Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6261749B2 - - Google Patents
[go: Go Back, main page]

JPS6261749B2 - - Google Patents

Info

Publication number
JPS6261749B2
JPS6261749B2 JP55111594A JP11159480A JPS6261749B2 JP S6261749 B2 JPS6261749 B2 JP S6261749B2 JP 55111594 A JP55111594 A JP 55111594A JP 11159480 A JP11159480 A JP 11159480A JP S6261749 B2 JPS6261749 B2 JP S6261749B2
Authority
JP
Japan
Prior art keywords
bar cage
steel wire
reinforcing bar
reinforcing
reinforcing bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP55111594A
Other languages
Japanese (ja)
Other versions
JPS5736244A (en
Inventor
Nobuyuki Abe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Concrete Industries Co Ltd
Original Assignee
Nippon Concrete Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Concrete Industries Co Ltd filed Critical Nippon Concrete Industries Co Ltd
Priority to JP11159480A priority Critical patent/JPS5736244A/en
Publication of JPS5736244A publication Critical patent/JPS5736244A/en
Publication of JPS6261749B2 publication Critical patent/JPS6261749B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【発明の詳細な説明】 本発明は、緊張用のPC鋼線と非緊張用の補強
筋とを有するコンクリート柱体用の鉄筋籠の編成
方法に関するものである。PC鋼線は引張状態に
てコンクリート柱体内に埋設されてコンクリート
柱体にプレストレスを導入し、柱体のひび割れ抵
抗を増加する。一方、非緊張用の補強筋は、柱体
の曲げ抵抗及び破壊強度を改善する為に柱体内に
埋設されるものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of knitting a reinforcing bar cage for a concrete column body having prestressed PC steel wires for tensioning and reinforcing bars for non-tensioning. The PC steel wire is buried in the concrete column under tension to introduce prestress into the concrete column and increase the cracking resistance of the column. On the other hand, non-tension reinforcing bars are embedded within the column in order to improve the bending resistance and fracture strength of the column.

従来、緊張用PC鋼線と非緊張用補強筋とを組
合せて鉄筋籠を編成するには、あらかじめ非緊張
用補強筋をリング筋等に溶接又は結束させて、さ
らにラセン筋を人手によつて巻きつけて補強筋籠
を形成し、この補強筋籠の両端に夫々端板を配設
し、該端板を挿通させてPC鋼線を設け、前記端
板を反対方向に引張つて鉄筋籠を編成していた。
しかしながら、この従来方法では補強筋籠の製造
に手編という作業が加わるため多大の労力を要
し、コンクリート柱体の製造上すこぶる作業能率
が悪かつた。
Conventionally, in order to form a reinforcing bar cage by combining tensioning PC steel wire and non-tensioning reinforcing bars, the non-tensioning reinforcing bars were first welded or tied to ring reinforcements, etc., and then spiral reinforcements were added manually. The reinforcing bar cage is formed by winding the reinforcing bar cage, end plates are provided at both ends of the reinforcing bar cage, a PC steel wire is provided by inserting the end plates, and the end plate is pulled in the opposite direction to form the reinforcing bar cage. was organizing.
However, in this conventional method, a large amount of labor was required because hand-weaving was added to the production of reinforcing bars, and the work efficiency was extremely poor in the production of concrete columns.

本発明は上記の如き従来技術の欠点を解消し、
コンクリート柱体製造過程におき作業能率の改善
されたコンクリート柱体用鉄筋籠の編成方法を提
供することを目的とする。本発明においては、従
来の補強筋籠を形成することなく、所定長さを有
するPC鋼線と該PC鋼線より長尺の補強筋とを自
動編組機によつて編組されたラセン筋籠内を挿通
させて該ラセン筋籠の両端近傍に配設した端板に
夫々係止させて鉄筋籠を形成し、前記両端板を反
対方向に引張つて鉄筋籠を編成する。尚、ここに
おいて、鉄筋籠を編成することは、鉄筋籠を構成
するラセン筋籠、PC鋼線、補強筋のうち少なく
ともPC鋼線を所定の引張状態に緊張させ、補強
筋は前記PC鋼線を所定の引張状態に緊張させた
とき、略々直線状態となるようにする。また補強
筋に許容限度力の範囲で引張力を付与させても良
いが、ラセン筋籠には引張力を作用させない。
The present invention eliminates the drawbacks of the prior art as described above,
The purpose of the present invention is to provide a method for organizing reinforcing bar cages for concrete columns that improves work efficiency in the process of manufacturing concrete columns. In the present invention, without forming a conventional reinforcing bar, a PC steel wire having a predetermined length and a reinforcing bar longer than the PC steel wire are placed inside a helical bar braided by an automatic braiding machine. are inserted through the helical bar cage and respectively locked to end plates disposed near both ends of the helical bar cage to form a reinforcing bar cage, and the both end plates are pulled in opposite directions to knit the reinforcing bar cage. In this case, organizing the reinforcing bar cage means tensioning at least the PC steel wire to a predetermined tensile state among the helical bar cage, PC steel wire, and reinforcing bars that constitute the reinforcing bar cage, and the reinforcing bars are the aforementioned PC steel wires. When it is tensed to a predetermined tension state, it becomes a substantially straight state. Further, a tensile force may be applied to the reinforcing bar within the allowable limit force, but no tensile force is applied to the helical bar cage.

