Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6261920B2 - - Google Patents
[go: Go Back, main page]

JPS6261920B2 - - Google Patents

Info

Publication number
JPS6261920B2
JPS6261920B2 JP56155174A JP15517481A JPS6261920B2 JP S6261920 B2 JPS6261920 B2 JP S6261920B2 JP 56155174 A JP56155174 A JP 56155174A JP 15517481 A JP15517481 A JP 15517481A JP S6261920 B2 JPS6261920 B2 JP S6261920B2
Authority
JP
Japan
Prior art keywords
main steam
pressure vessel
reactor pressure
reactor
support ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP56155174A
Other languages
Japanese (ja)
Other versions
JPS5855898A (en
Inventor
Tadashi Tsuji
Ryokichi Igarashi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP56155174A priority Critical patent/JPS5855898A/en
Publication of JPS5855898A publication Critical patent/JPS5855898A/en
Publication of JPS6261920B2 publication Critical patent/JPS6261920B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Description

【発明の詳細な説明】 この発明は定期点検時、原子炉圧力容器の主蒸
気ノズルを密栓するとともに原子炉圧力容器内の
照明を行うことのできる閉塞装置に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a closure device that can hermetically plug a main steam nozzle of a nuclear reactor pressure vessel and illuminate the inside of the reactor pressure vessel during periodic inspections.

沸騰水形原子炉の定期点検にはたとえば燃料交
換がある。この燃料交換は原子炉圧力容器内の炉
心に装荷された燃料集合体を新たなものに取換え
るものであり、この燃料集合体の取換えには燃料
交換機が使用される。この燃料交換機は原子炉圧
力容器上方の作業床上に配置されており、作業員
は燃料交換時、この作業床上から燃料交換機を操
作して上記燃料集合体の取換えを行うようになつ
ている。また、このような上記燃料交換を行う際
には上記作業床がはるか上方にあり、しかも原子
炉圧力容器内およびこの圧力容器上方の原子炉ウ
エル内には遮蔽用の水が満たされていることか
ら、上記炉心の位置は暗くて見づらいものであ
る。このため、燃料交換時には原子炉圧力容器内
つまり上記炉心を照らす照明具が必要となり、従
来は上記燃料交換機から水中照明具を吊下げて据
付け、この水中照明具で交換すべき燃料集合体付
近を局所的に照明するようになつている。しかし
ながら、このような水中照明具を吊げるものにあ
つては、作業時、この水中照明具が揺れて確実に
照明できない不具合があつた。また、水中照明具
の揺れに伴つて吊下げ用のケーブルも揺れること
から、上記原子炉ウエル水面も揺れてしまい、炉
心内の視認性が悪くなる欠点があつた。
Periodic inspections of boiling water reactors include, for example, fuel changes. This fuel exchange involves replacing the fuel assembly loaded in the reactor core within the reactor pressure vessel with a new one, and a fuel exchanger is used to replace this fuel assembly. This fuel exchange machine is placed on a work floor above the reactor pressure vessel, and when exchanging fuel, a worker operates the fuel exchange machine from the work floor to replace the fuel assembly. In addition, when performing such fuel exchange, the work floor is far above, and the reactor pressure vessel and the reactor well above the pressure vessel are filled with water for shielding. Therefore, the location of the reactor core is dark and difficult to see. For this reason, during fuel exchange, a lighting device is required to illuminate the inside of the reactor pressure vessel, that is, the reactor core. Conventionally, an underwater lighting device was installed by hanging from the fuel exchange machine, and this underwater lighting device illuminated the vicinity of the fuel assembly to be replaced. It is designed to provide localized illumination. However, in the case of such underwater lighting equipment that can be hung, there is a problem that the underwater lighting equipment shakes during work and cannot provide reliable illumination. Furthermore, since the hanging cable also sways as the underwater lighting equipment sways, the water surface of the reactor well also sways, resulting in poor visibility inside the reactor core.

ところで、上記定期点検時には燃料交換と並行
して主蒸気系の保守点検が行われ、この主蒸気系
の保守点検には閉塞装置が用いられる。この閉塞
装置は原子炉圧力容器内に据付けられ、その閉塞
プラグを主蒸気ノズルに挿入することにより、こ
の主蒸気ノズルを密栓するものであり、これによ
つて主蒸気系の漏洩試験等を行うようになつてい
る。このように、定期点検時には原子炉圧力容器
内に上記水中照明具および上記閉塞装置を据付け
たりするなどの据付作業があるが、これら据付作
業は従来別々に行われていた。このため、各据付
作業毎に作業時間を必要とすることから、定期点
検期間が長時間化し、作業員の放射性被曝量が増
大する不具合があつた。
By the way, during the above-mentioned periodic inspection, maintenance and inspection of the main steam system is performed in parallel with fuel exchange, and a blocking device is used for this maintenance and inspection of the main steam system. This blocking device is installed inside the reactor pressure vessel, and by inserting the blocking plug into the main steam nozzle, the main steam nozzle is hermetically sealed.This is used to conduct leakage tests of the main steam system, etc. It's becoming like that. As described above, during periodic inspections, there is installation work such as installing the above-mentioned underwater lighting equipment and the above-mentioned closure device inside the reactor pressure vessel, but these installation works have conventionally been performed separately. For this reason, since each installation work requires work time, the periodic inspection period becomes long and there is a problem that the amount of radiation exposure of the workers increases.

