Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6322132B2 - - Google Patents
[go: Go Back, main page]

JPS6322132B2 - - Google Patents

Info

Publication number
JPS6322132B2
JPS6322132B2 JP56190112A JP19011281A JPS6322132B2 JP S6322132 B2 JPS6322132 B2 JP S6322132B2 JP 56190112 A JP56190112 A JP 56190112A JP 19011281 A JP19011281 A JP 19011281A JP S6322132 B2 JPS6322132 B2 JP S6322132B2
Authority
JP
Japan
Prior art keywords
transmission system
initial load
frequency
power
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP56190112A
Other languages
Japanese (ja)
Other versions
JPS5893430A (en
Inventor
Buichi Sakurai
Kyoshi Goto
Keisuke Sekya
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Toshiba Corp
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Electric Power Co Inc filed Critical Toshiba Corp
Priority to JP56190112A priority Critical patent/JPS5893430A/en
Publication of JPS5893430A publication Critical patent/JPS5893430A/en
Publication of JPS6322132B2 publication Critical patent/JPS6322132B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Direct Current Feeding And Distribution (AREA)

Description

【発明の詳細な説明】 本発明は無負荷状態にある発電所の初負荷操作
方法に係り、特に、発電所発生電力を全量直流送
電系統のみで系統側の負荷に送電するように構成
した系統で、直流送電系統を起動して、発電所に
系統初負荷をとらせる発電所の初負荷操作方法に
関する。
[Detailed Description of the Invention] The present invention relates to an initial load operation method for a power plant in a no-load state, and particularly to a system configured to transmit all of the power generated by the power plant to loads on the grid side only through the DC transmission system. The present invention relates to an initial load operation method for a power plant that starts up a DC transmission system and causes the power plant to take the initial load on the system.

第1図は、交直連系系統の構成例を示すもので
ある。第1図に於いて、PSは発電所,Tはター
ビン,Gはタービン発電機,Trは昇圧用変圧器,
CB,CBL1,CBL2は交流しや断器、A,Bは連系
交流系統、ACLine1,ACLine2は連系交流送
電線、Bus1〜Bus3は交流母線を示す。また、
直流送電系統側において、C・Trは変換器用変
圧器、Vは交直変換器、DCLは直流リアクトル、
DCLineは直流送電線を示し、PGはタービン発電
機出力、Pdは直流送電系統運転電力を夫々示す。
FIG. 1 shows an example of the configuration of an AC/DC interconnection system. In Figure 1, PS is the power plant, T is the turbine, G is the turbine generator, Tr is the step-up transformer,
CB, CB L1 and CB L2 are AC line breakers, A and B are interconnected AC systems, ACLine 1 and ACLine 2 are interconnected AC transmission lines, and Bus 1 to Bus 3 are AC buses. Also,
On the DC transmission system side, C/Tr is a converter transformer, V is an AC/DC converter, DCL is a DC reactor,
DCLine indicates the DC transmission line, P G indicates the turbine generator output, and Pd indicates the DC transmission system operating power.

従来、発電所出力を直流送電系統で送電するよ
うな系統でも、第1図に示すように発電所PSの
交流母線又は、直流送電系統の変換装置交流側母
線Bus1には、連系交流送電線ACLine1が接続
されており交流系統でも発電所発生電力を送電で
きるよう構成されている。そして、発電所PSの
タービン発電機Gは、まず交流系統に同期併入さ
れて系統側初負荷をかけ、その後、負荷を立上げ
てから直流送電系統を起動して、しかる後、交流
系統負荷を除々に直流送電系統に移行させていく
ような方法がとられており、発電所のタービンT
およびタービン発電機Gの初負荷操作は従来の交
流連系系統発電所と特に変らない。
Conventionally, even in systems where power plant output is transmitted through a DC transmission system, as shown in Figure 1, the AC bus of the power plant PS or the AC side bus Bus 1 of the converter of the DC transmission system is connected to the interconnected AC transmission line. ACLine 1 is connected and the system is configured so that power generated by the power plant can be transmitted even on an AC system. Then, the turbine generator G of the power station PS is first synchronously connected to the AC system and applies an initial load on the system side, then starts the load, starts the DC transmission system, and then loads the AC system. A method is being taken to gradually transfer power to the DC transmission system, and the power plant's turbine T
The initial load operation of the turbine generator G is not particularly different from that of a conventional AC grid-connected power plant.

