JPS6238488B2 - - Google Patents
Info
- Publication number
- JPS6238488B2 JPS6238488B2 JP54067808A JP6780879A JPS6238488B2 JP S6238488 B2 JPS6238488 B2 JP S6238488B2 JP 54067808 A JP54067808 A JP 54067808A JP 6780879 A JP6780879 A JP 6780879A JP S6238488 B2 JPS6238488 B2 JP S6238488B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- piles
- excavation
- steel
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Description
【発明の詳細な説明】
この発明は、縦孔に設置した中空部付H形断面
の基準杭を利用して連続地中壁を構築する方法に
関し、特に大規模の地中壁において、縦孔を掘削
し、同孔内に中空部付H形鋼杭を建込んで基準杭
とし、該基準杭をガイドとしてリバースサーキユ
レーシヨンドリル等により隣接部を連接掘削及び
閉合掘削し、該掘削孔内に鉄筋蘢等を建込んだ後
コンクリートを打設し、大深度、高精度の連続地
中壁が確実にできるようにする。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a continuous underground wall using a reference pile with a hollow section and an H-shaped cross section installed in a vertical hole. An H-beam steel pile with a hollow section is erected in the same hole as a reference pile, and the adjacent part is connected and closed excavated using a reverse circulation drill etc. using the reference pile as a guide. After erecting reinforcing bars, etc., concrete is poured to ensure a continuous underground wall with great depth and high precision.
従来、大深度、高精度の連続地中壁(以下単に
地中壁という)を構築する方法として、地中壁の
連続する方向に適当間隔に縦孔を掘り、該縦孔内
にH形断面の鋼杭をその凹部が地中壁の連続する
方向を向くように建込み、前記縦孔内の内面と鋼
杭の凹部に砂利を充填して掘削の基準杭を設置
し、次にその基準杭間を掘削し、該掘削孔内に鉄
筋を挿入した後、コンクリートを打設して地中壁
を構築する方法(特公昭48―1891号)が知られて
いる。 Conventionally, as a method of constructing a continuous underground wall with great depth and high precision (hereinafter simply referred to as an underground wall), vertical holes are dug at appropriate intervals in the continuous direction of the underground wall, and an H-shaped cross section is inserted into the vertical hole. erect a steel pile with its recess facing the continuous direction of the underground wall, fill the inner surface of the vertical hole and the recess of the steel pile with gravel, install a reference pile for excavation, and then set the reference pile for excavation. There is a known method (Japanese Patent Publication No. 1891/1972) in which an underground wall is constructed by excavating between the piles, inserting reinforcing bars into the excavated hole, and then pouring concrete.
しかしながら、この従来の方法には次に挙げる
ような欠点がある。 However, this conventional method has the following drawbacks.
(1) 2本の基準杭間を掘削中に、基準杭の非掘削
側(裏側)の凹部の砂利が掘削中の孔に流下し
てくる場合があり、この場合、基準杭間の孔中
にコンクリートを充填するときに該コンクリー
トが裏側の凹部の砂利が流下したところにも充
填され、、次位の孔の掘削が不能となる。(1) While excavating between two reference piles, gravel in the recess on the non-excavation side (back side) of the reference pile may flow down into the hole being excavated. When filling the hole with concrete, the concrete also fills the groove on the back side where the gravel has flowed down, making it impossible to excavate the next hole.
(2) 孔中に充填した砂利の側圧で基準杭が彎曲
し、基準杭間の掘削が不能になる。(2) The standard piles are bent due to the lateral pressure of the gravel filled in the hole, making it impossible to excavate between the standard piles.
(3) 基準杭の底部付近における基準杭間の掘削に
おいて、砂利の側圧で基準杭が掘削孔側に押さ
れて横移動し、基準杭間の掘削が不能になる等
の欠点を有した。(3) When excavating between the reference piles near the bottom of the reference piles, the lateral pressure of the gravel pushed the reference piles toward the excavation hole and caused them to move laterally, making it impossible to excavate between the reference piles.
