JPS626234B2 - - Google Patents
[go: Go Back, main page]

JPS626234B2 - - Google Patents

Info

Publication number
JPS626234B2
JPS626234B2 JP3321781A JP3321781A JPS626234B2 JP S626234 B2 JPS626234 B2 JP S626234B2 JP 3321781 A JP3321781 A JP 3321781A JP 3321781 A JP3321781 A JP 3321781A JP S626234 B2 JPS626234 B2 JP S626234B2
Authority
JP
Japan
Prior art keywords
computer
plant
simulator
plant process
simulated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP3321781A
Other languages
Japanese (ja)
Other versions
JPS57147679A (en
Inventor
Toshikatsu Konda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP3321781A priority Critical patent/JPS57147679A/en
Publication of JPS57147679A publication Critical patent/JPS57147679A/en
Publication of JPS626234B2 publication Critical patent/JPS626234B2/ja
Granted legal-status Critical Current

Links

Description

【発明の詳細な説明】 本発明は発電プラント等の大規模なプラントプ
ロセスの運転操作訓練を行なうためのプラント模
擬装置に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a plant simulator for training the operation of large-scale plant processes such as power plants.

たとえば原子力、火力発電プラントにおいて
は、プラントの運転操作が非常に複雑であるの
で、これらに対して適切に対応した操作が出来る
様に運転訓練を行なう必要がある。このために、
運転訓練用の模擬装置(以下シミユレータとい
う)が製作されて、発電プラントの運転員の訓練
に供されて来ている。
For example, in nuclear power plants and thermal power plants, the operations of the plants are very complex, so it is necessary to conduct operation training so that the operations can be appropriately handled. For this,
Simulation devices for operator training (hereinafter referred to as simulators) have been manufactured and are being used to train power plant operators.

一方、原子力、火力発電プラントは、増大する
エネルギー需要に応えるため、単機容量の増大化
が計られ、それに従つて、発電プラントの監視制
御はより一層複雑かつ高度なものとなつている。
これに対応すべく、発電プラントにおいてはプラ
ントの監視制御用に電子計算機が導入されてい
る。すなわち、最近の電子計算機利用技術の進歩
に伴ない、従来のメータ、記録計を電子計算機で
駆動されるカラーCRT表示装置に代替したり、
また電子計算機によるプラントの制御など、広範
にプラントの監視制御を電子計算機が行なう様に
なつて来ている。またこの様な発電プラントの監
視制御用電子計算機は、1台の演算制御装置
(CPU)では、これらの監視制御をすべて処理し
切れないものとなつてきているので、マルチコン
ピユータシステムを構成して、各種の機能を分担
処理するように構成しているものであり、監視制
御用の電子計算機自体も複雑になつてきている。
したがつて発電プラントの運転操作においては、
電子計算機の故障はプラント運転操作に大きな影
響を与えることは明らかである。
On the other hand, in order to meet the increasing demand for energy in nuclear and thermal power plants, the capacity of each unit has been increased, and as a result, the monitoring and control of power plants has become even more complex and sophisticated.
In response to this, electronic computers have been introduced in power plants for plant monitoring and control. In other words, with recent advances in computer utilization technology, conventional meters and recorders have been replaced with color CRT display devices driven by electronic computers.
In addition, computers are increasingly being used to monitor and control plants over a wide range of areas, including computer-based plant control. In addition, the electronic computers for monitoring and controlling power generation plants are becoming more and more complex, as a single arithmetic and control unit (CPU) cannot handle all of the monitoring and control. , the electronic computers for monitoring and control are also becoming more complex.
Therefore, when operating a power plant,
It is clear that computer failure has a major impact on plant operation.

しかるに、従来の運転訓練用シミユレータにお
いては、この様なプラント監視制御用の電子計算
機の故障に対する訓練を行ないうる様、配慮され
ているものは少なく、十分な運転訓練を行うには
欠点があつた。
However, few conventional simulators for operating training have taken into consideration the possibility of training against failures of electronic computers used for plant monitoring and control, and have had drawbacks in providing sufficient operating training. .