しかるに、第1図に示すような系統において、
直流送電系統送電端側の交流母線Bus1に接続さ
れる交流送電線ACLine1のしや断器、CBL1また
はしや断器CBL2がOFFとなつている状態に於い
て、あるいは、交流送電線ACLine1が存在しな
い系統構成に於いては、発電所PSのタービン発
電機Gは直流送電線DCLineを含む直流送電系統
を介して、負荷となる交流系統Aまたは交流系統
Bに連系されており、無負荷運転状態にある発電
所PSのタービンT,タービン発電機Gに系統初
負荷をとらせるには、直流送電系統を起動させて
タービンTおよびタービン発電機Gの系統初負荷
相当の負荷で運転しなければならない。
However, in the system shown in Figure 1,
In a state where the edge disconnector, CB L1 , or edge disconnector CB L2 of the AC transmission line ACLine1 connected to the AC bus bus Bus1 on the transmission end side of the DC transmission system is OFF, or when the AC transmission line ACLine1 In a system configuration in which no In order to make the turbine T and turbine generator G of the power station PS, which are in load operation, take the initial load on the system, start the DC transmission system and operate the turbine T and turbine generator G at a load equivalent to the initial system load. There must be.

ところで、一般に直流送電系統の交直変換器V
は所定値以上の直流電流を流して直流電圧はほぼ
零とする運転、即ち有効電力をとらない零力率運
転を行なうことが可能であるが、長時間零力率運
転能力を有する交直変換器(以後、“変換器”と
称する)は高価となる。また、長時間零力率運転
能力を有さない変換器を適用した場合には、起動
後直ちに直流電流をを所定の値以上流すとともに
短時間の内に直流電圧を立上げる必要があるの
で、電源となる交流系統からは直流電圧の立上げ
に応じた負荷をとることになる。
By the way, in general, the AC/DC converter V of the DC transmission system
It is possible to perform operation in which a DC current of a predetermined value or more is passed and the DC voltage is almost zero, that is, zero power factor operation that does not consume active power. (hereinafter referred to as "transducers") are expensive. Furthermore, when using a converter that does not have the ability to operate at zero power factor for long periods of time, it is necessary to flow a DC current of a predetermined value or more immediately after startup, and to raise the DC voltage within a short period of time. The load corresponding to the rise of the DC voltage will be taken from the AC system that serves as the power source.

一方、発電所のタービン,タービン発電機等
は、初負荷をとらせる操作を行なつても蒸気流量
制御弁類の操作遅れ,タービンおよびタービン発
電機の特性等の影響により、数秒以上の時間遅れ
をもつて出力する。したがつて、発電所のタービ
ンおよびタービン発電機が起動後定格速度に達し
た後、タービンおよびタービン発電機に初負荷操
作を行なうときには、適切なタイミングと負荷の
立上げを考慮して直流送電系統を起動することが
要望される。
On the other hand, even when the initial load is applied to turbines and turbine generators in power plants, there is a time delay of several seconds or more due to delays in the operation of steam flow control valves and the characteristics of the turbine and turbine generator. Output with . Therefore, when performing initial load operations on the turbines and turbine generators after the power plant turbines and turbine generators have reached their rated speed after startup, appropriate timing and load start-up must be taken into account when adjusting the DC transmission system. It is requested to start.

第2図は、初負荷操作と同時に直流送電系統を
起動して直流送電系統負荷Pdcを立上げた場合の
タイムチヤート図を示すものである。図におい
て、直流送電系統負荷Pdcはタービン発電機出力
PGに先立つて立上がるため、タービンおよびタ
ービン発電機の出力が追いつかず、回転エネルギ
ーが不足分ΔETGをおぎない周波数が低下する為、
定格周波数に対する周波数偏差ΔFはΔF<0で大
きく変動することを示しており、場合によつては
タービン発電機がドリツプすることも考えられ
る。
FIG. 2 shows a time chart when the DC transmission system load Pdc is started by starting the DC transmission system at the same time as the initial load operation. In the figure, the DC transmission system load Pdc is the turbine generator output
Because it starts up before P G , the output of the turbine and turbine generator cannot catch up, and the frequency at which the rotational energy does not exceed the deficit ΔE TG decreases.
This shows that the frequency deviation ΔF with respect to the rated frequency fluctuates greatly when ΔF<0, and it is possible that the turbine generator may drip in some cases.

本発明は上記のような要望に鑑みて成されたも
ので、その目的は長時間零力率運転能力を有さな
い直流送電用交直変換器を適用した直流送電系統
を起動して、発電所のタービン発電機に安全かつ
安定に系統初負荷をかけることができる発電所の
初負荷操作方法を提供することにある。
The present invention was made in view of the above-mentioned demands, and its purpose is to start up a DC power transmission system to which an AC/DC converter for DC power transmission, which does not have long-term zero power factor operation capability, can be used to power a power plant. An object of the present invention is to provide an initial load operation method for a power plant that can safely and stably apply an initial load to a grid turbine generator.

