Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS62397B2 - - Google Patents
[go: Go Back, main page]

JPS62397B2 - - Google Patents

Info

Publication number
JPS62397B2
JPS62397B2 JP53092546A JP9254678A JPS62397B2 JP S62397 B2 JPS62397 B2 JP S62397B2 JP 53092546 A JP53092546 A JP 53092546A JP 9254678 A JP9254678 A JP 9254678A JP S62397 B2 JPS62397 B2 JP S62397B2
Authority
JP
Japan
Prior art keywords
welding
centering
pipe
work
cart
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP53092546A
Other languages
Japanese (ja)
Other versions
JPS5520921A (en
Inventor
Ryuichi Inami
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP9254678A priority Critical patent/JPS5520921A/en
Publication of JPS5520921A publication Critical patent/JPS5520921A/en
Publication of JPS62397B2 publication Critical patent/JPS62397B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Description

【発明の詳細な説明】 この発明は、敷設船上のパイプレイバージにお
いてコンクリート被覆鋼管からなるパイプを高能
率で溶接接合しつつ海底等の水底に敷設する方法
に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for laying pipes made of concrete-coated steel pipes by welding and joining them with high efficiency on the bottom of an ocean floor or the like on a pipe lay barge on a laying ship.

従来、水底にパイプラインを敷設する場合は、
第1図および第2図に示すように、敷設船1の甲
板上に固定配列されたパイプ移送用ローラー群4
の上に、水底まで連続している既接合パイプ2′
を載置し、かつそのパイプ2′をテンシヨナー5
により船体に定張力保持し、新規接合パイプ3′
を甲板上のストツクヤードSから縦送りローラー
6により船首側に移送し、次いでトランスフアー
7上で横送りして芯出機8の上に転送し、作業ス
テージ9Aにおいて芯出機8により新規接合パイ
プ3′の芯出しを行ない、進水方向に移動できる
ように1〜2層の溶接肉盛りする。そしてこの間
に他の作業ステージ9B〜9Eおよび10〜13
においては、それぞれ次の作業を行なう。
Traditionally, when laying pipelines underwater,
As shown in FIGS. 1 and 2, a group of pipe transfer rollers 4 fixedly arranged on the deck of the laying ship 1
On top of the water, there is a connected pipe 2' that continues to the bottom of the water.
and put the pipe 2' on the tensioner 5.
maintains a constant tension on the hull, and connects the new joint pipe 3'
is transferred from the stockyard S on the deck to the bow side by a longitudinal feed roller 6, then transferred horizontally on a transfer 7 and transferred to a centering machine 8, and at a work stage 9A, a new joint pipe is formed by a centering machine 8. 3' is centered, and one to two layers of welding are applied so that it can move in the launching direction. During this time, other work stages 9B to 9E and 10 to 13
In each case, perform the following tasks.

9B:2層〜3層溶接、9C:3層〜4層溶
接、9D:4層〜5層溶接、9E:5層〜仕上層
溶接、10:溶接部の検査(X線撮影判定)、1
1:手直しがある場合の溶接手直し、12:防蝕
塗装、13:コンクリートコーテイング。
9B: 2nd to 3rd layer welding, 9C: 3rd to 4th layer welding, 9D: 4th to 5th layer welding, 9E: 5th layer to finishing layer welding, 10: Inspection of welded part (X-ray photography judgment), 1
1: Welding rework if necessary, 12: Anti-corrosion coating, 13: Concrete coating.

また全ステージの割当作業が完了すると、各作
業ステージの作業を中断し、船体を新規接合パイ
プ1本分(通常は長さ12m)前進し、〓からパイ
プを前記長さ分だけ水底に向かつて進水してい
く。
In addition, when the assigned work for all stages is completed, the work for each work stage is interrupted, the hull is moved forward by one new joint pipe (usually 12 m long), and the pipe is directed from the bottom to the bottom by the above length. It will be launched.

以上の作業を繰返し行なつてパイプ敷設作業を
進めるが、進水時間は1〜2分を要するので、全
溶接作業時間に対し5ステージの場合は1〜2分
の5倍のロスタイムが出ることになる。また自動
溶接機により溶接を行なう場合は、機械着脱時間
の5倍のロスタイムが出ることになる。さらに新
規接合パイプは通常乱尺物が多く、10〜13mの間
で一定でないため、8〜9ステージに対して接合
部の位置のずれがしばしば発生し、接合部がステ
ージ位置から外れたり、移送ローラやテンシヨナ
ー等に重なつて、接合作業ができなくなることが
あり、またタイムサイクルを狂わせることによる
時間ロスも多大である。
The above work is repeated to proceed with the pipe laying work, but since the launching time takes 1 to 2 minutes, in the case of 5 stages, the loss time will be 5 times the total welding work time by 1 to 2 minutes. become. Furthermore, when welding is performed using an automatic welding machine, the loss time is five times the time taken to attach and detach the machine. Furthermore, newly joined pipes are usually of irregular length, and the length is not constant between 10 to 13 meters, so the position of the joint often deviates from the 8th to 9th stage, causing the joint to move out of the stage position, or when being transferred. It may overlap with rollers, tensioners, etc., making it impossible to perform the bonding work, and also disrupting the time cycle, resulting in a great deal of time loss.