本発明の目的は発電プラントの監視制御を行な
う電子計算機の故障をも模擬し、十分な運転訓練
を行ない得る様にしたプラント模擬装置を提供し
ようとするものである。
SUMMARY OF THE INVENTION An object of the present invention is to provide a plant simulator that simulates failures of electronic computers that supervise and control power plants, thereby enabling sufficient operation training.

以下、図面に示す一実施例を参照して本発明を
説明する。第1図は本発明の一実施例の構成を示
す全体システム構成図である。本発明のプラント
模擬装置はシミユレータ計算機1、制御盤2、イ
ンストラクタコンソール3およびオペレータコン
ソール4とから成り、シミユレータ計算機1には
プリンタ19が接続されている。
The present invention will be described below with reference to an embodiment shown in the drawings. FIG. 1 is an overall system configuration diagram showing the configuration of an embodiment of the present invention. The plant simulator of the present invention consists of a simulator computer 1, a control panel 2, an instructor console 3, and an operator console 4, and a printer 19 is connected to the simulator computer 1.

シミユレータ計算機1は、通常の計算機と同様
の構成で、演算制御装置11、主記憶装置12、
補助記憶装置13、CRT制御装置14、高速プ
ロセス入力装置15、高速プロセス出力装置16
及び周辺装置17とからなる。そして、このシミ
ユレータ計算機1により駆動されるプリンタ19
が接続される。
The simulator computer 1 has the same configuration as a normal computer, including an arithmetic and control unit 11, a main memory 12,
Auxiliary storage device 13, CRT control device 14, high speed process input device 15, high speed process output device 16
and a peripheral device 17. A printer 19 driven by this simulator computer 1
is connected.

制御盤2は操作器30、計器31、警報窓32
及び自動化コンソール18を備えており、またカ
ラーCRT表示装置215〜221を具備してい
る。このカラーCRT表示装置215〜221は
シミユレータ計算機1からの情報を表示する。
The control panel 2 includes an operating device 30, a meter 31, and an alarm window 32.
and an automation console 18, and color CRT display devices 215-221. The color CRT display devices 215 to 221 display information from the simulator computer 1.

オペレータコンソール4はシミユレータ計算機
1からの情報を表示するカラーCRT表示装置2
13,214及びオペレータコンソールキイボー
ド20とからなる。更に、インストラクタコンソ
ール3には、シミユレータ計算機1からの情報を
表示するカラーCRT表示装置211,212及
びインストラクタコンソールキイーボード21が
設置される。
The operator console 4 has a color CRT display device 2 that displays information from the simulator computer 1.
13, 214 and an operator console keyboard 20. Furthermore, the instructor console 3 is equipped with color CRT display devices 211 and 212 for displaying information from the simulator computer 1 and an instructor console keyboard 21.

第2図は本発明の演算制御装置11の機能を説
明するためのブロツク図である。プラント模擬装
置の運転状態はインストラクタコンソール3から
設定されるが、インストラクタコンソール3によ
る設定データは、インストラクタコンソールキイ
ーボード21からCRT制御装置14を介して、
もしくはインストラクタコンソール3から高速プ
ロセス入力装置15を介してシミユレータ計算機
1の演算制御装置11に読込まれる。そして、こ
のプラント運転状態の設定データは演算制御装置
11の表示制御部54を介してシミユレータ機能
部55へ情報伝達される。
FIG. 2 is a block diagram for explaining the functions of the arithmetic and control unit 11 of the present invention. The operating state of the plant simulation device is set from the instructor console 3, and the setting data from the instructor console 3 is transmitted from the instructor console keyboard 21 via the CRT control device 14.
Alternatively, it is read into the arithmetic and control unit 11 of the simulator computer 1 from the instructor console 3 via the high-speed process input device 15. This setting data of the plant operating state is transmitted to the simulator function section 55 via the display control section 54 of the arithmetic and control unit 11.