以下、添付の図面を参考に本発明の具体的実施
の態様に付き説明する。第1図乃至第4図は本発
明方法の工程を例示する工程図である。第1図に
示す如く、予め所定の長さを有し一端に鋲頭部1
を有するPC鋼線2及び補強筋3を用意してお
き、自動編組機によつて縦筋にラセン筋を溶接し
て構成したラセン筋籠4を組立台6上に位置さ
せ、ラセン筋籠4の両端近傍には夫々端板5,5
を配設する。この場合に、PC鋼線2の長さは製
造されるべきコンクリート柱体の長さより短く、
緊張されてコンクリート柱体の長さにまで延伸さ
れコンクリート柱体に所望のプレストレスを導入
可能な長さとする。一方、非緊張用の補強筋3は
製造されるべきコンクリート柱体の長さと略々同
等の長さとする。尚、使用すべきPC鋼線及び補
強筋の数はコンクリート柱体の径、必要とする強
度等に鑑み適数個円周上に配設するものとする。
Hereinafter, specific embodiments of the present invention will be described with reference to the accompanying drawings. 1 to 4 are process diagrams illustrating the steps of the method of the present invention. As shown in FIG.
A PC steel wire 2 and reinforcing bars 3 having the same characteristics are prepared, and a helical bar cage 4, which is constructed by welding spiral bars to vertical bars, is placed on an assembly table 6 using an automatic braiding machine. There are end plates 5, 5 near both ends of the
Place. In this case, the length of the PC steel wire 2 is shorter than the length of the concrete column to be manufactured,
It is tensioned and stretched to the length of the concrete column to a length that can introduce the desired prestress into the concrete column. On the other hand, the length of the non-tension reinforcing bars 3 is approximately the same as the length of the concrete column to be manufactured. An appropriate number of PC steel wires and reinforcing bars to be used shall be placed around the circumference in consideration of the diameter of the concrete column, the required strength, etc.

第2図に示す如く、一方の端板(本例では左側
の端板)から該端板に穿設されている透孔を通し
てPC鋼線及び補強筋を挿通させ、更にラセン筋
籠4内に無拘束の状態に内挿し、次いで他方の端
板の透孔を挿通させ、該他方の端板から突き出さ
れたPC鋼線及び補強筋の先端部にアプセツター
7により鋲頭部1′を形成する。従つて、PC鋼線
2及び補強筋3は一対の端板5,5間に架橋さ
れ、ラセン筋籠4と共に鉄筋籠10を構成する。
尚、組立台6上に位置された一対の端板5,5間
の距離は略々PC鋼線2の長さと同等であるか
ら、PC鋼線2は略々直線状態にて端板5,5間
に介装される。一方、補強筋3は組立台6上の端
板間距離よりも長いので、端板5,5間に懸垂状
態に介装される。
As shown in FIG. 2, the PC steel wire and reinforcing bars are inserted from one end plate (in this example, the left end plate) through the through hole drilled in the end plate, and then inserted into the helical bar cage 4. Insert it in an unrestricted state, then insert it through the through hole of the other end plate, and form a rivet head 1' at the tip of the PC steel wire and reinforcing bar protruding from the other end plate with an upsetter 7. . Therefore, the PC steel wire 2 and the reinforcing bars 3 are bridged between the pair of end plates 5, 5, and together with the helical bar cage 4 constitute the reinforcing bar cage 10.
Incidentally, since the distance between the pair of end plates 5, 5 placed on the assembly table 6 is approximately equal to the length of the PC steel wire 2, the PC steel wire 2 is connected to the end plates 5, 5 in a substantially straight state. It is interposed between 5 and 5. On the other hand, since the reinforcing bars 3 are longer than the distance between the end plates on the assembly table 6, they are interposed between the end plates 5 in a suspended state.

