Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6248020B2 - - Google Patents
[go: Go Back, main page]

JPS6248020B2 - - Google Patents

Info

Publication number
JPS6248020B2
JPS6248020B2 JP21414981A JP21414981A JPS6248020B2 JP S6248020 B2 JPS6248020 B2 JP S6248020B2 JP 21414981 A JP21414981 A JP 21414981A JP 21414981 A JP21414981 A JP 21414981A JP S6248020 B2 JPS6248020 B2 JP S6248020B2
Authority
JP
Japan
Prior art keywords
cable
girder
central
sub
cables
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP21414981A
Other languages
Japanese (ja)
Other versions
JPS58113455A (en
Inventor
Nobuo Yamaguchi
Toshiaki Ishise
Shigetaka Magara
Kimio Saito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP21414981A priority Critical patent/JPS58113455A/en
Publication of JPS58113455A publication Critical patent/JPS58113455A/en
Publication of JPS6248020B2 publication Critical patent/JPS6248020B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Fittings On The Vehicle Exterior For Carrying Loads, And Devices For Holding Or Mounting Articles (AREA)
  • Vehicle Step Arrangements And Article Storage (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Description

【発明の詳細な説明】 この発明は、大量の石炭を、周囲の景観と調和
を図るべく屋内に貯蔵する吊り屋根型貯炭施設に
係り、さらにいえば、石炭の搬入コンベアを高架
とし、その搬入コンベアを支持する中央支柱を利
用して吊り屋根を架設したこと、及び吊り屋根は
HP曲面を1単位としてこれを多単位連続せしめ
た構成を特徴とする吊り屋根型貯炭施設に関す
る。
[Detailed Description of the Invention] The present invention relates to a suspended roof type coal storage facility that stores a large amount of coal indoors in order to harmonize with the surrounding scenery, and more specifically, the coal carrying conveyor is elevated and the coal carrying conveyor is elevated. The hanging roof was constructed using the central support supporting the conveyor, and the hanging roof was
The present invention relates to a suspended roof type coal storage facility characterized by a configuration in which multiple HP curved surfaces are connected as one unit.

従来、石炭を屋内に貯蔵する貯炭施設は、ほと
んど鉄骨構造又はRC構造であり、用途上高価に
すぎること、及び施設の大規模化に不利という欠
点があつた。また、石炭の搬入、搬出のハンドリ
ングの合理性に乏しい欠点があつた。
Conventionally, most coal storage facilities for storing coal indoors have steel or reinforced concrete structures, which have the drawbacks of being too expensive for their intended use and being disadvantageous for increasing the scale of the facility. Another drawback was that the handling of coal loading and unloading was not rational.

そこでこの発明の目的は、大規模な恒久的構造
物としての適格性をもち、施工性が良く、安価な
吊り屋根構造の貯炭施設、即ち支柱間を単位に屋
根自重を支え、風による吹き上げ又は振動、揺れ
に対して効果的に抵抗するHP曲面(Hypabolic
Paroboloridal曲面=くら形曲面)を1単位の屋
根構成要素とし、該HP曲面が複数連続する構成
の吊り屋根型貯炭施設を提供することにある。
Therefore, the object of the present invention is to provide a coal storage facility with a suspended roof structure that is suitable as a large-scale permanent structure, has good construction properties, and is inexpensive. HP curved surface (Hypabolic) that effectively resists vibration and shaking
The object of the present invention is to provide a suspended roof type coal storage facility in which a paroboloridal curved surface (a hollow-shaped curved surface) is used as one roof component, and a plurality of HP curved surfaces are connected in succession.

この発明の次の目的は、HP曲面を2次元方向
に連続させることにより施設の規模の大小を自由
自在に設計施工でき、HP曲面を単位とするその
増結又は削減撤去により施設を拡張し又は縮小す
ることが可能な吊り屋根型貯炭施設を提供するこ
とにある。
The next object of this invention is that by making HP curved surfaces two-dimensionally continuous, it is possible to design and construct facilities of any size, and to expand or reduce facilities by adding, reducing, or removing HP curved surfaces as units. The purpose of the present invention is to provide a suspended roof type coal storage facility that can be used to store coal.

この発明の次の目的は、石炭の搬入又は搬出の
ハンドリングに有利な構成の吊り屋根型貯炭施設
を提供することにある。
Another object of the present invention is to provide a suspended roof type coal storage facility having an advantageous structure for handling coal in and out.

この発明の究極の目的は、所要の高さに所定の
スパンで所要数一列状に立設した中央支柱と、吊
りケーブル、押えケーブル及び両者を連結するタ
イバーよりなり、中央支柱の各スパン間に架設し
たメインガーダと、吊りケーブル、押えケーブル
及び両者を連結するタイバーよりなり、各中央支
柱とその側方に位置するサブガーダ支柱との間に
架設したサブガーダと、サブガーダ支柱間に上向
きに凸の境界曲線を形成するための押えケーブ
ル、側柱およびレーフステイケーブルを含む境界
構造と、メインガーダと境界構造との間に所要の
ピツチで各々平行に架設した所要数の吊りケーブ
ルと、隣り合うサブガーダ間に所要のピツチで
各々平行に、かつ、前記吊りケーブルとの各交点
を連結して架設した押えケーブルと、スパン方向
両端の中央支柱からスパン延長方向に張設したバ
ツクステイケーブルと、中央支柱のスパン方向両
端の位置に前記押えケーブルの定着部として張設
した境界ケーブルと、メインガーダとサブガー
ダ、境界構造及び境界ケーブル並びにこれらに架
設した吊りケーブル、押えケーブルにより形成し
たHP曲面の屋根面に取り付けた屋根葺材と、中
央支柱上所定の高さ位置に、かつ、そのスパン方
向にほぼ水平に架設した搬入コンベアと、中央支
柱の直下の部位のグランドレベル附近に設置した
払い出しコンベアとにより構成した吊り屋根型貯
炭施設、 又は前記吊り屋根型貯炭施設に係る発明の要旨
のほとんど全部を主要部とするが、中央支柱は所
要の間隔でほぼ平行に複数列立設し、該中央支柱
の列毎にHP曲面を1単位としそれが2次元方向
に多単位連続する構成の吊り屋根を架設した多数
列連続型の吊り屋根型貯炭施設をそれぞれ提供す
ることである。
The ultimate object of this invention is to consist of a central column that is erected in a row at a required height and with a specified span, and a suspension cable, a holding cable, and a tie bar that connects the two, and between each span of the central column. It consists of a main girder, a suspension cable, a holding cable, and a tie bar connecting the two, and a sub-girder installed between each central column and sub-girder columns located on the side thereof, and an upwardly convex structure between the sub-girder columns. A boundary structure including holding down cables, side columns and left stay cables to form a boundary curve, a required number of suspension cables each installed in parallel at a required pitch between the main girder and the boundary structure, and adjacent sub-girders. Holder cables are installed parallel to each other at the required pitch between them, and each intersection point with the suspension cable is connected, and a backstay cable is installed in the span extension direction from the central pillars at both ends of the span direction, and the central pillar. On the roof surface of the HP curved surface formed by the boundary cable stretched as the anchoring part of the holding cable at both ends in the span direction, the main girder and sub girder, the boundary structure and the boundary cable, the hanging cables installed thereon, and the holding cable. It consists of the installed roofing materials, an inlet conveyor installed at a predetermined height above the central pillar and almost horizontally in the span direction, and an unloading conveyor installed near the ground level directly below the central pillar. Almost all of the gist of the invention relating to a suspended roof type coal storage facility or the above-mentioned suspended roof type coal storage facility is the main part. To provide a multi-row continuous suspended roof type coal storage facility in which a suspended roof is constructed in which each HP curved surface is one unit and the HP curved surface is continuous in multiple units in two dimensions.