まず、本発明の考え方について述べる。第3図
は、火力発電所または原子力発電所の蒸気系を主
としたタービンおよびタービン発電機系統の概念
を示す構成図である。第3図において、Bはボイ
ラーまたは原子炉蒸気発生部、Cは復水器、Tは
タービン、Gはタービン発電機、VSは主蒸気止
め弁、VSPは主蒸気隔離弁、VCは蒸気加減弁、VB
は蒸気バイパス弁を夫々示す。図において、ター
ビンTは主蒸気止め弁VS,主蒸気隔離弁VSP,蒸
気バイパス弁VBを開き、蒸気加減弁VCを調節し
て定格速度に加速される。そして、発電所に負荷
となる交流系統が連系されていれば、定格速度に
なつたタービン発電機Gは交流系統に同期併入
し、その後蒸気加減弁VCおよび蒸気バイパス弁
VBの開度を調節して初負荷をとることになる。
しかし、この初負荷操作は蒸気加減弁VC,蒸気
バイパス弁VBの操作および動作遅れ時間,ター
ビンTおよびタービン発電機Gの入出力応答特性
などにより、初負荷操作指令後実際にタービン発
電機出力として初負荷がかかるまでには数秒オー
ダーの時間遅れを生ずる。この遅れ時間が存在す
る為、直流送電系統を介してのみ、発電所が負荷
をとるような系統構成である場合、直流送電系統
の起動タイミングを適性に確保する必要がある。
また、直流送電系統の変換器は起動すると直ちに
直流電流を所定の値とし、かつ長時間零力率運転
能力を有さない場合には短時間の内に直流電圧を
立上げる必要があるので負荷をとることになる。
その為、直流電圧の立上げも適切に行なうことが
必要である。
First, the concept of the present invention will be described. FIG. 3 is a block diagram showing the concept of a turbine and a turbine generator system mainly consisting of a steam system in a thermal power plant or a nuclear power plant. In Figure 3, B is the boiler or reactor steam generation section, C is the condenser, T is the turbine, G is the turbine generator, V S is the main steam stop valve, V SP is the main steam isolation valve, and V C is the Steam control valve, V B
indicate steam bypass valves, respectively. In the figure, the turbine T is accelerated to the rated speed by opening the main steam stop valve V S , the main steam isolation valve V SP , and the steam bypass valve V B , and adjusting the steam control valve V C. If the power plant is connected to an AC system that serves as a load, the turbine generator G, which has reached its rated speed, joins the AC system synchronously, and then the steam control valve V C and the steam bypass valve
The initial load will be taken by adjusting the opening of VB .
However, this initial load operation depends on the operation and operation delay time of the steam control valve V C and steam bypass valve V B , the input/output response characteristics of the turbine T and the turbine generator G, etc. There is a time delay on the order of several seconds before the initial load is applied as an output. Because of this delay time, if the system configuration is such that the power plant takes on the load only via the DC transmission system, it is necessary to ensure an appropriate start-up timing of the DC transmission system.
In addition, when a converter in a DC power transmission system is started, it immediately sets the DC current to a predetermined value, and if it does not have the ability to operate at zero power factor for a long time, it is necessary to ramp up the DC voltage within a short period of time. will be taken.
Therefore, it is necessary to properly start up the DC voltage.

