JPS6251330B2 - - Google Patents
Info
- Publication number
- JPS6251330B2 JPS6251330B2 JP2644181A JP2644181A JPS6251330B2 JP S6251330 B2 JPS6251330 B2 JP S6251330B2 JP 2644181 A JP2644181 A JP 2644181A JP 2644181 A JP2644181 A JP 2644181A JP S6251330 B2 JPS6251330 B2 JP S6251330B2
- Authority
- JP
- Japan
- Prior art keywords
- piles
- pile
- ground
- hole
- shaped steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Description
【発明の詳細な説明】
従来、ボーリングマシンによつてH形鋼の大き
さに合せた杭孔を穿孔し、同孔内に上記H形鋼を
押入し、孔の深部にモルタルを注入して同H形鋼
を自立させるものであつた(特開昭52―141007
号)。しかしボーリングマシンは回転ロツドの先
端の回転ビツトに給水する必要があつて設備が複
雑となり据付位置の移動に多大の時間を要し、か
つ上記モルタルによつて自立させる必要があつ
た。[Detailed Description of the Invention] Conventionally, a pile hole corresponding to the size of the H-section steel is bored using a boring machine, the H-section steel is pushed into the hole, and mortar is injected deep into the hole. It was designed to make the same H-shaped steel self-supporting (Japanese Patent Application Laid-Open No. 52-141007
issue). However, the boring machine required water to be supplied to the rotary bit at the tip of the rotary rod, making the equipment complex, requiring a great deal of time to move the installation position, and requiring the machine to be made self-supporting by the mortar.
本発明は簡便迅速に杭孔を穿設しその穿孔位置
の移動が迅速に行われ、かつモルタル等を要せず
押入するだけでH形鋼を自立させ得る土留工法で
あつて幅員の狭い道路における下水道工事の開削
に伴う土留施工を簡便迅速に施行しようとするも
のである。 The present invention is an earth retaining method that allows pile holes to be drilled simply and quickly, and the position of the hole to be moved quickly, and that allows H-shaped steel to stand on its own by simply pushing it in without using mortar, etc., for narrow roads. The purpose of this project is to simply and quickly carry out earth retaining construction in conjunction with excavation of sewerage works.
本発明は案内ガイドに沿つて送給される下向空
気式さく岩機によつて地面に穿孔を帯設し、同杭
孔にその孔径よりも外径なH形鋼杭を上記下向さ
く岩機の本体の下降および打撃力で押入して、地
面下にH形鋼杭を先行立込みし、その後同杭の列
に沿つて地面を掘削し、掘削深の進行に応じて隣
接H形鋼杭の対向溝内に鋼矢板の両側縁部を係止
状態に下降積重し、下段矢板よりも厚さの薄い上
段矢板を積重して土留壁を形成することを特徴と
する土留工法に関するものである。 The present invention involves drilling a hole in the ground using a downward pneumatic rock drill that is fed along a guide, and drilling an H-beam steel pile with an outer diameter larger than that of the hole in the downward direction. By lowering the main body of the rock machine and pushing it in with the impact force, H-shaped steel piles are placed under the ground in advance, and then the ground is excavated along the row of the piles, and the adjacent H-shaped steel piles are dug as the excavation depth progresses. An earth retaining method characterized by stacking steel sheet piles downward with both side edges locked in opposing grooves of steel piles, and stacking upper sheet piles, which are thinner than the lower sheet piles, to form an earth retaining wall. It is related to.
