JPS6310112B2 - - Google Patents
[go: Go Back, main page]

JPS6310112B2 - - Google Patents

Info

Publication number
JPS6310112B2
JPS6310112B2 JP58236799A JP23679983A JPS6310112B2 JP S6310112 B2 JPS6310112 B2 JP S6310112B2 JP 58236799 A JP58236799 A JP 58236799A JP 23679983 A JP23679983 A JP 23679983A JP S6310112 B2 JPS6310112 B2 JP S6310112B2
Authority
JP
Japan
Prior art keywords
tiles
polishing
pallet
tile
raw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP58236799A
Other languages
Japanese (ja)
Other versions
JPS60127258A (en
Inventor
Takeshi Iwatsuki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IWATOMI KK
Original Assignee
IWATOMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IWATOMI KK filed Critical IWATOMI KK
Priority to JP58236799A priority Critical patent/JPS60127258A/en
Publication of JPS60127258A publication Critical patent/JPS60127258A/en
Publication of JPS6310112B2 publication Critical patent/JPS6310112B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Compositions Of Oxide Ceramics (AREA)

Description

【発明の詳細な説明】 本発明は表面の滑沢な燻瓦の製造に適した白地
瓦を一連の機械的工程により製造せしめる様にし
た燻瓦用白地の製造ラインシステムに関するもの
である。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a production line system for white tiles for smoked roof tiles that is suitable for manufacturing smoked roof tiles with smooth surfaces and is capable of manufacturing white tiles with a smooth surface through a series of mechanical processes.

一般に燻瓦は燻化作用により表面に黒鉛炭素被
膜を形成せしめ、該被膜の呈する独特な燻銀の様
な艶と光択により高級瓦として重宝されている
が、その製造工程には高度な技術と手間を要し、
特に焼成前の白地瓦を得る段階においては素地の
表面を滑沢にしておく必要があり、かかる作業は
従来人手により1枚ずつ鏝で磨きをかけることに
より行わしめていたので作業能率が非常に悪く、
燻瓦を高価なものとする一因となつていた。
In general, smoked roof tiles have a graphite carbon film formed on their surface through the smoking action, and are prized as high-class roof tiles due to the unique smoked silver-like luster and brightness of this film, but the manufacturing process requires advanced technology. It takes time and effort,
In particular, at the stage of obtaining white tiles before firing, it is necessary to keep the surface of the base tiles smooth. Conventionally, this work was done manually by polishing each tile with a trowel, resulting in very poor work efficiency. ,
This was one of the reasons why smoked tiles were expensive.

本発明はかかる欠点に鑑み、土練機より押出し
プレス成型されプレス成型された生瓦をパレツト
に載置して水分コントロール室へ移送する工程
と、該水分コントロール室内で瓦の磨きに適した
含水率に調整する工程と、水分調整された半生瓦
をパレツトより降して機械的に磨きをかける工程
と、磨き仕上された半生瓦を乾燥室内へ搬入して
白地瓦を得る工程とから成る燻瓦用白地の製造ラ
インシステムを提供して上記欠点を解消せんとし
たものにして、以下本発明の一実施例を図面に基
づいて説明すると、 1は燻瓦用の白地瓦W3の製造ラインであり、
その基点には瓦成型用の荒地を押出成型せしめる
土練機2と、該土練機2より吐出する荒地をプレ
ス成型せしめるプレス成型機3を連設せしめ、こ
れら土練機2、プレス成型機3の側方には台車C
の走行軌道を有する走行ラインを手前から積込み
積降しライン4、調湿ライン5、乾燥ライン6の
順に並列的に配設せしめ、各ラインはその両端部
において連絡軌道78により相互に連結され、連
絡軌道78内を走行するトラバーサー910によ
つて各ライン間に台車Cを搬入せしめる様に成し
ている。
In view of these drawbacks, the present invention has been developed to include a step of extruding and press-molding raw tiles from a clay kneading machine and placing them on a pallet and transporting them to a moisture control room, and a process in which a moisture-containing material suitable for polishing the tiles is placed in the moisture control room. The smoking process consists of the following steps: adjusting the moisture content of semi-finished tiles, removing the semi-finished tiles from a pallet and mechanically polishing them, and transporting the polished semi-finished tiles into a drying room to obtain white tiles. An embodiment of the present invention will be described below based on the drawings, with the aim of solving the above-mentioned drawbacks by providing a production line system for white tiles for tiles.1 is a production line for white tiles W3 for smoked roof tiles. and
At its base point, a clay kneading machine 2 for extrusion molding the rough ground for tile molding, and a press molding machine 3 for pressing the rough ground discharged from the clay kneading machine 2 are installed in series, and these kneading machine 2, press molding machine There is a trolley C on the side of 3.
A running line having a running track is arranged in parallel in the order of a loading/unloading line 4, a humidity control line 5, and a drying line 6 from the front, and each line is interconnected at both ends by a connecting track 78, A traverser 910 running within the connecting track 78 is configured to transport the cart C between each line.