この発明はこのような事情にもとづいてなされ
たもので、その目的とするところは、上記水中照
明具を備えてなることにより、燃料交換時におい
て原子炉圧力容器を安定して照明することがで
き、また定期点検時間を短縮して作業員の被曝量
を低減することのできる原子炉主蒸気ノズルの閉
塞装置を提供することにある。
This invention was made based on the above circumstances, and its purpose is to stably illuminate the reactor pressure vessel during fuel exchange by providing the above-mentioned underwater lighting device. Another object of the present invention is to provide a closure device for a nuclear reactor main steam nozzle that can shorten periodic inspection time and reduce radiation exposure to workers.

すなわち、この発明は主蒸気ノズルに着脱可能
に挿入されてこの主蒸気ノズルを気水密に密封す
る閉塞プラグと、この閉塞プラグの挿入後、上記
主蒸気ノズル位置における原子炉圧力容器内の内
周面に沿つて位置付けられ原子炉圧力容器内への
閉塞プラグの飛び出しを防止するリング状のサポ
ートリングとを備え、このサポートリングの下部
に周方向に沿つて複数の水中照明具を設けたこと
を特徴とするものである。
That is, the present invention provides a blocking plug that is removably inserted into a main steam nozzle to seal the main steam nozzle in an air-water tight manner; The reactor pressure vessel is equipped with a ring-shaped support ring that is positioned along the surface of the reactor pressure vessel to prevent the plug from popping out into the reactor pressure vessel, and a plurality of underwater lighting devices are provided along the circumferential direction at the bottom of this support ring. This is a characteristic feature.

以下この発明の一実施例を第1図ないし10図
にもとづき説明する。
An embodiment of the present invention will be described below with reference to FIGS. 1 to 10.

第1図は沸騰水形原子炉を示したもので、図中
1は原子炉圧力容器である。この原子炉圧力容器
1には炉心2が内蔵されているとともに、その上
部には複数(通常は4個)の主蒸気ノズル3…が
設けられている。これら主蒸気ノズル3…はそれ
ぞれ主蒸気管4…に接続されており、上記沸騰水
形原子炉は上記炉心2で生じた蒸気をこれら主蒸
気管4…を通じて発電タービンに導き、この発電
タービンを駆動して発電をなすようになつてい
る。また、主蒸気管4…には原子炉格納容器壁5
を挟んでそれぞれ一対の主蒸気隔離弁6,6が設
けられるとともに、原子炉圧力容器1内の圧力異
常時に作動する圧力逃し弁7が設けられている。
また8は原子炉建屋の作業床である。なお、第1
図は定期点検時において原子炉圧力容器1内の蓋
(図示しない。)を取外し、原子炉圧力容器1の内
部と原子炉ウエル9とに遮蔽用の水を満たした状
態を示している。
Figure 1 shows a boiling water nuclear reactor, where 1 is the reactor pressure vessel. This reactor pressure vessel 1 contains a reactor core 2, and a plurality (usually four) of main steam nozzles 3 are provided in the upper part of the reactor pressure vessel 1. These main steam nozzles 3 are connected to main steam pipes 4, respectively, and the boiling water reactor guides the steam generated in the reactor core 2 through these main steam pipes 4 to a power generation turbine. It is designed to be driven to generate electricity. In addition, the main steam pipe 4... is provided with a reactor containment vessel wall 5.
A pair of main steam isolation valves 6, 6 are provided on either side of the reactor pressure vessel 1, and a pressure relief valve 7 is provided which operates when the pressure inside the reactor pressure vessel 1 is abnormal.
8 is the working floor of the reactor building. In addition, the first
The figure shows a state in which the lid (not shown) inside the reactor pressure vessel 1 is removed during periodic inspection, and the inside of the reactor pressure vessel 1 and the reactor well 9 are filled with water for shielding.

