JPS6245319B2 - - Google Patents
Info
- Publication number
- JPS6245319B2 JPS6245319B2 JP13150882A JP13150882A JPS6245319B2 JP S6245319 B2 JPS6245319 B2 JP S6245319B2 JP 13150882 A JP13150882 A JP 13150882A JP 13150882 A JP13150882 A JP 13150882A JP S6245319 B2 JPS6245319 B2 JP S6245319B2
- Authority
- JP
- Japan
- Prior art keywords
- partition wall
- washing tank
- water
- upstream
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000005192 partition Methods 0.000 claims description 75
- 238000005406 washing Methods 0.000 claims description 57
- 238000011144 upstream manufacturing Methods 0.000 claims description 44
- 238000007747 plating Methods 0.000 claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 69
- 238000000034 method Methods 0.000 description 5
- 238000011010 flushing procedure Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000002203 pretreatment Methods 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 238000004220 aggregation Methods 0.000 description 1
- 230000002776 aggregation Effects 0.000 description 1
- 238000005238 degreasing Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000005554 pickling Methods 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Landscapes
- Cleaning By Liquid Or Steam (AREA)
- Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)
Description
【発明の詳細な説明】
この発明は、めつきに使用される多段水洗槽の
改良に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an improvement in a multistage washing tank used for plating.
一般に、この種の多段水洗槽は、めつき処理前
の脱脂、酸洗などの前処理工程で被処理物の表面
に付着した混濁物を含む前処理液を洗浄するため
に使用され、水洗槽本体と、その水洗槽本体の所
定の位置に配置された上流側仕切壁、およびその
上流側仕切壁から適宜の間隔を保ち、かつ、底壁
側に隙間を形成するように、その水洗槽本体に配
置された下流側仕切壁よりなる堰とから構成され
てきている。 Generally, this type of multi-stage water washing tank is used to wash the pretreatment liquid containing turbid substances that adhere to the surface of the workpiece during pretreatment processes such as degreasing and pickling before plating. The main body, an upstream partition wall arranged at a predetermined position of the washing tank main body, and the washing tank main body so as to maintain an appropriate distance from the upstream partition wall and to form a gap on the bottom wall side. It has been constructed of a weir consisting of a downstream partition wall located at the downstream side.
そのように構成される多段水洗槽において、一
方の側に供給される流水は、その上流側仕切壁を
オーバ・フローし、そのオーバ・フローされた流
水はその下流側仕切壁によつてせき止められて、
その上流側および下流側仕切壁間を底壁側に向け
て流れ、さらに、その下流側仕切壁の下方の隙間
を通過し、そのような流れを繰り返しながらその
水洗槽本体内を上下に蛇行して一方の側から他方
の側へ流れる。 In a multi-stage washing tank configured in this way, the flowing water supplied to one side overflows the upstream partition wall, and the overflowing water is dammed by the downstream partition wall. hand,
The water flows between the upstream and downstream partition walls toward the bottom wall, passes through the gap below the downstream partition wall, and meanderes up and down within the washing tank body while repeating this flow. flows from one side to the other.
しかし、めつき処理前の工程における被処理物
をその多段水洗槽内で水洗すると、その被処理物
の表面に付着した混濁物を含む前処理液が除去さ
れ、比重が比較的重い混濁物はその多段水洗槽内
に沈殿するが、比重が軽い物、例えば、細かい汚
物や油分を含む汚物はその流水の水面に浮遊し、
そのような浮遊物は、流水が上述のように流れて
も、その流水の表面張力によつてその上流側仕切
壁の上端縁に付着し、また、その浮遊物はその上
流側仕切壁の上端縁付近で凝集し、漂流する傾向
にあることから、その浮遊物をその多段水洗槽の
外側に流し出すことが困難であり、さらに、その
ような汚物が浮遊している多段水洗槽内で被処理
物を水洗すると、その浮遊物が被処理物に付着
し、殊に、槽間の落差が少ない場合には適切な水
洗を行うことが困難であつた。 However, when the object to be treated in the step before plating treatment is washed with water in the multi-stage water washing tank, the pre-treatment liquid containing the turbidity adhering to the surface of the object is removed, and the turbidity with a relatively heavy specific gravity is removed. Although they settle in the multi-stage washing tank, substances with light specific gravity, such as fine dirt and dirt containing oil, float on the surface of the running water.
