Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6316531B2 - - Google Patents
[go: Go Back, main page]

JPS6316531B2 - - Google Patents

Info

Publication number
JPS6316531B2
JPS6316531B2 JP21838383A JP21838383A JPS6316531B2 JP S6316531 B2 JPS6316531 B2 JP S6316531B2 JP 21838383 A JP21838383 A JP 21838383A JP 21838383 A JP21838383 A JP 21838383A JP S6316531 B2 JPS6316531 B2 JP S6316531B2
Authority
JP
Japan
Prior art keywords
reinforcement
hung
metal fitting
end main
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP21838383A
Other languages
Japanese (ja)
Other versions
JPS60109424A (en
Inventor
Kaoru Sakai
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haseko Corp
Original Assignee
Hasegawa Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hasegawa Komuten Co Ltd filed Critical Hasegawa Komuten Co Ltd
Priority to JP21838383A priority Critical patent/JPS60109424A/en
Publication of JPS60109424A publication Critical patent/JPS60109424A/en
Publication of JPS6316531B2 publication Critical patent/JPS6316531B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Reinforcement Elements For Buildings (AREA)

Description

【発明の詳細な説明】 本発明は、鉄骨鉄筋コンクリート(SRC)造
建造物における地中梁の配筋組立方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a reinforcing assembly method for underground beams in steel reinforced concrete (SRC) buildings.

従来、この種の地中梁配筋組立にあつては、そ
のための専用の鉄筋足場を構築して配筋作業を行
つていたため、多くの工数や工材を必要とし、工
期も長くなる欠点があつた。その他、地中梁受金
具の上に地中梁を載置支持させる方法も採用され
ていたが、やはり多くの工数を必要とし、しか
も、底鉄筋のカブリ厚がなくなるなど、施工精度
上にも問題があつた。
Conventionally, for this type of underground beam reinforcement assembly, special reinforcing steel scaffolding was constructed and reinforcement work was carried out, which required a lot of man-hours and materials, and the construction period was long. It was hot. Another method used was to place and support underground beams on underground beam brackets, but this also required a lot of man-hours and also had problems with construction accuracy, such as eliminating the fogging of the bottom reinforcing bars. There was a problem.

本発明は、上記実情にかんがみてなされたもの
であつて、その目的は、工数や工材を大幅に削減
し、工期の短縮をも図るとともに、施工精度をも
向上させ得る新規な地中梁の配筋組立方法を提供
するにある。
The present invention has been made in view of the above-mentioned circumstances, and its purpose is to provide a novel underground beam that can significantly reduce the number of man-hours and construction materials, shorten the construction period, and improve construction accuracy. To provide a reinforcement assembly method.

先ず、本発明方法の実施の態様を図面にもとづ
いて説明する。
First, embodiments of the method of the present invention will be explained based on the drawings.

図中、1は予め構築されたSRC造建造物の2
階の梁材であつて、この梁材1は、梁鉄骨2、上
端主筋3…、下端主筋4…、スターラツプ5とか
ら構成されている。6は丸鋼から形成された吊り
金具で、その中間に設けられたターンバツクル7
によつて長さ調節可能に構成されるとともに、そ
の両端には、それぞれフツク8,9が一体的に形
成されている。10は地中梁で、上端主筋11
…、下端主筋12…、スターラツプ13…とから
構成され、14は丸鋼や平鋼などから形成された
主筋受金具である。
In the figure, 1 is a pre-built SRC structure 2
This beam material 1, which is a floor beam material, is composed of a beam steel frame 2, upper end main reinforcements 3..., lower end main reinforcements 4..., and stirrups 5. 6 is a hanging metal fitting made of round steel, and a turnbuckle 7 is provided in the middle of the hanging metal fitting.
It is constructed such that its length can be adjusted, and hooks 8 and 9 are integrally formed at both ends thereof, respectively. 10 is an underground beam, and the upper main reinforcement 11
. . . , lower end main reinforcing bars 12 . . . , and stirrups 13 .