そして、このような定期点検時には主蒸気系の
保守点検をなすため、上記原子炉圧力容器1内に
主蒸気ノズル3…の閉塞装置10が挿入されて据
付けられるようになつており、以下に上記閉塞装
置10の構成を第2図ないし第6図を参照して説
明する。図中11は基台である。この基台11は
中央部および両端部において連結部材12…で連
結された2本のビーム13,13からなり、これ
らビーム13,13の両端は挿入時、それぞれ主
蒸気ノズル3…と対向するように構成されてい
る。また、連結部材12…には吊持用の吊耳14
…が設けられており、これら吊耳14…にワイヤ
ロープを連結して閉塞装置10全体を原子炉建屋
の天井クレーンで吊持可能となつている。そし
て、上記ビーム13,13上にはそれぞれ両端側
に閉塞プラグ15…が設けられている。閉塞プラ
グ15…は主蒸気ノズル3の内径よりも小径の円
筒体16からなり、その先端にはローラ17…が
設けられている。また、円筒体16の中間部外周
にはそれぞれ中空の水圧シール18および空圧シ
ール19が設けられているとともに、その後端に
はOリング20が設けられている。また、21…
は上記水圧シール18および空圧シール19に水
および空気を供給する各ホースの集合体である。
そして、閉塞プラグ15…の後方には台車22…
がそれぞれ設けられており、これら台車22…は
水圧シリンダ23…によつてビーム13,13上
を長手方向に往復動可能となつている。また、2
4…は台車22…の車輪である。そして、上記台
車22…と閉塞プラグ15…とは第3図に示され
る如く互いに係合するフツク状の連結具25a,
25bによつてそれぞれ連結されており、台車2
2…の往復動により主蒸気ノズル3…に対して挿
抜する方向に閉塞プラグ15…の押出しおよび引
戻しがなされるように構成されている。また、台
車22…と閉塞プラグ15との連結は台車22…
側が上方に移動されることにより、解除可能とな
つているものである。また、閉塞プラグ15…は
ビーム13,13上において挿抜案内ガイド26
…により支持されている。この挿抜案内ガイド2
6…はビーム13,13上に固定して設けられて
おり、その先端側が閉塞プラグ15…の後端部に
着脱自在に差込まれている。
In order to carry out maintenance and inspection of the main steam system during such periodic inspections, a blockage device 10 for the main steam nozzles 3 is inserted and installed in the reactor pressure vessel 1, and as described below. The configuration of the closure device 10 will be explained with reference to FIGS. 2 to 6. In the figure, 11 is a base. This base 11 consists of two beams 13, 13 connected at the center and both ends by connecting members 12, and both ends of these beams 13, 13 are arranged to face the main steam nozzles 3, respectively, when inserted. It is composed of In addition, the connecting members 12... have hanging ears 14 for hanging.
... are provided, and wire ropes are connected to these hanging ears 14, so that the entire closure device 10 can be suspended by an overhead crane of the reactor building. Closing plugs 15 are provided on both ends of the beams 13, 13, respectively. The closing plugs 15 are made up of a cylindrical body 16 having a smaller diameter than the inner diameter of the main steam nozzle 3, and rollers 17 are provided at the tips thereof. Furthermore, a hollow hydraulic seal 18 and a hollow pneumatic seal 19 are provided on the outer periphery of the intermediate portion of the cylindrical body 16, respectively, and an O-ring 20 is provided at the rear end. Also, 21...
is a collection of hoses that supply water and air to the hydraulic seal 18 and pneumatic seal 19.
And behind the blockage plug 15... is a trolley 22...
These carts 22... are capable of reciprocating in the longitudinal direction on the beams 13, 13 by means of hydraulic cylinders 23.... Also, 2
4... are wheels of the trolley 22.... As shown in FIG. 3, the carts 22 and the closing plugs 15 are hook-shaped connectors 25a that engage with each other,
25b, respectively, and the trolley 2
The reciprocating motion of the plugs 15 and 2 causes the plugs 15 to be pushed out and pulled back in the direction of insertion and removal from the main steam nozzles 3. Moreover, the connection between the carriages 22... and the blocking plug 15 is the connection between the carriages 22...
It can be released by moving the side upward. Moreover, the blocking plugs 15... are inserted into the insertion/extraction guide 26 on the beams 13, 13
...supported by... This insertion/extraction guide 2
6... are fixedly provided on the beams 13, 13, and their distal ends are removably inserted into the rear ends of the closing plugs 15....