Even if the flowing water flows as described above, such floating objects will adhere to the upper edge of the upstream partition wall due to the surface tension of the flowing water; Because they tend to aggregate near the edges and drift, it is difficult to flush the floating material out of the multi-stage washing tank. When the treated material is washed with water, the suspended matter adheres to the treated material, making it difficult to perform proper washing with water, especially when the head difference between the tanks is small.
この発明の目的は、水洗槽本体内における水洗
工程によつて、流水の水面に浮遊する浮遊物の堰
への付着を防止し、その浮遊物を流水と共にその
水洗槽本体の外側に流し出し、その水洗槽本体内
の流水を常に清浄な状態に維持するところのめつ
きに使用される多段水洗槽の提供にある。 The purpose of this invention is to prevent floating matter floating on the water surface of running water from adhering to the weir through a flushing process within the flushing tank body, and to flush out the floating matter along with the running water to the outside of the flushing tank body. To provide a multi-stage rinsing tank used for plating, which always maintains the flowing water in the rinsing tank body in a clean state.
それらを課題として、この発明のめつきに使用
される多段水洗槽では、水洗槽本体の所定の位置
に配置された上流側仕切壁、および、その上流側
仕切壁から適宜の間隔を保ち、かつ、底壁側に所
定の隙間を形成するように、その水洗槽本体に配
置された下流側仕切壁よりなる堰を備えるものに
して、入口側切欠きが、その上流側仕切壁の上方
で、一方の側に偏せられた位置に形成され、か
つ、出口側切欠きが、その下流側仕切壁の上方
で、他方の側に偏せられた位置に形成されてい
る。 In view of these issues, the multi-stage washing tank used for plating of the present invention includes an upstream partition wall arranged at a predetermined position of the washing tank main body, an appropriate distance from the upstream partition wall, and , a weir consisting of a downstream partition wall arranged on the washing tank body so as to form a predetermined gap on the bottom wall side, and the inlet side notch is above the upstream partition wall, The outlet cutout is formed at a position offset to one side, and the outlet side notch is formed at a position offset to the other side above the downstream partition wall.
以下、この発明に係るめつきに使用される多段
水洗槽の望ましい具体例について、図面を参照し
て説明する。 Hereinafter, preferred specific examples of the multi-stage washing tank used for plating according to the present invention will be described with reference to the drawings.
第1ないし3図は、この発明のめつきに使用さ
れる多段水洗槽の具体例10を示している。 1 to 3 show a specific example 10 of a multi-stage washing tank used for plating according to the present invention.
その多段水洗槽10は、水洗槽本体11内に適
宜の間隔を保つて配置された上流側仕切壁14,
15および、その上流側仕切壁14,15から僅
かな間隔を保ち、かつ、底壁18側に隙間19,
20を形成するように、その水洗槽本体11に配
置された下流側仕切壁16,17よりなる堰1
2,13を備えるもので、入口側切欠き21,2
2が、その上流側仕切壁14,15の上方で、一
方の側に偏せられた位置にそれぞれ形成され、か
つ、出口側切欠き23,24が、その下流側仕切
壁16,17の上方で、他方の側に偏せられた位
置にそれぞれ形成されている。 The multi-stage washing tank 10 includes an upstream partition wall 14 arranged at an appropriate interval within the washing tank main body 11,
15, and a gap 19, which is kept at a small distance from the upstream partition walls 14, 15, and on the bottom wall 18 side.
A weir 1 consisting of downstream partition walls 16 and 17 arranged in the washing tank main body 11 so as to form a
2, 13, and the inlet side notches 21, 2
2 are formed above the upstream partition walls 14 and 15 at positions biased to one side, and outlet side notches 23 and 24 are formed above the downstream partition walls 16 and 17, respectively. and are each formed at a position offset to the other side.