次に、この発明を図示の実施例により説明す
る。
Next, the present invention will be explained with reference to illustrated embodiments.

第1図は、この発明の第一実施例である単列型
の吊り屋根型貯炭施設の建設途中の第一段階を示
す。
FIG. 1 shows the first stage of construction of a single-row suspended roof type coal storage facility, which is a first embodiment of the present invention.

石炭の搬入コンベア1を高架支持する中央支柱
2…は、地上約30m程度の高さのものとして一列
状に、かつ列方向には40m〜50m程度のスパン
で、全長約360mにわたりその間を等分した本数
だけ立設している。これら中央支柱2…の上部、
即ち地上約22m程度の高さ位置に、かつ、そのス
パン方向ほぼ水平に、搬入コンベア1を架設して
いる。中央支柱2…の直下の部位であつて中央支
柱2…の列方向に、横断面が山形の笠としてグラ
ンドレベルから突出するカバー3を設置してい
る。このカバー3は、グランドレベル下に形成し
た払い出しピツト5(第2図)の開口を覆い、か
つ、その両側面長手方向には石炭が払い出しピツ
ト5内に進入することを可能とするスリツト4,
4を形成する。搬入コンベア1に連絡する石炭の
受入れコンベア6は、搬入コンベア1の長手方向
略中央の横方向の位置において、地上に架橋設置
し、搬入コンベア1と連絡せしめている。
The central pillars 2 that support the coal carrying conveyor 1 are arranged in a row with a height of about 30 m above the ground, and have a span of about 40 m to 50 m in the row direction, and are divided equally between them over a total length of about 360 m. Only the number of trees that have been installed has been erected. The upper part of these central pillars 2...
That is, the carry-in conveyor 1 is installed at a height of about 22 m above the ground and substantially horizontally in the span direction. A cover 3 protruding from the ground level as a hat with a chevron-shaped cross section is installed at a location directly below the central pillars 2 in the row direction of the central pillars 2. This cover 3 covers the opening of a dispensing pit 5 (FIG. 2) formed below the ground level, and has slits 4 on both sides in the longitudinal direction that allow coal to enter the dispensing pit 5.
form 4. A coal receiving conveyor 6 communicating with the carrying-in conveyor 1 is installed as a bridge on the ground at a horizontal position approximately in the longitudinal direction of the carrying-in conveyor 1, and communicates with the carrying-in conveyor 1.

各中央支柱2…は、対をなす2本の円柱材2
a,2aを約5m程度の間隔で略平行に直立さ
せ、その柱材2a,2aの上下をつなぎ梁2b,
2bで剛結し1個の組合せ支柱として構成されて
いる。
Each central support 2... is a pair of two cylindrical members 2.
A, 2a are stood upright approximately in parallel at intervals of about 5 m, and the upper and lower parts of the columns 2a, 2a are connected by connecting beams 2b,
They are rigidly connected at 2b and configured as one combined strut.

搬入コンベア1は、その用途上石炭を中央支柱
2…の列方向の全長にわたり順に万遍なく装入可
能なものであることを条件とし、このため例えば
移動トリツパ付ベルトコンベアを適用することも
できるが、第2図にはシヤトルコンベアの適用例
を示す。即ち、テレスコーピツクに伸縮自在なガ
イドシユート1aが通過可能の間隔をあけて平行
に対峙する床板1b,1b上にレール1c,1c
を敷設し、該レール1c,1c上を移動するコン
ベアフレーム1d上に、中央支柱2…の列全長の
約1/2に相当する長さのベルトコンベア1eを設
置している。ベルトコンベア1eの両端のガイド
ヘツド1fからガイドシユート1aが懸垂されて
いる。床板1b,1bは、その外縁部をトラスビ
ーム7,7によつて補強し、中央支柱2…のスパ
ン方向に架設したメインガーダ10における吊り
ロープ10aに連結したタイバー8…によつて吊
り支持されている。図中9は両サイドのトラスビ
ーム7,7上にかけ渡して設置した屋根板であ
る。
Due to its purpose, the carrying-in conveyor 1 must be capable of loading coal evenly and sequentially over the entire length of the central columns 2 in the row direction, and for this purpose, for example, a belt conveyor with a moving tripper may be applied. However, FIG. 2 shows an application example of the shuttle conveyor. That is, rails 1c, 1c are placed on floorboards 1b, 1b facing parallel to each other with an interval such that a telescopically telescopic guide chute 1a can pass therethrough.
A belt conveyor 1e with a length corresponding to about 1/2 of the total length of the rows of central columns 2 is installed on a conveyor frame 1d that moves on the rails 1c, 1c. A guide chute 1a is suspended from guide heads 1f at both ends of the belt conveyor 1e. The floorboards 1b, 1b have their outer edges reinforced by truss beams 7, 7, and are suspended and supported by tie bars 8 connected to hanging ropes 10a in a main girder 10 constructed in the span direction of the central columns 2... ing. Reference numeral 9 in the figure indicates a roof plate installed over the truss beams 7, 7 on both sides.

グランドレベル下に設けた払い出しピツト5内
の底部略中央に、その全長にわたり、一連に連続
する払い出しコンベア11を設置している。そし
て、同払い出しピツト5の全長にわたり往復移動
自在で山形のカバー3の両側面のスリツト4,4
からずり込む石炭を払い出しコンベア11にかき
落す台車形式のかき出し装置12を設置してい
る。山形のカバー3は、同様の角度傾斜し、か
つ、長手方向に十分大きな間隔で配設した支柱3
a…によつて高架支持されており、もつてその両
側面長手方向にスリツト4,4を形成している。
A continuous delivery conveyor 11 is installed approximately in the center of the bottom of the delivery pit 5 provided below the ground level over its entire length. The dispensing pit 5 is movable back and forth over the entire length thereof, and the slits 4, 4 on both sides of the chevron-shaped cover 3
A cart-type scraping device 12 is installed to scrape off the coal coming in from the coal onto a conveyor 11. The chevron-shaped cover 3 has pillars 3 inclined at a similar angle and arranged at sufficiently large intervals in the longitudinal direction.
It is supported elevated by a..., and slits 4, 4 are formed in the longitudinal direction on both sides thereof.