また、他の方法として、縦孔内に基準杭を設置
し、次に該基準杭をガイドとしてリバースサーキ
ユレーシヨンドリル等により該基準杭の隣接部を
掘削(連接掘削)し、次に該連接掘削により掘削
された孔に杭(一般杭)を建込み、以後、一般杭
をガイドとした連接掘削と、該掘削孔に一般杭を
建込む工程とを繰返えして杭(柱)列式の地中壁
を構築する方法も知られている。 Another method is to install a reference pile in a vertical hole, then use a reverse circulation drill or the like to excavate the area adjacent to the reference pile using the reference pile as a guide (connected excavation). Piles (general piles) are erected in the holes excavated by continuous excavation, and thereafter, the process of continuous excavation using the general piles as a guide and the process of erecting the general piles in the excavated holes is repeated to form piles (pillars). Methods of constructing columnar underground walls are also known.
しかしながら、この方法は、連接掘削時の精度
の狂い及び一般杭建時の精度の狂いが累積され、
高精度の地中壁を構築するのは難かしいという欠
点があつた。 However, with this method, errors in accuracy during connected excavation and errors in accuracy during general pile erection accumulate.
The drawback was that it was difficult to construct underground walls with high precision.
この発明は、特に連続地中壁構築のかかる欠点
を排除し、関連する諸問題を解決するものであ
る。 The present invention specifically eliminates such drawbacks of continuous underground wall construction and solves the related problems.
而してこの発明の目的は、大深度且つ高精度の
連続地中壁を確実に造成することにあり、またこ
の発明の目的は、基準杭が変形したり、隣接部の
掘削が不能になることのない方法を提供するにあ
り、更にこの発明の目的は、掘削機械が一機種の
みで足りる方法を提供するにあり、また更にこの
発明の目的は、地下タンクの構築に好適な工法を
提供するにある。 Therefore, the purpose of this invention is to reliably create a continuous underground wall with great depth and high precision, and the purpose of this invention is to prevent the reference pile from deforming or making it impossible to excavate adjacent areas. A further object of the invention is to provide a method that requires only one type of excavation machine, and a further object of the invention is to provide a construction method suitable for constructing an underground tank. There is something to do.
すなわちこの発明は、図示する実施例の如く、
所定の間隔に縦孔5を掘削し、両縦孔5内に中空
部付H形鋼杭をそれぞれ建込み、前記鋼杭の下端
部を根固めし、前記中空部にコンクリートを打設
して各基準杭1となし、さらに前記H形鋼杭の幅
方向両側面となるフランジ外面と縦孔5内面との
間にモルタル等の固化性流動材を施して縦孔5内
に各基準杭1を固定し、一方の基準杭1をガイド
としてリバースサーキユレーシヨンドリル4等に
より前記一方の基準杭1の隣接部を他方の基準杭
1の側に連接掘削し、しかるのち、前記連接掘削
された最終段の既掘削孔26と前記他方の基準杭
1との間を、両側のそれぞれの基準杭1をガイド
として閉合掘削して、両基準杭1間に連続した溝
を形成させ、かくして構成された掘削溝内にH形
鋼杭、鉄筋篭等を建込んだ後コンクリートを打設
して地中壁を形成することを特徴とする連続地中
壁構築方法に係る。 That is, the present invention, as shown in the illustrated embodiment,
Vertical holes 5 are excavated at predetermined intervals, H-shaped steel piles with hollow parts are erected in both vertical holes 5, the lower ends of the steel piles are reinforced, and concrete is poured into the hollow parts. Each reference pile 1 is placed inside the vertical hole 5 by applying a solidifying fluid material such as mortar between the outer surface of the flange, which forms both sides of the H-shaped steel pile in the width direction, and the inner surface of the vertical hole 5. is fixed, and using one of the reference piles 1 as a guide, a reverse circulation drill 4 or the like is used to continuously excavate the adjacent part of the one reference pile 1 to the other reference pile 1 side, and then the connected excavation is performed. Closed excavation is performed between the final stage of the previously excavated hole 26 and the other reference pile 1 using the respective reference piles 1 on both sides as guides to form a continuous groove between both reference piles 1. The present invention relates to a continuous underground wall construction method characterized by erecting H-shaped steel piles, reinforcing bar cages, etc. in an excavated trench, and then pouring concrete to form an underground wall.