以下、本発明による一実施例について図面を参
照して説明する。第4図は、本発明による直流送
電系統を起動して、発電所のタービン発電機に系
統初負荷をかけるための回路構成をブロツク的に
示したものである。第4図において、Tはタービ
ン、Gはタービン発電機、Trは昇圧変圧器、
C・Trは変換器用変圧器、Vは変換器、DCLは
直流リアクトル、PDは電圧変成器を示す。また、
1はタービンTの蒸気制御弁類の操作制御装置、
2は周波数検出装置、3はアンドゲート回路、4
は直流送電系統の制御装置を夫々示すものであ
る。ここで、周波数検出装置2は、つぎのように
構成している。系統からの電圧信号を周波数−
電圧変換器FVCに入力し、周波数に比例した直
流電圧に変換し、基準周波数信号F・R(但し、
直流電圧信号)との差をとつて比較器Cに入力す
る。この比較器Cは、設定器LSで設定された値
Δs以上の入力があつたとき動作するものであ
り、周波数偏差ΔF入力が設定値Δsを越えたと
き動作するように構成している。また、直流送電
系統の制御装置4は起動制御回路41,リミツタ
ー回路42および運転制御回路43から構成して
いる。
Hereinafter, one embodiment of the present invention will be described with reference to the drawings. FIG. 4 is a block diagram showing a circuit configuration for starting the DC power transmission system according to the present invention and applying an initial load to the turbine generator of the power plant. In Fig. 4, T is a turbine, G is a turbine generator, Tr is a step-up transformer,
C.Tr indicates a converter transformer, V indicates a converter, DCL indicates a DC reactor, and PD indicates a voltage transformer. Also,
1 is an operation control device for steam control valves of turbine T;
2 is a frequency detection device, 3 is an AND gate circuit, 4
1 and 2 show control devices for the DC power transmission system, respectively. Here, the frequency detection device 2 is configured as follows. The voltage signal from the grid is converted to a frequency −
It is input to the voltage converter FVC and converted to a DC voltage proportional to the frequency, and the reference frequency signal F・R (however,
(DC voltage signal) and inputs it to comparator C. This comparator C operates when an input equal to or greater than the value Δs set by the setter LS is received, and is configured to operate when the frequency deviation ΔF input exceeds the set value Δs. Further, the control device 4 for the DC power transmission system includes a starting control circuit 41, a limiter circuit 42, and an operation control circuit 43.

次に本発明による発電所の系統初負荷操作方法
について述べる。第4図において、発電機用ター
ビンGは第3図にて説明した如く起動され定格速
度に達する。しかる後、蒸気制御弁類の操作制御
装置1に指令して第3図に示す蒸気加減弁VC
よび蒸気バイパス弁VB開度調整を行ない、初負
荷をかける為の操作信号を発するとともに、該操
作制御装置1より上記初負荷操作のための指令信
号または操作信号を得る。一方、初負荷操作信
号によつて蒸気加減弁VC,蒸気バイパス弁VB
制御されタービンTへの蒸気流量が増加すると、
無負荷状態にあるタービンT,タービン発電機G
が加速されてタービン発電機Gの出力周波数が増
加する。このため、変換器用変圧器C・Trの一
次側電圧(交流母線電圧でもよい)を電圧変成器
PDにて検出し、その出力電圧を周波数検出装
置2に入力して、周波数が所定値以上、増加した
ことを判定して出力してアンドゲート回路3に一
方の入力として加える。また、アンドゲート回路
3のもう一方の入力としては、上記操作制御装置
1よりの初負荷指令信号または操作信号を与え
る。そして、これによりアンドゲート回路3のア
ンド条件が成立したことを条件に、その出力が直
流送電系統の制御装置4の中の起動制御回路41
に起動指令として与えられて直流送電系統は起動
するとともに、リミツター回路42で適当な変化
率で直流送電系統の直流電圧を制御することによ
り負荷を所定の値(タービン発電機Gの許容初負
荷レベル)まで立上げる。したがつて、タービン
Tの初負荷操作後、タービン発電機Gの出力周波
数が上昇し始めたこと、すなわちタービンTおよ
びタービン発電機Gの出力変化となつて現われた
ことを検出して直流送電系統を起動するので、直
流送電系統起動タイミングの心配は一切なくなる
ことになる。また、起動とともに所定の値まで立
上げる直流送電系統の負荷変化は、タービンTお
よびタービン発電機Gの初負荷許容レベルと応答
特性を考慮して、運転制御回路43で直流送電系
統の起動時の直流電流レベルを設定するととも
に、リミツター回路42で直流電圧を適当な変化
率で立上げるように設定することにより、タービ
ン発電機出力立上げと直流送電系統の起動時負荷
立上げとの協調が図られるので、初負荷時の周波
数動揺を抑えることができる。
Next, a method for operating the initial load on a power plant system according to the present invention will be described. In FIG. 4, the generator turbine G is started up as described in FIG. 3 and reaches its rated speed. Thereafter, a command is given to the steam control valve operation control device 1 to adjust the openings of the steam control valve V C and the steam bypass valve V B shown in FIG. 3, and to issue an operation signal for applying an initial load. A command signal or operation signal for the initial load operation is obtained from the operation control device 1. On the other hand, when the steam control valve V C and the steam bypass valve V B are controlled by the initial load operation signal and the steam flow rate to the turbine T increases,
Turbine T and turbine generator G in no-load state
is accelerated, and the output frequency of the turbine generator G increases. For this reason, the primary side voltage of the converter transformer C/Tr (AC bus voltage may be used) is transferred to the voltage transformer.
The PD detects the output voltage, inputs the output voltage to the frequency detection device 2, determines that the frequency has increased by more than a predetermined value, outputs it, and adds it to the AND gate circuit 3 as one input. Further, as the other input of the AND gate circuit 3, an initial load command signal or an operation signal from the operation control device 1 is applied. Then, on the condition that the AND condition of the AND gate circuit 3 is satisfied, the output is transmitted to the startup control circuit 41 in the control device 4 of the DC power transmission system.
is given as a startup command to start up the DC transmission system, and the limiter circuit 42 controls the DC voltage of the DC transmission system at an appropriate rate of change to maintain the load at a predetermined value (the allowable initial load level of the turbine generator G). ). Therefore, after the initial load operation of the turbine T, it is detected that the output frequency of the turbine generator G begins to increase, that is, this appears as a change in the output of the turbine T and the turbine generator G, and the DC transmission system , so there is no need to worry about the timing of starting the DC transmission system. In addition, the load change of the DC transmission system, which is brought up to a predetermined value at the time of startup, is controlled by the operation control circuit 43 in consideration of the initial load permissible level and response characteristics of the turbine T and turbine generator G. By setting the DC current level and setting the DC voltage to rise at an appropriate rate of change in the limiter circuit 42, coordination between the turbine generator output rise and the start-up load of the DC transmission system can be achieved. Therefore, frequency fluctuations at the time of initial load can be suppressed.