一方、制御盤2における操作状態は高速プロセ
ス入力装置15を介して演算制御装置11に読み
込まれ、演算制御装置11内の入力部53を介し
てシミユレータ機能部55へ伝達される。このよ
うにして読み込まれた設定データ及び操作状態と
からシミユレータ機能部55では、シミユレータ
計算機1の主記憶装置12、及び補助記憶装置1
3に予め記憶してある発電プラントの動作モデル
である動特性モデル及び制御論理モデルに従つて
演算処理して、発電プラントの動作を模擬的に演
算する。その演算処理の結果を演算制御装置11
の出力部50から高速プロセス出力装置16を介
して制御盤2の計器等に出力する。
On the other hand, the operating state on the control panel 2 is read into the arithmetic and control unit 11 via the high-speed process input device 15 and transmitted to the simulator function unit 55 via the input unit 53 in the arithmetic and control unit 11 . Based on the setting data and operation status read in this way, the simulator function unit 55 stores the main storage device 12 and the auxiliary storage device 1 of the simulator computer 1.
3, the operation of the power plant is simulated by calculations in accordance with a dynamic characteristic model and a control logic model, which are operational models of the power plant stored in advance. The result of the arithmetic processing is sent to the arithmetic control device 11.
The output unit 50 outputs the data to the instruments of the control panel 2 via the high-speed process output device 16.

また演算制御装置11のプラントプロセスコン
ピユータ機能部52は、プラントのプロセスコン
ピユータを模擬するもので、シミユレータ機能部
55により演算処理された結果を模擬入力信号と
して入力し、プラントプロセスコンピユータとし
て必要な機能を実行する。すなわち、スキヤン・
ログ・アラーム、性能計算、CRT表示のための
計算などを行ない、その結果を構成制御部51へ
出力する。
The plant process computer function unit 52 of the arithmetic and control unit 11 simulates a plant process computer, and inputs the results of calculation processing by the simulator function unit 55 as a simulated input signal, and performs the necessary functions as a plant process computer. Execute. In other words, the scan
It performs calculations for logs/alarms, performance calculations, CRT display, etc., and outputs the results to the configuration control section 51.

構成制御部51はプラントプロセスコンピユー
タの故障を模擬するためのものであり、シミユレ
ータ機能部55に対し、インストラクタコンソー
ル3から入力されたプラントプロセスコンピユー
タの構成状態の設定データ、即ち稼動、停止等の
データに従がい、プラントプロセスコンピユータ
の構成を演算処理して、その結果を出力部50を
介して、高速プロセス出力装置16へ信号出力す
るものである。
The configuration control unit 51 is for simulating a failure of the plant process computer, and sends setting data of the configuration state of the plant process computer input from the instructor console 3 to the simulator function unit 55, that is, data on operation, stop, etc. According to the above, the configuration of the plant process computer is processed and the result is output as a signal to the high-speed process output device 16 via the output section 50.

いまインストラクタコンソール3よりプラント
プロセスコンピユータ故障を模擬する場合につい
て説明する。インストラクタコンソール3で設定
されたプラントプロセスコンピユータ故障の設定
信号はシミユレータ機能部55に入力され、その
結果がプラントプロセスコンピユータ故障信号と
して構成制御部51に入力される。このプロセス
コンピユータ故障信号を入力すると、プラントプ
ロセスコンピユータは故障であるから構成制御部
51では、プラントプロセスコンピユータ機能部
52からの出力信号をすべて切断する。すなわち
プラントプロセスコンピユータ機能部52からの
自動化コンソール18への出力信号およびカラー
CRT表示装置213,214、さらには制御盤
2のCRT表示装置215〜221への出力信号
のすべてを切断せしめる。これとともに、出力部
50に対して信号出力し、制御盤2の警報窓32
を点灯させるためのプラントプロセスコンピユー
タ故障出力40を高速プロセス出力装置16を介
して警報窓32に出力し、プラントプロセスコン
ピユータ故障窓を信号41により点灯せしめる。
The case where a plant process computer failure is simulated from the instructor console 3 will now be described. The plant process computer failure setting signal set on the instructor console 3 is input to the simulator function unit 55, and the result is input to the configuration control unit 51 as a plant process computer failure signal. When this process computer failure signal is input, the configuration control unit 51 disconnects all output signals from the plant process computer function unit 52 because the plant process computer is in failure. That is, the output signals from the plant process computer function 52 to the automation console 18 and the color
All output signals to the CRT display devices 213, 214 and further to the CRT display devices 215 to 221 of the control panel 2 are cut off. At the same time, a signal is output to the output unit 50 and the alarm window 32 of the control panel 2
A plant process computer failure output 40 for lighting up is outputted to the alarm window 32 via the high speed process output device 16, and the plant process computer failure window is turned on by a signal 41.