この発明の実施例を図面を参照して説明する。
この発明においては、中空部付H形鋼杭(以下鋼
杭という)として、第1図に示すように、I形鋼
2本を夫々のフランジ部で固着したような形状の
ものか、又は第2図に示すように、I形鋼2本の
夫々のフランジ部をラチス部材を介して固着した
形状のもの、又はその他形状のものを用いる。 Embodiments of the invention will be described with reference to the drawings.
In this invention, the H-beam steel pile with a hollow section (hereinafter referred to as a steel pile) has a shape in which two I-beam steels are fixed at their respective flanges, as shown in FIG. As shown in Fig. 2, a shape in which the respective flanges of two I-shaped steels are fixed via a lattice member, or a shape in other shapes is used.
また、これら鋼杭には、第1図及び第2図のよ
うに、ウエブ部(凹部)を覆うようにフランジ間
全長に亘つてシートバツク2を取付けて用いる
か、又は取付けない場合もある。 Further, as shown in FIGS. 1 and 2, these steel piles may be used with seat backs 2 attached over the entire length between the flanges so as to cover the web portion (recessed portion), or may not be attached.
次に第3図乃至第10図に、この発明になる工
程を手順を追つて説明する。 Next, the steps of the present invention will be explained step by step with reference to FIGS. 3 to 10.
(1) 予め地中壁予定位置を挾んで鋼矢板を2列打
込んでガイドウオール3となし、その間を深さ
約2m掘削する。鋼矢板の天端は作業地盤に合
わせる。(1) In advance, drive two rows of steel sheet piles between the planned underground wall locations to form the guide wall 3, and excavate approximately 2m deep between them. The top of the steel sheet pile should be aligned with the working ground.
(2) 第3図a,bに示す如く、ガイドウオール3
内に安定液を満し、リバースサーキユレーシヨ
ンドリル4(以下リバース掘削機という)等に
より所定位置に基準杭用の縦孔5を掘削する。
縦孔5は径約2.6m、深さは設計長(隣接孔
部)よりも2m程度深く掘削する。掘削中は縦
孔5内に安定液を満たし、孔壁の安定を計る。
掘削孔の精度は1/500以上とする。排土計画
は、当初はポンプサクシヨン等とし、残りをエ
アリフト方式とする。掘削完了時のスライムは
リバース掘削機にて処理する。リバース掘削機
の障害物となる吸込口径より大きい玉石、木片
等は掘削進行の障害となるので、ハンマーグラ
ブ、クラムシエルバケツト等によりこれらの層
を突破する。(2) As shown in Figure 3 a and b, the guide wall 3
The inside is filled with a stabilizing liquid, and a vertical hole 5 for a reference pile is drilled at a predetermined position using a reverse circulation drill 4 (hereinafter referred to as a reverse excavator) or the like.
The vertical hole 5 is approximately 2.6 m in diameter and approximately 2 m deeper than the design length (adjacent hole). During excavation, the vertical hole 5 is filled with a stabilizing liquid to ensure the stability of the hole wall.
The accuracy of the drilling hole shall be 1/500 or more. The soil removal plan will initially be by pump suction, etc., and the rest will be by air lift method. Slime upon completion of excavation will be disposed of using a reverse excavator. Boulders, pieces of wood, etc. that are larger than the suction port diameter and are obstacles to the reverse excavator are obstacles to the progress of excavation, so break through these layers using a hammer grab, clam shell bucket, etc.