かくして、搬入コンベア1は、石炭13を、カ
バー3の峰の位置を中心として、中央支柱2…の
列方向全長にわたり万遍なく搬入し、第11図に
示すとおり大きな石炭の山13′を築く。他方、
払い出しコンベア11は、スリツト4,4を通じ
てかき出し装置12がかき落す限度に、石炭13
を次々と運搬し、前記石炭の山13′を崩してゆ
く。よつて、石炭のハンドリングについては、一
応、先入れ、先出しとなる。石炭の山13′が小
さくなつたときは、ブルドーザ等で払い出しピツ
ト5のところにかき集める。
In this way, the carrying-in conveyor 1 carries the coal 13 evenly over the entire length of the central columns 2 in the column direction, centering on the position of the peak of the cover 3, and builds a large pile of coal 13' as shown in FIG. . On the other hand,
The discharging conveyor 11 collects the coal 13 through the slits 4, 4 to the extent that the scraping device 12 can scrape it off.
are transported one after another to break down the pile of coal 13'. Therefore, when it comes to handling coal, it will be first in, first out. When the pile of coal 13' becomes small, it is scraped into a discharging pit 5 using a bulldozer or the like.

石炭の受入れコンベア6は、第1図に示すとお
り、橋脚14…を立設して架橋設置し、高架の搬
入コンベア1と連絡せしめている。図示を省略し
たが、受入れコンベア6のグランドレベル側端部
には、例えば船から下された石炭を運搬するコン
ベアが接続される。
As shown in FIG. 1, the coal receiving conveyor 6 is installed as a bridge by erecting piers 14, and is connected to the elevated delivery conveyor 1. Although not shown, a conveyor for transporting coal unloaded from a ship, for example, is connected to the ground level side end of the receiving conveyor 6.

次に、第3図は、第1図の状態から1歩進んだ
建設途中の第二段階を示す。
Next, FIG. 3 shows the second stage of construction, which is one step ahead of the state shown in FIG. 1.

即ち、中央支柱2…の上端部の各スパン間に中
央支柱2を構成する2本の柱材2a,2a毎に分
れてメインガータ10,10をそれぞれ2列平行
に架設し、各中央支柱2…における前記メインガ
ーダ10の連結位置よりも低い部位と中央支柱2
…の列の両側の略直角側方に約30m程度離れて位
置するサブガーダ支柱15,15との間にサブガ
ーダ16,16を、そして、隣接するサブガーダ
支柱15,15の間には上向きに凸の境界曲線を
形成する境界構造としての主境界ケーブル17…
をそれぞれ架設している。また、列両端に位置す
る中央支柱2′,2′の上部からは、そのスパン延
長方向(列延長方向)に長い2本のメイン吊りバ
ツクステイケーブル18,18及び短かい2本の
メイン押えバツクステイケーブル19,19を張
設している。中央支柱2…列方向両端の位置に
は、サブガーダ16′,16′を架設した中央支柱
2′及びサブガーダ支柱15′からそれぞれ三角形
の2辺に相当する配置で先端が交わる2本づつの
境界ケーブル20,21を押えケーブルとして張
設し、これを後記押えケーブル群の定着部として
いる。
That is, two rows of main garters 10, 10 are installed in parallel between each of the two pillar members 2a, 2a constituting the central pillar 2 between each span of the upper end of the central pillar 2... 2... and a portion lower than the connection position of the main girder 10 and the central support 2.
The sub-girders 16, 16 are located between the sub-girder columns 15, 15 located about 30 m apart on both sides of the rows at right angles, and the sub-girders 16, 16 are arranged between the adjacent sub-girder columns 15, 15. Main boundary cable 17 as a boundary structure forming a boundary curve...
are being constructed respectively. Also, from the upper part of the center columns 2', 2' located at both ends of the row, two long main suspension backstay cables 18, 18 and two short main presser backstay cables are connected in the span extension direction (row extension direction). Stay cables 19, 19 are stretched. Central strut 2...At both ends in the column direction, there are two boundary cables whose tips intersect from the central strut 2' and the sub girder strut 15' on which the sub girders 16' and 16' are constructed, respectively, in an arrangement corresponding to two sides of a triangle. 20 and 21 are stretched as hold-down cables, which serve as the fixing portion of the hold-down cable group described later.

これらをさらに詳述するに、メインガーダ10
は、その上位に位置する下向きに凸の曲線をなす
吊りケーブル10aと、下位に位置する上向きに
凸の曲線をなす押えケーブル10bとを逆符号の
曲率をもつ円弧状となし、両者間に垂直なタイバ
ー10c…を多数平行に連結し、吊りケーブル1
0a及び押えケーブル10bに相当大きさの初期
張力(プレストレス)を導入して構成し、もつて
偏荷重、動的風荷重等に対する安定性と剛性を確
保し、構造形式として成立せしめている。通常、
メインガーダ10…は、全て共通仕様の同一構成
のものとされる。
To explain these in more detail, the main girder 10
The suspension cable 10a, which is located above the suspension cable 10a and has a downwardly convex curve, and the presser cable 10b, which is located below and has a curved upwardly convex, are arcuate with opposite signs of curvature, and there is a vertical line between them. A large number of tie bars 10c... are connected in parallel to form a suspension cable 1.
A considerable amount of initial tension (prestress) is introduced into the cable 0a and the holding cable 10b to ensure stability and rigidity against unbalanced loads, dynamic wind loads, etc., and to establish the structure. usually,
The main girders 10 are all of the same configuration with common specifications.

サブガーダ16も全く同様に、上位の吊りケー
ブル16aと下位の押えケーブル16bとを逆符
号の曲率をもつ円弧状となし、両者間に垂直なタ
イバー16c…を連結し、吊りケーブル16a及
び押えケーブル16bに相当大きさの初期張力を
導入した構成であり、もつて構造形式として成立
せしめている。このサブガーダ16…も、一般に
全て共通仕様の同一構成のものとされる。
In the sub-girder 16, the upper suspension cable 16a and the lower holding cable 16b are formed in an arc shape with curvatures of opposite signs, and vertical tie bars 16c are connected between them, and the hanging cable 16a and the holding cable 16b are connected to each other. This structure introduces a considerable amount of initial tension into the structure, making it a viable structural form. These sub-girders 16 are also generally all of the same configuration with common specifications.

従つて、この吊り屋根型貯炭施設の吊り屋根に
おける構造系は、中央支柱2,2とその間に架設
したメインガーダ10及び中央支柱2から側方に
架設したサブガーダ16,16で形成される中央
大架構を前提として成立する。
Therefore, the structural system of the suspended roof of this suspended roof type coal storage facility consists of the central pillars 2, 2, the main girder 10 constructed between them, and the sub-girders 16, 16 constructed laterally from the central pillars 2. It is established assuming a frame.