また従来、敷設船上でパイプを接合する場合
は、(イ)鋼管溶接端面の芯合わせ作業、(ロ)鋼管溶
接々合作業、(ハ)接合部の溶接品質検査(X線等に
よる)、(ニ)接合部の防蝕塗装作業、(ホ)接合部のコ
ンクリート被覆作業(重量調整用)を順次行なつ
ている。
In addition, conventionally, when joining pipes on a laying ship, (a) alignment of the welded ends of the steel pipes, (b) welding of the steel pipes, (c) welding quality inspection of the joints (using X-rays, etc.), ( d) Corrosion-proof painting work on the joints, and (e) concrete coating work on the joints (for weight adjustment) are being carried out in sequence.

また前記各作業を流れ作業で処理するため、作
業別ステージを直列に配置して同時併行作業にわ
ゆるシリーズ接合作業を行なつている。さらに前
記各作業のうち、溶接々合作業は他の作業に比較
して著しく長い作業時間を必要とするため、溶
接々合ステージだけを4〜5個所あるいは6個所
以上設けて溶接々合作業を分割して行なつてい
る。
Furthermore, in order to process each of the above-mentioned operations in an assembly line, stages for each operation are arranged in series to perform so-called series joining operations. Furthermore, among the above-mentioned operations, welding and welding operations require significantly longer work time than other tasks, so welding and welding stages are set up at 4 to 5 or more than 6 locations to perform welding and welding operations. It is being divided into parts.

また実際の敷設作業は、各ステージの割当作業
をほぼ均等サイクルタイム内で処理し、全ステー
ジが割当作業終了後に、作業を一時中断して敷設
船を前進させることにより、1区画分のパイプを
船尾から水底に向かつて下ろし、前記作業を繰返
すことにより接合されたパイプを順次船尾から進
水させて水底に敷設していく。
In addition, in actual laying work, the work assigned to each stage is processed within an approximately equal cycle time, and after all stages have finished their assigned work, the work is temporarily suspended and the laying vessel is moved forward to complete one section of pipe. The pipes are lowered from the stern toward the bottom of the water, and by repeating the above operations, the joined pipes are successively launched from the stern and laid on the bottom of the water.

前述のようにして行なう敷設速度を速くするた
めには、(A)溶接を自動化して溶接時間を短縮す
る、(B)溶接作業ステージを多数に細分化する、(C)
敷設サイクルタイム内からロスタイムをなくする
こと等が考えられる。しかし、前記(A)の場合は、
各ステージごとに自動溶接機の着脱および初期調
整時間を必要とするので、総合的な溶接時間短縮
ができない。前記(B)の場合は、ステージ数の増加
により船体長が増大し、かつ溶接作業員の数が多
くなると共に設備費および労務費が多額になる。
また前記(C)の場合は、従来の方法においてもロス
タイムが殆んどなく流れ作業を行なつているが、
5〜10分間のサイクルタイム中に1〜2分間のパ
イプ進水時間があり、この間は溶接作業を全ステ
ージとも中断しなければならないという問題があ
る。
In order to speed up the installation process as described above, (A) automate welding to shorten the welding time, (B) subdivide the welding work stage into multiple stages, and (C)
It is possible to eliminate loss time from the installation cycle time. However, in the case of (A) above,
Since time is required for attaching and detaching the automatic welding machine and initial adjustment for each stage, overall welding time cannot be shortened. In the case of (B), the hull length increases due to the increase in the number of stages, the number of welding workers increases, and equipment costs and labor costs increase.
In the case of (C) above, the conventional method involves assembly line work with almost no loss time.
The problem is that there is a 1-2 minute pipe launch time during the 5-10 minute cycle time during which all stages of the welding operation must be interrupted.

一方、陸上において多数のパイプを接続して長
尺パイプを構成し、その長尺パイプを敷設船上に
搬送して長尺パイプ相互を接合することも考えら
れるが、この場合は、敷設船へ長尺パイプを搬送
するのに極めて大型のクレーン船を必要とすると
共にその搬送作業が困難であり、かつ敷設船上の
クレーン等の設備が大型化し、さらにパイプが長
尺であるとその周面への重量調整用コンクリート
の吹付け作業を行ないにくくなり、しかも長尺パ
イプの運搬作業中に長尺パイプが折れ曲がる恐れ
がある。
On the other hand, it is also conceivable to connect a large number of pipes on land to form long pipes, transport the long pipes onto the laying ship, and join the long pipes together. An extremely large crane ship is required to transport the long pipe, and the transport work is difficult, and equipment such as a crane on the laying ship becomes large.Furthermore, if the pipe is long, it may damage the surrounding surface. This makes it difficult to perform the work of spraying concrete for weight adjustment, and there is a risk that the long pipe may be bent during transportation work.