そして、上記基台11の側方にはサポートリン
グ27が設けられている。このサポートリング2
7は4分割可能なフレーム28から構成され、こ
のフレーム28は原子炉圧力容器1の内周面に沿
つたリング状をなしている。そして、フレーム2
8は第2図に示される如くビーム13,13に連
結ロツド29…を介して連結されており、これら
連結ロツド29…はビーム13,13に設けられ
た水圧シリンダ30…によりフレーム28に対し
て挿抜可能となつている。したがつて、上記サポ
ートリング27は基台11に対して着脱可能に支
持されているものである。なお、31a,31b
はサポートリング27と基台11との間の位置決
めをなす係合部である。そして、上記フレーム2
8の外周には位置決めガイド32,32が設けら
れている。これら位置決めガイド32,32は原
子炉圧力容器1内面のガイドロツド33,33に
嵌合案内され、閉塞装置10全体の周方向に対す
る位置決め、すなわち主蒸気ノズル3…に対する
閉塞プラグ15…の挿抜方向を位置決めするよう
になつている。また、フレーム28の外周には上
部サポート34…が設けられている。これら上部
サポート34…はフレーム28の上部において側
方に突出され、原子炉圧力容器1内面のドライヤ
サポートブラケツト35…と係合可能となつてい
る。また、上部サポート34…とドライヤサポー
ト35…の係合時には主蒸気ノズル3…に対する
閉塞プラグ15…の高さ方向の位置決めがなされ
るようになつている。なお、これらドライヤサポ
ートブラケツト35…は原子炉の運転時、蒸気乾
燥器(図示しない。)の支持に用いられるもので
ある。また、フレーム28には第4図に示される
如く上部サポート34…の下側にそれぞれ下部サ
ポート36…が設けられている。これら下部サポ
ート36…は通常フレーム28内に収容されてい
るとともに、水圧シリンダ37…によつて上記ド
ライヤサポートブラケツト35…側に突出可能と
なつている。また、下部サポート36…を突出さ
せ、これら下部サポート36…とドライヤサポー
トブラケツト35…を係合させた際には上記主蒸
気ノズル位置に対するサポートリング27の高さ
方向の位置決めがなされるようになつているもの
である。そして、フレーム28内には第1図に示
される如く押付けロツド38…が収容されてい
る。これら押付けロツド38は閉塞プラグ15…
の下方に位置し、水圧シリンダ39…によつてフ
レーム28から原子炉圧力容器1の内面に向けて
突没可能となつている。
A support ring 27 is provided on the side of the base 11. This support ring 2
7 is composed of a frame 28 that can be divided into four parts, and this frame 28 has a ring shape along the inner peripheral surface of the reactor pressure vessel 1. And frame 2
8 is connected to the beams 13, 13 via connecting rods 29, as shown in FIG. It can be inserted and removed. Therefore, the support ring 27 is supported on the base 11 in a detachable manner. In addition, 31a, 31b
is an engaging portion that determines the position between the support ring 27 and the base 11. And the above frame 2
Positioning guides 32, 32 are provided on the outer periphery of 8. These positioning guides 32, 32 are fitted and guided by guide rods 33, 33 on the inner surface of the reactor pressure vessel 1, and position the entire closure device 10 in the circumferential direction, that is, position the insertion/extraction direction of the closure plugs 15 with respect to the main steam nozzles 3. I'm starting to do that. Furthermore, upper supports 34 are provided on the outer periphery of the frame 28. These upper supports 34 project laterally from the upper part of the frame 28 and can engage with dryer support brackets 35 on the inner surface of the reactor pressure vessel 1. Further, when the upper supports 34 and the dryer supports 35 are engaged, the closing plugs 15 are positioned in the height direction with respect to the main steam nozzles 3. These dryer support brackets 35 are used to support a steam dryer (not shown) during operation of the nuclear reactor. Further, as shown in FIG. 4, the frame 28 is provided with lower supports 36 below the upper supports 34, respectively. These lower supports 36 are normally housed within the frame 28, and can be projected toward the dryer support brackets 35 by means of hydraulic cylinders 37. Further, when the lower supports 36 are made to protrude and the lower supports 36 are engaged with the dryer support brackets 35, the support ring 27 is positioned in the height direction relative to the main steam nozzle position. It is something that As shown in FIG. 1, pressing rods 38 are accommodated within the frame 28. These pressing rods 38 are connected to the closing plugs 15...
It is located below the frame 28 and can be protruded and retracted from the frame 28 toward the inner surface of the reactor pressure vessel 1 by means of hydraulic cylinders 39 .

そして、上記サポートリング27には水中照明
具40…が設けられている。これら水中照明具4
0…はフレーム28…の下部においてその周方向
に配置され、それぞれ原子炉圧力容器1の内部中
央に向けて光を照射するようになつており、その
構成を第5図および第6図を参照して説明する。
上記フレーム28の下部には下方に向けてアーム
41,41が突出されており、これらアーム4
1,41間にその照明具本体42が取付けられて
いる。この照明具本体42は透光性および防水性
を有するプラスチツク製のランプケース43内に
たとえば複数のハロゲン電球44…を収容して構
成され、45はハロゲン電球44のソケツト、4
6はハロゲン電球44の反射笠である。また、4
7はランプケース43の外面に設けられた保護金
網である。そして、照明具本体42には給電用の
キヤブタイヤケーブル48の一端が防水用のゴム
さや49を介して接続されているとともに、この
キヤブタイヤケーブル48の他端は原子炉建屋の
作業床面8上まで導かれて給電コンセントに接続
されるようになつている。なお、50はスイツチ
ボツクスである。そして、この一実施例において
は上記照明具本体42がアーム41,41間にお
いて枢軸51を介して支持され、この枢軸51を
中心として回動自在となつている。そして、この
枢軸51の一端には照明方向設定用の円板52が
固定されており、この円板52の表面には複数の
係合孔53…が円周上に等ピツチで形成されてい
る。また、上記円板52側のアーム41には設定
レバー54が取付けられており、この設定レバー
54には上記係合孔53…に嵌合可能な突起(図
示しない。)が設けられている。したがつて、上
記突起を任意の係合孔53に嵌合することによ
り、照明具本体42の回動角つまり照明角を調整
して固定できるようになつている。
The support ring 27 is provided with underwater lighting devices 40. These underwater lighting equipment 4
0... are arranged in the circumferential direction at the lower part of the frame 28..., and are adapted to irradiate light toward the center of the interior of the reactor pressure vessel 1, respectively.See FIGS. 5 and 6 for the configuration. and explain.
Arms 41, 41 are protruded downward from the lower part of the frame 28, and these arms 4
The lighting fixture main body 42 is attached between 1 and 41. The lighting main body 42 is constructed by accommodating, for example, a plurality of halogen light bulbs 44 in a lamp case 43 made of translucent and waterproof plastic, and 45 is a socket for the halogen light bulb 44;
6 is a reflective shade for the halogen light bulb 44. Also, 4
7 is a protective wire mesh provided on the outer surface of the lamp case 43. One end of a cabtire cable 48 for power supply is connected to the lighting fixture body 42 via a waterproof rubber sheath 49, and the other end of the cabtire cable 48 is connected to the work floor of the reactor building. It is led up to the surface 8 and connected to a power supply outlet. Note that 50 is a switch box. In this embodiment, the lighting main body 42 is supported between the arms 41, 41 via a pivot 51, and is rotatable about the pivot 51. A disc 52 for setting the illumination direction is fixed to one end of the pivot 51, and a plurality of engagement holes 53 are formed on the surface of the disc 52 at equal pitches on the circumference. . Further, a setting lever 54 is attached to the arm 41 on the side of the disc 52, and the setting lever 54 is provided with a projection (not shown) that can fit into the engagement hole 53. Therefore, by fitting the protrusion into any engagement hole 53, the rotation angle, that is, the illumination angle of the lighting device body 42 can be adjusted and fixed.