境界構造として中央支柱2…の列方向にほぼ平
行する配置の主境界ケーブル17,17は、隣接
のサブガーダ支柱15,15間に上向きに凸の境
界曲線を形成するべく押えケーブルとして架設
し、その中間部には側柱22…を所要の間隔で多
数平行に、かつ、斜めに設置してその上端部に境
界ケーブル17を支持せしめ、サブガーダ支柱1
5の上端からはサブバツクステイケーブル23…
を、各側柱22…の上端からはルーフバツクステ
イケーブル24…をそれぞれ強力に張設し、各主
境界ケーブル17…に相当大きさの初期張力を導
入して境界構造を完成している。
The main boundary cables 17, 17, which are arranged substantially parallel to the row direction of the central columns 2 as a boundary structure, are installed as holding cables to form an upwardly convex boundary curve between the adjacent sub-girder columns 15, 15. In the middle part, a large number of side columns 22 are installed in parallel and diagonally at required intervals, and the boundary cable 17 is supported at the upper end of the side columns 22.
From the upper end of 5 is the sub-back stay cable 23...
The roof backstay cables 24 are strongly stretched from the upper ends of the side pillars 22, respectively, and a considerable initial tension is introduced into each main boundary cable 17 to complete the boundary structure.

2本のメインバツクステイケーブル18,18
は、メインガーダ10,10における吊りケーブ
ル10a,10aの延長部分として、また、2本
のメイン押えバツクステイケーブル19,19
は、同じメインガーダ10,10における押えケ
ーブル10b,10bの延長部分として、各々地
盤中にアンカーをとつて強力に設置している。
Two main backstay cables 18, 18
is used as an extension of the suspension cables 10a, 10a in the main girders 10, 10, and as an extension of the two main backstay cables 19, 19.
As extensions of the holding cables 10b, 10b in the same main girders 10, 10, anchors are set in the ground and installed strongly.

中央支柱のスパン方向両端の位置に後記押えケ
ーブルの定着部として設置した境界ケーブル20
と21は、HP曲面のケーブルネツトを形成する
後記吊りケーブル及び押えケーブルと共通のHP
曲面において交わるように、それぞれ上向きに凸
の円弧状をなす押えケーブルとして張設し相当大
きさの初期張力を導入してあり、その外端部は地
盤中にアンカーをとつて強固に設置している。
Boundary cables 20 installed at both ends of the central column in the span direction as anchoring parts for the holding cables described later.
and 21 are HPs that are common to the hanging cables and holding cables described later that form the HP curved cable net.
The holding cables are stretched in an upwardly convex arc shape so as to intersect on the curved surface, and a considerable initial tension is introduced, and the outer ends are firmly installed with anchors in the ground. There is.

次に、第4図は、第3図からさらに1歩建設を
進めた第三段階を示す。即ち、上記中央大架構を
形成するメインガーダ10とサブガーダ16,1
6及び境界構造たる主境界ケーブル17で囲まれ
た面を1単位としてHP曲面のケーブルネツトを
形成しつつある。
Next, Figure 4 shows the third stage, which is one step further in construction from Figure 3. That is, the main girder 10 and the sub girders 16, 1 forming the central large frame
6 and the main boundary cable 17 serving as the boundary structure is considered as one unit, and a cable net of the HP curved surface is being formed.

これを詳述するに、メインガーダ10の押えケ
ーブル10bと主境界ケーブル17との間には、
メインガーダ10を通して(又は個々の単位長さ
に分断したものとして)サブガーダ16とほぼ平
行におよそ1.5m程度のピツチで多数の吊りケー
ブル25…をサブガーダ16における吊りケーブ
ル16aとほぼ共通な曲率で下向きに凸の円弧状
をなすものとして各々平行に架設している。左右
に隣り合うサブガーダ16,16における吊りケ
ーブル16a,16a同志の間には、各サブガー
ダ16…を通して(又は個々の単位長さに分断し
たものとして)メインガーダ10および境界ケー
ブル17とほぼ平行におよそ1.5m程度のピツチ
で多数の押えケーブル26…をメインガーダ10
における押えケーブル10b及び主境界ケーブル
17とほぼ共通な曲率で上向きに凸の円弧状をな
すものとして各々平行に架設している。これら吊
りケーブル25…及び押えケーブル26…には、
相当大きさの初期張力を導入し、かつ、両者の各
交点を結合し、もつてHP曲面の屋根面を形成し
ている。この吊り屋根構造は、HP曲面を1単位
とし、これが中央支柱の列と同方向に複数個連続
した吊り屋根として形成されている。しかも、共
通仕様のケーブルを用い、同様な工程のくり返し
により、同一の構成に施工されている。従つて、
中央支柱2…の列方向の全長の大小は、HP曲面
の単位数の増減により自在に対処できるし、そう
することによつても構造上何ら問題は生じない。
To explain this in detail, between the holding cable 10b of the main girder 10 and the main boundary cable 17,
A large number of suspension cables 25... are passed through the main girder 10 (or cut into individual unit lengths) approximately parallel to the sub-girder 16 at a pitch of approximately 1.5 m, and are directed downward at a curvature that is approximately the same as the suspension cable 16a in the sub-girder 16. They are constructed parallel to each other in a convex arc shape. Between the suspension cables 16a, 16a of the sub-girders 16, 16 adjacent to each other on the left and right, there is a cable extending approximately parallel to the main girder 10 and the boundary cable 17 through each sub-girder 16 (or as a cable cut into individual unit lengths). A large number of holding cables 26 are connected to the main girder 10 at a pitch of about 1.5m.
The holding cable 10b and the main boundary cable 17 each have an upwardly convex arc shape with a curvature that is substantially the same as those of the holding cable 10b and the main boundary cable 17, and are installed in parallel with each other. These suspension cables 25... and presser cables 26...
A considerable amount of initial tension is introduced, and each intersection of the two is connected to form the roof surface of the HP curved surface. This suspended roof structure has a HP curved surface as one unit, and is formed as a suspended roof in which multiple units are continuous in the same direction as the row of central pillars. Furthermore, cables with common specifications are used and the same configuration is constructed by repeating the same process. Therefore,
The overall length of the central columns 2 in the column direction can be adjusted freely by increasing or decreasing the number of units of the HP curved surface, and doing so will not cause any structural problems.

上記HP曲面のケーブルネツトは、ケーブル相
互の緊張関係のみによつて形成されるが、初期張
力の存在が曲面の剛体変形に対し極めて有効に作
用する。加うるに他の関連構造による補剛効果に
よつて安定化されるので、偏荷重、動的風荷重等
に対する高い安定性と剛性を発揮する構成となつ
ている。また、この吊り屋根の下は、天井の高い
大張間の空間となるので、石炭等の貯蔵、ハンド
リングに好適である。
The cable net of the HP curved surface is formed only by the tension relationship between the cables, but the presence of initial tension has an extremely effective effect on the rigid deformation of the curved surface. In addition, it is stabilized by the stiffening effects of other related structures, so it has a configuration that exhibits high stability and rigidity against unbalanced loads, dynamic wind loads, etc. In addition, the space under this suspended roof is a large space with a high ceiling, which is suitable for storing and handling coal and the like.