11はプレス成型機3の前方と積込み積降しラ
イン4との間に渉つて配設せしめた積込み装置で
あり、プレス成型機3にて成型された生瓦W1
適宜な移載手段により積込み積降しライン4の中
間に配したパレツトコンベア12上を移送される
パレツトP上に配列載置せしめる様に成してい
る。
Reference numeral 11 denotes a loading device disposed across the front of the press molding machine 3 and the loading/unloading line 4, which loads the raw tiles W1 molded by the press molding machine 3 by appropriate transfer means. The pallets P are arranged and placed on a pallet conveyor 12 disposed in the middle of the loading/unloading line 4.

13は積込み装置11の前方に配設せしめた積
重ね装置であり、生瓦W1が載置されたパレツト
Pを待機中の台車C上に複数段積重ねせしめる様
に成し、パレツトPが積重ねられた台車は順次連
絡軌道7側へ移動し、トラバーサー9により調湿
ライン5又は乾燥ライン6へ移送される様に成し
ている。
Reference numeral 13 denotes a stacking device disposed in front of the loading device 11, and is configured to stack pallets P on which raw tiles W1 are placed in multiple stages on a waiting cart C, so that the pallets P are stacked. The carts are sequentially moved toward the connecting track 7 and are transferred to the humidity control line 5 or the drying line 6 by the traverser 9.

次に調湿ライン5はトンネル式の水分コントロ
ール室14にて構成され、該水分コントロール室
14は内部に移動フアンが配置されると共に、必
要に応じて熱風が供給される様に成つている。
Next, the humidity control line 5 is composed of a tunnel-type moisture control chamber 14, in which a moving fan is arranged and hot air is supplied as needed.

又乾燥ライン6は台車Cを2列並列して収容移
送せしめるトンネル式の乾燥室15にて構成せし
めている。
Further, the drying line 6 is constituted by a tunnel type drying chamber 15 in which two rows of carts C are accommodated and transferred in parallel.

16は積込み積降しライン4の後部に配設せし
めた分離装置であり、積込み装置とは逆の動作を
行わしめて台車Cに積重ねられたパレツトPをパ
レツトコンベア12上に順次分離移載せしめ、又
該パレツトコンベア12の搬送経路の途中には水
分コントロール室で所定の含水率に調整された半
生瓦W2をパレツトP上より1枚ずつ分離せしめ
る積降し装置17を配設せしめ、又該積降し装置
17と前記積込み装置11との間には分離された
半生瓦W2を積込み装置11へ移送せしめる搬送
コンベア18をパレツトコンベア12に並列して
配設せしめ、この搬送コンベア18の搬送経路の
途中には機械的に作動制御される鏝により半生瓦
W2の表面に磨きをかけて滑沢にする磨き装置1
9を配設せしめている。
Reference numeral 16 denotes a separation device disposed at the rear of the loading/unloading line 4, which performs an operation opposite to that of the loading device and sequentially separates and transfers the pallets P stacked on the cart C onto the pallet conveyor 12. In addition, a loading/unloading device 17 is disposed in the middle of the conveyance path of the pallet conveyor 12 to separate the semi-finished tiles W2 , which have been adjusted to a predetermined moisture content in a moisture control room, from the pallet P one by one. Further, between the loading/unloading device 17 and the loading device 11, a conveyor 18 for transferring the separated semi-finished tiles W2 to the loading device 11 is arranged in parallel with the pallet conveyor 12. Halfway through the conveyance path of 18, half-baked tiles are removed by a mechanically controlled trowel.
Polishing device 1 that polishes the surface of W 2 to make it smooth
9 is arranged.

