているとと
もに、左右のベースマスト(昇降装置支持用マス
ト)9が設置されており、ベースマスト9は架台
5、ペースマスト9の上部と鉄塔主柱1との間に
それぞれ張り渡した水平地支線4、斜地支線3に
より支えられている。マスト10の中間部は、鉄
塔の中央部に上下に間隔をおいて支線により支持
させたマストガイド2により支持されている。第
2図に示すように、マスト10には鉄塔の建造に
ともなつて鉄塔に支持させる複数のマストガイド
2が取付けられている。
The lower end of a crane mast (hereinafter referred to as "mast") 10 is installed on the gantry (base) 5, and left and right base masts (masts for supporting lifting equipment) 9 are installed. It is supported by a horizontal ground branch line 4 and a diagonal ground branch line 3 stretched between the upper part of the pace mast 9 and the steel tower main column 1, respectively. The middle portion of the mast 10 is supported by a mast guide 2 supported by branch lines at vertical intervals in the center of the steel tower. As shown in FIG. 2, a plurality of mast guides 2 are attached to the mast 10 to be supported by the steel tower as the tower is constructed.

左右のベースマスト9に対して昇降させる昇降
フレーム6には、架台5上に設置したクライミン
グウインチ7からくり出させたクライミングロー
プ8が連結されている。第6図に示すように、ク
ライミングロープ8の途中は、ベースマスト9の
上部のフレームに設置したシーブ群24Aおよび
昇降フレーム6に取付けたシーブ群24Bに掛け
わたされており、端末部はベースマスト9の上部
のフレームに固定されている。
A climbing rope 8 extended from a climbing winch 7 installed on a pedestal 5 is connected to a lifting frame 6 that is raised and lowered relative to the left and right base masts 9. As shown in FIG. 6, the middle of the climbing rope 8 is wrapped around a sheave group 24A installed on the upper frame of the base mast 9 and a sheave group 24B installed on the lifting frame 6, and the end part is connected to the base mast 9. It is fixed to the upper frame of 9.

第2図に示すように、マスト10の上部には下
フレーム11、中フレーム12、上フレーム13
が設けられており、上フレーム13には巻上ウイ
ンチ14および俯仰ウインチ15が設置されてお
り、Aフレーム16が固定されているとともに、
ジブ17が起伏できるように取付けられている。
巻上ウインチ14からくり出させた巻上ロープ1
9はジブ17の先端のシーブから垂下させられ、
その末端にはフツク18が取付けられている。俯
仰ウインチ15からくり出させた俯仰ロープ20
はジブ17の先端部に連結されている。
As shown in FIG. 2, the upper part of the mast 10 includes a lower frame 11, a middle frame 12, and an upper frame 13.
A hoisting winch 14 and an elevating winch 15 are installed on the upper frame 13, and an A frame 16 is fixed.
The jib 17 is attached so that it can be raised and lowered.
Hoisting rope 1 let out from hoisting winch 14
9 is suspended from the sheave at the tip of the jib 17,
A hook 18 is attached to its end. Elevation rope 20 extended from elevation winch 15
is connected to the tip of the jib 17.