なお、中央支柱のスパン方向両端に位置する定
着部としての境界ケーブル20,21には、サブ
ガーダ16における吊りケーブル16aと共通す
る曲率の吊りケーブル25′…及び隣接のサブガ
ーダ16を通した押えケーブル26′をそれぞれ
定着し、各々に同前の大きさの初期張力を導入
し、ケーブルの各交点を結合してやはりHP曲面
のケーブルネツトを形成し、隣接単位のHP曲面
に対する補剛効果を奏するように構成している。
In addition, the boundary cables 20 and 21 as anchoring parts located at both ends of the central column in the span direction include suspension cables 25' having the same curvature as the suspension cable 16a in the sub-girder 16, and a holding cable 26 passed through the adjacent sub-girder 16. ′ are respectively fixed, initial tension of the same magnitude is introduced into each, and each intersection point of the cable is connected to form a cable net of the HP curved surface, so as to exert a stiffening effect on the HP curved surface of the adjacent unit. It is composed of

上記のようにしてケーブルネツトにより形成し
た屋根面には、鋼板若しくは折板又はテント等の
屋根葺材(図示省略)を敷設し、かくして貯炭場
の上屋が完成されている。
Roofing materials (not shown) such as steel plates, folded plates, or tents are laid on the roof surface formed by the cable net as described above, and thus the coal storage shed is completed.

なお、屋根面外周の側面に当る開口部分は、必
要に応じて、壁板などで遮蔽する。
Note that the opening on the side surface of the outer periphery of the roof surface will be covered with a wall plate, etc., if necessary.

第5図、第6図及び第7図は、上記のようにし
て建設し完成した単列吊り屋根型貯炭施設の概要
を示す。
Figures 5, 6, and 7 show an outline of the single-row suspended roof type coal storage facility constructed and completed as described above.

次に、第8図〜第11図は、この発明の第二実
施例である四列連続型の吊り屋根型貯炭施設の全
体を概念的に示す。
Next, FIGS. 8 to 11 conceptually show the entire suspended roof type coal storage facility with four continuous rows, which is a second embodiment of the present invention.

本実施例のものにおける中央支枉列毎の構成態
様は、ほとんど上記第一実施例のものと共通す
る。もつとも、中央支柱2…は、その列を、サブ
ガーダ16の長さの約2倍相当の間隔をあけてほ
ぼ平行に4列(列数はこの限りでない。)に立設
し、メインガーダ10は中央支柱の列毎にそのス
パン間に架設し、サブガーダ16は中央支柱2…
の列間ほぼ中央に位置するサブガーダ支柱15を
共通に利用して対称に架設し、もつてPC曲面は
縦・横2方向に多数個連続する構成としている。
従つて、基本的には第1実施例に示す単列構成の
複合したものであり、第1実施例で述べた単列吊
り屋根型貯炭施設の施工工程のくり返しにより全
く同様に建設することができる。
The configuration of each central support row in this embodiment is almost the same as that in the first embodiment. However, the central pillars 2... are erected in four rows (the number of rows is not limited to this) approximately in parallel with an interval equivalent to about twice the length of the sub-girder 16, and the main girder 10 is The sub-girder 16 is installed between the spans of each row of central columns, and the sub-girder 16 is installed between the central columns 2...
The sub-girder columns 15 located approximately in the center between the rows are commonly used and erected symmetrically, so that a large number of PC curved surfaces are continuous in both the vertical and horizontal directions.
Therefore, it is basically a composite of the single-row structure shown in the first embodiment, and can be constructed in exactly the same way by repeating the construction process of the single-row suspended roof type coal storage facility described in the first embodiment. can.

なお、本実施例の場合、中央支柱の列間に位置
するサブガーダ支柱15,15間に形成する境界
構造は、主境界ケーブル17を支持するべき側柱
22…及びルーフバツクステイケーブル24…並
びにサブバツクステイケーブル23…が無用であ
り、主境界ケーブル17は押えケーブルの1つに
すぎないものとなる。従つて、当該サブガーダ支
柱15は垂直に立設できる。他方、両サイドの中
央支柱列の側方に位置するサブガーダ支柱1
5″,15″間に形成するサイド境界構造にあつて
は、その境界ケーブル17を支持する側柱22…
及びルーフバツクステイケーブル24…を設置
し、また、当該サブガーダ支柱15′…は反力を
とり易い角度に傾けて斜めに設置し、その上端か
らサブバツクステイケーブル23…を張設した構
成とされる。
In the case of this embodiment, the boundary structure formed between the sub girder columns 15, 15 located between the rows of central columns includes the side columns 22, which should support the main boundary cable 17, the roof backstay cables 24, and the sub girder columns 15, 15. The backstay cables 23... are unnecessary, and the main boundary cable 17 becomes only one of the holding cables. Therefore, the sub girder support 15 can be vertically erected. On the other hand, sub-girder struts 1 located on the sides of the central strut row on both sides
In the case of the side boundary structure formed between 5'' and 15'', the side pillars 22 supporting the boundary cable 17...
and a roof backstay cable 24... are installed, and the sub girder support 15'... is installed diagonally at an angle that facilitates the reaction force, and the sub backstay cable 23... is stretched from its upper end. Ru.

第12図は、上記第2実施例のものにおける石
炭ハンドリングの平面概念図を示す。石炭の受入
れコンベア6は、その始端を港湾の荷下し場から
敷設した運搬コンベア30と接続し、一方、各中
央支柱列のシヤトルコンベア1′…とはトリツパ
などにより連絡せしめている。各列中央支柱列に
沿う払い出しコンベア5…は、その終端を共通の
搬出コンベア31と接続している。搬出コンベア
31は、そのまま石炭の需要部にまで延長する
か、又は船積みバンカーあるいはトラツク用、貨
車用のバンカーに導かれる。
FIG. 12 shows a conceptual plan view of coal handling in the second embodiment. The starting end of the coal receiving conveyor 6 is connected to a transport conveyor 30 installed from the unloading area of the port, and on the other hand, it is communicated with the shuttle conveyors 1' of each central pillar row by means of trippers or the like. The dispensing conveyors 5 along each central column column have their terminal ends connected to a common discharging conveyor 31. The discharge conveyor 31 may be extended directly to the coal demand section, or may be guided to a shipping bunker or a bunker for trucks or freight cars.

次に、この発明が奏する効果を説明する。 Next, the effects of this invention will be explained.