次に、上記構成による閉塞装置10の作用を説
明する。
Next, the operation of the closure device 10 having the above configuration will be explained.

まず、定期点検時、上記作業床8上で基台11
に閉塞プラグ15…およびサポートリング27を
取付けて装置全体を組立て、この閉塞装置10を
天井クレーンで吊上げる。そして、この天井クレ
ーンによつて閉塞装置10を原子炉圧力容器1の
上方まで移送し、この閉塞装置10を原子炉圧力
容器1内に除々に挿入する。なお、このとき、上
記位置決めガイド32,32がガイドロツド3
3,33に嵌合案内されて閉塞装置10の挿入が
行われ、この閉塞装置10つまり閉塞プラグ15
…の周方向に対する位置決めがなされている。ま
た、閉塞装置10が水中に没した時点で上記水中
照明具40…を点灯させて原子炉圧力容器1内の
照明を行い、閉塞装置10据付けのための照明と
しても利用する。そして、閉塞装置10をさらに
吊下げていき、サポートリング28の上部サポー
ト34…を第4図に示される如くドライヤサポー
トブラケツト35…に係合させ、閉塞装置10を
これらドライヤサポートブラケツト35…で支持
する。このとき、上記閉塞プラグ15…と主蒸気
ノズル3…とが対向し、閉塞プラグ15…の高さ
方向の位置決めがなされる。そして、この後、水
圧シリンダ23…を作動させることにより、台車
22…を介して閉塞プラグ15…を押出し、これ
ら閉塞プラグ15…をそれぞれの主蒸気ノズル3
…内に挿入する。なお、このとき、閉塞プラグ1
5…はビーム13,13上を摺動し、かつ挿抜案
内ガイド26…に案内されて挿入される。そして
閉塞プラグ15…の挿入後、第7図に示される如
く、水圧シール18…および空圧シール19…内
に水および空気をそれぞれ供給してこれら水圧シ
ール18…および空圧シール19…を膨張させ、
これによつて主蒸気ノズル3…を気水密に密封す
る。そして、この後、基台11側を吊上げ、上記
サポートリング28を主蒸気ノズル位置よりも少
し上方まで持上げる。このとき、各閉塞プラグ1
5と台車22との連結具25a,25bの係合は
基台11つまり台車22の上昇に伴つて外れ、こ
れらの連結は解除されている。そして、この後、
上記水圧シリンダ37…を作動させて下部サポー
ト36…を上記フレーム28から突出させた後、
基台11側を再び除々に吊下げる。そして、上記
下部サポート36…を第8図に示される如く上記
ドライヤサポートブラケツト35…に係合させ、
サポートリング27をこのドライヤサポートブラ
ケツト35…上に据付ける。このとき、このサポ
ートリング27は主蒸気ノズル位置に位置決めさ
れる。また、上記水圧シリンダ39…を作動させ
て押付けロツド38…をフレーム28から突出さ
せ、これら押付けロツド38…で第9図に示され
る如くそれぞれ閉塞プラグ15…を押圧して保持
する。そして、この後、水圧シリンダ30…を作
動させて連結ロツド29…をフレーム28から引
抜いてサポートリング28と基台11との連結を
解除した後、基台11を吊上げて原子炉圧力容器
1内から取除く。このとき、原子炉圧力容器1内
には第10図に示される如く閉塞装置10の閉塞
プラグ15…とサポートリング27とが残されて
いる。そして、このようにして主蒸気ノズル3…
を密封した後、主蒸気系の主蒸気隔離弁6等…を
取外してこれらの保守点検を行うとともに、主蒸
気管4…内に蒸気圧を加えて主蒸気管4…および
主蒸気隔離弁6…等の漏洩試験を行うものであ
る。なお、主蒸気管4…内に蒸気圧を加えた場合
でも、上記閉塞プラグ15…がサポートリング2
7によつて押え付けられているので、上記蒸気圧
による閉塞プラグ15…の飛び出しを確実に防止
できるものである。
First, during regular inspection, the base 11 is placed on the work floor 8.
The entire device is assembled by attaching the blocking plugs 15 and the support ring 27 to the device, and the blocking device 10 is lifted by an overhead crane. Then, the closure device 10 is transferred to the upper part of the reactor pressure vessel 1 by this overhead crane, and the closure device 10 is gradually inserted into the reactor pressure vessel 1. Note that at this time, the positioning guides 32, 32 are connected to the guide rod 3.
3, 33, and the occlusion device 10 is inserted, and this occlusion device 10, that is, the occlusion plug 15
... is positioned in the circumferential direction. Furthermore, when the closure device 10 is submerged in water, the underwater lighting devices 40 are turned on to illuminate the inside of the reactor pressure vessel 1, and are also used as lighting for installing the closure device 10. Then, the closing device 10 is further suspended, the upper supports 34 of the support ring 28 are engaged with the dryer support brackets 35 as shown in FIG. 4, and the closing device 10 is supported by these dryer support brackets 35. do. At this time, the closing plugs 15 are opposed to the main steam nozzles 3, and the closing plugs 15 are positioned in the height direction. Then, by operating the hydraulic cylinders 23, the blockage plugs 15 are pushed out via the carts 22, and these blockage plugs 15 are connected to the respective main steam nozzles 3.
…Insert within. In addition, at this time, the blockage plug 1
5... slides on the beams 13, 13, and is guided by the insertion/extraction guides 26... to be inserted. After the closing plugs 15 are inserted, as shown in FIG. 7, water and air are supplied into the hydraulic seals 18 and pneumatic seals 19 to inflate them. let me,
As a result, the main steam nozzles 3 are air-tightly sealed. Then, the base 11 is lifted up and the support ring 28 is lifted up to a position slightly above the main steam nozzle position. At this time, each blockage plug 1
5 and the truck 22 are disengaged from each other as the base 11, that is, the truck 22 rises, and these connections are released. And after this,
After operating the hydraulic cylinders 37 and causing the lower supports 36 to protrude from the frame 28,
Gradually hang the base 11 side again. Then, the lower supports 36 are engaged with the dryer support brackets 35 as shown in FIG.
The support ring 27 is installed on this dryer support bracket 35. At this time, this support ring 27 is positioned at the main steam nozzle position. Further, the hydraulic cylinders 39 are operated to cause the pressing rods 38 to protrude from the frame 28, and these pressing rods 38 press and hold the closing plugs 15, respectively, as shown in FIG. After that, the hydraulic cylinders 30 are operated to pull out the connecting rods 29 from the frame 28 to release the connection between the support ring 28 and the base 11, and then the base 11 is lifted up and placed inside the reactor pressure vessel 1. remove from At this time, the closing plugs 15 of the closing device 10 and the support ring 27 remain in the reactor pressure vessel 1, as shown in FIG. In this way, the main steam nozzle 3...
After sealing, remove the main steam isolation valves 6, etc. in the main steam system and perform maintenance and inspection on them, and apply steam pressure inside the main steam pipes 4 to close the main steam pipes 4 and the main steam isolation valves 6. It is used to perform leakage tests such as... Note that even if steam pressure is applied inside the main steam pipe 4, the blocking plugs 15 are not connected to the support ring 2.
7, it is possible to reliably prevent the closing plugs 15 from popping out due to the steam pressure.