第5図は、以上の説明をタイムチヤート図にて
示したものである。図において、Pdcは直流送電
系統の送電電力、PGはタービン発電機出力電力、
ΔFは定格周波数に対する周波数偏差を示し、
Δsは第4図における周波数検出装置2の設定レ
ベルを意味している。つまり、本図は初負荷操作
後、タービン発電機出力周波数が定格値からΔs
増加したとき、周波数検出装置2が動作して出力
され、直流送電系統が起動されて、タービン発電
機出力周波数の変化が抑えられることを示してい
る。
FIG. 5 shows the above explanation in the form of a time chart. In the figure, Pdc is the transmitted power of the DC transmission system, P G is the turbine generator output power,
ΔF indicates the frequency deviation from the rated frequency,
Δs means the set level of the frequency detection device 2 in FIG. In other words, this figure shows that after the initial load operation, the turbine generator output frequency is Δs from the rated value.
When the frequency increases, the frequency detection device 2 operates to output an output, and the DC power transmission system is activated, indicating that the change in the turbine generator output frequency is suppressed.

このように、タービンTおよびタービン発電機
Gを備えた発電所PSの発生電力を直流送電系統
のみにて送電するようにした系統で、無負荷運転
状態またはそれに近い運転状態にある発電所PS
のタービン発電機Gに直流送電系統を起動して系
統初負荷をとらせる場合において、上記発電所
PSの交流母線または直流送電系統の送電端側変
換所交流母線の周波数を検出し該周波数が所定値
以上上昇したことを判定して出力する周波数検出
装置2を備え、初負荷操作のため蒸気制御弁類の
操作制御装置1に指令して発電機タービンTの蒸
気加減弁VSおよび蒸気バイパス弁VBを操作する
と共に該指令信号または操作信号を得て、上記
発電機タービンTが初負荷をかける操作に入りか
つ上記タービン発電機出力周波数が所定値以上上
昇したことを条件に上記直流送電系統の制御装置
4に指令して直流送電系統を起動し、上記タービ
ン発電機Gの許容初負荷レベルまで該直流送電系
統の負荷を直流電圧の立上がりを制御することに
より適当な変化率で立上げるようにして発電所の
タービン発電機Gの初負荷操作を行なうようにし
たものである。
In this way, in a system in which the power generated by a power station PS equipped with a turbine T and a turbine generator G is transmitted only through the DC transmission system, a power station PS that is in a no-load operating state or an operating state close to it is
In the case where the turbine generator G of
Equipped with a frequency detection device 2 that detects the frequency of the AC bus of the PS or the AC bus of the power transmission end converter station of the DC transmission system, determines that the frequency has increased by a predetermined value or more, and outputs the output, and steam control for initial load operation. The valve operation control device 1 is commanded to operate the steam control valve V S and the steam bypass valve V B of the generator turbine T, and the command signal or operation signal is obtained so that the generator turbine T receives the initial load. On the condition that the turbine generator output frequency has increased by a predetermined value or more, the controller 4 of the DC power transmission system is commanded to start the DC power transmission system, and the permissible initial load level of the turbine generator G is set. By controlling the rise of the DC voltage, the load on the DC power transmission system is increased at an appropriate rate of change, and the initial load operation of the turbine generator G of the power plant is performed.