この発明は、前記(A)および(C)の点に鑑み、船上
の溶接作業を鋼管接合部の芯出し後に継続して行
なえるようにするため、移動式作業ステージを船
上に設け、パイプの進水作業中も連続して溶接作
業ができるようにし、かつ自動溶接機を使用する
場合はその着脱時間のロスをなくし、低設備費、
低労務費で溶接々合能率を著しく向上させること
ができ、しかも被接合管の乱尺長に対する適応性
をも拡大することができ、さらに長尺パイプを搬
送して接合する場合の欠点も排除できる水底敷設
用パイプの接合方法を提供することを目的とする
ものである。
In view of the above-mentioned points (A) and (C), this invention provides a movable work stage on board the ship so that the welding work on the ship can be continued after centering the joint of the steel pipes. It enables continuous welding work even during launch work, and when using an automatic welding machine, eliminates the loss of installation and removal time, resulting in lower equipment costs and
It is possible to significantly improve welding efficiency with low labor costs, expand the adaptability to irregular lengths of pipes to be joined, and eliminate the disadvantages of transporting and joining long pipes. The purpose of the present invention is to provide a method of joining pipes for laying under water that is possible.

第3図ないし第9図はこの発明の実施例を示す
ものであつて、敷設船1における船首側芯出溶接
作業位置に、パイプ敷設ラインに沿つて延長する
左右1対の進水レール14からなる進水軌道と、
その側方においてこれと平行に延長する左右1対
の帰還レール15からなる帰還軌道とが配置さ
れ、前記進水レール14および帰還レール15
は、相互に同一レール間隔を有し敷設船1の甲板
またはこれに取付けられた支持ビーム17′に固
定されている。
3 to 9 show an embodiment of the present invention, in which a pair of left and right launching rails 14 extending along the pipe laying line are installed at the centering welding work position on the bow side of the laying ship 1. The launch trajectory and
A return track consisting of a pair of left and right return rails 15 extending parallel to the launch rail 14 and the return rail 15 is arranged on the side thereof.
have the same rail spacing and are fixed to the deck of the laying ship 1 or to a support beam 17' attached thereto.

進水軌道および帰還軌道の両端部間の中央部に
は、それぞれ縦軸16が配置され、その縦軸16
の下部は甲板または支持台17に固定され、かつ
進水軌道および帰還軌道の船首側端部間に船首側
回転盤18が配置されると共に、進水軌道および
帰還軌道の船尾側端部間に船尾側回転盤19が配
置され、各回転盤18,19の中心部に取付けら
れた軸受20は前記縦軸16に嵌合され、さらに
各回転盤18,19の上面には、回転盤中心の左
右両側において前記進水レール14の間隔および
帰還レール15の間隔と同一レール間隔を有する
2組の中継レール21が固定され、回転盤18,
19を180゜回転させることにより、中継レール
21を進水レール14または帰還レール15に対
し選択的に接続し得るように構成されている。
A vertical axis 16 is disposed in the center between the ends of the launch trajectory and the return trajectory, and the vertical axis 16
The lower part of the is fixed to the deck or support 17, and a bow rotary disk 18 is arranged between the bow side ends of the launch track and the return track, and a bow side rotary disk 18 is arranged between the stern ends of the launch track and the return track. A rotary disk 19 on the stern side is disposed, and a bearing 20 attached to the center of each rotary disk 18, 19 is fitted to the vertical shaft 16. Two sets of relay rails 21 having the same rail spacing as the spacing between the launching rails 14 and the spacing between the return rails 15 are fixed on both the left and right sides, and the rotating disks 18,
By rotating the relay rail 19 by 180 degrees, the relay rail 21 can be selectively connected to the launch rail 14 or the return rail 15.