この発明は、地上所要の高さのものとして所定
のスパンで一列状に所要数立設した中央支柱と、
吊りケーブルと押えケーブル及び両者を連結する
タイバーとよりなり中央支柱の各スパン間に架設
したメインガーダと、吊りケーブルと押えケーブ
ル及び両者を連結するタイバーとよりなり各中央
支柱とその側方に位置するサブガーダ支柱との間
に架設したサブガーダと、サブガーダ支柱間に上
向きに凸の境界曲線を形成するための側柱、ルー
フステイケーブル等を含む境界構造と、メインガ
ーダと境界構造との間に所要のピツチで各々平行
に架設した所要数の吊りケーブルと、隣り合うサ
ブガーダ間に所要のピツチで各々平行に、かつ、
前記吊りケーブルとの各交点を連結して架設した
押えケーブルと、スパン方向両端の中央支柱に、
スパン延長方向に張設したバツクステイケーブル
と、スパン方向両端の位置に前記押えケーブルの
定着部として張設した境界ケーブルと、メインガ
ーダとサブガーダ、境界構造及び境界ケーブル並
びにこれらに架設した吊りケーブル、押えケーブ
ルにより形成したHP曲面の屋根面に取り付けた
屋根葺材と、中央支柱上所定の高さ位置に、か
つ、そのスパン方向にほぼ水平に架設した搬入コ
ンベアと、中央支柱の直下の部位のグランドレベ
ル附近に設置した払い出しコンベアとより成るい
わば単列型の吊り屋根型貯炭施設を要旨とし、 即ち搬入コンベアを高架支持する中央支柱と、
該中央支柱を利用した吊り屋根とを巧みに組合せ
た合理性の高い構成としたから、次の効果を奏す
る。
This invention provides a central pillar having a required height above the ground and having a required number of central pillars erected in a row with a predetermined span;
The main girder consists of a suspension cable, a holding cable, and a tie bar that connects the two, and is installed between each span of the central column.The main girder consists of a hanging cable, a holding cable, and a tie bar that connects the two, and is located on each central column and its side. The sub-girder installed between the sub-girder supports, the boundary structure including side pillars, roof stay cables, etc. to form an upwardly convex boundary curve between the sub-girder supports, and the required distance between the main girder and the boundary structure. The required number of suspension cables are installed parallel to each other at a pitch of
A presser cable is constructed by connecting each intersection with the suspension cable, and a central support at both ends in the span direction,
A backstay cable stretched in the span extension direction, a boundary cable stretched at both ends in the span direction as an anchoring part of the holding cable, a main girder, a sub girder, a boundary structure, a boundary cable, and a suspension cable installed therein; The roofing material attached to the HP curved roof surface formed by holding down cables, the loading conveyor installed at a predetermined height above the central pillar and almost horizontally in the span direction, and the ground directly below the central pillar. The main idea is a so-called single-row suspended roof type coal storage facility consisting of a delivery conveyor installed near the level, that is, a central column that supports the incoming conveyor elevated,
Since it has a highly rational structure that skillfully combines the suspended roof using the central support, the following effects are achieved.

(a) 石炭の搬入、搬出のハンドリングに有利な吊
り屋根構造である。しかも吊り屋根構造の本質
的特徴であるところの大張間で天井の高い柱な
し空間を形成するので、大規模な上屋付貯炭施
設として優れた適格性を具備する。
(a) It has a suspended roof structure that is advantageous for handling coal loading and unloading. Moreover, since it forms a column-free space with a high ceiling, which is an essential feature of the suspended roof structure, it has excellent suitability as a large-scale coal storage facility with a shed.

(b) 使用部材数量の節減とその単一化が図れる。
即ち、屋根構造はほとんどケーブルによる構成
とすることができる。
(b) The number of parts used can be reduced and they can be unified.
That is, the roof structure can be made mostly of cables.

(c) 部材のモジユール化を図れるので、コストダ
ウンに有利であり、貯炭施設として適合する程
度の価格に近づけられる。また、施工の容易
性、工期の短縮を図ることができる。
(c) Since the components can be modularized, it is advantageous for cost reduction, and the price can be brought close to the level suitable for coal storage facilities. Furthermore, ease of construction and shortening of construction period can be achieved.

(d) 吊り屋根はHP曲面のケーブルネツトを1単
位として形成しているので、偏荷重、動的風荷
重に対する安定性と剛性を確保できる。即ち、
HP曲面は、風による吹きあげ又は振動、揺れ
に効果的に抵抗する構造形式として成立せしめ
ているので、大規模な恒久的吊り屋根構造物と
しての適格性をもち、貯炭施設としての用途に
かなう。
(d) Since the suspended roof is formed by a cable net with a HP curved surface as one unit, it can ensure stability and rigidity against unbalanced loads and dynamic wind loads. That is,
Since the HP curved surface has been established as a structural form that effectively resists wind blow-up, vibration, and shaking, it is suitable for use as a large-scale permanent suspended roof structure, and is suitable for use as a coal storage facility. .

次に、この発明は、地上所要の高さのものとし
て所定のスパンで一列状に所要数立設するととも
に前同様の列を所要の間隔でほぼ平行に複数列立
設した中央支柱と、吊りケーブルと押えケーブル
及び両者を連結するタイバーとよりなり、中央支
柱の列毎にその中央支柱の各スパン間に架設した
メインガーダと、吊りケーブルと押えケーブル及
び両者を連結するタイバーとよりなり、中央支柱
の列間ほぼ中央に位置する共通のサブガーダ支柱
又は両サイドの中央支柱列の側方に位置するサブ
ガーダ支柱と中央支柱との間に架設したサブガー
ダと、中央支柱の列間に位置するサブガーダ支柱
間に上向きに凸の境界曲線を形成するための境界
構造、および両サイドの中央支柱列の側方に位置
するサブガーダ支柱間に上向きに凸の境界曲線を
形成するための側柱、ルーフステイケーブルを含
むサイド境界構造と、メインガーダと境界構造若
しくはサイド境界構造との間に、所要のピツチで
各々平行に架設した所要数の吊りケーブルと、隣
り合うサブガーダ間に、所要のピツチで各々平行
に、かつ、前記吊りケーブルとの各交点を連結し
て架設した押えケーブルと、各列スパン方向両端
の中央支柱に、そのスパン延長方向に張設したバ
ツクステイケーブルと、スパン方向両端の位置に
前記押えケーブルの定着部として張設した境界ケ
ーブルと、メインガーダとサブガーダ、境界構造
若しくはサイド境界構造及び各境界ケーブル並び
にこれらに架設した吊りケーブル、押えケーブル
により形成したHP曲面の屋根面に取り付けた屋
根葺材と、各列の中央支柱上所定の高さ位置に、
かつ、そのスパン方向にほぼ水平に架設した搬入
コンベアと、各列の中央支柱の直下の部位のグラ
ンドレベル附近に設置した払い出しコンベアとよ
り成る多数列連続型の吊り屋根型貯炭施設を要旨
とし、 いわばHP曲面を1単位としこれを縦・横方向
に多数連続せしめて所望規模(大規模)の吊り屋
根構造に構成したから、上記(a)〜(d)のほかに次の
効果を奏する。
Next, this invention has a central pillar of the required height above the ground that is erected in a row with a predetermined span, and a plurality of the same rows as before are erected substantially parallel to each other at a predetermined interval; The central girder consists of a cable, a holding cable, and a tie bar that connects the two, a main girder is installed between each span of the central support for each row of central columns, a suspension cable, a holding cable, and a tie bar that connects the two. A common sub-girder column located approximately in the center between the rows of columns, or a sub-girder installed between the sub-girder columns located on the sides of the row of central columns on both sides and the central column, and a sub-girder column located between the rows of central columns. A boundary structure to form an upwardly convex boundary curve between them, and side columns and roof stay cables to form an upwardly convex boundary curve between the sub girder columns located on the sides of the central column column on both sides. The required number of suspension cables are installed in parallel at the required pitch between the main girder and the boundary structure or the side boundary structure, and the required number of suspension cables are installed in parallel at the required pitch between the adjacent sub-girders. , and a presser cable installed by connecting each intersection with the suspension cable, a backstay cable stretched in the span extension direction on the center column at both ends of each row in the span direction, and the A roof attached to the roof surface of the HP curved surface formed by the boundary cable stretched as the anchoring part of the holding cable, the main girder and sub girder, the boundary structure or side boundary structure, each boundary cable, the hanging cables installed thereon, and the holding cable. The roofing material and the central pillar of each row are placed at a predetermined height position.
In addition, the main feature is a multi-row continuous suspended roof type coal storage facility consisting of an inlet conveyor installed almost horizontally in the span direction, and an outlet conveyor installed near the ground level directly below the central column of each row. In other words, since the HP curved surface is taken as one unit and a large number of them are connected in the vertical and horizontal directions to form a suspended roof structure of a desired scale (large scale), in addition to the above (a) to (d), the following effects are achieved.