また同時にもう一つのプラントプロセスコンピ
ユータ故障出力42は自動化コンソール18に高
速プロセス出力装置16から出力され、自動化可
能とする論理回路を不動作せしめ、自動化可能信
号43をオフとする。更には、CRT制御装置1
4からカラーCRT表示装置213〜221への
出力信号をも停止せしめ、カラーCRT表示装置
213〜221をすべて故障とする。この場合、
プリンタ19への印字出力もすべて停止される。
こうしてプラントプロセスコンピユータの故障時
を模擬する。
At the same time, another plant process computer failure output 42 is output from the high speed process output device 16 to the automation console 18, disabling the logic circuitry that enables automation and turning off the automation enable signal 43. Furthermore, the CRT control device 1
The output signal from 4 to the color CRT display devices 213 to 221 is also stopped, and all of the color CRT display devices 213 to 221 are made to be out of order. in this case,
All print output to the printer 19 is also stopped.
In this way, a failure of a plant process computer is simulated.

上述の実施例においては、プラントプロセスコ
ンピユータが1台で処理している発電プラントを
模擬した場合であるが、プラントプロセスコンピ
ユータがマルチコンピユータシステムとなつてい
る場合についても同じ様に適用できる。
In the above embodiment, a power generation plant in which processing is performed by one plant process computer is simulated, but the present invention can be similarly applied to a case where the plant process computer is a multi-computer system.

第3図はプラントプロセスコンピユータが2台
の演算処理装置より成る場合についての一実施例
である。プラントプロセスコンピユータ機能部5
2は、CPU1機能部521とCPU2機能部522
とから成りプラントプロセスコンピユータ機能部
52は、構成制御部51と2つのスイツチ部SW
3及びSW4を介して接続される。更にプラント
プロセスコンピユータ機能部52はシミユレータ
機能部55と2つのスイツチ部SW1及びSW2
を介して接続される。
FIG. 3 shows an embodiment in which the plant process computer consists of two processing units. Plant process computer function section 5
2 is a CPU1 functional unit 521 and a CPU2 functional unit 522
The plant process computer function section 52 consists of a configuration control section 51 and two switch sections SW.
3 and SW4. Furthermore, the plant process computer function section 52 includes a simulator function section 55 and two switch sections SW1 and SW2.
connected via.

この様な構成において、CPU1機能部521、
CPU2機能部522のいずれも正常な状態を模擬
している時はシミユレータ機能部55よりスイツ
チ部SW1を介してCPU1機能部521にプラン
トプロセス量の模擬信号入力される。プラントを
計算機制御するための模擬出力信号は、スイツチ
部SW4を介して構成制御部51を介して出力部
50から高速プロセス出力装置16へ出力され
る。またCRTへの表示データはCPU1機能部52
1からCPU2機能部522へ信号出力されて、
CRT表示のための演算処理をCPU2機能部522
にて行ない、スイツチ部SW3を介して構成制御
部51へ出力し表示出力部54からCRT制御装
置14へ出力信号を出す。
In such a configuration, the CPU1 functional unit 521,
When all of the CPU2 functional units 522 are simulating a normal state, a simulated signal of the plant process amount is inputted from the simulator functional unit 55 to the CPU1 functional unit 521 via the switch unit SW1. A simulated output signal for controlling the plant by computer is output from the output section 50 to the high-speed process output device 16 via the configuration control section 51 via the switch section SW4. In addition, the display data on the CRT is sent to the CPU1 functional unit 52.
A signal is output from 1 to the CPU2 function section 522,
The CPU2 functional unit 522 performs calculation processing for CRT display.
The output signal is output to the configuration control section 51 via the switch section SW3, and an output signal is output from the display output section 54 to the CRT control device 14.