(3) 次に第4図a,bに示す如く、縦孔5内に鋼
杭のウエブ部(凹部)を掘削孔の連続する方向
に向けわ建込み、基準杭1とする。所定長さ
(約20m程度)に分割された鋼杭にシートバツ
ク2を取付け、上杭、下杭を建込やぐらで保持
し、順次溶接を行ないながら建込む。而して全
長溶接が完了後は、杭の下端が縦孔底部の根固
めコンクリートの天端よりも離した位置で仮吊
りしておく。(3) Next, as shown in FIGS. 4a and 4b, the web part (recessed part) of the steel pile is erected in the vertical hole 5 in the direction in which the excavated hole continues, and is used as the reference pile 1. Seat back 2 is attached to steel piles divided into predetermined lengths (approximately 20 m), the upper and lower piles are held in place by a construction tower, and the piles are welded in sequence as they are erected. After the full length welding is completed, the pile is temporarily suspended at a position where the lower end of the pile is further away from the top of the cemented concrete at the bottom of the vertical hole.
(4) 次に第5図a,bに示す如く、鋼杭を吊つた
状態で縦孔内にトレミー管6を設置し、これに
より孔底に根固めコンクリート7を打設する。
打設後直ちに鋼杭を所定の位置に吊り降ろす
か、又は鋼杭をそのまま吊つた状態にしておい
て根固めをする。鋼杭の頭部は鋼矢板から鋼材
を使つて動かないように固定する。シートバツ
グの下端は袋状とし、根固めコンクリート7の
上面にあるようにする。シートバツグは、例え
ば鋼杭の周辺部を泥水固化する場合には不要で
あるが、この実施例ではシートバツクを取付け
たものについて説明を続ける。(4) Next, as shown in FIGS. 5a and 5b, a tremie pipe 6 is installed in the vertical hole with the steel pile suspended, and concrete 7 for foot protection is poured into the bottom of the hole.
Immediately after driving, lower the steel pile into the specified position, or leave the steel pile suspended as it is and perform foot protection. The head of the steel pile will be fixed using steel from the steel sheet pile to prevent it from moving. The lower end of the sheet bag is shaped like a bag and is placed on the upper surface of the foot protection concrete 7. Although the seat bag is not necessary, for example, when solidifying the surrounding area of a steel pile with muddy water, in this embodiment, the explanation will be continued with a seat bag attached.
(5) 次に第6図a,bに示す如く、シートバツク
内に泥水を入れ、シートバツクを縦孔内面に溶
着させた後、この中に砂利8(直径20〜40mm程
度)を投入する。この砂利の高さと同等又は多
少高低差のある程度に鋼杭の中空部、及び縦孔
内面とフランジ部との間にコンクリートポンプ
によりコンクリート9を打設するが、砂利とコ
ンクリートの天端位置は必ずしも同一レベルに
あるように操作する必要はない。最初に砂利に
より基準杭1を位置決めしてもよい。(5) Next, as shown in FIGS. 6a and 6b, muddy water is poured into the seat bag, and after the seat bag is welded to the inner surface of the vertical hole, gravel 8 (about 20 to 40 mm in diameter) is thrown into it. Concrete 9 is poured by a concrete pump into the hollow part of the steel pile and between the inner surface of the vertical hole and the flange part at a height that is equal to or slightly different from the height of this gravel, but the top positions of the gravel and concrete are not necessarily the same. There is no need to operate so that they are on the same level. The reference pile 1 may be positioned using gravel first.
なお、前記したように、鋼杭の周辺部を泥水
固化する方法も採用し得るし、又は鋼杭の周辺
部に砂利を充填し、ここにシルトモルタルやベ
ントナイトモルタルを注入する方法も採用し得
る。以上のようにして基準杭1を作る。 As mentioned above, a method of solidifying the surrounding area of the steel pile with muddy water may also be adopted, or a method of filling the surrounding area of the steel pile with gravel and injecting silt mortar or bentonite mortar therein may also be adopted. . The reference pile 1 is made as described above.