次に本発明に係る燻瓦用白地の製造ラインシス
テムの流れについて説明すると、土練機2により
押出成型された荒地はプレス成型機3にて所定形
状に成型されて生瓦W1となる。成型直後の生瓦
W1は含水率が略20%前後であり、この状態で表
面に磨きをかけても表面滑沢なる白地瓦W3を得
ることは出来ない。これは一般に含水率の多い粒
子体成型物が乾燥される過程において、水分が表
面へ移動する際に微粒子成分が内部へ向かつて移
動するため、これに伴い粗粒子成分は表面側へ押
し上げられて成型物の表面がこの粗粉子成分のた
めに粗面化される性質を有するからであり、従つ
て表面への磨きは生瓦W1がその内部において粒
子の移動がなくなる程度に含水率が減少した時点
で行わなければ効果がない。
Next, the flow of the manufacturing line system for white background for smoked roof tiles according to the present invention will be explained. The rough ground extruded by the clay kneading machine 2 is molded into a predetermined shape by the press molding machine 3 to become the raw roof tile W1 . Raw tiles just after forming
W 1 has a moisture content of approximately 20%, and even if the surface is polished in this state, it is not possible to obtain white tile W 3 with a smooth surface. This is because, in the process of drying a molded particulate material with a high water content, when the water moves to the surface, the fine particulate components move inward, and as a result, the coarse particulate components are pushed up toward the surface. This is because the surface of the molded product has the property of being roughened due to this coarse particle component, and therefore, polishing the surface is necessary until the moisture content of the raw tile W 1 is reduced to such an extent that there is no movement of particles within the raw tile W1. It will not be effective if it is not done when it has decreased.

次にプレス成型された生瓦W1は積込み装置1
1により順次パレツトコンベア12上に待機中の
空のパレツトP上に所定枚数毎に移載され、この
移載済のパレツトPはパレツトコンベア12によ
り順次前進して積重ね装置13の位置に至り、該
位置において待機中の台車C上に所定段数毎に積
重ねられ、パレツトPを積載した台車Cは順次前
進して連絡軌道7に至り、1台ずつトラバーサー
9上に載置される。
Next, the press-formed raw tile W 1 is loaded into the loading device 1.
1, a predetermined number of pallets are sequentially transferred onto the pallet conveyor 12 onto waiting empty pallets P, and the transferred pallets P are sequentially advanced by the pallet conveyor 12 and reach the position of the stacking device 13. The pallets P are stacked at predetermined intervals on a waiting cart C at that position, and the carts C loaded with pallets P move forward one by one until reaching the connecting track 7, where they are placed one by one on the traverser 9.

そしてトラバーサー9の作動により生瓦W1
積載した台車Cは調湿ライン5の水分コントロー
ル室14の入口に移動し、順次水分コントロール
室14内に搬入される。
Then, by the operation of the traverser 9, the cart C loaded with the raw tiles W1 is moved to the entrance of the moisture control chamber 14 of the humidity control line 5, and is carried into the moisture control chamber 14 one after another.

台車Cは水分コントロール室14内で略8時間
滞留され、その間に移動フアンによる送風、熱風
の作用を適宜受けて生瓦W1の成分粒子の移動が
なくなる含水率略14〜16%程度に予備乾燥され、
後の磨き操作に適した乾燥状態の半生瓦W2が得
られるものである。
The trolley C is retained in the moisture control room 14 for approximately 8 hours, during which time it is appropriately blown by a moving fan and hot air to maintain a moisture content of approximately 14 to 16%, which eliminates the movement of component particles of the raw tile W1 . dried,
A dry half-baked tile W2 suitable for subsequent polishing operation is obtained.

尚生瓦W1のプレス成型操作は水分コントロー
ル室14内に生瓦W1が満たされた時点で中断さ
れ、略半日間隔で成型と調湿操作が交互に繰返さ
れる。
The press-molding operation of the raw tile W 1 is interrupted when the moisture control chamber 14 is filled with the raw tile W 1 , and the molding and humidity control operations are alternately repeated at approximately half-day intervals.

