Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6236097B2 - - Google Patents
[go: Go Back, main page]

JPS6236097B2 - - Google Patents

Info

Publication number
JPS6236097B2
JPS6236097B2 JP55091666A JP9166680A JPS6236097B2 JP S6236097 B2 JPS6236097 B2 JP S6236097B2 JP 55091666 A JP55091666 A JP 55091666A JP 9166680 A JP9166680 A JP 9166680A JP S6236097 B2 JPS6236097 B2 JP S6236097B2
Authority
JP
Japan
Prior art keywords
concrete
wall
precast
gap
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP55091666A
Other languages
Japanese (ja)
Other versions
JPS5719452A (en
Inventor
Yoshisada Munemura
Kyoshi Tanaka
Satoshi Kobayakawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP9166680A priority Critical patent/JPS5719452A/en
Publication of JPS5719452A publication Critical patent/JPS5719452A/en
Publication of JPS6236097B2 publication Critical patent/JPS6236097B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

【発明の詳細な説明】 本発明はプレキヤスト鉄筋コンクリート骨組に
おける現場打ちコンクリート壁の施工方法に係る
ものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a cast-in-place concrete wall in a precast reinforced concrete frame.

プレキヤスト鉄筋コンクリート骨組において
は、耐震要素としての現場打ちコンクリートを如
何に打設して前記骨組に組込むかは重要な問題で
ある。
In a precast reinforced concrete frame, an important issue is how to place cast-in-place concrete as an earthquake-resistant element and incorporate it into the frame.

従来、プレキヤスト鉄筋コンクリート骨組に現
場打ちコンクリート壁を打設する方法としては、
第1図に示すようにプレキヤストコンクリート梁
aの下部に組立てられた、上部に空気抜孔bを有
する壁型枠cの下部に設けた圧入孔dよりコンク
リートeを圧入するか、第2図に示すようにプレ
キヤストコンクリート梁aの下部に組立てられた
壁型枠cに、その上方に設けた漏斗部fよりコン
クリートeを打設する方法があるが、前者は作業
が煩雑であり、後者はハンチ部が残り、また両者
共、コンクリートの充填度に信頼性を欠く憾みが
ある。
Conventionally, the method of placing cast-in-place concrete walls on precast reinforced concrete frames is as follows:
As shown in Fig. 1, concrete e is press-fitted through a press-fit hole d provided at the bottom of a wall formwork c, which is assembled at the bottom of a precast concrete beam a and has an air vent b at the top, or as shown in Fig. 2. As shown in the figure, there is a method of pouring concrete e into a wall formwork c assembled at the bottom of a precast concrete beam a through a funnel part f provided above, but the former method is complicated, and the latter method is complicated. A corrugated portion remains, and the degree of filling of concrete in both cases is unreliable.

このため、底部片に透孔を有する溝型断面のプ
レキヤストコンクリート梁用枠部材を所定位置に
架設し、同枠部材内に梁鉄筋を配筋したのち、前
記枠部材の底部片の透孔より同枠部材下部の壁コ
ンクリートを打設し、壁コンクリートの打設作業
を確実に行なう施工法が特公昭50−14444号公報
において提案されている。
For this purpose, a frame member for a precast concrete beam with a channel-shaped cross section having a through hole in the bottom piece is erected at a predetermined position, beam reinforcing bars are arranged in the frame member, and then a through hole in the bottom piece of the frame member is installed. A construction method has been proposed in Japanese Patent Publication No. 14444/1983 in which wall concrete is placed at the lower part of the frame member, and the work of placing wall concrete is carried out reliably.

しかしながら前記従来の工法においては、同工
法において使用されるプレキヤストコンクリート
梁用枠部材は実質的には梁型枠と同一であつて、
煩雑な梁鉄筋の配筋作業が必要となり、施工能率
が低減する。
However, in the conventional construction method, the precast concrete beam frame member used in the construction method is substantially the same as the beam formwork,
Complicated beam reinforcement work is required, reducing construction efficiency.

本発明はこのような問題点を解決するために提
案されたもので、幅方向中央部に、成方向に貫通
するコンクリート打設用空隙を有し、且つ梁筋が
内蔵されたプレキヤストコンクリート梁を所定位
置に架設したのち、前記空隙を介して前記プレキ
ヤストコンクリート梁の下部に位置する壁部のコ
ンクリートを打設することを特徴とするプレキヤ
スト鉄筋コンクリート骨組における現場打ちコン
クリート壁の施工方法に係るものである。
The present invention was proposed in order to solve these problems, and it provides a precast concrete beam that has a concrete casting gap that penetrates in the direction of growth in the center of the width direction, and has built-in beam reinforcement. A method for constructing a cast-in-place concrete wall in a precast reinforced concrete frame, characterized in that after the precast concrete beam is erected at a predetermined position, concrete for a wall portion located below the precast concrete beam is poured through the gap. It is.