鉄塔の建造の進行にともない下記のようにして
クレーンのクライミングを行う。まず、ジブ17
を直立状態に起し、クライミング姿勢にする。つ
いで、昇降フレーム6とマスト10とをかんぬき
ピン22(第4図参照)でたがいに結合させ、ク
ライミングウインチ7を巻上げ方向に作動させて
マスト10を第3図に示すように上昇させる。そ
の後、あらかじめキヤリヤ(台車)21上に設置
した継ぎ足しマスト10Aを、上昇させたマスト
10の直下に移動して定置させる。そして、クラ
イミングウインチ7を巻下げ方向に回転して昇降
フレーム6を下降させ、継ぎ足しマスト10Aの
上端部をマスト10の下端部に連結ピン23で連
結する。すなわち、マスト10の下端部の角穴1
0aに継ぎ足しマスト10Aの上端の嵌合突出部
を嵌合させ、両嵌合部を連結ピン23で連結す
る。この状態で、昇降フレーム6を僅か上昇さ
せ、キヤリヤ21を継ぎ足しマスト10Aの下端
からはずして元の位置に戻す。そして、かんぬき
ピン22をはずし、昇降フレーム6を降下させ、
これを架台5上に設置する。これでクライミング
作業が完了する。
As the construction of the steel tower progresses, the crane will be climbed in the following manner. First, jib 17
Raise the person to an upright position and assume a climbing position. Next, the lifting frame 6 and the mast 10 are connected to each other by a bolt pin 22 (see FIG. 4), and the climbing winch 7 is operated in the hoisting direction to raise the mast 10 as shown in FIG. 3. Thereafter, the supplementary mast 10A, which has been previously installed on the carrier (truck) 21, is moved and placed directly below the raised mast 10. Then, the climbing winch 7 is rotated in the lowering direction to lower the elevating frame 6, and the upper end of the replenishing mast 10A is connected to the lower end of the mast 10 by the connecting pin 23. That is, the square hole 1 at the lower end of the mast 10
A fitting protrusion at the upper end of the additional mast 10A is fitted into the fitting part 0a, and both fitting parts are connected by a connecting pin 23. In this state, the elevating frame 6 is slightly raised, the carrier 21 is added and removed from the lower end of the mast 10A, and returned to its original position. Then, remove the bolt pin 22, lower the elevating frame 6,
This is installed on the pedestal 5. The climbing work is now complete.

さて、一般的に50t.m程度のクライミングクレ
ーンにおけるマスト単体は、重量が1t〜1.5t位あ
り、これをキヤリヤに乗せて連結位置まで押し込
むことはかなりの重労働となり、その作業には
2、3人の人力を要する。また、高所でマストの
連結ピンの着脱を行わなければならない。かつ、
マストの重量に耐えるキヤリヤを装備しなければ
ならず、原価および運搬経費が高くなる。ちなみ
に、鉄塔建造用のクライミングクレーンは山岳地
での稼動が多く、その部材の運送は主として索道
あるいはヘリコプターによるため、工事総経費に
対して占める運搬経費の割合いが大きい。さら
に、継ぎ足し用マストをキヤリヤに乗せる際、マ
ストをいつたん立てた状態にし、その上部に玉掛
けをする必要がある。したがつて、作業能率およ
び安全性が良くない。
Generally speaking, a single mast for a climbing crane of about 50 t.m weighs about 1 t to 1.5 t, and putting it on a carrier and pushing it to the connecting position is quite hard work. Requires human labor. In addition, the mast connecting pin must be attached and detached at a high place. and,
A carrier must be equipped to withstand the weight of the mast, which increases cost and transportation costs. Incidentally, climbing cranes for constructing steel towers are often operated in mountainous areas, and their parts are mainly transported by cableway or helicopter, so transportation costs account for a large proportion of the total construction cost. Furthermore, when placing the supplementary mast on the carrier, it is necessary to set the mast in an upright position and sling the top of the mast. Therefore, work efficiency and safety are poor.

この発明は、継ぎ足しマストの連結を容易、か
つ、安全に行うことができる方法を提供すること
を目的とするものである。
An object of the present invention is to provide a method for easily and safely connecting additional masts.

以下、この発明の一実施態様を第7図ないし第
12図により説明する。それらの図において、第
1図ないし第6図と同じ符号をつけたものは、同
じもの、もしくは相当するものを表わす。
Hereinafter, one embodiment of the present invention will be explained with reference to FIGS. 7 to 12. In these figures, the same reference numerals as in FIGS. 1 to 6 represent the same or equivalent items.

第10図に示すように、継ぎ足しマスト10A
の上端部には、ピン穴25aを設けたリンク状の
連結用挿入突出部25が2本の固定ピン26によ
り取付けられており、マスト10の下端部には、
連結用挿入突出部25を挿入させる半割れ挿入用
穴部(角穴部)27が形成されており、半割れ溝
27aを設けてない側壁部にはピン穴25aを合
致させるピン穴27bが設けられている。半割れ
溝27aは連結用突出部25を直下からも側方か
らも挿入できるようになつている。
As shown in Fig. 10, the addition mast 10A
A link-shaped connecting insertion protrusion 25 with a pin hole 25a is attached to the upper end of the mast 10 by two fixing pins 26, and the lower end of the mast 10 has a
A half-split insertion hole (square hole) 27 is formed into which the coupling insertion protrusion 25 is inserted, and a pin hole 27b that matches the pin hole 25a is provided in the side wall portion where the half-split groove 27a is not provided. It is being The connecting protrusion 25 can be inserted into the half-split groove 27a both from directly below and from the side.