本発明を図面に示す実施例について説明する
と、履帯1による走行車体2の前部に起伏自在の
ドリル送給案内ガイド3を設け、同ガイド3に空
気式さく岩機4の本体5を摺動自在に支持し、同
本体5にさく岩用中空ロツド6を着脱自在に設け
てなるクローラードリル7を用いるものである。
上記さく岩機4は下向でありスリーブ8を介して
上記中空ロツド6を着脱自在に螺着し同ロツド6
の下端にビツト9を装着してなり、道路に上記ク
ローラードリル7を走行させ、案内ガイド3の下
端を地面10に支持して同ガイド3を測量調節し
て垂直に起立固定し、同さく岩機4を動作して地
面10にビツト9より杭孔11を穿設する。穿設
後ガイド3に沿つて本体5を上昇させロツド6を
同孔11から取外し、スリーブ8を本体5から取
外すことによりロツド6を本体5から分離し、ス
リーブ8に代えてアタツチメント12を同本体5
に螺着し、同アタツチメント12によつてH形鋼
杭13の上端部を支持し、下端を上記杭孔11に
符合させる(第3図仮想線でその状態を示す)。
この状態において本体5の回転動作機構を止め振
動打撃機構のみ動作させると同時に本体5をガイ
ド3に沿つて下降させると本体5の打撃力で同杭
13は杭孔11に押入埋設される。このH形鋼杭
13の外径は第3図に示すように上記杭孔11の
孔径より大である(例えば杭孔11の穿孔径150
mmに対し、125×125mmH形鋼杭13の対角長(外
径)が175mmのものを用いる)が上記本体5の下
降と打撃力で同杭13はその上端が地面10の水
準又は地面10下に至るまで杭孔11をリード孔
として押入され同杭13の上端部を地面10上に
突出させない方が良い。このようなH形鋼杭13
は第4図に示すように2列に先行立込みし、隣接
杭13,13の間隔は可及的正確に均等に配列す
る。その後第5図に示すようにパワーシヨベル1
4(商標名ユンボ)によつて列に沿つて地面10
を掘削し、掘削深の進行に応じて隣接H形鋼杭1
3,13の対向溝15,15内に鋼矢板16の両
側縁部を直接又は間接的に係止し(間接的とは両
側縁部に設た横向突起等による場合をいう)、掘
削深の進行が進むにつれて上記鋼矢板16を溝1
5,15に沿つて摺動下降し同矢板16の厚さよ
りも薄い厚さを有する鋼矢板16′を下降した上
記下段矢板16の上段に積重し順次数段に積重し
て土留壁を形成し、同壁による溝17の底部に下
水道管18を配設するものである(第13図)。
鋼矢板16の横幅には550mm、705mm、960mm、
1220mm、1750mmのものをサイズ別に揃え、各サイ
ズ毎に板厚を22mm〜9mmまで揃え、例えば最下段
に22mm厚×1220mm巾×705mm高のものを2〜3段
に積重しその上に16mm厚×1220mm巾×705mm高の
ものを積重し、最上段に12mm厚×1220mm巾×705
mm高のものを積重する(第15図参照)。尚図中
19で示すものは上下段鋼矢板16,16′の接
続用止め板、20は腹起し、21は腹起し20,
20を支持するサポート、22はH形鋼杭13,
13間のサポート、23は鋼矢板16,16間の
サポート、第14図中24はサポート支持突起で
ある。 To explain the embodiment of the present invention shown in the drawings, a drill feeding guide 3 which can be raised and lowered is provided at the front of a traveling vehicle body 2 using a crawler track 1, and a main body 5 of a pneumatic rock drill 4 is slid on the guide 3. A crawler drill 7 is used which is freely supported and has a hollow rock drilling rod 6 detachably attached to the main body 5.
The rock drill 4 faces downward, and the hollow rod 6 is removably screwed through the sleeve 8.
The crawler drill 7 is mounted on the lower end of the guide, the crawler drill 7 is run on the road, the lower end of the guide 3 is supported on the ground 10, the guide 3 is adjusted for surveying and fixed vertically, and the same is drilled into the rock. The machine 4 is operated to drill a pile hole 11 in the ground 10 using the bit 9. After drilling, the main body 5 is raised along the guide 3 to remove the rod 6 from the same hole 11, and the sleeve 8 is removed from the main body 5 to separate the rod 6 from the main body 5, and the attachment 12 is inserted in place of the sleeve 8. 5
The upper end of the H-shaped steel pile 13 is supported by the attachment 12, and the lower end is aligned with the pile hole 11 (this state is shown by the imaginary line in FIG. 3).
In this state, when the rotating mechanism of the main body 5 is stopped and only the vibration impact mechanism is operated, the main body 5 is lowered along the guide 3, and the impact force of the main body 5 forces the pile 13 into the pile hole 11. The outer diameter of this H-shaped steel pile 13 is larger than the hole diameter of the pile hole 11, as shown in FIG.
mm, the diagonal length (outer diameter) of the 125×125mm H-beam steel pile 13 is 175mm). Due to the lowering of the main body 5 and the impact force, the pile 13 has its upper end at the level of the ground 10 or the ground 10. It is better to push the pile hole 11 into the lead hole all the way to the bottom so that the upper end of the pile 13 does not protrude above the ground 10. Such H-shaped steel pile 13
As shown in FIG. 4, the piles are placed in advance in two rows, and the intervals between adjacent piles 13, 13 are arranged as precisely and evenly as possible. After that, as shown in Figure 5, the power shovel 1
Ground 10 along the row by 4 (trade name Yumbo)
The adjacent H-beam steel pile 1 is excavated as the excavation depth progresses.
Both side edges of the steel sheet pile 16 are directly or indirectly locked in the opposing grooves 15 and 15 of No. 3 and 13 (indirectly means by horizontal protrusions etc. provided on both side edges), and the excavation depth is As progress progresses, the steel sheet pile 16 is cut into the groove 1.