次に、以上の如く構成された鉄筋籠10を第3
図に示す如く型枠11内に配設する。この場合、
一方の端板5を吊りボルト13によりアンカープ
レート12に固着し、他方の端板5を型枠11内
に摺動自在に位置させる。そして前記他方の端板
5に吊りボルト13によりテンシヨンプレート1
4を固着する。テンシヨンプレート14には切欠
き部14aが刻設されている。
Next, the reinforcing bar cage 10 configured as described above is placed in a third
It is placed in a formwork 11 as shown in the figure. in this case,
One end plate 5 is fixed to the anchor plate 12 by a hanging bolt 13, and the other end plate 5 is slidably positioned within the formwork 11. Then, the tension plate 1 is attached to the other end plate 5 by a hanging bolt 13.
Fix 4. The tension plate 14 has a notch 14a carved therein.

そして、油圧ジヤツキ等所望の引張手段(不図
示)をテンシヨンプレート14に連結してテンシ
ヨンプレート14を右方向に引張り、PC鋼線に
緊張力を付与する。テンシヨンプレート14を所
望の長さ(図示例では型枠11の端部に端板5が
到達した長さ)に迄牽引した後、セツトリング1
5をテンシヨンプレート14の切欠き部14aに
嵌入させてPC鋼線2を緊張状態に保持する。
尚、この際に、補強筋3は直線状態にセツトされ
るが、その許容限度内において多少の引張力が付
与されても良い。しかして、鉄筋籠の緊張は完了
され、次いで混練されたコンクリートを型枠内に
充填し、遠心締固めの後養生工程を経てコンクリ
ート柱体を製造する。
Then, a desired tensioning means (not shown) such as a hydraulic jack is connected to the tension plate 14 and the tension plate 14 is pulled rightward to apply tension to the PC steel wire. After pulling the tension plate 14 to a desired length (in the illustrated example, the length at which the end plate 5 reaches the end of the formwork 11), the settling 1
5 is fitted into the notch 14a of the tension plate 14 to hold the PC steel wire 2 under tension.
At this time, the reinforcing bars 3 are set in a straight line, but some tensile force may be applied within the permissible limits. Thus, the tensioning of the reinforcing bar cage is completed, and then the mixed concrete is filled into the formwork, centrifugally compacted, and then subjected to a curing process to produce a concrete column.

叙上の如く、本発明方法によれば、従来のよう
な補強筋籠を編組する必要がなく、PC鋼線と補
強筋とを無拘束状態にてラセン筋籠内に内挿させ
て鉄筋籠を構成し、PC鋼線と補強筋とを同時に
引張つて鉄筋籠を編成するので、作業能率が著し
く改善される。又、本発明方法ではPC鋼線、補
強筋を緊張状態とするに従い、PC鋼線、補強筋
は、端板並びにラセン筋籠に対し自動的に整合さ
れるので、各部材の配置関係は一様となり柱体強
度の改善に寄与する。更に、従来のような補強筋
籠を使用した場合と比較し、本発明方法では補強
筋も鋲頭部を介して端板に強固に接続されるの
で、柱体両端部における強度が改善されており、
継杭する場合にも端板に補強筋を溶接する必要が
なくて、しかも継手部の十分な強度が確保され
る。
As described above, according to the method of the present invention, there is no need to braid the reinforcing bar cage as in the conventional method, and the reinforcing bar cage can be constructed by inserting the PC steel wire and the reinforcing bars into the helical bar cage in an unrestricted state. Since the reinforcing bar cage is formed by simultaneously pulling the PC steel wire and reinforcing bars, work efficiency is significantly improved. In addition, in the method of the present invention, as the PC steel wire and reinforcing bars are brought into tension, they are automatically aligned with the end plate and helical bar cage, so the arrangement relationship of each member is the same. This contributes to improving the strength of the column. Furthermore, compared to the case of using conventional reinforcing bar cages, in the method of the present invention, the reinforcing bars are also firmly connected to the end plates via the rivet heads, so the strength at both ends of the column is improved. Ori,
Even when connecting piles, there is no need to weld reinforcing bars to the end plates, and sufficient strength of the joint can be ensured.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第4図は本発明方法の1実施例を例
示する工程図、第5図は第4図X―X方向に見た
場合のPC鋼線と補強筋との配置状態を示す説明
図である。 主要部分の符号の説明、2:PC鋼線、3:補
強筋、4:ラセン筋籠、5:端板、10:鉄筋
籠、11:型枠。
Figures 1 to 4 are process diagrams illustrating one embodiment of the method of the present invention, and Figure 5 is an explanation showing the arrangement of the PC steel wire and reinforcing bars when viewed in the XX direction of Figure 4. It is a diagram. Explanation of the symbols of the main parts, 2: PC steel wire, 3: Reinforcement bar, 4: Spiral bar cage, 5: End plate, 10: Rebar cage, 11: Formwork.