本発明においては前記したように、幅方向中央
部に、成方向に貫通するコンクリート打設用空隙
を有し、且つ梁筋が内蔵されたプレキヤストコン
クリート梁を使用し、同梁を所定位置に架設した
のち、同梁に設けられた前記空隙よりコンクリー
トを打設することによつて、同梁の下部に配設さ
れた壁型枠内に簡単にコンクリートを打設しうる
ものであり、前記梁に設けられた成方向に貫通す
る空隙より垂直にコンクリートを打設することに
より、梁直下に配設された壁型枠にはコンクリー
トが密実に填装され、信頼度の高い現場打ちコン
クリート壁が施工されるものである。
As described above, in the present invention, a precast concrete beam is used which has a concrete casting gap penetrating in the growth direction in the widthwise center part and has built-in beam reinforcement, and the beam is placed in a predetermined position. After the beam is erected, by pouring concrete through the gap provided in the beam, concrete can be easily poured into the wall formwork provided at the bottom of the beam, and as described above. By pouring concrete vertically through the gaps in the beams that penetrate in the growth direction, the wall formwork placed directly under the beams is densely filled with concrete, creating highly reliable cast-in-place concrete walls. will be constructed.

しかも同壁コンクリートの上部は前記プレキヤ
ストコンクリート梁のコンクリート打設用空隙内
にも填装され、前記梁、壁の両者が一体に結合さ
れるものであり、また壁コンクリート打設時に、
梁上部と床スラブとの接合も同時に処理される。
Moreover, the upper part of the wall concrete is also filled into the concrete casting cavity of the precast concrete beam, so that both the beam and the wall are joined together, and when the wall concrete is poured,
The connection between the upper part of the beam and the floor slab is also processed at the same time.

更にまた前記プレキヤストコンクリート梁には
梁筋が内蔵されているので、前記従来の工法にお
けるように梁筋を配筋する必要がなくなり、施工
が簡略化され、工期が短縮される。
Furthermore, since the precast concrete beam has built-in beam reinforcement, there is no need to arrange beam reinforcement as in the conventional construction method, which simplifies the construction and shortens the construction period.

以下本発明を図示の実施例について説明する。 The present invention will be described below with reference to the illustrated embodiments.

第5図は本発明の方法に使用されるプレキヤス
トコンクリート梁Aの一実施例を示し、同梁Aの
幅方向中央部には成方向に貫通するコンクリート
打設用空隙1が設けられ、同空隙1の対向面は下
方に至るに伴つて幅の漸減するテーパ面に形成さ
れている。また梁Aの上部には所定間隔毎に前記
空隙1を挟む対向面間を連結する連結部片2が配
設され、同連結部片2の上面にはコツタ3が設け
られている。
Fig. 5 shows an embodiment of a precast concrete beam A used in the method of the present invention, in which a concrete pouring gap 1 is provided in the center of the width direction of the beam A, penetrating in the direction of formation. The opposing surface of the gap 1 is formed into a tapered surface whose width gradually decreases as it goes downward. Further, on the upper part of the beam A, connecting pieces 2 are arranged at predetermined intervals to connect the opposing surfaces with the gap 1 interposed therebetween, and on the upper surface of the connecting piece 2, a cotter 3 is provided.

更に下端主筋4、及び肋筋5の大部分がプレキ
ヤストコンクリート梁Aに内蔵され、肋筋5の梁
上面突出部間に亘つて上端主筋6が連結されてい
る。
Furthermore, the lower end main reinforcement 4 and most of the cost reinforcements 5 are built into the precast concrete beam A, and the upper end main reinforcement 6 is connected between the projecting parts of the top surface of the beam of the cost reinforcement 5.

而して前記梁Aを相隣るプレキヤストコンクリ
ート柱B間に横架し、同梁Aの直下に組立てられ
た壁型枠C内に、前記梁Aの空隙1よりコンクリ
ートDを打設し、前記梁A及び柱Bと一体化され
た現場打ちコンクリート壁Eを施工する。
Then, the beam A was suspended horizontally between adjacent precast concrete columns B, and concrete D was poured into the wall form C assembled directly under the beam A through the gap 1 of the beam A. , a cast-in-place concrete wall E integrated with the beam A and column B is constructed.

図中7は壁筋、8は柱主筋である。 In the figure, 7 is a wall reinforcement, and 8 is a column main reinforcement.

なお同時に前記梁A間に橋架されたプレキヤス
トコンクリート床版Fと梁Aの頂面との間にもコ
ンクリートD′を打設して、前記床版F及び梁A
を同時に接合するものである。
At the same time, concrete D' is also poured between the precast concrete deck slab F, which is bridged between the beams A, and the top surface of the beam A.
This is to join the two at the same time.