続いて水分コントロール室14において調湿さ
れた半生瓦W2を積載した台車Cは出口側の連絡
軌道8で待機中のトラバーサー10上に載置さ
れ、該トラバーサー10の作動により積込み積降
しライン4の後部に移動し、順次分離装置16の
位置へ送られ、該分離装置16により台車C上に
積重ねられたパレツトPは1枚ずつパレツトコン
ベア12上に移載され、該パレツトコンベア12
により積降し装置1の位置へ搬送され、該積降し
装置17によりパレツトP上の半生瓦W2は搬送
コンベア18上に1枚ずつ移載されると共に、空
のパレツトPはパレツトコンベア12により積込
み装置11側へ順次搬送される。
Next, the trolley C loaded with half-baked tiles W 2 whose humidity has been controlled in the moisture control room 14 is placed on the traverser 10 waiting on the connecting track 8 on the exit side, and by the operation of the traverser 10, it is moved to the loading/unloading line. The pallets P stacked on the cart C by the separating device 16 are transferred one by one onto the pallet conveyor 12.
The unfinished tiles W2 on the pallet P are transferred one by one onto the conveyor 18 by the unloading device 17, and the empty pallets P are transferred to the pallet conveyor 18. 12 to the loading device 11 side.

搬送コンベア18上に移載された半生瓦W2
積込み装置11へ搬送される過程において磨き装
置19により瓦表面に磨きがかけられ、滑沢な表
面に加工された後積込み装置11へ搬送される。
そして積込み装置11に至つた後は生瓦W1の移
送経路と同様にパレツトP上に移載されると共
に、積重ね装置13により半生瓦W2を載置した
パレツトPが台車C上に積重ねられ、該台車Cは
トラバーサー9上に移載される。
During the process of conveying the semi-finished tiles W 2 onto the conveyor 18 to the loading device 11, the tile surface is polished by the polishing device 19 to give it a smooth surface, and then conveyed to the loading device 11. Ru.
After reaching the loading device 11, they are transferred onto a pallet P in the same way as the raw tile W1 was transferred, and the pallet P on which the semi-finished tiles W2 are placed is stacked on the cart C by the stacking device 13. , the cart C is transferred onto the traverser 9.

トラバーサー9に移載された台車Cは今度は乾
燥ライン6における乾燥室15の入口に移動し、
順次乾燥室15内に搬入されて最終的な本乾燥が
行われ、乾燥後の白地瓦W3は台車Cと共に搬入
されると共に、トラバーサー10に移載されて次
工程への滞溜部20へ搬送されるのである。
The cart C transferred to the traverser 9 is now moved to the entrance of the drying chamber 15 in the drying line 6,
They are sequentially carried into the drying chamber 15 for final main drying, and the dried white tiles W 3 are carried together with the trolley C, and are transferred to the traverser 10 to the storage section 20 for the next process. It is transported.

要するに本発明は、土練機2より押出しプレス
成型された生瓦W1をパレツトPに載置して水分
コントロール室14へ移送する工程と、該水分コ
ントロール室14内で瓦の磨きに適した含水率に
調整する工程と、水分調整された半生瓦W2をパ
レツトPより降して機械的に磨きをかける工程
と、磨き仕上された半生瓦W2を乾燥室15内へ
搬入して白地瓦W3を得る工程とから成るので、
成型から乾燥へ至る一連の工程中において生瓦
W1を表面の磨きに最適な状態に調湿された半生
瓦W2として得ることが出来、而も該半生瓦W2
全て同じ条件で連続的に調整均一化されているた
め、機械的な磨き操作によつてもバラツキを生じ
ることなく全ての製品に対し表面を均一に滑沢仕
上せしめることが出来、かかる操作は全て一連の
流れの中において自動的に行われるため高品質の
燻瓦用白地を安価に提供せしめることが出来る等
その実用的効果甚だ大なるものである。
In short, the present invention includes a step of placing the green tile W 1 extruded and press-molded from the clay kneading machine 2 on a pallet P and transferring it to the moisture control chamber 14, and a process suitable for polishing the tile in the moisture control chamber 14. A process of adjusting the moisture content, a process of unloading the moisture-adjusted half-baked tiles W 2 from the pallet P and mechanically polishing them, and carrying the polished semi-baked tiles W 2 into the drying room 15 to dry the white tiles. It consists of the process of obtaining tiles W3 ,
During the series of processes from molding to drying, raw tiles
W 1 can be obtained as a half-baked tile W 2 whose humidity is adjusted to the optimum condition for surface polishing, and since the semi-baked tile W 2 is all continuously adjusted and homogenized under the same conditions, mechanical The surface of all products can be given a uniform, smooth finish without any variation even through thorough polishing operations, and all such operations are performed automatically in a series of steps, resulting in high-quality smoked roof tiles. Its practical effects are enormous, such as being able to provide a white background at a low cost.