各回転盤18,19の周囲の下部には、甲板ま
たは支持台17に固定された環状レール22上を
転動する支承ローラ23が取付けられ、かつ甲板
または支持台17には回転用減速機付きモーター
24が固定され、その減速機付きモーター24の
出力軸に固定された駆動歯車25は回転盤18,
19に同心的に固定された従動歯車26に噛み合
わされている。鋼板や形鋼等により構成された作
業員が乗ることができる走行フレーム27には、
前記進水レール14または帰還レール15上を転
動する車輪28が取付けられると共に、走行用減
速機付きモーター29が固定され、かつその減速
機付きモーター29の出力軸に固定された駆動歯
車30と前記車輪28に固定された従動歯車31
とに噛み合う中間歯車32は前記走行フレーム2
7に取付けられている。
A support roller 23 that rolls on an annular rail 22 fixed to the deck or support stand 17 is attached to the lower part around each turntable 18, 19, and the deck or support stand 17 is equipped with a rotation reducer. A motor 24 is fixed, and a drive gear 25 fixed to the output shaft of the motor 24 with a reduction gear is connected to a rotary disk 18,
19 is meshed with a driven gear 26 concentrically fixed to the drive gear 19. The traveling frame 27, on which a worker can ride, is made of steel plates, shaped steel, etc.
Wheels 28 rolling on the launch rail 14 or the return rail 15 are attached, a motor 29 with a traveling reduction gear is fixed, and a drive gear 30 is fixed to the output shaft of the motor 29 with a reduction gear. A driven gear 31 fixed to the wheel 28
The intermediate gear 32 that meshes with the traveling frame 2
It is attached to 7.

走行フレーム27の前部および後部に横行用ガ
イドフレーム33が固定され、その横行用ガイド
フレーム33には、横行用減速機付きモーター3
4により駆動される左右微動用スクリユウジヤツ
キ35が取付けられると共に、これにより左右方
向に移動される横行支持台36が摺動自在に嵌設
され、その横行支持台36には、昇降用減速機付
きモーター37とこれにより駆動される上下微動
用スクリユウジヤツキ38におけるシリンダー3
9とが固定され、そのスクリユウジヤツキ38に
おけるピストン40は、シリンダー39により案
内されて上下動すると共にシリンダー39内で回
動(首振り)することができる。
A traverse guide frame 33 is fixed to the front and rear portions of the traveling frame 27, and the traverse guide frame 33 includes a traverse reducer-equipped motor 3.
A screw jack 35 for fine horizontal movement driven by a screwdriver 4 is attached, and a traversing support 36 that is moved in the left-right direction by this is slidably fitted. cylinder 3 in the screw jack 38 for vertical fine movement driven by the motor 37 with
9 is fixed, and a piston 40 in the screw jack 38 is guided by a cylinder 39 and can move up and down and also rotate (oscillate) within the cylinder 39.

ピストン40の上端部には左右方向に延長する
支軸41によりパイプ支持台42が枢着され、船
尾側のパイプ支持台42にはパイプ支承用金属製
固定シユー43が取付けられると共に、船首側の
パイプ支持台42にはパイプ支承用金属製自由回
転ローラ44が取付けられ、前記固定シユー43
により既接合パイプ2が支持されると共に前記自
由回転ローラ44により新規接合パイプ3が支持
され、パイプと芯出溶接台車とが相対的に移動し
得るように構成されている。
A pipe support stand 42 is pivotally attached to the upper end of the piston 40 by a support shaft 41 extending in the left-right direction, and a metal fixed shoe 43 for supporting the pipe is attached to the pipe support stand 42 on the stern side. A metal freely rotating roller 44 for supporting a pipe is attached to the pipe support base 42, and the fixed shoe 43
The already joined pipe 2 is supported by the free rotating rollers 44, and the newly joined pipe 3 is supported by the freely rotating rollers 44, so that the pipe and the centering welding cart can be moved relative to each other.

前記走行フレーム27上には、溶接機電源4
5、制御盤46およびその他溶接ガス、手動溶接
機、または自動溶接機あるいは半自動溶接機、芯
出センサー等接合作業に必要なすべての機械器具
類が搭載される。また走行フレーム27の側部に
は受電装置47が取付けられ、かつ各軌道を覆う
オーニング装置48の側部に連続して架設された
給電レール49から前記受電装置47を介して常
時受電して溶接用電源、芯出センサー用電源、芯
出制御装置用電源、芯出駆動用電源、走行用電源
とする。
On the traveling frame 27, a welding machine power source 4 is installed.
5. A control panel 46 and all other mechanical equipment necessary for welding work such as welding gas, manual welding machine, automatic welding machine, semi-automatic welding machine, centering sensor, etc. are installed. In addition, a power receiving device 47 is attached to the side of the running frame 27, and constantly receives power from a power feeding rail 49 installed continuously on the side of an awning device 48 covering each track via the power receiving device 47 for welding. power source for the centering sensor, power source for the centering control device, power source for the centering drive, and power source for driving.

次に前述のように構成されたパイプ接合装置を
使用して水底敷設用配管を接合する場合について
説明する。
Next, a case will be described in which the pipe joining apparatus configured as described above is used to join pipes for laying under water.