(e)吊り構造でありながら自由度が大きい。(e) Although it is a suspended structure, it has a large degree of freedom.

(f) 即ち、施設の規模の大小を自由自在に設計施
工でき、あるいはHP曲面を単位とするその増
結又は削減撤去により施設の拡張又は縮小を行
なえる自由度がある。
(f) In other words, there is a degree of freedom in which the scale of the facility can be designed and constructed as desired, or the facility can be expanded or reduced by adding to, reducing or removing HP curved surfaces.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の第1実施例である単列型の
吊り屋根型貯炭施設の建設の第1段階を示す斜視
図、第2図は搬入コンベア、払い出しコンベアの
詳細を示す斜視図、第3図、第4図は同前の貯炭
施設の建設のさらに進行した段階を示す斜視図、
第5図は完成した単列吊り屋根型貯炭施設の一部
省略の正面図、第6図と第7図は第5図の−
、−断面図、第8図はこの発明の第2実施
例である4列吊り屋根型貯炭施設の概念的に簡単
化した平面図、第9図と第10図は第8図の−
、−断面図、第11図は第8図のXI−XI拡
大断面図、第12図は第8図の施設における石炭
ハンドリングの概念図である。 2,2′……中央支柱、10a……吊りケーブ
ル(メインガーダ)、10b……押えケーブル
(メインガーダ)、10c……タイバー(メインガ
ーダ)、10……メインガーダ、16a……吊り
ケーブル(サブガーダ)、16b……押えケーブ
ル(サブガーダ)、16c……タイバー(サブガ
ーダ)、16,16′……サブガーダ、15,1
5′……サブガーダ支柱、17……主境界ケーブ
ル、25……吊りケーブル、26……押えケーブ
ル、18,19……バツクステイケーブル、2
0,21……境界ケーブル、1……搬入コンベ
ア、5……払い出しコンベア、24……ルーフス
テイケーブル。
FIG. 1 is a perspective view showing the first stage of construction of a single-row suspended roof type coal storage facility, which is the first embodiment of the present invention; FIG. Figures 3 and 4 are perspective views showing further advanced stages of the construction of the previous coal storage facility;
Figure 5 is a partially omitted front view of the completed single-row suspended roof type coal storage facility, and Figures 6 and 7 are -
, - sectional view, FIG. 8 is a conceptually simplified plan view of a four-row suspended roof type coal storage facility which is a second embodiment of the present invention, and FIGS. 9 and 10 are - of FIG.
, - sectional view, FIG. 11 is an enlarged sectional view taken along line XI-XI of FIG. 8, and FIG. 12 is a conceptual diagram of coal handling in the facility of FIG. 8. 2, 2'... Central column, 10a... Hanging cable (main girder), 10b... Holder cable (main girder), 10c... Tie bar (main girder), 10... Main girder, 16a... Hanging cable ( Sub girder), 16b... Holder cable (sub girder), 16c... Tie bar (sub girder), 16, 16'... Sub girder, 15,1
5'...Sub girder strut, 17...Main boundary cable, 25...Hanging cable, 26...Holding cable, 18, 19...Backstay cable, 2
0, 21... Boundary cable, 1... Incoming conveyor, 5... Outgoing conveyor, 24... Roof stay cable.

Claims (1)