この様な2台のマルチコンピユータから成る、
プラントプロセスコンピユータの機能の故障の模
擬において、CPU2機能部522の故障を模擬す
る場合、スイツチ部SW2、及びSW3を切替え
て、CPU1機能部521にてすべての機能を演算
処理可能な様に構成制御する。この場合、例えば
自動化コンソール18の動作としては、プラント
プロセスコンピユータ故障出力42が出力されて
自動化可能信号43をオフすると同時に、復帰信
号45が出力されオンデイレイタイマ46を作用
せしめ、自動化可能信号43をオン可能とする。
Consisting of two multi-computers like this,
When simulating a failure in the functions of the plant process computer, when simulating a failure in the CPU2 function unit 522, switch units SW2 and SW3 are switched to control the configuration so that the CPU1 function unit 521 can process all functions. do. In this case, for example, the automation console 18 operates by outputting the plant process computer failure output 42 and turning off the automation enable signal 43, and at the same time outputting the recovery signal 45 and activating the on-delay timer 46 to turn off the automation enable signal 43. Enable to turn on.

更に、本発明の要旨はシミユレータ計算機1の
システム構成にかかわりなく適用可能であり、か
つ、プラントプロセスコンピユータのシステム構
成にもかかわりなく適用出来ることは勿論であ
る。
Furthermore, it goes without saying that the gist of the present invention can be applied regardless of the system configuration of the simulator computer 1, and can also be applied regardless of the system configuration of the plant process computer.

以上述べた様に本発明によれば、発電プラント
の運転訓練シミユレータにおいて、プラントプロ
セスコンピユータが故障する場合の模擬訓練が可
能となり、したがつて、運転員をより高速に教育
することが可能となる。
As described above, according to the present invention, it is possible to perform simulation training in the event that a plant process computer breaks down in a power generation plant operation training simulator, and therefore, it is possible to train operators more quickly. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明のプラント模擬装置の全体構成
図、第2図は本発明の一実施例を示すブロツク
図、第3図は本発明の他の一実施例を示すブロツ
図である。 1……シミユレータ計算機、2……制御盤、3
……インストラクタコンソール、4……オペレー
タコンソール、11……演算制御装置、12……
主記憶装置、13……補助記憶装置、14……
CRT制御装置、15……高速プロセス入力装
置、16……高速プロセス出力装置、17……周
辺装置、18……自動化コンソール、19……プ
リンタ、20……オペレータコンソールキイボー
ド、21……インストラクタコンソールキイボー
ド、30……操作器、31……計器、32……警
報窓、211〜221……カラーCRT表示装
置、50……出力部、51……構成制御部、52
……プラントプロセスコンピユータ機能部、53
………入力部、54……表示出力部、55……シ
ミユレータ機能部。
FIG. 1 is an overall configuration diagram of a plant simulator according to the present invention, FIG. 2 is a block diagram showing one embodiment of the present invention, and FIG. 3 is a block diagram showing another embodiment of the present invention. 1...Simulator computer, 2...Control panel, 3
...Instructor console, 4...Operator console, 11...Arithmetic control unit, 12...
Main storage device, 13... Auxiliary storage device, 14...
CRT control device, 15...High speed process input device, 16...High speed process output device, 17...Peripheral device, 18...Automation console, 19...Printer, 20...Operator console keyboard, 21...Instructor console keyboard , 30... Operating device, 31... Instrument, 32... Alarm window, 211-221... Color CRT display device, 50... Output section, 51... Configuration control section, 52
...Plant process computer function department, 53
......Input section, 54...Display output section, 55...Simulator function section.