The steel sheet piles 16' having a thickness thinner than the thickness of the same sheet piles 16 are slid down along the lower sheet piles 16 and stacked on top of the lower sheet piles 16 which have been lowered, and are stacked one after another in several stages to form an earth retaining wall. A sewer pipe 18 is disposed at the bottom of a groove 17 formed by the same wall (FIG. 13).
The width of steel sheet pile 16 is 550mm, 705mm, 960mm,
1220mm and 1750mm products are arranged by size, and the board thickness for each size is arranged from 22mm to 9mm. For example, 22mm thick x 1220mm wide x 705mm high are stacked in 2 to 3 tiers on the bottom row, and 16mm thick is stacked on top of that. Stack 12mm thick x 1220mm wide x 705mm high items on the top layer.
Stack the pieces with a height of mm (see Figure 15). In addition, what is shown by 19 in the figure is a stop plate for connecting the upper and lower steel sheet piles 16, 16', 20 is a raised plate, 21 is a raised plate 20,
A support supporting 20, 22 is an H-shaped steel pile 13,
13 is a support, 23 is a support between the steel sheet piles 16, 16, and 24 in FIG. 14 is a support support protrusion.
本発明は上述の工法によつたので下向空気式さ
く岩機4を狭い道路や家屋密集地に搬入し、同さ
く岩機4により給水を要せずきわめて簡便迅速に
杭孔11を穿設し得ると共に同さく岩機4の本体
5の打撃によつてH形鋼杭13を迅速に同孔11
内に押入し得て自立用モルタルを注入することな
く同H形鋼杭13を地中に自立させることができ
るものである。又同杭13の列に沿つて形成した
上記溝17の土留壁は深部の下段矢板16の厚さ
が大であり上段に行くに従つて薄い矢板16′を
用いて積重したので深部に行くに従つて増加する
土圧P(第15図)に対応して土留壁を安全に保
持し得るものである。 Since the present invention is based on the above-mentioned construction method, the downward pneumatic rock drill 4 can be carried into a narrow road or a densely populated area, and the pile hole 11 can be drilled very simply and quickly without the need for water supply using the same rock drill 4. At the same time, the H-shaped steel pile 13 is quickly drilled into the same hole 11 by the impact of the main body 5 of the rock drilling machine 4.
The H-beam steel pile 13 can be made to stand on its own in the ground without injecting mortar into the ground. In addition, the earth retaining wall of the groove 17 formed along the row of the same piles 13 has a large thickness of the lower sheet pile 16 in the deep part, and the thinner sheet piles 16' are stacked toward the top, so that the retaining wall goes deeper. The earth retaining wall can be safely held in response to the earth pressure P (Fig. 15) which increases accordingly.
第1図は本発明の土留工法における杭孔工事状
態を示す側面図、第2図はH形鋼杭打設状態の側
面図、第3図は先行杭孔の平面図、第4図は先行
杭の平面図、第5図は掘削状態側面図、第6図は
第5図の平面図、第7図は矢板工事の側面図、第
8図は第7図の平面図、第9図は矢板2段積重状
態の側面図、第10図は第9図の平面図、第11
図は矢板3段積重状態の側面図、第12図は第1
1図の平面図、第13図は下水道工事の縦断面
図、第14図はH形鋼杭と鋼矢板との係止状態拡
大横断面図、第15図は土圧状態の縦断面図であ
る。
3…案内ガイド、4…下向空気式さく岩機、1
0…地面、11…杭孔、13…H形鋼杭、5…本
体、15…対向溝、16…鋼矢板、16′…上段
矢板。
Fig. 1 is a side view showing the state of pile hole construction in the earth retaining method of the present invention, Fig. 2 is a side view of the H-section steel pile driving state, Fig. 3 is a plan view of the preceding pile hole, and Fig. 4 is the preceding A plan view of the pile, Fig. 5 is a side view of the excavation state, Fig. 6 is a plan view of Fig. 5, Fig. 7 is a side view of the sheet pile construction, Fig. 8 is a plan view of Fig. 7, and Fig. 9 is a plan view of the excavation state. A side view of the stacked sheet piles in two stages, Fig. 10 is a plan view of Fig. 9, and Fig. 11
The figure is a side view of three stacked sheet piles, and Figure 12 is the first one.