第6図は本発明の他の実施例構成を示すもので
ある。図において、41′は起動制御回路、4
2′は直流送電系統の制御装置4の中の起動リミ
ツター制御回路等起動時に直流電圧の立上げを制
御するリミツター回路、43′は、直流送電系統
の運転制御回路を示し、その他の要素については
第4図と同様である。
FIG. 6 shows the structure of another embodiment of the present invention. In the figure, 41' is a starting control circuit;
2' is a start limiter control circuit in the control device 4 of the DC power transmission system, etc., which controls the rise of the DC voltage at startup, 43' is the operation control circuit of the DC power transmission system, and other elements are as follows. It is similar to FIG.

つまり、本方法は第6図において、タービンの
蒸気制御弁類の操作制御装置1からの初負荷操作
指令信号または操作信号を得て、起動制御回路
41に与え直流送電系統を零力率運転状態、つま
り所定の直流電流を流し、直流電圧は零で運転し
ている状態で起動する。かかる状態では、タービ
ン発電機Gは有効電力を供給する必要はない。し
かる後、タービン発電機出力周波数が増加し始
め、そのことを系統電圧信号を入力とする周波
数検出装置2で検出し、アンドゲート3を介して
リミツター回路42に指令し、直流電圧をあらか
じめ設定された適当な変化率で、すなわちタービ
ン発電機Gの出力電力立上り特性と協調して直流
電圧を立上げ、直流送電系統送電電力を立上げ
て、タービン発電機Gに初負荷(有効電力負荷)
をかけるような方法である。
That is, in this method, in FIG. 6, an initial load operation command signal or operation signal is obtained from the operation control device 1 for the steam control valves of the turbine, and is applied to the startup control circuit 41 to bring the DC power transmission system into a zero power factor operating state. In other words, it is started with a predetermined DC current flowing and the DC voltage being zero. In such a situation, turbine generator G does not need to supply active power. Thereafter, the turbine generator output frequency begins to increase, which is detected by the frequency detection device 2 which receives the grid voltage signal as input, and a command is sent to the limiter circuit 42 via the AND gate 3 to set the DC voltage to the preset value. The DC voltage is increased at an appropriate rate of change, that is, in coordination with the output power rise characteristics of the turbine generator G, the DC power transmission system is increased, and the initial load (active power load) is applied to the turbine generator G.
This is a method similar to applying .

このようなタービンTおよびタービン発電機G
を備えた発電所PSの発生電力を直流送電系統の
みにて送電するようにした系統で、無負荷運転状
態またはそれに近い運転状態にある発電所PSの
タービン発電機Gに直流送電系統を起動して系統
初負荷をとらせる場合において、上記発電所PS
の交流母線または直流送電系統の送電端側変換所
交流母線の周波数を検出し該周波数が所定以上上
昇したことを判定して出力する周波数検出装置2
を備え、初負荷操作のため蒸気制御弁類の操作制
御装置1に指令して発電機タービンTの蒸気加減
弁VSおよび蒸気バイパス弁VBを操作すると共に
該指令信号または操作信号を得て、上記発電機
タービンTに初負荷をかけるための操作を加える
と共に上記直流送電系統の制御装置4に指令して
直流送電系統を零力率運転状態で起動し、上記タ
ービン発電機出力周波数が所定値以上上昇したこ
とを条件に上記制御装置4に指令して直流送電系
統の直流送電電圧を上記タービン発電機出力電力
の立上がり特性と協調して制御することにより負
荷を適当な変化率で立上げるようにして発電所の
初負荷操作を行なうようにしたものである。
Such a turbine T and a turbine generator G
In a system in which the generated power of a power plant PS equipped with When the initial load is taken on the system, the above power station PS
A frequency detection device 2 that detects the frequency of an AC bus or an AC bus at a power transmission end conversion station of a DC transmission system, determines that the frequency has increased by a predetermined value, and outputs the result.
and commands the steam control valve operation control device 1 to operate the steam control valve V S and steam bypass valve V B of the generator turbine T for initial load operation, and obtains the command signal or operation signal. , adds an operation to apply an initial load to the generator turbine T, and also instructs the control device 4 of the DC transmission system to start the DC transmission system in a zero power factor operating state, so that the output frequency of the turbine generator is set to a predetermined value. On the condition that the voltage has increased by more than the specified value, the controller 4 is commanded to control the DC transmission voltage of the DC transmission system in coordination with the rise characteristic of the turbine generator output power, thereby starting up the load at an appropriate rate of change. In this way, the initial load operation of the power plant is performed.