また、このような定期点検時には主蒸気系の保
守点検と並行して燃料の交換作業が行われる。こ
の燃料交換は炉心2内の使用済の燃料集合体を上
記作業床8上の燃料交換器によつて新たなものに
取替えるものであるが、この燃料交換時には上記
サポートリング27に設けた水中照明具40…を
点灯し、原子炉圧力容器1内全域の照明を行う。
これによつて、上記作業床8から炉心2付近の視
認性が良好となり、作業性を向上できるものであ
る。また、このような燃料交換時、原子炉圧力容
器1内には第10図に示される如く閉塞装置10
のサポートリング27だけが残されているだけで
あるので、何等燃料交換作業に支障となるもので
はない。
Furthermore, during such periodic inspections, fuel replacement work is performed in parallel with maintenance inspections of the main steam system. This fuel exchange involves replacing spent fuel assemblies in the core 2 with new ones using the fuel exchanger on the work floor 8. During this fuel exchange, the underwater lighting provided on the support ring 27 The devices 40 are turned on to illuminate the entire area inside the reactor pressure vessel 1.
As a result, visibility of the vicinity of the reactor core 2 from the work floor 8 is improved, and workability can be improved. Also, during such fuel exchange, a closure device 10 is installed inside the reactor pressure vessel 1 as shown in FIG.
Since only the support ring 27 remains, it does not interfere with the fuel exchange operation in any way.

また、上記水中照明具40…はサポートリング
27に取付けられていることから、燃料交換時従
来の吊下げ形のように水中照明具40…が揺れた
りすることはなく、原子炉圧力容器1内を確実に
安定して照明することができる。さらに、従来の
吊下げ形の場合のように水中照明具40…の揺れ
つまりその吊下げ用ワイヤの振れによつて原子炉
ウエル9の水面が揺れるようなこともないので、
上記作業床8からの炉内の視認性を一層良好にで
きる。
In addition, since the underwater lighting fixtures 40 are attached to the support ring 27, the underwater lighting fixtures 40 do not shake like conventional hanging types during refueling, and the inside of the reactor pressure vessel 1 is can ensure stable lighting. Furthermore, the water surface of the reactor well 9 does not sway due to the shaking of the underwater lighting fixtures 40, or the shaking of the hanging wires, unlike in the case of conventional hanging types.
The visibility of the inside of the furnace from the work floor 8 can be further improved.

さらにまた、水中照明具40…の原子炉圧力容
器1内据付けを閉塞装置10つまりサポートリン
グ27の据付けと同時に行うことができるので、
従来の吊下げ形のものに比べ、水中照明具40…
自体の据付けに要する作業時間を省略することが
できる。この結果、定期点検期間の短縮が図ら
れ、作業員の放射性被曝量を低減することができ
る。
Furthermore, since the underwater lighting devices 40 can be installed in the reactor pressure vessel 1 at the same time as the closure device 10, that is, the support ring 27 is installed,
Compared to the conventional hanging type, underwater lighting equipment has 40...
The work time required for the installation itself can be omitted. As a result, the regular inspection period can be shortened, and the amount of radiation exposure of workers can be reduced.