Figure 1 is a plan view, Figure 13 is a longitudinal cross-sectional view of sewerage construction, Figure 14 is an enlarged cross-sectional view of the state in which the H-shaped steel pile and steel sheet pile are engaged, and Figure 15 is a vertical cross-sectional view of the state of earth pressure. be. 3... Guide guide, 4... Downward pneumatic rock drill, 1
0... Ground, 11... Pile hole, 13... H-shaped steel pile, 5... Main body, 15... Opposing groove, 16... Steel sheet pile, 16'... Upper sheet pile.
Claims (1)
さく岩機4によつて地面10に杭孔11を穿設
し、同杭孔11にその孔径よりも外径大なH形鋼
杭13を上記下向さく岩機4の本体5の下降およ
び打撃力で押入して、地面下にH形鋼杭13を先
行立込みし、その後同杭13の列に沿つて地面1
0を掘削し、掘削深の進行に応じて隣接H形鋼杭
13,13の対向溝15,15内に鋼矢板16の
両側縁部を係止状態に下降積重し、下段矢板16
よりも厚さの薄い上段矢板16′を積重して土留
壁を形成することを特徴とする土留工法。1 A pile hole 11 is drilled in the ground 10 by a downward pneumatic rock drill 4 that is fed along the guide 3, and an H-shaped steel pile with an outer diameter larger than the hole diameter is inserted into the pile hole 11. 13 by lowering the main body 5 of the downward rock drilling machine 4 and pushing it in with impact force, the H-beam steel piles 13 are pre-erected under the ground, and then the H-shaped steel piles 13 are driven into the ground 1 along the row of the same piles 13.
0 is excavated, and as the excavation depth progresses, both side edges of the steel sheet piles 16 are locked in the facing grooves 15, 15 of the adjacent H-shaped steel piles 13, 13 and stacked downward, and the lower sheet piles 16 are
This earth retaining method is characterized in that an earth retaining wall is formed by stacking upper sheet piles 16' that are thinner than the upper sheet piles 16'.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2644181A JPS57140419A (en) | 1981-02-24 | 1981-02-24 | Sheathing work |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2644181A JPS57140419A (en) | 1981-02-24 | 1981-02-24 | Sheathing work |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS57140419A JPS57140419A (en) | 1982-08-31 |
| JPS6251330B2 true JPS6251330B2 (en) | 1987-10-29 |
Family
ID=12193589
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2644181A Granted JPS57140419A (en) | 1981-02-24 | 1981-02-24 | Sheathing work |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS57140419A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112196059B (en) * | 2020-09-28 | 2022-04-15 | 上海市机械施工集团有限公司 | Municipal rainwater pipeline construction method |
-
1981
- 1981-02-24 JP JP2644181A patent/JPS57140419A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS57140419A (en) | 1982-08-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3999392A (en) | Method of constructing a wall for supporting earth | |
| CN110984133A (en) | Construction method for foundation of deep-water shallow-covering-layer trestle | |
| CN114370234A (en) | Bare rock riverbed steel pipe pile construction equipment and construction method | |
| KR20130061377A (en) | Structure of retaining wall and construction method for installing underground structures | |
| JPS6251330B2 (en) | ||
| US6554544B1 (en) | Method to build a water seal, creep-line increasing cutoff | |
| KR0145495B1 (en) | Underground drilling method and device by multi and hammer auger machine | |
| KR102821801B1 (en) | Guide device used in SCW method And Construction metood usinf thereof | |
| JP2532751B2 (en) | METHOD FOR BUILDING A CONCRETE STRUCTURE TO COARSE MATERIAL FROM THE GROUND LEVEL AND EQUIPMENT FOR IMPLEMENTING THE SAME | |
| KR101224440B1 (en) | Construction method of screw file | |
| KR20180127703A (en) | Boring machine having Gear-Box of two rod | |
| KR100669527B1 (en) | Earthwork | |
| KR20230058821A (en) | the improved retaining wall structure reduced its thickness | |
| JPS58156630A (en) | Trench formation for underground wall | |
| KR101483181B1 (en) | H beams for placing perforated part piercing can be done in the absence of H-type perforated and construction method for H-type perforated | |
| CN113338943B (en) | Multi-cutter-head vertical shield system | |
| JP2818838B2 (en) | Construction method for underground structures | |
| CN222228461U (en) | Frozen soil body drilling equipment | |
| CN223003397U (en) | Pipe pile construction node | |
| CN220580081U (en) | Rotary drilling wallboard structure hole drill bit in rock-soil stratum | |
| JPH02178418A (en) | Building method for continuous underground wall and striation drilling device | |
| JP2001146739A (en) | Construction method for impervious wall | |
| JPH0921131A (en) | Construction of continuous underground hole | |
| JPS6229597B2 (en) | ||
| JPS5848693B2 (en) | High pressure continuous wall construction method |