【図面の簡単な説明】[Brief explanation of the drawing]

図は本発明に係る燻瓦用白地の製造ラインの一
実施例を示す平面図である。 14……水分コントロール室、15……乾燥
室、19……磨き装置。
The figure is a plan view showing an embodiment of a production line for white background for smoked roof tiles according to the present invention. 14...moisture control room, 15...drying room, 19...polishing device.

Claims (1)

【特許請求の範囲】[Claims] 1 土練機より押出しプレス成型された生瓦をパ
レツトに載置して水分コントロール室へ移送する
工程と、該水分コントロール室内で瓦の磨きに適
した含水率に調整する工程と、水分調整された半
生瓦をパレツトより降して機械的に磨きをかける
工程と、磨き仕上された半生瓦を乾燥室内へ搬入
して白地瓦を得る工程とから成ることを特徴とす
る燻瓦用白地の製造ラインシステム。
1. A step in which raw tiles extruded and press-molded from a clay kneading machine is placed on a pallet and transferred to a moisture control room, a step in which the moisture content is adjusted to a level suitable for polishing tiles in the moisture control room, and a step in which the moisture content is adjusted to be suitable for polishing the tiles. Manufacturing of a white background for smoked roof tiles, characterized by comprising the steps of: unloading half-finished tiles from a pallet and mechanically polishing them; and carrying the polished half-finished tiles into a drying room to obtain white tiles. line system.
JP58236799A 1983-12-13 1983-12-13 White-base manufacture line system for smoke roof tile Granted JPS60127258A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58236799A JPS60127258A (en) 1983-12-13 1983-12-13 White-base manufacture line system for smoke roof tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58236799A JPS60127258A (en) 1983-12-13 1983-12-13 White-base manufacture line system for smoke roof tile

Publications (2)

Publication Number Publication Date
JPS60127258A JPS60127258A (en) 1985-07-06
JPS6310112B2 true JPS6310112B2 (en) 1988-03-03

Family

ID=17005958

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58236799A Granted JPS60127258A (en) 1983-12-13 1983-12-13 White-base manufacture line system for smoke roof tile

Country Status (1)

Country Link
JP (1) JPS60127258A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0218810U (en) * 1988-07-25 1990-02-07

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0218810U (en) * 1988-07-25 1990-02-07

Also Published As

Publication number Publication date
JPS60127258A (en) 1985-07-06

Similar Documents

Publication Publication Date Title
US20120230802A1 (en) Device and a method for transporting blanks made from an initially plastic, especially ceramic, material to and from a dryer and a kiln
JPS6310112B2 (en)
FR2063490A5 (en) Automatic handling of raw bricks between the cutting machine - and the firing furnace-ace carriage
JP2542299B2 (en) White tile manufacturing system
US3598376A (en) Plant for drying, firing and stacking bricks
JP2544259B2 (en) Drying Palette of White Roof Tiles
JPS60264205A (en) Production system of white ground tile
CN113566554A (en) Sintering brick stacking and burning staggered grouping system and stacking and burning process thereof
JPS6332112Y2 (en)
CN218808799U (en) Noodle box feedback system
DE4137798A1 (en) Tile handling equipment between extrusion machines and furnace - includes carriers deposited by handling devices onto wagons and used for loading and unloading
SU1575030A1 (en) Method of drying plum fruits
US3760508A (en) Method for loading and drying of ceramic products prior to baking
JPS6313708A (en) Treater for molded form
JPS61217213A (en) Production line system for white foundation for brick
US961314A (en) Method for handling brick and delivering the same for use or storage.
EP0036313A1 (en) Manufacturing process for concrete roof tiles
JPH06219814A (en) Tile producing line system by wet compacting
JPH01261256A (en) Continuous production of tile
US532178A (en) Brick-drier
JPH0513902B2 (en)
NL8101369A (en) Green bricks stacked in bonded sheet pattern - are handled as such from drying through to placing on building site scaffolding
JPH0353907A (en) Manufacturing line system for ceramic article
RU2087309C1 (en) Pottery moulding, drying and upsetting line
JPS5942234Y2 (en) Transfer welding rod sorting device