継ぎ足しマスト10Aの継ぎ足しは下記のよう
にして行う。
The addition of the addition mast 10A is performed as follows.

(a) 継ぎ足し用マスト10Aをクライミングクレ
ーンのフツク18、もしくは他のクレーンのフ
ツクで吊り込み、連結用挿入突出部25をマス
ト10がわに位置させて架台5上に横倒しに設
置する。
(a) Suspend the supplementary mast 10A with the hook 18 of the climbing crane or the hook of another crane, position the connecting insertion protrusion 25 beside the mast 10, and install it horizontally on the pedestal 5.

(b) 連結作業を行うためあらかじめ上昇させてお
いたマスト10を昇降フレーム6を介して下降
させ、上がわに位置する連結用挿入突出部25
を、マスト10の半割れ溝27aに差し込み、
連結用ピン28をピン穴27b,25aに差し
込んで両部をたがいに連結する(第8図参
照)。
(b) The mast 10, which has been raised in advance for connection work, is lowered via the lifting frame 6, and the connection insertion protrusion 25 is located on the upper side.
into the half-split groove 27a of the mast 10,
Connecting pins 28 are inserted into pin holes 27b and 25a to connect both parts to each other (see FIG. 8).

(c) 昇降フレーム6を引き上げることにより、継
ぎ足しマスト10Aをほぼ垂直状態になるまで
上昇させた後、人力により僅かに押し、マスト
10と継ぎ足しマスト10Aとを連結する。
(c) After raising the replenishment mast 10A to a nearly vertical state by pulling up the elevating frame 6, the mast 10 and the replenishment mast 10A are connected by pushing slightly with human power.

(d) 連結用ピン28を挿入していない他のピン穴
27b,25aに連結用ピン28を差し込んで
両部をたがいに連結する。連結用ピン28に設
けてあるピン穴28aにそれぞれ割りピン29
を差し込んで、各連結用ピン28の抜け出しを
防ぐ。第11図、第12図は継ぎ足しマスト1
0Aがマスト10に完全に連結用ピン28で連
結された状態を示す。
(d) Connecting pins 28 are inserted into the other pin holes 27b and 25a in which the connecting pins 28 are not inserted, and the two parts are connected to each other. Insert a split pin 29 into each pin hole 28a provided in the connecting pin 28.
to prevent each connecting pin 28 from coming off. Figures 11 and 12 show additional mast 1
0A is shown completely connected to the mast 10 by the connecting pin 28.

以上がマストの連結動作の順序であるが、クレ
ーンを解体する場合にマストを引きぬいていく動
作は逆に行えばよい。
The above is the order of mast connection operations, but when dismantling the crane, the operation of pulling out the mast can be performed in the reverse order.

以上説明したこの発明によれば下記の効果が得
られる。
According to the invention described above, the following effects can be obtained.

(1) キヤリヤに乗せたまま継ぎ足しマストを連結
位置まで押し込む作業が不要となるので、労力
をはぶくことができる。かつ、キヤリヤが不要
なので、製造原価、運搬経費を低減できる。
(1) Labor can be saved because there is no need to push the additional mast to the connecting position while it is on the carrier. Moreover, since a carrier is not required, manufacturing costs and transportation costs can be reduced.

(2) 高所での連結用ピンの着脱作業は、従来の方
法にくらべて半分ですみ、作業能率が向上する
とともに安全性が良くなる。
(2) The work of attaching and detaching connecting pins at high places can be done in half the time compared to conventional methods, improving work efficiency and safety.