図中10は前記床版Fに設けたコツタ、11は
スラブ筋である。
In the figure, numeral 10 is a slat provided on the floor slab F, and numeral 11 is a slab line.

第6図は本発明の他の実施例を示し、前記梁A
の直下にプレキヤストコンクリート壁版Gを配設
し、同壁版G間の間隙、同壁版Gと前記柱B、梁
A及び床版との各間隙を挟んでその両側に部分的
型枠を組立て、前記梁Aに設けたコンクリート打
設用空隙よりコンクリートを打設し、前記各間隙
にコンクリートD″を填装する。
FIG. 6 shows another embodiment of the present invention, in which the beam A
A precast concrete wall slab G is installed directly below the wall slab G, and partial formwork is placed on both sides of the gap between the wall slabs G and the gaps between the wall slab G and the column B, beam A, and floor slab. are assembled, concrete is poured through the concrete casting gaps provided in the beam A, and concrete D'' is filled into each gap.

図中Dは前記柱Bの柱頭において、相隣る前
記梁A間に打設されたコンクリート、12は前記
壁版Gに設けたコツタである。
In the figure, D indicates concrete poured between the adjacent beams A at the capital of the column B, and 12 indicates a cotter provided on the wall slab G.

第7図はプレキヤストコンクリート梁Aの他の
実施例を示し、対向面が下方に向うに従つて幅が
漸大するテーパ面に形成されたプレキヤストコン
クリート梁部材A1,A2の上部に、所定間隔毎
に、頂面にコツタ13を有する連結ブロツク14
を介装し、同ブロツク14と前記各部材A1,A2
とを連結用鋼棒15で連結し、幅方向中央部に成
方向に貫通するコンクリート打設用空隙1を有す
るプレキヤストコンクリート梁Aを構成するもの
である。
Figure 7 shows another embodiment of the precast concrete beam A, in which the opposing surfaces are formed into tapered surfaces that gradually increase in width as they go downward. , connecting blocks 14 having cotters 13 on their top surfaces at predetermined intervals.
interposed between the same block 14 and each of the above-mentioned members A 1 and A 2
and are connected by a connecting steel rod 15 to form a precast concrete beam A having a concrete casting cavity 1 in the widthwise center portion penetrating in the growth direction.

図中16は前記各部材A1,A2に設けた凹窩
で、同凹窩16内に突出する連結用鋼棒15の端
部を被覆するように、前記凹窩16内にモルタル
17を充填するものである。
Reference numeral 16 in the figure indicates a recess provided in each of the members A 1 and A 2 , and mortar 17 is placed in the recess 16 so as to cover the end of the connecting steel rod 15 protruding into the recess 16 . It is to be filled.

また第8図に示すように、方形断面のプレキヤ
ストコンクリート梁Aに所定間隔毎に上下に貫通
する方形断面のコンクリート打設用空隙1を列設
するか、または梁の全長の大部分に亘つてコンク
リート打設用空隙を設けてもよい。
Further, as shown in Fig. 8, a precast concrete beam A having a rectangular cross section is provided with concrete casting gaps 1 having a rectangular cross section that penetrate vertically at predetermined intervals, or extending over most of the entire length of the beam. It is also possible to provide a void for concrete pouring.

この場合、第9図及び第10図に示すように、
前記コンクリート打設用空隙1を設ける個所に、
メタルラス、エキスパンドメタル等によつて形成
された上下端の開口した筒状体18を梁の鉄筋に
先付しておいて、同筒状体18にコンクリートが
充填されないように梁コンクリートを打設して、
第8図に示す如きプレキヤストコンクリート梁A
を製作するものである。
In this case, as shown in FIGS. 9 and 10,
At the location where the concrete casting void 1 is provided,
A cylindrical body 18 made of metal lath, expanded metal, etc. with open top and bottom ends is attached to the reinforcing bars of the beam in advance, and beam concrete is poured so that the cylindrical body 18 is not filled with concrete. hand,
Precast concrete beam A as shown in Figure 8
It is intended to produce.

なお第9図及び第10図において、前記実施例
と均等部分には同一符号が附されている。
Note that in FIGS. 9 and 10, parts equivalent to those of the above embodiment are given the same reference numerals.