次に、地中梁10の配筋組立の手順について説
明すると、まず、吊り金具6の一方のフツク8
を、2階梁材1の適当箇所に引掛けて吊り金具6
を垂下させる。図示の実施例では、2階梁材1の
下端主筋4…に引掛けた例を示しているが、上端
主筋3…に引掛けたり、梁鉄骨2に引掛けたりす
ることもできる。そして、吊り金具6の他方のフ
ツク9に主筋受金具14を引掛け、必要に応じ
て、番線などで固定する。この場合、図示のよう
に、吊り金具6を左右一対垂下させ、左右一対の
フツク9間にわたつて主筋受金具14を引掛けて
もよいし、吊り金具6を一本だけ垂下させ、その
フツク9に主筋受金具14を引掛けてもよい。こ
のようにして、ほぼ水平に位置させた主筋受金具
14上に、張間方向地中梁10を構成するための
上端主筋11…を載置支持させ、さらに、この上
端主筋11…にスターラツプ13…を掛けわた
し、スターラツプ13…の下部内側に下端主筋1
2…を載置させる。そして、これら上下端主筋1
1…,12…とスターラツプ13とを互いに結束
固定し、地中梁10の配筋組立を完了するのであ
る。その際、吊り金具6の長さをターンバツクル
7によつて調節することにより、地中梁10の配
筋が水平になるようにレベル調整する。その後、
コンクリートを打設するのであるが、それに先立
つて、吊り金具6や主筋金具14は取外され、別
の工事で再利用されるのである。
Next, the procedure for assembling reinforcement for the underground beam 10 will be explained. First, one hook 8 of the hanging fitting 6 will be
to an appropriate location on the second floor beam 1 and attach it to the hanging bracket 6.
hang down. In the illustrated embodiment, an example is shown where it is hooked to the lower end main reinforcements 4 of the second floor beam material 1, but it can also be hooked to the upper end main reinforcements 3... or the beam steel frame 2. Then, the main reinforcing metal fitting 14 is hooked onto the other hook 9 of the hanging metal fitting 6, and fixed with a wire or the like as necessary. In this case, as shown in the figure, a pair of left and right hanging fittings 6 may be hung, and the main reinforcement bracket 14 may be hung between the left and right pair of hooks 9, or only one hanging fitting 6 may be hung, and the hooks The main reinforcement bracket 14 may be hooked onto the 9. In this way, the upper end main reinforcements 11 for configuring the tension direction underground beam 10 are placed and supported on the main reinforcement support fittings 14 positioned almost horizontally, and the stirrups 13 are further mounted on the upper end main reinforcements 11. Hang ... on the inside of the bottom of stirrup 13... and lower end main reinforcement 1.
2... is placed. And these upper and lower end main reinforcements 1
1..., 12... and the stirrup 13 are bound and fixed to each other, and the reinforcement assembly of the underground beam 10 is completed. At that time, by adjusting the length of the hanging fitting 6 using the turnbuckle 7, the level is adjusted so that the reinforcement of the underground beam 10 is horizontal. after that,
Prior to pouring concrete, the hanging fittings 6 and main reinforcing fittings 14 are removed and reused in another construction project.

以上の説明から明らかなように、本発明による
地中梁の配筋組立方法は、両端にフツクを有する
吊り金具の一方のフツクを、予め構築された2階
梁材の適当箇所に引掛けて垂下させ、他方のフツ
クにほぼ水平になるように引掛けた主筋受金具上
に地中梁の上端主筋を載置支持させ、この上端主
筋に掛けわたしたスターラツプによつて地中梁の
下端主筋をも載置支持させるものであるから、す
でに出来上つている2階の梁材を有効に利用し
て、特別な鉄筋足場などを必要とせずに、地中梁
の配筋組立作業を簡単に行なうことができる。し
かも、吊り金具にはターンバツクルが設けられ、
その長さが調節できるように構成されているの
で、配筋の施工精度をも向上させることができ、
結局、工数と工材の大幅な削減によるコストダウ
ン、ならびに工期の短縮を図り得るとともに、施
工精度の向上をも図り得るに至つたのである。
As is clear from the above explanation, the method for assembling reinforcement for underground beams according to the present invention involves hooking one hook of a hanging fitting having hooks at both ends to an appropriate location on a pre-constructed second floor beam. The upper end main reinforcement of the underground beam is placed and supported on the main reinforcement holder which is suspended from the other hook so as to be almost horizontal. Since it also supports the underground beams, it makes effective use of the existing beam materials on the second floor and makes it easy to assemble the reinforcing beams for underground beams without the need for special reinforcing scaffolding. can be done. Moreover, the hanging metal fittings are equipped with turnbuckles,
Since the length is adjustable, the construction accuracy of reinforcement can be improved.
In the end, we were able to reduce costs by significantly reducing the number of man-hours and materials used, shorten the construction period, and improve construction accuracy.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は、本発明による地中梁の配筋組立方法の
実施の態様を例示し、第1図は、一部断面側面
図、第2図は、要部の斜視図である。 1…2階の梁材、6…吊り金具、7…ターンバ
ツクル、8,9…フツク、10…地中梁、11…
上端主筋、12…下端主筋、13…スターラツ
プ、14…主筋受金具。
The drawings illustrate an embodiment of the reinforcing assembly method for underground beams according to the present invention, and FIG. 1 is a partially sectional side view, and FIG. 2 is a perspective view of the main parts. 1... Beam material for the second floor, 6... Hanging fittings, 7... Turnbuckles, 8, 9... Hooks, 10... Underground beams, 11...
Upper end main reinforcement, 12...lower end main reinforcement, 13...starrup, 14...main reinforcement bracket.