(6) この基準杭1は、リバース掘削機等による2
回重ね掘削(2回オーバーラツプ掘削)可能で
且つ充分な孔幅で孔が連続するように合わせた
適当間隔毎に設ける。(第7図)
(7) 次に第7図a,bに示す如く、基準杭1をガ
イドとし、ガイドフレーム10を取付けたリバ
ース掘削機4等により隣接部を連接掘削する。(6) This reference pile 1 is
Holes are provided at appropriate intervals so that repeated drilling (double overlap drilling) is possible and the holes are continuous with a sufficient hole width. (FIG. 7) (7) Next, as shown in FIGS. 7a and 7b, using the reference pile 1 as a guide, a reverse excavator 4 or the like to which the guide frame 10 is attached is used to excavate the adjacent part in a continuous manner.
(8) 次に第8図a,bに示す如く、連接掘削側に
ガイドフレーム10を付け、他側の基準杭1の
フランジを外れ止めとし、リバース掘削機4等
により閉合掘削する。このとき先行した連接掘
削孔への落込み土砂は、予め建込まれたジエツ
ト併用エアリフト11により吸上げる。掘削完
了後のスライム処理は、リバース掘削機4等と
ジエツト併用エアリフト11により行なう。(8) Next, as shown in FIGS. 8a and 8b, a guide frame 10 is attached to the connected excavation side, and the flange of the reference pile 1 on the other side is used to prevent removal, and closed excavation is performed using a reverse excavator 4 or the like. At this time, the earth and sand that has fallen into the preceding connected excavation hole is sucked up by the air lift 11 that has been built in advance. Slime treatment after the completion of excavation is carried out using a reverse excavator 4 or the like and an air lift 11 combined with a jet.
(9) 次に第9図a,bに示す如く、鋼杭又は鉄筋
蘢(図示せず)を基準杭1間の孔中に基準杭1
と同様に建込み、所定の位置で頭部のみ保持す
る。(9) Next, as shown in Figure 9a and b, insert steel piles or reinforcing bars (not shown) into the holes between the reference piles 1 and 1.
Set it up in the same way as above, and hold only the head in place.
(10) 次に第10図a,bに示す如く、建込んだ鋼
杭の内部をエアリフトでスライム処理した後、
コンクリートポンプでコンクリートを圧送して
鋼杭内部に打設するとともに、これと並行又は
前後して鋼杭と孔との間隙部にコンクリート、
モルタル等を充填するか又は泥水を固化する。
以上を繰返えして連続地中壁を構築する。(10) Next, as shown in Figure 10a and b, after treating the inside of the erected steel pile with slime using an air lift,
Concrete is pumped by a concrete pump and placed inside the steel pile, and at the same time or before and after this, concrete is poured into the gap between the steel pile and the hole.
Fill with mortar or solidify muddy water.
Repeat the above steps to construct a continuous underground wall.
次に第11図乃至第13図について、前記連接
掘削時と閉合掘削時との装置の詳細構成を説明す
る。第11図は掘削軸の立面を示し、ドリルパイ
プ12はスイベル機構13を介してガイドフレー
ム10によつて支承される。14は錘である。そ
の上方にいてドリルパイプ12にスダビライザ1
5が取付けられる。ドリルパイプ12の下端に
は、この例では、スタビライザ付の三翼ビツト1
6が取付けられており、17はカラー状の錘であ
る。 Next, with reference to FIGS. 11 to 13, detailed configurations of the apparatus during the above-mentioned continuous excavation and closed excavation will be explained. FIG. 11 shows an elevation of the drilling shaft, in which the drill pipe 12 is supported by the guide frame 10 via the swivel mechanism 13. 14 is a weight. Above it, attach the drill pipe 12 to the sudabi riser 1.
5 is installed. At the lower end of the drill pipe 12, in this example, a three-winged bit 1 with a stabilizer is attached.
6 is attached, and 17 is a collar-shaped weight.