以上本発明を実施例について説明したが、本発
明は勿論このような実施例にだけ局限されるもの
ではなく、本発明の精神を逸脱しない範囲内で種
種の設計の改変を施しうるものである。
Although the present invention has been described above with reference to embodiments, the present invention is, of course, not limited to such embodiments, and can be modified in various designs without departing from the spirit of the present invention. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図及び第2図は夫々従来のプレキヤスト鉄
筋コンクリート骨組における現場打ちコンクリー
ト壁の施工方法の実施状況を示す縦断面図、第3
図は本発明に係るプレキヤスト鉄筋コンクリート
骨組における現場打ちコンクリート壁の施工方法
の一実施例の実施状況を示す斜面図、第4図はそ
の縦断面図、第5図は本発明の方法に使用される
プレキヤストコンクリート梁の一実施例の斜面
図、第6図は本発明の方法の他の実施例の実施状
況を示す正面図、第7図及び第8図は夫々前記プ
レキヤストコンクリート梁の他の各実施例を示す
斜面図、第9図及び第10図は夫々第8図に示し
たプレキヤストコンクリート梁の一部を欠截して
示した平面図並にその使用状況を示す縦断面図で
ある。 A……プレキヤストコンクリート梁、D……現
場打ちコンクリート、1……コンクリート打設用
空隙。
Figures 1 and 2 are longitudinal cross-sectional views showing the implementation status of a conventional cast-in-place concrete wall construction method in a precast reinforced concrete frame, respectively.
The figure is a slope view showing the implementation status of one embodiment of the method for constructing a cast-in-place concrete wall in a precast reinforced concrete frame according to the present invention, FIG. 4 is a longitudinal cross-sectional view thereof, and FIG. 5 is a method used in the method of the present invention FIG. 6 is a front view showing the implementation status of another embodiment of the method of the present invention, and FIGS. 7 and 8 are respectively a slope view of one embodiment of the precast concrete beam. The slope view, FIG. 9 and FIG. 10 showing each example are a partially cutaway plan view of the precast concrete beam shown in FIG. 8, and a vertical cross-sectional view showing its usage situation. be. A...Precast concrete beam, D...Cast-in-place concrete, 1...Void for concrete pouring.

Claims (1)

【特許請求の範囲】[Claims] 1 幅方向中央部に、成方向に貫通するコンクリ
ート打設用空隙を有し、且つ梁筋が内蔵されたプ
レキヤストコンクリート梁を所定位置に架設した
のち、前記空隙を介して前記プレキヤストコンク
リート梁の下部に位置する壁部のコンクリートを
打設することを特徴とするプレキヤスト鉄筋コン
クリート骨組における現場打ちコンクリート壁の
施工方法。
1. After erecting a precast concrete beam in a predetermined position, which has a concrete casting gap that penetrates in the width direction in the width direction and has built-in beam reinforcement, the precast concrete beam is inserted through the gap. A method for constructing a cast-in-place concrete wall in a precast reinforced concrete frame, characterized by pouring concrete for the wall portion located at the bottom of the frame.
JP9166680A 1980-07-07 1980-07-07 Installation of cast-in-place concrete wall for precast reinforced concrete frame Granted JPS5719452A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9166680A JPS5719452A (en) 1980-07-07 1980-07-07 Installation of cast-in-place concrete wall for precast reinforced concrete frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9166680A JPS5719452A (en) 1980-07-07 1980-07-07 Installation of cast-in-place concrete wall for precast reinforced concrete frame

Publications (2)

Publication Number Publication Date
JPS5719452A JPS5719452A (en) 1982-02-01
JPS6236097B2 true JPS6236097B2 (en) 1987-08-05

Family

ID=14032800

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9166680A Granted JPS5719452A (en) 1980-07-07 1980-07-07 Installation of cast-in-place concrete wall for precast reinforced concrete frame

Country Status (1)

Country Link
JP (1) JPS5719452A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61129022U (en) * 1985-01-31 1986-08-13

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5014444A (en) * 1973-06-12 1975-02-15

Also Published As

Publication number Publication date
JPS5719452A (en) 1982-02-01

Similar Documents

Publication Publication Date Title
JP3333786B2 (en) Prefabricated piers and concrete blocks for piers
JP2622013B2 (en) Reinforced concrete shear wall structure
JPH11270146A (en) Reinforcement method of existing beam
JPS6236097B2 (en)
JPH07324376A (en) Method for constructing reinforced concrete structure
JPS6312987B2 (en)
JPS6022151B2 (en) Precast reinforced concrete beam section split vertically
JPS6039401Y2 (en) joint reinforcing bars
CN221345973U (en) Prefabricated component splice joint
JPS6335773B2 (en)
JPS632534Y2 (en)
JP2917159B2 (en) Column, beam joining method
JPH0444550A (en) Semi-precast rc building
JPS6351212B2 (en)
JPS6020738Y2 (en) shear connector
JP2978011B2 (en) U-shaped beam formwork and method of constructing beam and beam joint using the same
JP2972955B2 (en) Column and beam joining method and its structure
JPS5830459B2 (en) Construction method of precast reinforced concrete structure
JPH06158712A (en) Construction method of beam
JPS6312191Y2 (en)
JPH0421874Y2 (en)
JPS6220571Y2 (en)
JPS6029494Y2 (en) retaining wall
JP2026003529A (en) How to reinforce existing beams
JP2566477B2 (en) Outer wall construction method