また、この一実施例によれば、水中照明具40
…の照明角度が可変できるので、必要とされる個
所を重点的に照明することができ、その照明効果
は高いものである。
Further, according to this embodiment, the underwater lighting device 40
Since the illumination angle can be varied, it is possible to intensively illuminate the areas where it is needed, and the illumination effect is high.

なお、この発明は上記一実施例に制約されるも
のではない。たとえば、照明具本体42の照明角
度を変える機構を第11図および第12図に示さ
れるものとしてもよい。すなわち、この場合には
照明具本体42を支持する枢軸51の一端にウオ
ームホイール60が設けられているとともに、こ
のウオームホイール60にはウオームギヤ61が
噛合されている。また、このウオームギヤ61に
は上記サポートリング27を貫通した操作ロツド
62が連結されておりこの操作ロツド62の上端
は6角などのレンチボツクスを嵌合可能な形状に
構成されている。したがつて、作業床8上から長
尺なレンチを操作ロツド62の上端に嵌合してこ
の操作ロツド62を回転させることにより、ウオ
ームギヤ61およびウオームホイール60を介し
て上記照明具本体42を回動させれば、燃料交換
の作業中においても照明具本体42の照明角度を
変えることができる。
Note that the present invention is not limited to the above embodiment. For example, the mechanism for changing the illumination angle of the lighting fixture main body 42 may be as shown in FIGS. 11 and 12. That is, in this case, a worm wheel 60 is provided at one end of a pivot shaft 51 that supports the lighting device main body 42, and a worm gear 61 is meshed with the worm wheel 60. Further, an operating rod 62 passing through the support ring 27 is connected to the worm gear 61, and the upper end of the operating rod 62 has a shape capable of fitting a hexagonal wrench box or the like. Therefore, by fitting a long wrench onto the upper end of the operating rod 62 from above the work floor 8 and rotating the operating rod 62, the lighting main body 42 can be rotated via the worm gear 61 and the worm wheel 60. By moving it, the illumination angle of the lighting device main body 42 can be changed even during fuel exchange work.

以上説明したようにこの発明は主蒸気ノズルに
着脱可能に挿入されてこの主蒸気ノズルを気水密
に密封する閉塞プラグと、この閉塞プラグの挿入
後、上記主蒸気ノズル位置における原子炉圧力容
器内の内周面に沿つて位置付けられ原子炉圧力容
器内への閉塞プラグの飛び出しを防止するリング
状のサポートリングとを備え、このサポートリン
グの下部に周方向に沿つて複数の水中照明具を設
けたことを特徴とする。したがつて、上記水中照
明具がサポートリングに取付けられていることか
ら、燃料交換作業時に水中照明具が揺れたり、ま
たこの水中照明具の揺れに伴つて水面が揺れたり
するようなこともないので、原子炉圧力容器内を
確実かつ安定して照明することができ、原子炉圧
力容器内の視認性を向上することができる。ま
た、水中照明具自体の据付けに要する作業を省略
できることから、定期点検期間の短縮を図つて、
作業員の被曝量を低減できるとともに原子炉の稼
動率を向上できる等、その効果は大である。
As explained above, the present invention provides a blockage plug that is removably inserted into a main steam nozzle and seals the main steam nozzle in an air-watertight manner, and a blockage plug that is inserted into a reactor pressure vessel at the main steam nozzle position after insertion of the blockage plug. A ring-shaped support ring is positioned along the inner peripheral surface of the reactor pressure vessel to prevent the plug from popping out into the reactor pressure vessel, and a plurality of underwater lighting devices are provided below the support ring along the circumferential direction. It is characterized by: Therefore, since the above-mentioned underwater lighting equipment is attached to the support ring, there is no possibility that the underwater lighting equipment will shake during the fuel exchange operation, and the water surface will not shake due to the shaking of this underwater lighting equipment. Therefore, the inside of the reactor pressure vessel can be illuminated reliably and stably, and the visibility inside the reactor pressure vessel can be improved. In addition, since the work required to install the underwater lighting equipment itself can be omitted, periodic inspection periods can be shortened.
The effects are significant, such as reducing the radiation exposure of workers and improving the operating rate of the reactor.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図ないし第10図はこの発明の一実施例を
示し、第1図は原子炉圧力容器の断面図、第2図
は閉塞装置の一部断面して示す側面図、第3図は
閉塞装置の平面図、第4図は第3図中―線に
沿う断面図、第5図は第3図中―線に沿う断
面図、第6図は第3図中―線に沿う断面図、
第7図は主蒸気ノズル内への閉塞プラグ挿入直後
を示す図、第8図は下部サポートの突出時を示す
サポートリングの断面図、第9図は押付けロツド
の突出時を示す図、第10図は閉塞プラグ挿入
時、基台を取除いた状態を示す原子炉圧力容器の
横断面図である。第11図および第12図はこの
発明の他の実施例を示し第11図は水中照明具の
正面図、第12図は第11図中XII方向から見た水
中照明具の側面図である。 1…原子炉圧力容器、3…主蒸気ノズル、15
…閉塞プラグ、27…サポートリング、40…水
中照明具、41…アーム。
1 to 10 show an embodiment of the present invention, in which FIG. 1 is a sectional view of a reactor pressure vessel, FIG. 2 is a partially sectional side view of a closure device, and FIG. 3 is a sectional view of a closure device. A plan view of the device, FIG. 4 is a cross-sectional view taken along the line in FIG. 3, FIG. 5 is a cross-sectional view taken along the line in FIG. 3, and FIG. 6 is a cross-sectional view taken along the line in FIG.
Fig. 7 is a view immediately after the blocking plug is inserted into the main steam nozzle, Fig. 8 is a sectional view of the support ring when the lower support is protruding, Fig. 9 is a view when the pressing rod is ejected, Fig. 10 The figure is a cross-sectional view of the reactor pressure vessel with the base removed when the plug is inserted. 11 and 12 show another embodiment of the present invention, FIG. 11 is a front view of the underwater lighting device, and FIG. 12 is a side view of the underwater lighting device seen from the direction XII in FIG. 11. 1... Reactor pressure vessel, 3... Main steam nozzle, 15
...Closure plug, 27... Support ring, 40... Underwater lighting device, 41... Arm.