まず船首側の回転盤18上には新規に再使用す
る芯出溶接台車50Aが待機しており、既接合パ
イプ2は敷設船1上の多数の移送ローラ51によ
り支持されると共にテンシヨナー5により敷設船
1に繋止され水底まで連続している。また船尾側
の芯出溶接台車50Fは、全作業サイクルを終了
して既接合パイプ2と共に進水方向の移動を終了
している。
First, a new centering welding cart 50A to be reused is waiting on the rotary disk 18 on the bow side, and the already joined pipe 2 is supported by a number of transfer rollers 51 on the laying ship 1 and laid by the tensioner 5. It is moored to Ship 1 and continues to the bottom of the water. Furthermore, the centering welding cart 50F on the stern side has completed the entire work cycle and has finished moving in the launching direction together with the joined pipe 2.

進水方向移動の過程で、芯出溶接台車50Bの
車輪が船首側の回転盤18上の中継レールを通過
してから、その回転盤18を180゜回転させて、
次の新規芯出溶接台車50Aを帰還レール15か
ら進水レール14へ回転移動させる。この新規芯
出溶接台車50Aは新規接合パイプ3を支持でき
る位置まで進水レール14上を移動している。ま
た上部クレーン装置51により吊り下げて待機し
ていた新規接合パイプ3を芯出溶接台車50Cの
自由回転ローラ44および芯出溶接台車50Bの
固定シユー43の上に下ろす(第3図および第4
図参照)。
In the process of movement in the launching direction, the wheels of the centering welding cart 50B pass the relay rail on the rotary disk 18 on the bow side, and then the rotary disk 18 is rotated 180 degrees.
The next new centering welding cart 50A is rotationally moved from the return rail 15 to the launch rail 14. This new centering welding cart 50A has moved on the launch rail 14 to a position where it can support the new joint pipe 3. In addition, the newly joined pipe 3, which has been suspended and waiting by the upper crane device 51, is lowered onto the freely rotating roller 44 of the centering welding cart 50C and the fixed shoe 43 of the centering welding cart 50B (see FIGS. 3 and 4).
(see figure).

次に管溶接部の内面に装着したインナークラン
プ用動力ケーブルホース等の接続や交換を行なつ
たのち、芯出溶接台車50Bを船尾側に走行させ
て新規接合パイプ3の管端と既接合パイプ2の管
端とを芯出溶接台車50Cの上で対向させ、かつ
芯出溶接台車50Cの両側の芯出装置(左右微動
用スクリユウジヤツキおよび上下微動用スクリユ
ウジヤツキ)を適宜駆動して接合部の芯出しを行
なう。
Next, after connecting or replacing the power cable hose for the inner clamp attached to the inner surface of the pipe welding part, the centering welding cart 50B is driven toward the stern side, and the pipe end of the newly joined pipe 3 is connected to the already joined pipe. 2 and the pipe ends facing each other on the centering welding cart 50C, and joining by appropriately driving the centering devices (screw jacks for left and right fine movement and screw jacks for vertical fine movement) on both sides of the centering welding cart 50C. Center the parts.

そして手動溶接機による溶接の場合は、直ちに
溶接作業を行ない、同一継手部の全溶接が完了す
るまでロスタイムなしに溶接作業を続行する。ま
た自動溶接機による溶接の場合は、全作業サイク
ルタイムの間自動溶接機を既接合パイプ2の管端
側に装着し、接合管端線にセツト調整されている
ので、この場合も芯出完了後に直ちにアーク開始
することができる。
In the case of welding using a manual welding machine, the welding work is started immediately, and the welding work is continued without loss time until all welding of the same joint is completed. In addition, in the case of welding with an automatic welding machine, the automatic welding machine is attached to the pipe end side of the joined pipe 2 during the entire work cycle time, and the welding pipe is set and adjusted to the joint pipe end line, so centering is completed in this case as well. The arc can then be started immediately.

溶接以外の接合部作業は他のステージで完了
し、また芯出溶接台車上で芯出初層溶接後にパイ
プを進水移動しても支障がない状態になつたと
き、直ちにパイプを1本分だけ進水させる。
Joint work other than welding is completed in other stages, and when the state is reached where there is no problem in launching and moving the pipe after centering and first layer welding on the centering welding cart, immediately move only one pipe. launch it.

芯出溶接台車上では、このサイクルタイムを繰
り返す間にパイプと共に移動し、連続して全溶接
作業が完了するまで接合作業を続行する。
On the centering welding cart, it moves with the pipe as this cycle time repeats, continuing the joining operation until all welding operations are completed.

芯出溶接台車50F上の接合部は、溶接が完了
しており、次の進水に備えて自由回転ローラおよ
び固定シユーを下降して待機している。
Welding of the joints on the centering welding cart 50F has been completed, and the free-rotating rollers and fixed shoe are lowered to wait in preparation for the next launch.