第12図は前記第7図aの連接掘削に相当した
段階を示し、ガイドフレーム10及び18を装備
したリバース掘削機によりガイドフレーム10を
基準杭1に沿わせた状態で基準杭1をガイドとし
て掘削孔5に連接して掘削溝19を掘ることを表
わす。20はガイドフレーム18に取付けた錘で
ある。 FIG. 12 shows a stage corresponding to the continuous excavation shown in FIG. This indicates that an excavation groove 19 is dug in connection with the excavation hole 5. 20 is a weight attached to the guide frame 18.
第13図は前記第8図aの閉合掘削に相当した
段階を示し、この段階では前記連接掘削により掘
削溝19が完成しているので、ガイドフレーム1
0に延長用ガイドフレーム21をボルト等により
取付け、ガイドフレーム18は前記第12図と同
様基準杭1に沿わせる。ガイドフレーム21のガ
イドフレーム10との反対側には錘22付のガイ
ドフレーム18がボルト等により取付けられ、且
つ錘22にはガイドフレーム23がボルト等によ
り取付けられ、ガイドフレーム23は基準杭24
に沿わせられているため、基準杭1と20とを
夫々のガイドとして掘削溝25を掘削することを
表わしている。前記錘20,22の目的は何れも
ガイドフレームとの重量バランスをとることにあ
る。 FIG. 13 shows a stage corresponding to the closed excavation shown in FIG.
The extension guide frame 21 is attached to the base plate 1 with bolts or the like, and the guide frame 18 is placed along the reference stake 1 in the same manner as in FIG. A guide frame 18 with a weight 22 is attached to the opposite side of the guide frame 21 from the guide frame 10 with bolts or the like, and a guide frame 23 is attached to the weight 22 with bolts or the like.
This indicates that the excavation groove 25 is excavated using the reference piles 1 and 20 as respective guides. The purpose of the weights 20 and 22 is to balance the weight with the guide frame.
以上の説明から明らかなように、この発明によ
れば次に挙げるような効果がある。 As is clear from the above description, the present invention has the following effects.
(1) 鋼杭の中空部にコンクリートを打設するた
め、基準杭としての剛性が高くなり、隣接部の
掘削の際に凹部に詰めた砂利の側圧等により同
鋼材が変形して掘削不能になるというようなこ
とは生じなくなつた。(1) Since concrete is poured into the hollow part of the steel pile, it has high rigidity as a reference pile, but when excavating the adjacent part, the steel material becomes deformed due to the lateral pressure of gravel packed into the recess, making it impossible to excavate. Things like this no longer occur.
(2) 基準杭としての鋼杭のフランジ部と縦孔内面
の間に、固化性流動材、例えばコンクリート、
モルタル等を充填するか、又は砂利充填後同じ
くシルトモルタルやベントナイモルタル等を充
填するか、又は同じく泥水固化の材料を充填す
るため、これらの粘着力や摩擦力により基準杭
が強固に固止され、凹部に詰めた砂利の側圧等
により該鋼杭が変形し掘削不能になるというこ
とは生じなくなつた。(2) A solidifying fluid material such as concrete,
Either by filling with mortar, etc., or by filling with silt mortar, bentonite mortar, etc. after filling with gravel, or by filling with muddy water solidification materials, the standard pile is firmly fixed due to the adhesive force and frictional force of these materials. As a result, the steel pile no longer becomes deformed due to the lateral pressure of the gravel filled in the recess, making it impossible to excavate.