水洗槽本体11は、金属、合成樹脂などからな
り、上方を開口して箱型に構成されている。 The washing tank main body 11 is made of metal, synthetic resin, or the like, and has a box shape with an upper opening.
堰12,13は、それぞれ上流側仕切壁14,
15および下流側仕切壁16,17よりなり、そ
の水洗槽本体11内に複数の槽30,31,32
を形成するように、その水洗槽本体11内に所定
の間隔を保つてほぼ平行に配置されている。 Weirs 12 and 13 are connected to upstream partition walls 14 and 13, respectively.
15 and downstream partition walls 16, 17, and a plurality of tanks 30, 31, 32 are provided in the washing tank main body 11.
They are arranged substantially parallel to each other at a predetermined distance within the washing tank main body 11 so as to form the following.
すなわち、その堰12を構成する上流側仕切壁
14は、その水洗槽本体11内で所定の位置に配
置され、その水洗槽本体11の一方の側に槽30
を形成している。 That is, the upstream partition wall 14 constituting the weir 12 is arranged at a predetermined position within the washing tank main body 11, and the tank 30 is placed on one side of the washing tank main body 11.
is formed.
勿論、その上流側仕切壁14の高さは、その水
洗槽本体11の高さよりも低く、その槽30内に
供給される流水がその上流側仕切壁14の上端縁
においてオーバ・フローするように構成されてい
る。 Of course, the height of the upstream partition wall 14 is lower than the height of the washing tank main body 11, so that the running water supplied into the tank 30 overflows at the upper edge of the upstream partition wall 14. It is configured.
従つて、その上流側仕切壁14の高さは、その
槽30内の流水の水位面を決定する。 Therefore, the height of the upstream partition wall 14 determines the water level of the flowing water in the tank 30.
その堰12を構成する下流側仕切壁16は、そ
の上流側仕切壁14から僅かな間隔を保ち、しか
も、その水洗槽本体11の底壁18側に所定の隙
間19を形成するように、その水洗槽本体11に
配置されている。 The downstream partition wall 16 constituting the weir 12 is spaced a short distance from the upstream partition wall 14, and is arranged so as to form a predetermined gap 19 on the bottom wall 18 side of the washing tank main body 11. It is arranged in the washing tank main body 11.
その下流側仕切壁16は、その上流側仕切壁1
4をオーバー・フローする流水をせき止め、その
流水をその隙間19側に流すように構成されてい
る。 The downstream partition wall 16 is the upstream partition wall 1
4 is constructed so as to dam up the flowing water overflowing the gap 19 and allow the flowing water to flow toward the gap 19 side.
勿論、その下流側仕切壁16は、第1および2
図から理解されるように、その水洗槽本体11内
において上方に持ち上げられた状態で、その水洗
槽本体11の両側壁に固定され、その底壁18側
に隙間19を形成しているが、槽31内の流水の
流れに対して極端な妨げにならない程度にその下
流側仕切壁16の下方に開口を形成し、その下流
側仕切壁16の下端をその水洗槽本体11の底壁
18に近接させて配置するものでも良い。 Of course, the downstream partition wall 16
As can be understood from the figure, it is fixed to both side walls of the washing tank main body 11 while being lifted upward within the washing tank main body 11, and a gap 19 is formed on the bottom wall 18 side. An opening is formed below the downstream partition wall 16 to the extent that it does not significantly impede the flow of water in the tank 31, and the lower end of the downstream partition wall 16 is connected to the bottom wall 18 of the washing tank main body 11. They may be placed close to each other.
また、その堰13を構成する上流側仕切壁15
は、上述の下流側仕切壁16から適宜の間隔を保
ち、その下流側仕切壁16との間に槽31を形成
するように、その水洗槽本体11内に配置されて
いる。 In addition, the upstream partition wall 15 that constitutes the weir 13
is arranged within the washing tank main body 11 so as to maintain an appropriate distance from the above-mentioned downstream partition wall 16 and form a tank 31 between the downstream partition wall 16 and the downstream partition wall 16 .