次の進水開始後、芯出溶接台車50Eが回転盤
19の中継レールに乗る前に、その回転盤19を
180゜回転して芯出溶接台車50Fを帰還レール
15のライン上に移動する。また芯出溶接台車5
0Eは新たにセツトされた回転盤19上の他の中
継レール上に乗つて進水を行なう。
After the start of the next launch, before the centering welding cart 50E gets on the relay rail of the turntable 19, the turntable 19 is
Rotate 180 degrees and move the centering welding cart 50F onto the line of the return rail 15. Also, centering welding cart 5
0E rides on another relay rail on the newly set turntable 19 and launches.

一方、前記芯出溶接台車50Fは帰還レール1
5上を直ちに自走して船首側の回転盤18の中継
レール上に乗り次のサイクルに備えて待機する。
各芯出溶接台車上には、芯出および溶接の作業者
が乗つていて台車と共に移動しながら作業を行な
う。
On the other hand, the centering welding cart 50F is connected to the return rail 1.
5, and rides on the relay rail of the turntable 18 on the bow side, waiting for the next cycle.
A centering and welding worker rides on each centering and welding cart and performs the work while moving with the cart.

前記実施例のように、芯出溶接台車として進水
レール上を転動する車輪を有する型式のものを使
用すれば、大荷重の支持が可能であり、かつ移動
摩擦が少なくなると共にパイプテンシヨナーに与
える摩擦抵抗も少なくなつてテンシヨン管理が容
易になり、さらに敷設ラインの移送設備費はコス
ト安になる。
As in the above embodiment, if a type of centering welding cart with wheels that rolls on a launching rail is used, it is possible to support a large load, reduce movement friction, and reduce the pipe tensioner. The frictional resistance exerted on the wire is also reduced, making tension management easier, and furthermore, the cost of transport equipment for the laying line is reduced.

前記実施例においては、芯出溶接台車としてレ
ール上を走行する型式のものを使用しているが、
これに代えて無限軌道式走行車あるいはその他の
走行車を使用してもよい。また芯出溶接台車に発
電設備を搭載しこれにより必要な電源を得るよう
にしてもよい。
In the above embodiment, a type of centering welding cart that runs on rails is used.
Alternatively, a tracked vehicle or other vehicle may be used. Alternatively, a power generation facility may be mounted on the centering welding cart to obtain the necessary power.

芯出溶接台車を進水レールまたは帰還レールに
乗り移らせる手段としては、第10図に示すよう
に進水レール14および帰還レール15の両端部
を半円形の中継レール52により接続して、その
中継レール52を経て乗り移らせる手段を採用し
てもよく、第11図に示すように直線状の中継レ
ール21を備えているトラバーサ53,54を、
流体圧式ジヤツキ55により左右方向に移動させ
る手段を採用してもよく、あるいは進水レールの
下方に帰還レールを設置して流体圧式ジヤツキに
より中継レール付きトラバーサを上下方向に移動
させる手段を採用してもよい。さらにまた前記芯
出溶接台車としては自走用駆動装置を持たないも
のを使用してもよい。
As a means for transferring the centering welding cart to the launch rail or the return rail, as shown in FIG. A means for transferring via a relay rail 52 may be adopted, and as shown in FIG.
A means for moving the traverser with a relay rail in the left-right direction using a hydraulic jack 55 may be adopted, or a means for installing a return rail below the launch rail and moving the traverser with a relay rail in the vertical direction using a hydraulic jack may be adopted. Good too. Furthermore, the centering welding cart may be one that does not have a self-propelled drive device.