(3) 基準杭としての鋼杭のフランジとウエブとフ
ランジ間にシートバツグを掛け渡し、この中に
砂利を詰める場合には、この砂利中にコンクリ
ートが入り込むということはない。また、該部
にシートバツクを掛け渡さず、泥水固化する方
法においても、この部分にコンクリートが入り
込むということはない。従つて、基準杭に隣接
した孔の掘削(連接掘削、閉合掘削)が容易で
あり、従来のように凹部等にコンクリートが回
り込み、固化し、掘削不能になるということは
なくなつた。(3) When a sheet bag is strung between the flange, web and flange of a steel pile used as a reference pile, and gravel is filled in the bag, concrete will not get into the gravel. Furthermore, even in the method of solidifying muddy water without placing a sheet bag over the area, concrete will not get into this area. Therefore, it is easy to excavate a hole adjacent to the reference pile (connected excavation, closed excavation), and there is no longer a problem in the past where concrete wraps around and hardens into recesses, making it impossible to excavate.
(4) 基準杭としての鋼杭は予め根固めするので、
隣接部の掘削時に砂利の側圧で鋼杭が隣接部側
へ移動するということはなくなつた。従つてこ
れによる掘削不能ということはなくなつた。(4) Steel piles used as standard piles are reinforced in advance, so
During excavation in the adjacent area, the steel pile no longer moves to the adjacent area due to the lateral pressure of the gravel. Therefore, it is no longer impossible to excavate due to this.
(5) 正確に構築された基準杭をガイドとして、そ
の隣接部を連接掘削及び閉合掘削するので、高
精度の地下壁の構築が可能である。一般杭をガ
イドとして連接掘削をする従来の方法のよう
に、精度の狂いが累積されるということはな
い。(5) Using accurately constructed reference piles as a guide, connected and closed excavations are performed in adjacent areas, making it possible to construct underground walls with high precision. Unlike the conventional method of connecting excavation using general piles as a guide, there is no accumulation of errors in accuracy.
(6) 地中壁の用途によつては、連接掘削部及び閉
合掘削部の下方の鉄筋又は鉄骨を入れずにコン
クリートだけを打設するという工法を採用する
こともでき、この場合、当然経済的となる。(6) Depending on the purpose of the underground wall, it is also possible to adopt a construction method in which only concrete is poured without reinforcing bars or steel frames under the connected and closed excavations; in this case, it is naturally economical. become a target.
(7) 掘削機械は一機種で、例えばリバース掘削機
だけで掘削ができるので、経済的にも有利であ
ると共に、取扱上も容易である。(7) Since excavation can be carried out with only one type of excavation machine, for example, a reverse excavator, it is economically advantageous and easy to handle.
(8) この発明になる工法は、地下タンクの構築に
適用すれば好適である。(8) The construction method of this invention is suitable if applied to the construction of underground tanks.
第1図及び第2図は、この発明の実施に使用す
る中空部付H形鋼杭の斜視図、第3図a,b乃至
第10図a,bは、この発明の実施例を示す平面
図及び縦断面図、第11図乃至第13図は、連接
掘削及び閉合掘削の詳細を示すもので、第11図
は掘削軸の立面図、第12図及び第13図は掘削
孔の横断面図である。
図中、1は基準杭、4はリバースサーキユレー
シヨンドリル、5は縦孔、19,26は掘削孔で
ある。
Figures 1 and 2 are perspective views of an H-section steel pile with a hollow section used in carrying out the present invention, and Figures 3a, b to 10 a, b are plane views showing an embodiment of the invention. Figures and longitudinal cross-sectional views, Figures 11 to 13, show details of connected drilling and closed drilling, with Figure 11 being an elevational view of the drilling shaft, and Figures 12 and 13 being a cross-sectional view of the borehole. It is a front view. In the figure, 1 is a reference pile, 4 is a reverse circulation drill, 5 is a vertical hole, and 19 and 26 are excavated holes.