勿論、その上流側仕切壁15の高さは、上述の
上流側仕切壁14の高さよりも僅かに低く、その
槽31内に供給される流水がその上流側仕切壁1
5の上端縁においてオーバ・フローするように構
成されている。 Of course, the height of the upstream partition wall 15 is slightly lower than the height of the above-mentioned upstream partition wall 14, so that the flowing water supplied into the tank 31 flows through the upstream partition wall 1.
It is configured to overflow at the upper edge of 5.
従つて、その上流側仕切壁15は、その槽31
内の流水の水位面を決定する。 Therefore, the upstream partition wall 15 is connected to the tank 31.
Determine the water level of running water within.
その堰13を構成する下流側仕切壁17は、そ
の上流側仕切壁15から僅かな間隔を保ち、しか
も、その水洗槽本体11の底壁18側に所定の隙
間20を形成するように、その水洗槽本体11に
配置されている。 The downstream partition wall 17 constituting the weir 13 is spaced a short distance from the upstream partition wall 15, and is arranged so as to form a predetermined gap 20 on the bottom wall 18 side of the washing tank body 11. It is arranged in the washing tank main body 11.
その下流側仕切壁17は、その上流側仕切壁1
5をオーバ・フローする流水をせき止め、その流
水をその隙間20側に流すように構成されてい
る。 The downstream partition wall 17 is the upstream partition wall 1
It is configured to dam the running water overflowing the gap 5 and allow the running water to flow toward the gap 20 side.
勿論、その下流側仕切壁17は、第1および2
図から理解されるように、その水洗槽本体11内
において、上方に持ち上げられた状態で、その水
洗槽本体11の両側壁に固定され、その底壁18
側に隙間20を形成しているが、槽32内の流水
の流れに対して極端な妨げにならない程度に、そ
の下流側仕切壁17の下方に開口を形成し、その
下流側仕切壁17の下端をその水洗槽本体11の
底壁18に近接させて配置するものでも良い。 Of course, the downstream partition wall 17
As can be understood from the figure, inside the washing tank main body 11, the bottom wall 18 is fixed to both side walls of the washing tank main body 11 in an upwardly lifted state.
Although a gap 20 is formed on the side, an opening is formed below the downstream partition wall 17 to the extent that it does not significantly impede the flow of water in the tank 32. The lower end may be placed close to the bottom wall 18 of the washing tank main body 11.
また、その下流側仕切壁17は、上述のように
配置されることにより、その水洗槽本体11の他
方の側に槽32を形成していることは勿論であ
る。 Moreover, it goes without saying that the downstream partition wall 17 forms the tank 32 on the other side of the washing tank main body 11 by being arranged as described above.
入口側切欠き21,22は、上述の堰12,1
3における上流側仕切壁14,15の上方で、一
方の側に偏せられた位置にそれぞれ形成され、ま
た下流側切欠き23,24は、その堰12,13
における下流側仕切壁16,17の上方で、他方
の側に偏せられた位置にそれぞれ形成されてい
る。 The inlet side notches 21 and 22 are the above-mentioned weirs 12 and 1.
The downstream notches 23 and 24 are formed above the upstream partition walls 14 and 15 in the weirs 12 and 13, respectively, at positions biased to one side.
They are formed above the downstream partition walls 16, 17 at positions offset to the other side.
すなわち、その堰12における入口側切欠き2
1は、その上流側仕切壁14の上方の縁で、一端
側に偏せられた位置に形成されている。 That is, the inlet side notch 2 in the weir 12
1 is an upper edge of the upstream partition wall 14, and is formed at a position biased toward one end.
勿論、その入口側切欠き21は所定の幅および
深さをもつて形成され、その幅および深さは、そ
の水洗槽本体11の大きさ、換言するならば、容
量、および、その水洗槽本体11に供給される流
水の流速に応じて決定される。 Of course, the inlet side notch 21 is formed with a predetermined width and depth, and the width and depth correspond to the size of the washing tank body 11, in other words, the capacity and the washing tank main body. It is determined according to the flow rate of the flowing water supplied to 11.