Claims (1)

【特許請求の範囲】[Claims] 1 所定長を有するPC鋼線と該PC鋼線より長尺
の補強筋をラセン筋籠内に挿通しラセン筋籠の両
端近傍に配設した端板に夫々係止させて前記補強
筋は端板間に懸垂した状態でまたPC鋼線は略直
線状態として鉄筋籠を形成し、次いで前記鉄筋籠
を型枠内において前記補強筋が略々直線状態にな
るまで前記両端板を反対方向に牽引して前記PC
鋼線を緊張状態にすることを特徴とするコンクリ
ート柱体用鉄筋籠の編成方法。
1 A prestressed steel wire having a predetermined length and a reinforcing bar longer than the prestressed steel wire are inserted into the helical bar cage, and each of the reinforcing bars is fixed to the end plate arranged near both ends of the helical bar cage. The PC steel wire is suspended between the plates and is in a substantially straight state to form a reinforcing bar cage, and then the reinforcing bar cage is placed in a formwork and the both end plates are pulled in opposite directions until the reinforcing bars are in a substantially straight state. and said PC
A method for organizing a reinforcing bar cage for a concrete column body, which is characterized by keeping steel wires under tension.
JP11159480A 1980-08-15 1980-08-15 KONKURIITOCHUTAIYOTETSUKINKAGONOHENSEIHOHO Granted JPS5736244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11159480A JPS5736244A (en) 1980-08-15 1980-08-15 KONKURIITOCHUTAIYOTETSUKINKAGONOHENSEIHOHO

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11159480A JPS5736244A (en) 1980-08-15 1980-08-15 KONKURIITOCHUTAIYOTETSUKINKAGONOHENSEIHOHO

Publications (2)

Publication Number Publication Date
JPS5736244A JPS5736244A (en) 1982-02-27
JPS6261749B2 true JPS6261749B2 (en) 1987-12-23

Family

ID=14565312

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11159480A Granted JPS5736244A (en) 1980-08-15 1980-08-15 KONKURIITOCHUTAIYOTETSUKINKAGONOHENSEIHOHO

Country Status (1)

Country Link
JP (1) JPS5736244A (en)

Also Published As

Publication number Publication date
JPS5736244A (en) 1982-02-27

Similar Documents

Publication Publication Date Title
JP6442104B1 (en) Continuous fiber reinforced strand fixing tool
JPH0474503B2 (en)
DE2759726C2 (en) Method of making a reinforced concrete pile in the ground
KR101636225B1 (en) Lateral stiffness reinforced internal reinforced concrete ICP file and its construction method
JPS6261749B2 (en)
JPS5915167A (en) Assembling of reinforcing cage for concrete pillar
EP3336258B1 (en) End anchorage for a soil and/or rock anchor
JPS60119853A (en) Reinforcing material of structural material
JPH05302490A (en) Fiber Reinforced Concrete Wall at Start-up Area in Vertical Shaft for Tunneling
CN211172060U (en) Anchoring structure of pre-buried steel sleeve of photovoltaic support foundation
JPH08120667A (en) Prestressed reinforced concrete pile
JP3683615B2 (en) How to build pre-assembled column reinforcement bar
JP3684539B2 (en) Flexible rebar fixing method
JPH0555676B2 (en)
DE2758489B2 (en) Process for the production of a pre-stressed ground pile as well as a ground pile manufactured according to the process
JPS634158A (en) Structural material
CN110735443A (en) Anchoring structure and anchoring method of pre-embedded steel casing for photovoltaic support foundation
JP3590561B2 (en) Precast concrete block joining method
JPS5965149A (en) Rebar joint structure
US1420166A (en) Method and means for constructing forms for concrete
JPH0515861B2 (en)
JPH0743182U (en) Rebar assembly
AT164329B (en) Process for prestressing the steel inserts of hollow stone beams, especially for the production of ceilings
JPS6167534A (en) Assembling method of beam brace formed wire gauze through welding stirrups
JPH0874319A (en) Joint building construction between precast concrete beam and column with circular section