尚、上記第4図,第6図において周波数検出装
置2は、周波数偏差レベル検出方式を用いたもの
であるが、これに限らず周波数絶対値検出方式で
も或いは周波数変化率検出方式を用いるようにし
てもよいことはもちろんのことである。また、上
記第6図においては初負荷操作指令信号または操
作信号を起動制御回路41にその起動指令とし
て与えるようにしたが、この起動指令として手動
操作指令または適当な操作指令を発電所の初負荷
操作前に起動制御回路41に与え、直流送電系統
を零力率運転状態にて起動するようにしてもよい
ものである。
Although the frequency detection device 2 in FIGS. 4 and 6 above uses a frequency deviation level detection method, it is not limited to this, and may also use a frequency absolute value detection method or a frequency change rate detection method. Of course, it is possible. In addition, in FIG. 6 above, the initial load operation command signal or operation signal is given to the startup control circuit 41 as the startup command, but as this startup command, a manual operation command or an appropriate operation command is given to the initial load of the power plant. It may be applied to the startup control circuit 41 before operation to start the DC power transmission system in a zero power factor operating state.

その他、本発明はその要旨を変更しない範囲
で、種々に変形して実施することができる。
In addition, the present invention can be implemented with various modifications without changing the gist thereof.

以上説明したように本発明によれば、長時間零
力率運転能力を有さない直流送電用交直変換器を
適用した直流送電系統を起動して発電所のタービ
ン発電機の周波数動揺を抑えて安全かつ安定に系
統初負荷をかけることができる信頼性の高い発電
所の初負荷操作方法が提供できる。
As explained above, according to the present invention, it is possible to suppress frequency fluctuations of a turbine generator in a power plant by starting a DC power transmission system to which an AC/DC converter for DC power transmission, which does not have long-term zero power factor operation capability, is applied. It is possible to provide a highly reliable initial load operation method for a power plant that can safely and stably apply an initial load to the system.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は一般的な交直連系系統を示す概要図、
第2図は従来技術による欠点を説明するためのタ
イムチヤート図、第3図は本発明の考え方を示す
概念図、第4図は本発明の一実施例を示すブロツ
ク図、第5図は本発明の作用を説明するためのタ
イムチヤート図、第6図は本発明の他の実施例を
示すブロツク図である。 1……操作制御装置、2……周波数検出装置、
3……アンドゲート回路、4……直流送電系統の
制御装置、41,41′……起動制御回路、42,
42′……リミツター回路、43,43′……運転
制御回路。
Figure 1 is a schematic diagram showing a general AC/DC interconnection system.
Fig. 2 is a time chart for explaining the drawbacks of the prior art, Fig. 3 is a conceptual diagram showing the concept of the present invention, Fig. 4 is a block diagram showing an embodiment of the present invention, and Fig. 5 is a diagram of the present invention. FIG. 6 is a time chart diagram for explaining the operation of the invention, and FIG. 6 is a block diagram showing another embodiment of the invention. 1... Operation control device, 2... Frequency detection device,
3...AND gate circuit, 4...DC transmission system control device, 41, 41'...Start control circuit, 42,
42'... Limiter circuit, 43, 43'... Operation control circuit.

Claims (1)