従つて、流水がその槽30内を満たすように供
給されれば、その流水は、その上流側仕切壁14
をオーバ・フローすることは勿論のこと、その流
水は、その入口側切欠き21側に向けて、その槽
30内を対角線状に流れる。 Therefore, if running water is supplied to fill the tank 30, the running water will flow through the upstream partition wall 14.
Not only does the water overflow, but the water also flows diagonally within the tank 30 toward the inlet cutout 21 side.
その堰12における出口側切欠き23はその下
流側仕切壁16の上方の縁で、他端側に偏せられ
た位置に形成されている。 The outlet side notch 23 in the weir 12 is formed at the upper edge of the downstream partition wall 16 at a position biased toward the other end.
その出口側切欠き23は、所定の幅および深さ
をもつて形成されるが、その上流側および下流側
仕切壁14,16間を流れる流水の水位面よりも
僅かに下方に相当する位置まで切り欠くことによ
つて形成されている。 The outlet side notch 23 is formed with a predetermined width and depth, and extends to a position slightly below the water level of the flowing water flowing between the upstream and downstream partition walls 14 and 16. It is formed by cutting out.
また、その堰13における入口側切欠き22
は、その上流側仕切壁15の上方の縁で、一端側
に偏せられた位置に形成されている。 In addition, the inlet side notch 22 in the weir 13
is formed at the upper edge of the upstream partition wall 15 at a position biased toward one end.
その入口側切欠き22は、所定の幅および深さ
をもつて形成されるが、上述の下流側仕切壁16
とその上流側仕切壁15との間、すなわち、槽3
1内を流れる流水の水位面よりも僅かに下方に相
当する位置まで切り欠くことによつて形成されて
いる。 The entrance side notch 22 is formed with a predetermined width and depth, but the downstream partition wall 16 described above
and the upstream partition wall 15, that is, the tank 3
It is formed by cutting out to a position slightly below the water level of the flowing water flowing inside the pipe.
勿論、上述の堰12における隙間19および出
口側切欠き23を通過して、その槽31に供給さ
れる流水は、その上流側仕切壁15をオーバ・フ
ローしながら、その入口側切欠き22側に向け
て、その槽31内を対角線状に流れる。 Of course, the flowing water that passes through the gap 19 and the outlet side notch 23 in the weir 12 and is supplied to the tank 31 flows over the upstream partition wall 15 and flows to the inlet side notch 22 side. The water flows diagonally within the tank 31 toward.
その堰13における出口側切欠き24は、その
下流側仕切壁17の上方の縁で、他端側に偏せら
れた位置に形成されている。 The outlet side notch 24 in the weir 13 is formed at the upper edge of the downstream partition wall 17 at a position biased toward the other end side.
その出口側切欠き24は、所定の幅および深さ
をもつて形成されるが、その上流側および下流側
仕切壁15,17間を流れる流水の水位面よりも
僅かに下方に相当する位置まで切り欠くことによ
つて形成されている。 The outlet side notch 24 is formed with a predetermined width and depth, and extends to a position slightly below the water level of the flowing water flowing between the upstream and downstream partition walls 15 and 17. It is formed by cutting out.
また、その水洗槽本体11における槽32で、
一方の側には、内側にオーバ・フロー壁26を備
えた排出溜り25が形成され、その排出溜り25
の排出口27からその槽32内の流水を排出する
ように構成されている。 In addition, in the tank 32 in the washing tank main body 11,
On one side, a drain sump 25 is formed with an overflow wall 26 inside;
The running water in the tank 32 is discharged from the discharge port 27 of the tank 32 .
勿論、その排出溜り25のオーバ・フロー壁2
6は、上端縁がその槽32内の流水の水位面より
も僅かに低くなるように位置されている。 Of course, the overflow wall 2 of the discharge sump 25
6 is positioned so that its upper edge is slightly lower than the water level of the flowing water in the tank 32.
従つて、その堰13における隙間20および出
口側切欠き24を通過して、その槽32内に供給
される流水は、その槽32内をその排出溜り25
側に向けてほぼ対角線状に流れ、そのオーバ・フ
ロー壁26の部分でオーバ・フローし、排出され
る。 Therefore, the flowing water that passes through the gap 20 and outlet side notch 24 in the weir 13 and is supplied into the tank 32 flows through the tank 32 to the discharge pool 25.