(3) 継ぎ足しマストに対する玉掛け作業は、継ぎ
足しマストを横倒しにした状態で行えるので、
作業能率を向上し、安全性を高めることができ
る。
(3) Slinging work on the additional mast can be carried out with the additional mast lying on its side.
It can improve work efficiency and safety.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の鉄塔建造用クライミングクレー
ンで組立てられた鉄塔を示す正面図、第2図はク
ライミングクレーンを示す正面図、第3図は第2
図における昇降装置部分を示す拡大正面図、第4
図は第3図の側面図、第5図は従来のマストの下
端部と継ぎ足しマストの上端部との連結部を示す
斜視図、第6図は第2図における昇降装置のロー
プの掛け方を示す説明用斜視図、第7図はこの発
明による継ぎ足しマストを横倒しにしてマストの
一側の連結部に連結用ピンで連結した状態を示す
正面図、第8図は第7図の−線から見た側面
図、第9図は第8図の状態から継ぎ足しマストを
昇降フレームを介して斜め上に引き上げた状態を
示す側面図、第10図はこの発明によるマストの
下端部と継ぎ足しマストの上端部との連結部、そ
の連結部を連結する連結用ピン、連結用ピンに取
付ける割りピンを示す斜視図、第11図はこの発
明の方法によりマストに対する継ぎ足しマストの
連結を完了した状態を示す正面図、第12図は第
11図のXII−XII線から見た側面図である。 1……鉄塔主柱、3……斜地支線、4……水平
地支線、5……架台、6……昇降フレーム、7…
…クライミングウインチ、8……クライミングロ
ープ、9……ベースマスト、10……クレーンマ
スト、10A……継ぎ足しマスト、14……巻上
ウインチ、15……俯仰ウインチ、16……Aフ
レーム、17……ジブ、19……巻上ロープ、2
0……俯仰ロープ、21……キヤリヤ、24A,
24B……シーブ群、25……連結用挿入突出
部、25a……ピン穴、26……固定ピン、27
……半割れ挿入用穴部、27a……半割れ溝、2
7b……ピン穴、28……連結用ピン、29……
割りピン。
Figure 1 is a front view showing a steel tower assembled with a conventional climbing crane for building steel towers, Figure 2 is a front view showing a climbing crane, and Figure 3 is a
Enlarged front view showing the lifting device part in the figure, No. 4
The figure is a side view of Figure 3, Figure 5 is a perspective view showing the connection between the lower end of the conventional mast and the upper end of the additional mast, and Figure 6 shows how to hang the rope of the lifting device in Figure 2. Fig. 7 is a front view showing a state in which the replenishing mast according to the present invention is laid down sideways and connected to the connecting part on one side of the mast with a connecting pin, and Fig. 8 is a view taken from the - line in Fig. 7. 9 is a side view showing the state in which the additional mast is lifted diagonally upward from the state shown in FIG. 8 through the lifting frame. FIG. 10 is a side view showing the lower end of the mast according to the present invention and the upper end of the additional mast according to the present invention. FIG. 11 is a perspective view showing a connecting portion with a connecting portion, a connecting pin that connects the connecting portion, and a cotter pin attached to the connecting pin; FIG. 12 is a side view taken along line XII-XII in FIG. 11. 1... Steel tower main column, 3... Diagonal ground branch line, 4... Horizontal ground branch line, 5... Frame, 6... Lifting frame, 7...
... Climbing winch, 8 ... Climbing rope, 9 ... Base mast, 10 ... Crane mast, 10A ... Additional mast, 14 ... Hoisting winch, 15 ... Elevation winch, 16 ... A frame, 17 ... Jib, 19...Hoisting rope, 2
0...Elevation rope, 21...Carrier, 24A,
24B... Sheave group, 25... Connection insertion protrusion, 25a... Pin hole, 26... Fixing pin, 27
...Half-crack insertion hole, 27a...Half-crack groove, 2
7b...Pin hole, 28...Connecting pin, 29...
Split pin.

Claims (1)