Claims (1)

【特許請求の範囲】[Claims] 1 電子計算機を用いて監視制御されるプラント
の運転操作訓練のために設けられ、前記プラント
の動作モデルを発生してプラントプロセスを模擬
するシミユレータ計算機と、このシミユレータ計
算機で発生された模擬プラントプロセスの状態を
監視制御するための制御盤と、訓練員により操作
され前記模擬プラントプロセスの監視制御に指令
を与えるオペレータコンソールと、前記模擬プラ
ントプロセスを発生させるための設定データを前
記シミユレータ計算機に与えるインストラクタコ
ンソールとからなるプラント模擬装置において、
前記シミユレータ計算機内に前記プラントを監視
制御する電子計算機の機能を模擬するプラントプ
ロセスコンピユータ機能部を設け、またこのプラ
ントプロセスコンピユータ機能部で模擬された前
記電子計算機を模擬的に故障せしめる構成制御部
を設け、前記インストラクタコンソールに設定さ
れる前記電子計算機の故障設定データに基づき前
記構成制御部を動作させて前記電子計算機の故障
を模擬させるようにしたことを特徴とするプラン
ト模擬装置。
1. A simulator computer, which is provided for the operation and operation training of a plant that is monitored and controlled using an electronic computer, that generates an operating model of the plant and simulates the plant process, and a simulator computer that simulates the plant process generated by this simulator computer. a control panel for monitoring and controlling the state, an operator console operated by a trainee and giving commands to the monitoring and controlling of the simulated plant process, and an instructor console that gives the simulator computer setting data for generating the simulated plant process. In a plant simulation device consisting of
A plant process computer function section that simulates the function of an electronic computer that monitors and controls the plant is provided in the simulator computer, and a configuration control section that causes the computer simulated by the plant process computer function section to break down in a simulated manner. 1. A plant simulating device, wherein the configuration control unit is operated based on failure setting data of the computer set in the instructor console to simulate a failure of the computer.
JP3321781A 1981-03-10 1981-03-10 Plant simulator Granted JPS57147679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3321781A JPS57147679A (en) 1981-03-10 1981-03-10 Plant simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3321781A JPS57147679A (en) 1981-03-10 1981-03-10 Plant simulator

Publications (2)

Publication Number Publication Date
JPS57147679A JPS57147679A (en) 1982-09-11
JPS626234B2 true JPS626234B2 (en) 1987-02-09

Family

ID=12380274

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3321781A Granted JPS57147679A (en) 1981-03-10 1981-03-10 Plant simulator

Country Status (1)

Country Link
JP (1) JPS57147679A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61282878A (en) * 1985-06-10 1986-12-13 株式会社東芝 Plant simulator
JPH0614239B2 (en) * 1985-07-25 1994-02-23 株式会社東芝 Plant simulator

Also Published As

Publication number Publication date
JPS57147679A (en) 1982-09-11

Similar Documents

Publication Publication Date Title
US5136528A (en) Maintenance and operational simulators
JPS63236103A (en) Plant control system
JP2008299068A (en) Operation training system and operation training method
JPS626234B2 (en)
JPH1039728A (en) Plant simulator
JP2018124446A (en) Plant simulator, plant simulator system, plant simulation method, and plant simulation program
JPH01177585A (en) Operation training support device
JPH0473116B2 (en)
JPH0229225B2 (en)
JPS59208574A (en) Driving operation training apparatus
JPH0426882A (en) Operator training simulator device
RU2065622C1 (en) Device for training operator
JPH11272307A (en) Motion control device
JPS58137874A (en) Plant simulator
JPH10187015A (en) Driving training simulator
Brewer et al. Simulator reduces cogen plant's start-up and training costs
JPH01296284A (en) Simulator for training plant operation
JPS6229793B2 (en)
JPH04288582A (en) Operation training simulator device
JPH0526702A (en) Monitor-control apparatus for plant
JP2001142384A (en) Driving training simulator
JPH02125284A (en) Power plant operation training simulator
JPH01316789A (en) Plant operation training simulation device
JPS54156449A (en) Simulate unit
JPS6370277A (en) Compact driving training simulator