It flows approximately diagonally to the side, overflows at its overflow wall 26, and is discharged.
次に、上述の多段水洗槽10における流水の流
れについて説明するに、先ず、その多段水洗槽1
0に流水を供給する場合、槽30側に給水栓28
を配置するが、その給水栓28は、その槽30側
で、入口側切欠き21とほぼ対角線上の位置に配
置される。 Next, to explain the flow of water in the above-mentioned multi-stage washing tank 10, first, the multi-stage washing tank 1
When supplying running water to tank 30, water tap 28 is installed on the tank 30 side.
The water supply faucet 28 is arranged on the tank 30 side at a position substantially diagonal to the inlet side notch 21.
その給水栓28から流水を供給し続けると、そ
の槽30,31,32はその流水でほぼ満たされ
るが、その槽30,31,32の水位面は堰1
2,13によつて順に低くされている。 If running water is continued to be supplied from the hydrant 28, the tanks 30, 31, 32 will be almost filled with the running water, but the water level of the tanks 30, 31, 32 will be lower than the weir 1.
2 and 13 are lowered in order.
そのような状態から流水をさらに供給し続ける
と、その槽30内の流水は、上流側仕切壁14を
オーバ・フローしながら、入口側切欠き21側に
向けて対角線状に流れる。 If flowing water is further supplied from such a state, the flowing water in the tank 30 will flow diagonally toward the inlet side notch 21 while overflowing the upstream partition wall 14.
その流れによつて堰12における隙間19およ
び出口側切欠き23を通過してその槽31に供給
される流水は、堰13の上流側仕切壁15をオー
バ・フローしながら入口側切欠き22側に向けて
対角線状に流れる。 The flowing water passes through the gap 19 in the weir 12 and the outlet side notch 23 and is supplied to the tank 31 due to the flow, while overflowing the upstream partition wall 15 of the weir 13, the water passes through the inlet side notch 22 side. It flows diagonally towards.
さらに、そのような流れによつて堰13におけ
る隙間20および出口側切欠き24を通過してそ
の槽32に供給される流水は、排出部分25側に
向けてほぼ対角線状に流れる。 Furthermore, the flowing water that passes through the gap 20 and the outlet side notch 24 in the weir 13 and is supplied to the tank 32 due to such a flow flows approximately diagonally toward the discharge portion 25 side.
従つて、その多段水洗槽10において、めつき
前処理工程の被処理物を水洗し、それぞれの槽3
0,31,32内の流水に混濁物や油分が浮遊し
ても、上述のような流水の水面側の流れによつ
て、その混濁物や油分が上流側仕切壁14,15
の上端縁に付着し難くなり、その上流側仕切壁1
4,15の上端縁付近での混濁物や油分の凝集が
回避され、その混濁物や油分が入口側切欠き2
1,22および出口側切欠き23,24を通過
し、流水と共に、槽30,31,32側へと順に
流され、その槽32の排出溜り25から排出さ
れ、その結果、その槽30,31,32内の流水
が清浄な状態に維持される。 Therefore, in the multi-stage water washing tank 10, the objects to be treated in the plating pre-treatment process are washed with water, and each tank 3
Even if turbidity or oil is suspended in the flowing water in the water flowing through the water in the upstream partition walls 14, 15, the turbidity or oil will be removed by the surface flow of the flowing water as described above.
It becomes difficult to adhere to the upper edge of the partition wall 1 on the upstream side.
The aggregation of turbidity and oil near the upper edge of 4 and 15 is avoided, and the turbidity and oil are transferred to the inlet side notch 2.
1, 22 and the outlet side notches 23, 24, and are sequentially flowed together with the flowing water to the tanks 30, 31, 32 side, and are discharged from the discharge reservoir 25 of the tank 32, and as a result, the tanks 30, 31 , 32 is maintained in a clean state.