【特許請求の範囲】 1 下記の(a)〜(d)の各工程を含む下がわ継ぎ足し
式クライミングクレーンにおけるマストの連結方
法。 (a) 連結がわ端部に連結用挿入突出部を設けた継
ぎ足しマストをクレーンにより吊りこみ、連結
用挿入突出部をクレーンマストがわに位置させ
て架台上に横倒しに設置する工程、 (b) 継ぎ足しマストの連結用挿入突出部を挿入さ
せる半割れ挿入用穴部を下端部に形成するとと
もに、半割れ挿入用穴部の半割れ溝を設けてな
い壁部に連結用ピン穴を設けたマストを昇降フ
レームを介して下降させ、上がわに位置する連
結用挿入突出部を半割れ溝を通して挿入用穴部
に差しこみ、両部を連結用ピンでたがいに連結
する工程、 (c) 昇降フレームを上昇させることにより、マス
トとともに継ぎ足しマストをほぼ垂直状態にな
るまで引き上げる工程、 (d) 未挿入の連結用挿入突出部を相対向する挿入
用穴部にそれぞれ挿入し、両部をピンでたがい
に連結する工程、
[Scope of Claims] 1. A method for connecting a mast in a bottom-jointed climbing crane, which includes the following steps (a) to (d). (a) The process of hoisting a supplementary mast with a connection insertion protrusion at the end of the connection side using a crane, positioning the connection insertion protrusion on the side of the crane mast, and installing it horizontally on a pedestal; (b) ) A half-break insertion hole into which the connection insertion protrusion of the supplementary mast is inserted is formed at the lower end, and a connection pin hole is provided in the wall where the half-break groove of the half-break insertion hole is not provided. (c) lowering the mast via the lifting frame, inserting the connecting insertion protrusion located on the upper side into the insertion hole through the half-split groove, and connecting both parts to each other with the connecting pin; (d) Insert the uninserted coupling insertion protrusions into the opposing insertion holes, and pin both parts together. The process of connecting each other,
JP4427482A 1982-03-19 1982-03-19 Method of connecting mast in lower extending type climbing crane Granted JPS58162495A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4427482A JPS58162495A (en) 1982-03-19 1982-03-19 Method of connecting mast in lower extending type climbing crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4427482A JPS58162495A (en) 1982-03-19 1982-03-19 Method of connecting mast in lower extending type climbing crane

Publications (2)

Publication Number Publication Date
JPS58162495A JPS58162495A (en) 1983-09-27
JPS6228078B2 true JPS6228078B2 (en) 1987-06-18

Family

ID=12686925

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4427482A Granted JPS58162495A (en) 1982-03-19 1982-03-19 Method of connecting mast in lower extending type climbing crane

Country Status (1)

Country Link
JP (1) JPS58162495A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5535719B2 (en) * 2010-03-26 2014-07-02 関西電力株式会社 Simple assembly type derrick
KR102039853B1 (en) * 2019-01-24 2019-11-26 한윤주 Moisture removal device for packaged food

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2230996C2 (en) * 1972-06-24 1974-10-03 Liebherr, Hans, Dr.-Ing. E.H., 7950 Biberach Tower crane

Also Published As

Publication number Publication date
JPS58162495A (en) 1983-09-27

Similar Documents

Publication Publication Date Title
JPH07100582B2 (en) Elevator work platform and elevator installation method
CN102359303A (en) Extra-high voltage common circuit iron tower assembling method
CN216587766U (en) Hoisting facility and hoisting structure of large-span overhanging steel structural member
CN112942661B (en) Construction method of stay cable with flexible cable net boundary
CN102535939A (en) Inversely assembling process for standing stay wire V-type tower
CN110745683A (en) Hoisting device and method for reinforcement cage of underground continuous wall
CN210460016U (en) Integrated form single power lift material platform
CN216339064U (en) Fence mounting platform for bridge pier crane
JPS6228078B2 (en)
CN214379737U (en) Distribution lines steps on pole operation auxiliary platform
CN220926130U (en) Full-automatic tower column building device
JP3822084B2 (en) Construction lifting system for high-rise buildings
JPH09177070A (en) Method and apparatus for constructing rebar cage for deep foundation
JPH10205429A (en) Construction method of wind power generator
JP2006077456A (en) Tower-like building erection method and erection device
JPS6038626Y2 (en) Climbing crane mast connection guide
JPH028106B2 (en)
JPH08120936A (en) Construction method of high-rise building structure and its construction equipment
CN113753716A (en) Method for installing guide rail of elevator arraying crane with machine room
JPS5846993B2 (en) Method of constructing a steel tower using a lifting crane
JP7174806B1 (en) Wind turbine dismantling method, wind turbine assembly method, and wind turbine construction stand
JP7586877B2 (en) Method for dismantling and assembling a wind turbine
CN217581111U (en) Base rigging platform for jacket of booster station
CN110386546A (en) A kind of hanging method for the installation of more steel structure wall purlins
JP2944998B1 (en) Scaffolding equipment for building tower structures