Claims (1)

【特許請求の範囲】[Claims] 1 両端にフツク8,9を有し、ターンバツクル
7によつて長さ調節可能に構成された吊り金具6
の一方のフツク8を、予め構築された2階梁材1
の適当箇所に引掛けて前記吊り金具6を垂下さ
せ、この吊り金具6の他方のフツク9に主筋受金
具14をほぼ水平になるように引掛け、この主筋
受金具14上に地中梁10用の上端主筋11…を
載置支持させるとともに、この上端主筋11…に
スターラツプ13…を掛けわたして、スターラツ
プ13…の下部内側に地中梁10用の下端主筋1
2…を載置支持させることを特徴とする地中梁の
配筋組立方法。
1 Hanging metal fitting 6 having hooks 8 and 9 at both ends and configured to be adjustable in length with a turnbuckle 7
One hook 8 of the
The hanging metal fitting 6 is hung at an appropriate place, and the main bar support fitting 14 is hung on the other hook 9 of this hanging metal fitting 6 so as to be almost horizontal, and the underground beam 10 is hung on this main reinforcement holding metal fitting 14. At the same time, the upper end main reinforcement 11 for the underground beam 10 is placed and supported, and the stirrup 13 is hung over the upper end main reinforcement 11 and the lower end main reinforcement 1 for the underground beam 10 is placed inside the lower part of the stirrup 13.
2. An underground beam reinforcement assembly method characterized by placing and supporting...
JP21838383A 1983-11-18 1983-11-18 Bar arrangement and assembly of underground beam Granted JPS60109424A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21838383A JPS60109424A (en) 1983-11-18 1983-11-18 Bar arrangement and assembly of underground beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21838383A JPS60109424A (en) 1983-11-18 1983-11-18 Bar arrangement and assembly of underground beam

Publications (2)

Publication Number Publication Date
JPS60109424A JPS60109424A (en) 1985-06-14
JPS6316531B2 true JPS6316531B2 (en) 1988-04-09

Family

ID=16719036

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21838383A Granted JPS60109424A (en) 1983-11-18 1983-11-18 Bar arrangement and assembly of underground beam

Country Status (1)

Country Link
JP (1) JPS60109424A (en)

Also Published As

Publication number Publication date
JPS60109424A (en) 1985-06-14

Similar Documents

Publication Publication Date Title
US20050188638A1 (en) Apparatus and method for composite concrete and steel floor construction
JP2000345708A (en) Hanging jig for rebar for wall
JPS6316531B2 (en)
JP2714763B2 (en) Construction method of reinforced concrete structure
JP2733536B2 (en) Beam rebar preassembly method and beam rebar suspension device
JP2648937B2 (en) Reinforcing bar for long span beams
JPH0410281Y2 (en)
JP4148631B2 (en) Suspension scaffold for steel construction
JP2697807B2 (en) Reinforcing cage assembly / building equipment
JP2003013535A (en) Fixing structure and fixing method of void form unit to floor form
JPH09221865A (en) Hollow slab construction method
JPH061981Y2 (en) Kanzashi bar support metal fittings for beam reinforcement
JPH0913673A (en) Reinforced concrete beam girder Reinforcing rod construction method
JP2526492Y2 (en) Pillar safety net
JPH108417A (en) Suspension floor bridge
JP3045248B2 (en) Installation jig for wall reinforcement
JPH0447107B2 (en)
JPS6146129Y2 (en)
CN206245561U (en) Assembled architecture hollow building cover
JPH07268950A (en) Rooftop balcony unit and hanging hardware
JPS6137697Y2 (en)
JPH0343282Y2 (en)
JP3539507B2 (en) Sleeve fixing bracket
JPH0348969Y2 (en)
JPH06167067A (en) Deck plate construction method