この発明に基づいて通常使用される多段水洗槽
においては、その入口側および出口側切欠き2
1,22,23,24は、それぞれの槽30,3
1,32の流水の水面から2ないし8mmの深さに
し、また、切欠きの幅は流水量に応じて調整しオ
ーバ・フローする水の厚さを2mm以上にすること
が望ましく、そのように構成すれば、上述のよう
な浮遊物の除去が効果的になされる。 In the multi-stage washing tank normally used based on this invention, the inlet side and outlet side notches 2
1, 22, 23, 24 are the respective tanks 30, 3
It is desirable that the depth of the notch be 2 to 8 mm from the water surface of the flowing water at points 1 and 32, and the width of the notch should be adjusted according to the flow rate so that the thickness of the overflowing water is 2 mm or more. With this configuration, the above-mentioned floating substances can be effectively removed.
勿論、上述の多段水洗槽10は、めつきの前処
理工程において使用されるものとして説明した
が、めつきの後処理工程に使用しても、上述と同
様の効果が発揮される。 Of course, the above-described multi-stage washing tank 10 has been described as being used in the plating pre-treatment process, but the same effects as described above can be achieved even if it is used in the plating post-treatment process.
如上のこの発明によれば、水洗槽本体の所定の
位置に配置された上流側仕切壁、および、その上
流側仕切壁から適宜の間隔を保ち、かつ、底壁側
に所定の隙間を形成するように、その水洗槽本体
に配置された下流側仕切壁よりなる堰を備えるめ
つきに使用される多段水洗槽において、入口側切
欠きが、その上流側仕切壁の上方で、一方の側に
偏せられた位置に形成され、かつ、出口側切欠き
が、その下流側仕切壁の上方で、他方の側に偏せ
られた位置に形成されているため、水洗槽本体内
における水洗工程によつて、流水の表面に浮遊す
る浮遊物の堰への付着が防止され、その浮遊物が
流水と共にその水洗槽本体の外側に流し出され、
その水洗槽本体内の流水が常に清浄な状態に維持
され、極めて実用的になる。 According to the above invention, there is an upstream partition wall disposed at a predetermined position of the washing tank main body, an appropriate distance from the upstream partition wall, and a predetermined gap formed on the bottom wall side. In a multi-stage washing tank used for plating equipped with a weir consisting of a downstream partition wall arranged in the main body of the washing tank, the inlet side notch is located above the upstream partition wall on one side. The notch on the outlet side is formed in a position offset to the other side above the downstream partition wall. Therefore, floating matter floating on the surface of the running water is prevented from adhering to the weir, and the floating matter is flushed out of the washing tank body along with the running water.
The running water in the washing tank body is always maintained in a clean state, making it extremely practical.
第1図はこの発明のめつきに使用される多段水
洗槽の具体例の側壁の一部を切り欠いた状態を示
す斜視図、第2図は第1図の多段水洗槽の側壁を
取り除いた状態を示す正面図、および第3図は第
1図に示された多段水洗槽の平面図である。
10…めつきに使用される多段水洗槽、11…
水洗槽本体、12,13…堰、14,15…上流
側仕切壁、16,17…下流側仕切壁、18…底
壁、19,20…隙間、21,22…入口側切欠
き、23,24…出口側切欠き。
Fig. 1 is a perspective view showing a specific example of the multi-stage washing tank used for plating according to the present invention, with a part of the side wall cut away, and Fig. 2 shows the multi-stage washing tank shown in Fig. 1 with the side wall removed. FIG. 3 is a front view showing the state, and a plan view of the multi-stage washing tank shown in FIG. 1. 10...Multi-stage washing tank used for plating, 11...
Washing tank body, 12, 13... Weir, 14, 15... Upstream partition wall, 16, 17... Downstream partition wall, 18... Bottom wall, 19, 20... Gap, 21, 22... Inlet side notch, 23, 24...Exit side notch.