【特許請求の範囲】 1 下記(イ)〜(ル)のとおり構成した吊り屋根型
貯炭施設。 (イ) 地上所要の高さのものとして所定のスパンで
一列状に所要数立設した中央支柱と、 (ロ) 吊りケーブルと押えケーブル及び両者を連結
するタイバーとよりなり、中央支柱の各スパン
間に架設したメインガーダと、 (ハ) 吊りケーブルと押えケーブル及び両者を連結
するタイバーとよりなり、各中央支柱とその側
方に位置するサブガーダ支柱との間に架設した
サブガーダと、 (ニ) サブガーダ支柱間に上向きに凸の境界曲線を
形成するための側柱、ルーフステイケーブル等
を含む境界構造と、 (ホ) メインガーダと境界構造との間に、所要のピ
ツチで各々平行に架設した所要数の吊りケーブ
ルと、 (ヘ) 隣り合うサブガーダ間に、所要のピツチで
各々平行に、かつ、上記(ホ)の吊りケーブルとの
各交点を連結して架設した押えケーブルと、 (ト) スパン方向両端の中央支柱に、スパン延長方
向に張設したバツクステイケーブルと、 (チ) スパン方向両端の位置に上記(ヘ)の押えケーブ
ルの定着部として張設した境界ケーブルと、 (リ) メインガーダとサブガーダ、境界構造及び境
界ケーブル並びにこれらに架設した吊りケーブ
ル、押えケーブルにより形成したHP曲面の屋
根面に取り付けた屋根葺材と、 (ヌ) 中央支柱上所定の高さ位置に、かつ、そのス
パン方向にほぼ水平に架設した搬入コンベア
と、 (ル) 中央支柱の直下の部位のグランドレベル附
近に設置した払い出しコンベアとより成る。 2 下記(イ)′〜(ル)′のとおり構成した吊り屋根
型貯炭施設。 (イ)′ 地上所要の高さのものとして所定のスパン
で一列状に所要数立設するとともに前同様の列
を所要の間隔でほぼ平行に複数列立設した中央
支柱と、 (ロ)′ 吊りケーブルと押えケーブル及び両者を連
結するタイバーとよりなり、中央支柱の列毎に
その中央支柱の各スパン間に架設したメインガ
ーダと、 (ハ)′ 吊りケーブルと押えケーブル及び両者を連
結するタイバーとよりなり、中央支柱の列間ほ
ぼ中央に位置する共通のサブガーダ支柱、又は
両サイドの中央支柱列の側方に位置するサブガ
ーダ支柱と中央支柱との間にそれぞれ架設した
サブガーダと、 (ニ)′ 中央支柱の列間に位置するサブガーダ支柱
間に上向きに凸の境界曲線を形成するための境
界構造、および両サイドの中央支柱列の側方に
位置するサブガーダ支柱間に上向きに凸の境界
曲線を形成するための側柱、ルーフステイケー
ブルを含むサイド境界構造と、 (ホ)′ メインガーダと境界構造若しくはサイド境
界構造との間に、所要のピツチで各々平行に架
設した所要数の吊りケーブルと、 (ヘ)′ 隣り合うサブガーダ間に、所要のピツチで
各々平行に、かつ、上記(ホ)′の吊りケーブルと
の各交点を連結して架設した押えケーブルと、 (ト)′ 各列のスパン方向両端の中央支柱に、その
スパン延長方向に張設したバツクステイケーブ
ルと、 (チ)′ スパン方向両端の位置に、上記(ヘ)′の押えケ
ーブルの定着部として張設した境界ケーブル
と、 (リ)′ メインガーダとサブガーダ、境界構造若し
くはサイド境界構造、及び境界ケーブル並びに
これらに架設した吊りケーブル、押えケーブル
により形成したHP曲面の屋根面に取り付けた
屋根葺材と、 (ヌ) 各列の中央支柱上所定の高さ位置に、かつ、
そのスパン方向にほぼ水平に架設した搬入コン
ベアと、 (ル)′ 各列の中央支柱の直下の部位のグランドレ
ベル附近に設置した払い出しコンベアとよりな
る。
[Scope of Claims] 1. A hanging roof type coal storage facility configured as shown in (a) to (l) below. (a) A central pillar with the required height above the ground and a required number of central pillars erected in a line with a specified span; (b) A suspension cable, a holding cable, and a tie bar connecting the two, each span of the central pillar. (c) A sub-girder consisting of a suspension cable, a holding cable, and a tie bar connecting the two, and constructed between each central column and the sub-girder column located on its side; (d) A boundary structure including side columns, roof stay cables, etc. to form an upwardly convex boundary curve between the sub-girder columns, and (e) a boundary structure that is constructed parallel to each other at the required pitch between the main girder and the boundary structure. Required number of suspension cables, (f) Holder cables installed parallel to each other at the required pitch between adjacent sub-girders, and connecting each intersection with the suspension cables in (e) above, and (g) A backstay cable stretched in the span extension direction on the central column at both ends in the span direction, (h) A boundary cable stretched as an anchor for the holding cable in (f) above at both ends in the span direction, and (li) Roofing materials attached to the roof surface of the HP curved surface formed by the main girder, sub-girder, boundary structure, boundary cable, hanging cables and holding cables installed thereon, (v) at a predetermined height position on the central support, and It consists of an inlet conveyor installed almost horizontally in the span direction, and (1) an outlet conveyor installed near the ground level directly below the central column. 2 A hanging roof type coal storage facility configured as shown in (a)′ to (l)′ below. (b)′ A central pillar of the required height above the ground that is erected in a row with a predetermined span and a plurality of similar columns erected approximately parallel to each other at the required intervals, and (b)′ A main girder consisting of a suspension cable, a holding cable, and a tie bar connecting the two, and installed between each span of the central column for each row of central columns; (c)' A hanging cable, a holding cable, and a tie bar connecting the two Therefore, a common sub-girder column located approximately in the center between the rows of central columns, or a sub-girder installed between the sub-girder columns located on the sides of the rows of central columns on both sides and the central column, (d) ′ A boundary structure for forming an upwardly convex boundary curve between the sub-girder columns located between the rows of central columns, and an upwardly convex boundary curve between the sub-girder columns located on the sides of the central column rows on both sides. the side boundary structure including the side pillars and roof stay cables to form the main girder, and the required number of suspension cables installed in parallel at the required pitch between the main girder and the boundary structure or side boundary structure. (F)′ Holder cables are installed between adjacent sub-girders in parallel at the required pitches, and each intersection with the suspension cable of (E)′ above is connected, and (G)′ Each row of A backstay cable stretched in the span extension direction on the central column at both ends of the span, and a boundary cable stretched at both ends of the span in (H)' as an anchorage for the holding cable in (F)' above. (li)′ The roofing material attached to the roof surface of the HP curved surface formed by the main girder, sub-girder, boundary structure or side boundary structure, boundary cable, hanging cables and holding cables installed thereon, and (n) each at a predetermined height position on the central column of the column, and
It consists of an incoming conveyor installed almost horizontally in the span direction, and an outgoing conveyor installed near the ground level directly below the center column of each row.
JP21414981A 1981-12-26 1981-12-26 Suspension roof type coal storage installation Granted JPS58113455A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21414981A JPS58113455A (en) 1981-12-26 1981-12-26 Suspension roof type coal storage installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21414981A JPS58113455A (en) 1981-12-26 1981-12-26 Suspension roof type coal storage installation

Publications (2)

Publication Number Publication Date
JPS58113455A JPS58113455A (en) 1983-07-06
JPS6248020B2 true JPS6248020B2 (en) 1987-10-12

Family

ID=16651030

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21414981A Granted JPS58113455A (en) 1981-12-26 1981-12-26 Suspension roof type coal storage installation

Country Status (1)

Country Link
JP (1) JPS58113455A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61233141A (en) * 1985-04-08 1986-10-17 元旦ビューティ工業株式会社 suspended roof structure building

Also Published As

Publication number Publication date
JPS58113455A (en) 1983-07-06

Similar Documents

Publication Publication Date Title
US4805734A (en) Acoustic wall
US4281489A (en) Floor support for grain drying and storage bin
JPS6248020B2 (en)
US4130969A (en) Hanging prestressed roof structure
JPH09104389A (en) Vessel with flat face element arranged at inside of hull andextended horizontally
JP3409265B2 (en) Large dome with membrane structure and its construction method
US4036921A (en) Method of making a curved roof
US3248828A (en) Warehouse construction employing independent rack units
AU632066B2 (en) Prefabricated building kit in container form
JP2625327B2 (en) Building unit roof structure
RU97112664A (en) ALTITUDE MECHANIZED PARKING PLACE AND METHOD OF ITS ESTABLISHMENT
US3885366A (en) Silo construction
US4246730A (en) Support structure for a roof of an accomodation for cultivation
US3993087A (en) Kinetic steel skeleton
US4197034A (en) Floating pier
SU894114A2 (en) Roof for building and structures
US20050050657A1 (en) Pier system and method of construction
JPH08175639A (en) Tube gallery
EP0015984A1 (en) Prefabricated building for storage or the like
JP3317011B2 (en) Multi-parallel belt conveyor
US3924368A (en) Building construction having three-hinged arched lattice girders
KR102745282B1 (en) Modular shelter for architectural 3d printer
SU950880A1 (en) Droplet-shaped tank for storing liquids
GB1596019A (en) Lattice structure and method of making the same
JP4043652B2 (en) Roof structure of powder storage facility