この発明によれば、多数の芯出溶接台車を船首
側から船尾側に向かつて移行させながら、その芯
出溶接台車上で既接合パイプ2と新規接合パイプ
3との芯出しおよび溶接その他の接合作業を行な
うので、進水時間中も溶接を行なつて溶接開始か
ら溶接完了までの所要時間を著しく短縮すること
ができ、かつステージ毎の溶接機の着脱作業が不
要であるので、作業が簡単であると共に、着脱初
期調整時間が不要であるので作業時間を短縮する
ことができ、しかも着脱回数が少なくなるので、
溶接機の損傷率が少なくなり、さらに各溶接部の
全溶接を同一作業者が行なえるので、品質管理を
明確化できると共に溶接部の合格率を向上させる
ことができ、その上、管長に乱尺があつても接合
部毎に溶接機や作業者が移動する必要はない。ま
た1個所の接合部に対する溶接機の着脱は1回で
済むので、溶接機の着脱時間をあまり短縮する必
要はなく、そのため自動溶接機を使用する場合は
迅速に着脱できる高価なものを使用する必要がな
いので設備費を安くすることができ、かつ各芯出
溶接台車は独立して移動できるので、乱尺パイプ
に対して容易に対応させることができ、さらに溶
接機や芯出センサー等の装着および位置合わせを
芯出溶接に入る前の段階で行なうことができるの
で、サイクルタイムを短縮することができ、しか
も芯出溶接台車の帰還行程中に台車上の機械器具
類の保守、修理および消耗品の補給等を行なうこ
とができるので、管理が容易である。さらにま
た、芯出溶接台車とパイプとは相対的に移動しな
いので、船体動揺によりパイプが船体に対し往復
移動しても支障なく芯出溶接作業を行なうことが
でき、そのためロスタイムをなくして稼働率を向
上させることができ、さらに芯出から溶接完了ま
での全作業を同一作業者チームで行なえるので、
要員数を少なくできる等の効果が得られる。
According to this invention, while moving a large number of centering welding carts from the bow side to the stern side, centering and welding and other joining of the already joined pipe 2 and the newly joined pipe 3 are performed on the centering welding carts. Since welding is carried out during the launch time, the time required from the start of welding to the completion of welding can be significantly shortened, and there is no need to attach or detach the welding machine at each stage, making the operation easy. In addition, there is no need for initial adjustment time for attachment/detachment, which reduces work time, and also reduces the number of times of attachment/detachment.
The rate of damage to the welding machine is reduced, and since all welding can be done by the same worker, quality control can be clarified and the pass rate of welds can be improved. Even if there is a length, there is no need for welders or workers to move for each joint. In addition, since the welding machine only needs to be attached and detached once for each joint, there is no need to reduce the time taken to attach and detach the welding machine. Therefore, when using an automatic welding machine, use an expensive one that can be attached and detached quickly. This eliminates the need for equipment costs, and since each centering welding cart can be moved independently, it can be easily adapted to handle irregular length pipes. Since installation and positioning can be carried out before starting centering welding, cycle time can be shortened, and the machinery and equipment on the centering welding cart can be maintained, repaired, and repaired during the return process of the centering welding cart. Management is easy because consumables can be replenished. Furthermore, since the centering welding trolley and the pipe do not move relative to each other, centering welding work can be performed without any problem even if the pipe moves back and forth with respect to the ship due to ship shaking, which eliminates loss time and improves operating efficiency. Furthermore, all work from centering to welding completion can be performed by the same team of workers.
Effects such as being able to reduce the number of personnel can be obtained.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の水底敷設用パイプ接合方法を説
明するための側面図、第2図はその平面図であ
る。第3図ないし第9図はこの発明の一実施例を
示すものであつて、第3図はパイプ接合作業を行
なつている状態を示す概略側面図、第4図はその
概略平面図、第5図は芯出溶接台車を載置する回
転盤を示す一部縦断正面図、第6図は芯出溶接台
車の概略平面図、第7図はその概略側面図、第8
図は芯出溶接台車における芯出装置を切断して示
す側面図、第9図はその一部縦断正面図である。
第10図および第11図は進水レールおよび帰還
レール間の芯出溶接台車の移動装置の他の例を示
す平面図である。 図において、1は敷設船、2は既接合パイプ、
3は新規接合パイプ、14は進水レール、15は
帰還レール、18は船首側回転盤、19は船尾側
回転盤、21は中継レール、22は環状レール、
24は減速機付きモーター、27は走行フレー
ム、29は走行用減速機付きモーター、34は横
行用減速機付きモーター、35は左右微動用スク
リユウジヤツキ、36は横行支持台、37は昇降
用減速機付きモータ、38は上下微動用スクリユ
ウジヤツキ、40はピストン、42はパイプ支持
台、43はパイプ支承用金属製固定シユー、44
は自由回転ローラである。
FIG. 1 is a side view for explaining a conventional method of joining pipes for laying on the bottom of the water, and FIG. 2 is a plan view thereof. 3 to 9 show one embodiment of the present invention, in which FIG. 3 is a schematic side view showing a state in which pipe joining work is being performed, FIG. 4 is a schematic plan view thereof, and FIG. Fig. 5 is a partially vertical front view showing a rotary disk on which the centering welding cart is placed, Fig. 6 is a schematic plan view of the centering welding cart, Fig. 7 is a schematic side view thereof, and Fig. 8 is a schematic plan view of the centering welding cart.
The figure is a cutaway side view showing the centering device in the centering welding cart, and FIG. 9 is a partially longitudinal sectional front view thereof.
FIGS. 10 and 11 are plan views showing other examples of a moving device for a centering welding cart between a launch rail and a return rail. In the figure, 1 is the laying ship, 2 is the joined pipe,
3 is a new joint pipe, 14 is a launching rail, 15 is a return rail, 18 is a bow side rotating disk, 19 is a stern side rotating disk, 21 is a relay rail, 22 is an annular rail,
24 is a motor with a speed reducer, 27 is a traveling frame, 29 is a motor with a speed reducer for traveling, 34 is a motor with a traverse speed reducer, 35 is a screw jack for left and right fine movement, 36 is a traverse support base, 37 is a speed reducer for lifting 38 is a screw jack for vertical fine movement, 40 is a piston, 42 is a pipe support stand, 43 is a metal fixed shoe for pipe support, 44
is a freely rotating roller.