Claims (1)
仕切壁、および、その上流側仕切壁から適宜の間
隔を保ち、かつ、底壁側に所定の隙間を形成する
ように、その水洗槽本体に配置された下流側仕切
壁よりなる堰を備えるものにおいて、 入口側切欠きが、その上流側仕切壁の上方で、
一方の側に偏せられた位置に形成され、かつ、 出口側切欠きが、その下流側仕切壁の上方で、
他方の側に偏せられた位置に形成されている ことを特徴とするめつきに使用される多段水洗
槽。[Claims] 1. An upstream partition wall disposed at a predetermined position in the washing tank main body, and a partition wall that maintains an appropriate distance from the upstream partition wall and forms a predetermined gap on the bottom wall side. and a weir consisting of a downstream partition wall arranged in the washing tank body, the inlet side notch is above the upstream partition wall,
is formed at a position biased to one side, and the outlet side notch is above the downstream partition wall,
A multi-stage washing tank used for plating, characterized in that it is formed in a position biased to the other side.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13150882A JPS5923900A (en) | 1982-07-28 | 1982-07-28 | Multistage rinsing tank to be used for plating |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13150882A JPS5923900A (en) | 1982-07-28 | 1982-07-28 | Multistage rinsing tank to be used for plating |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5923900A JPS5923900A (en) | 1984-02-07 |
| JPS6245319B2 true JPS6245319B2 (en) | 1987-09-25 |
Family
ID=15059664
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13150882A Granted JPS5923900A (en) | 1982-07-28 | 1982-07-28 | Multistage rinsing tank to be used for plating |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5923900A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4125167A1 (en) | 2021-07-27 | 2023-02-01 | FUJIFILM Business Innovation Corp. | Light-emitting element array, optical device, optical measurement device, and method for manufacturing light-emitting element array |
| US11594572B2 (en) | 2017-12-22 | 2023-02-28 | Lumileds Llc | III-nitride multi-wavelength LED for visible light communication |
-
1982
- 1982-07-28 JP JP13150882A patent/JPS5923900A/en active Granted
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11594572B2 (en) | 2017-12-22 | 2023-02-28 | Lumileds Llc | III-nitride multi-wavelength LED for visible light communication |
| EP4125167A1 (en) | 2021-07-27 | 2023-02-01 | FUJIFILM Business Innovation Corp. | Light-emitting element array, optical device, optical measurement device, and method for manufacturing light-emitting element array |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5923900A (en) | 1984-02-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3369732B2 (en) | Wastewater, especially rainwater treatment equipment | |
| US4135530A (en) | Rinsing tank | |
| JPS6245319B2 (en) | ||
| US4641941A (en) | Treatment tank in photosensitive material processing system including a plurality of overflow devices | |
| JPH04290589A (en) | Paint sludge separation tank | |
| JP2541525B2 (en) | Semiconductor substrate processing equipment | |
| CN217854723U (en) | Automatic oil removing device for inclined plate sedimentation tank | |
| JP2001054766A (en) | Multistage cleaning tub | |
| JPH0499025A (en) | Water rinser | |
| US4023369A (en) | Prevention of sand bar formation at outlets into the sea or other bodies of water | |
| JP4350139B2 (en) | Liquid circulation system | |
| JP3144626B2 (en) | Oil-water separation equipment | |
| KR0121204Y1 (en) | Piping Structure of the Body Wash Tank | |
| RU55628U1 (en) | DEVICE FOR CONTINUOUS SEPARATION OF TWO LIQUIDS WITH VARIOUS DENSITY | |
| JP3959879B2 (en) | Electrodeposition coating equipment | |
| SU1175523A1 (en) | Apparatus for degassing water | |
| CN216259243U (en) | Oil-water separation tank in cleaning device | |
| SU1187841A2 (en) | Apparatus for degassing water | |
| CN212664362U (en) | Water washing tank for electroplating processing | |
| KR880002486Y1 (en) | Syphons | |
| CN201132981Y (en) | Anti-overflow device for bottom liquid discharge | |
| JP3605457B2 (en) | painting booth | |
| JP2020000990A (en) | Separation device | |
| JPS59143097A (en) | Stirring equipment of liquid vessel for coating by electrodeposition | |
| JPH0523947A (en) | Chip disposer |