Claims (1)

【特許請求の範囲】 1 主蒸気ノズル内に原子炉圧力容器の内部側か
ら着脱可能に挿入されてこの主蒸気ノズルを気水
密に密封する閉塞プラグと、この閉塞プラグの挿
入後上記主蒸気ノズル位置における原子炉圧力容
器の内周面に沿つて位置付けられ原子炉圧力容器
内への閉塞プラグの飛び出しを防止するリング状
のサポートリングとを備え、このサポートリング
の下部に周方向に沿つて複数の水中照明具を設け
たことを特徴とする原子炉主蒸気ノズルの閉塞装
置。 2 上記水中照明具はサポートリングの下部に回
動可能に取着されていることを特徴とする特許請
求の範囲第1項記載の原子炉主蒸気ノズルの閉塞
装置。
[Scope of Claims] 1. A blocking plug that is removably inserted into a main steam nozzle from the inside of the reactor pressure vessel to seal the main steam nozzle in an air-watertight manner, and after the blocking plug is inserted, the main steam nozzle a ring-shaped support ring that is positioned along the inner circumferential surface of the reactor pressure vessel at a position to prevent the plug from popping out into the reactor pressure vessel; A nuclear reactor main steam nozzle blocking device characterized by being provided with an underwater lighting device. 2. The nuclear reactor main steam nozzle closing device according to claim 1, wherein the underwater lighting device is rotatably attached to the lower part of the support ring.
JP56155174A 1981-09-30 1981-09-30 Closing device of reactor main steam nozzle Granted JPS5855898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP56155174A JPS5855898A (en) 1981-09-30 1981-09-30 Closing device of reactor main steam nozzle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56155174A JPS5855898A (en) 1981-09-30 1981-09-30 Closing device of reactor main steam nozzle

Publications (2)

Publication Number Publication Date
JPS5855898A JPS5855898A (en) 1983-04-02
JPS6261920B2 true JPS6261920B2 (en) 1987-12-23

Family

ID=15600108

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56155174A Granted JPS5855898A (en) 1981-09-30 1981-09-30 Closing device of reactor main steam nozzle

Country Status (1)

Country Link
JP (1) JPS5855898A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6050491A (en) * 1983-08-31 1985-03-20 株式会社東芝 Blocking device for main steam nozzle of nuclear reactor
ES2029798T3 (en) * 1985-12-05 1992-10-01 Ego Kunststoffwerk Ag PROCEDURE AND INJECTION TOOL FOR THE MANUFACTURE OF A BAND OF PLASTIC ELEMENTS, ESPECIALLY A BALL CHAIN.

Also Published As

Publication number Publication date
JPS5855898A (en) 1983-04-02

Similar Documents

Publication Publication Date Title
JPS6261920B2 (en)
JPH0344279B2 (en)
JPH0875892A (en) Reactor dismantling method and apparatus
CN206115136U (en) Multi -functional printing -down machine
JPS6114000Y2 (en)
US4259979A (en) Closure fixture and assembly cap
US4684492A (en) Repair fixture
CN116642144B (en) Nuclear radiation prevention atmosphere LED lamp
JP3321498B2 (en) Secondary seal attachment / detachment device
JP5100703B2 (en) Shroud head repair method and repair structure
JPS6119838Y2 (en)
CN222070467U (en) Catalyst carrier leak source detection equipment based on vision system
CN223709625U (en) Deaerator for boiler
JPS6126723Y2 (en)
CN215112028U (en) Chlorine safety relief device
CN218037387U (en) Waterproof light curtain
JPH0225796A (en) Support structural body for lower core construction
JP2677643B2 (en) Repair equipment for nuclear reactor equipment
JP2786773B2 (en) Control rod drive mechanism
JPH095477A (en) Water blocking device on the inner wall of the water holding container
JPS6032637Y2 (en) Nuclear reactor plug insertion device
JPH05312992A (en) Method for repairing internal structure of reactor and water seal chamber
JPS6328160Y2 (en)
KR880002047B1 (en) Cooling water inlet nozzle sealing device of nuclear reactor and its sealing method
JPH0650718Y2 (en) Plug for pipe blockage