Claims (1)

【特許請求の範囲】[Claims] 1 敷設船1上の進水ラインにおいて芯出装置お
よび溶接機等の接合用機械器具を搭載した多数の
芯出溶接台車を、船首側から船尾側に向かつて独
立して移行させ、その移行中に芯出溶接台車上で
既接合パイプ2と新規接合パイプ3とを前記芯出
装置により支持して芯出しすると共に前記溶接機
により溶接し、芯出溶接が完了した接合部の下部
にある芯出溶接台車を、前記進水ラインの側方ま
たは下方の帰還ラインを通つて進水ラインの船首
側端部に帰還させることを特徴とする水底敷設用
パイプの接合方法。
1 In the launching line on the laying ship 1, a large number of centering welding carts equipped with centering devices and welding machines and other joining machines are independently moved from the bow side to the stern side, and during the transfer The already joined pipe 2 and the newly joined pipe 3 are supported and centered by the centering device on the centering welding cart and welded by the welding machine. A method for joining pipes for laying on the underwater bottom, characterized in that the welding cart is returned to the bow side end of the launching line through a return line on the side or below the launching line.
JP9254678A 1978-07-31 1978-07-31 Jointing method of pipe laying on water bottom Granted JPS5520921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9254678A JPS5520921A (en) 1978-07-31 1978-07-31 Jointing method of pipe laying on water bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9254678A JPS5520921A (en) 1978-07-31 1978-07-31 Jointing method of pipe laying on water bottom

Publications (2)

Publication Number Publication Date
JPS5520921A JPS5520921A (en) 1980-02-14
JPS62397B2 true JPS62397B2 (en) 1987-01-07

Family

ID=14057381

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9254678A Granted JPS5520921A (en) 1978-07-31 1978-07-31 Jointing method of pipe laying on water bottom

Country Status (1)

Country Link
JP (1) JPS5520921A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5707181B2 (en) * 2011-03-07 2015-04-22 新日鉄住金エンジニアリング株式会社 Nondestructive inspection method and nondestructive inspection device for butt welds of pipes on laid ships
JP5583832B1 (en) * 2013-09-30 2014-09-03 東芝プラントシステム株式会社 Tube support device, tube connection method and tube connection post-treatment method
ES2937964T3 (en) * 2018-04-13 2023-04-03 Nippon Steel Corp Splice connection method for long pipes and method for producing coiled pipes with splices

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2089215A5 (en) * 1970-04-09 1972-01-07 Saipem Spa
JPS5178521A (en) * 1974-12-30 1976-07-08 Nippon Steel Corp SUITEIHAIKANSHISETSUYOSHINDASHIISOSOCHI

Also Published As

Publication number Publication date
JPS5520921A (en) 1980-02-14

Similar Documents

Publication Publication Date Title
US4117692A (en) Method and a system for producing and laying oil or gas pipelines on the sea bottom
EP0090672B1 (en) Improvements in or relating to welding and laying pipelines
CA2355624C (en) Method and apparatus for welding pipes together
US20100040417A1 (en) Pipelaying Vessel
CN107980015B (en) Pipe assembly station
US5413434A (en) Method and installation for laying a pipeline
CN114986048B (en) Automatic pipeline welding device and installation and construction method
WO2019228304A1 (en) Manufacturing tool for welding u-shaped rib of orthotropic plate unit, and assembly line and method
US3920946A (en) Method and apparatus for automatic welding of steel pipes
US3890482A (en) Apparatus for welding together substantially vertically extending pipe sections
CN214134406U (en) Automatic welding device for cylinder welding seam
US3969905A (en) Method and apparatus for laying pipelines
JPS62397B2 (en)
JP4090134B2 (en) Automatic flange / rib welding equipment for pipes
CN116928446A (en) Large-caliber metal pipeline installation device and method
JPS63158386A (en) In-pipe execution method
CN217142902U (en) Bearing roller transmission device of usefulness is assembled to steel construction
JP5707181B2 (en) Nondestructive inspection method and nondestructive inspection device for butt welds of pipes on laid ships
CN115041905B (en) Pipeline installation method in tunnel
CN113814568B (en) A kind of automatic welding equipment and method for large taper powder drum
CN210023339U (en) Steel construction processing of preventing running off is with equipment of bending
JPH1018575A (en) Piping mounting structure of work cart for spraying refractories
US4549060A (en) Mobile arrangement for laying a continuous pipeline
CN201752813U (en) Novel belt-type welding flux backing
JP4292059B2 (en) Pipeline laying method