Claims (1)
部付H形鋼杭をそれぞれ建込み、前記鋼杭の下端
部を根固めし、前記中空部にコンクリートをを打
設して各基準杭となし、さらに前記H形鋼杭の幅
方向両側面となるフランジ外面と縦孔内面との間
にモルタル等の固化性流動材を施して縦孔内に各
基準杭を固定し、一方の基準杭をガイドとしてリ
バースサーキユレーシヨンドリル等により前記一
方の基準杭の隣接部を他方の基準杭の側に連接掘
削し、しかるのち、前記連設掘削された最終段の
既掘削孔と前記他方の基準杭との間を、両側のそ
れぞれの基準杭をガイドとして閉合掘削して、両
基準杭間に連続した溝を形成させ、かくして構成
された掘削溝内にH形鋼杭、鉄筋籠等を建込んだ
後コンクリートを打設して地中壁を形成すること
を特徴とする連続地中壁構築方法。1. Vertical holes are excavated at predetermined intervals, H-shaped steel piles with hollow sections are erected in both vertical holes, the lower ends of the steel piles are reinforced, and concrete is poured into the hollow sections. Each reference pile is fixed in the vertical hole by applying a solidifying fluid material such as mortar between the outer surface of the flange, which is both sides in the width direction of the H-shaped steel pile, and the inner surface of the vertical hole, Using one of the reference piles as a guide, use a reverse circulation drill or the like to continuously drill the adjacent part of one of the reference piles to the side of the other reference pile, and then drill the previously drilled hole in the final stage of the continuous drilling. A closed excavation is performed between the reference pile and the other reference pile using the respective reference piles on both sides as guides to form a continuous groove between the two reference piles, and in the thus formed excavation groove, an H-beam steel pile, A continuous underground wall construction method characterized by erecting a reinforcing cage, etc., and then pouring concrete to form an underground wall.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6780879A JPS55161113A (en) | 1979-05-31 | 1979-05-31 | Constructing method for continuous underground wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6780879A JPS55161113A (en) | 1979-05-31 | 1979-05-31 | Constructing method for continuous underground wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS55161113A JPS55161113A (en) | 1980-12-15 |
| JPS6238488B2 true JPS6238488B2 (en) | 1987-08-18 |
Family
ID=13355609
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6780879A Granted JPS55161113A (en) | 1979-05-31 | 1979-05-31 | Constructing method for continuous underground wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS55161113A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7280602B2 (en) * | 2019-04-26 | 2023-05-24 | 株式会社アストリード | Concrete wall forming method for earth retaining |
-
1979
- 1979-05-31 JP JP6780879A patent/JPS55161113A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS55161113A (en) | 1980-12-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101121538B1 (en) | Diaphragm wall tunnel method - dtm, and tunnel structure using diaphragm wall | |
| KR20140055639A (en) | A execution method of architecture beam | |
| US7025537B2 (en) | Subterranean structures and methods for constructing subterranean structures | |
| JP3036295B2 (en) | Construction method of retaining wall | |
| KR20180124795A (en) | An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same | |
| JPH0960028A (en) | Strengthening method of existing steel pipe pile | |
| JP2784317B2 (en) | Open caisson structure | |
| RU2058464C1 (en) | Method for making foundation | |
| JPS5847823A (en) | Construction of in-place concrete pile | |
| KR101021913B1 (en) | Order temporary construction method for earthquake construction | |
| JPH02200917A (en) | Landslide suppressing well cylinder and its building method | |
| JPS6238488B2 (en) | ||
| CN211873023U (en) | Foundation pit supporting device | |
| KR100654973B1 (en) | Block structure and construction method using precast concrete pile | |
| JPS6011178B2 (en) | How to install standard piles for continuous underground wall construction | |
| JPH11190024A (en) | Earth retaining work | |
| JP2004132124A (en) | Pneumatic caisson and pneumatic caisson method | |
| JPH09111754A (en) | Parent pile water stop wall construction method | |
| JP3511145B2 (en) | How to build underground structures | |
| JP2005048460A (en) | Construction method of foundation structure | |
| JPS6018769B2 (en) | Construction method of underground structure | |
| JPH0959984A (en) | Simple underground construction structure | |
| JP5017528B2 (en) | Cast-in-place concrete earth retaining method | |
| JP2003074076A (en) | Construction method of building with underground part | |
| CN121654115A (en) | Combined supporting method for high-steep side slopes of mountain terrain |