【特許請求の範囲】 1 タービン発電機を備えた発電所の発生電力を
直流送電系統のみにて送電するようにした系統
で、無負荷運転状態またはそれに近い運転状態に
ある発電所のタービン発電機に直流送電系統を起
動して系統初負荷をとらせる場合において、前記
発電所の交流母線または直流送電系統の送電端側
変換所交流母線の周波数または周波数偏差を検出
し該周波数が所定値以上上昇したことまたは増加
方向に変化していることを判定して出力する周波
数検出装置を備え、初負荷操作のため蒸気制御弁
類の操作制御装置に指令して発電機タービンの蒸
気加減弁および蒸気バイパス弁を操作すると共に
該指令信号または操作信号を得て、前記発電機タ
ービンが初負荷をかける操作に入りかつ前記ター
ビン発電機出力周波数が所定値以上上昇したこと
または増加方向に変化していることを条件に前記
直流送電系統の制御装置に指令して直流送電系統
を起動し、前記タービン発電機の許容初負荷レベ
ルまで該直流送電系統の負荷を直流電圧の立上が
りを制御することにより適当な変化率で立上げる
ようにして行なうことを特徴とする発電所の初負
荷操作方法。 2 タービン発電機を備えた発電所の発生電力を
直流送電系統のみにて送電するようにした系統
で、無負荷運転状態またはそれに近い運転状態に
ある発電所のタービン発電機に直流送電系統を起
動して系統初負荷をとらせる場合において、前記
発電所の交流母線または直流送電系統の送電端側
変換所交流母線の周波数または周波数偏差を検出
し該周波数が所定値以上上昇したことまたは増加
方向に変化していることを判定して出力する周波
数検出装置を備え、初負荷操作のため蒸気制御弁
類の操作制御装置に指令して発電機タービンの蒸
気加減弁および蒸気バイパス弁を操作すると共に
該指令信号または操作信号を得て、前記発電機タ
ービンに初負荷をかけるための操作を加えると共
に前記直流送電系統の制御装置に指令して直流送
電系統を零力率運転状態で起動し、前記タービン
発電機出力周波数が所定値以上上昇したことまた
は増加方向に変化していることを条件に前記制御
装置に指令して直流送電系統の直流送電々圧を前
記タービン発電機出力電力の立上がり特性と協調
して制御することにより負荷を適当な変化率で立
上げるようにして行なうことを特徴とする発電所
の初負荷操作方法。 3 手動操作指令または適当な操作指令を発電所
の初負荷操作前に与え直流送電系統を零力率運転
状態にて起動するようにしたものである特許請求
の範囲第2項記載の発電所の初負荷操作方法。
[Claims] 1. A turbine generator of a power plant that is in a no-load operating state or an operating state close to it in a system in which the generated power of a power plant equipped with a turbine generator is transmitted only through a DC transmission system. When starting up the DC transmission system to take the initial load on the system, detect the frequency or frequency deviation of the AC bus of the power plant or the AC bus of the transmission end converter station of the DC transmission system, and the frequency increases by a predetermined value or more. Equipped with a frequency detection device that determines whether the change has occurred or is changing in an increasing direction and outputs an output, which instructs the steam control valve operation control device for initial load operation to control the steam control valve and steam bypass of the generator turbine. When the valve is operated and the command signal or operation signal is obtained, the generator turbine enters an operation to apply an initial load, and the turbine generator output frequency increases by more than a predetermined value or changes in an increasing direction. Start the DC transmission system by instructing the control device of the DC transmission system under the condition that An initial load operation method for a power plant characterized by starting up at a certain rate. 2 In a system in which the power generated by a power plant equipped with a turbine generator is transmitted only through the DC transmission system, the DC transmission system is activated to the turbine generator of the power plant that is in a no-load operation state or a similar operating state. When the initial load is taken on the system, the frequency or frequency deviation of the AC bus of the power plant or the AC bus of the transmission end side converter of the DC transmission system is detected, and the frequency is determined to be higher than a predetermined value or in an increasing direction. It is equipped with a frequency detection device that determines and outputs a frequency change, and for initial load operation, it commands the operation control device of the steam control valves to operate the steam control valve and steam bypass valve of the generator turbine. Obtaining a command signal or an operation signal, performs an operation to apply an initial load to the generator turbine, and also instructs the control device of the DC transmission system to start the DC transmission system in a zero power factor operating state, and Under the condition that the generator output frequency has increased by more than a predetermined value or is changing in an increasing direction, the control device is commanded to coordinate the DC power transmission voltage of the DC power transmission system with the rise characteristics of the turbine generator output power. An initial load operation method for a power plant, characterized in that the load is started up at an appropriate rate of change by controlling the load. 3. The power plant according to claim 2, wherein a manual operation command or an appropriate operation command is given before the initial load operation of the power plant to start the DC transmission system in a zero power factor operating state. Initial load operation method.
JP56190112A 1981-11-27 1981-11-27 Initial load operating method for power generation plant Granted JPS5893430A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP56190112A JPS5893430A (en) 1981-11-27 1981-11-27 Initial load operating method for power generation plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56190112A JPS5893430A (en) 1981-11-27 1981-11-27 Initial load operating method for power generation plant

Publications (2)

Publication Number Publication Date
JPS5893430A JPS5893430A (en) 1983-06-03
JPS6322132B2 true JPS6322132B2 (en) 1988-05-10

Family

ID=16252572

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56190112A Granted JPS5893430A (en) 1981-11-27 1981-11-27 Initial load operating method for power generation plant

Country Status (1)

Country Link
JP (1) JPS5893430A (en)

Also Published As

Publication number Publication date
JPS5893430A (en) 1983-06-03

Similar Documents

Publication Publication Date Title
JP5216181B2 (en) Wind park driving method
US5761895A (en) Transient load controller for gas turbine power generator
US10972029B2 (en) Method for operating a wind turbine
JPS64899B2 (en)
JPS6146799B2 (en)
JPS6322132B2 (en)
JPH0278704A (en) Steam turbine control system by output feedback
JPS6322133B2 (en)
JPS58112475A (en) Starting system for ac/dc converter
JPS6345815Y2 (en)
JPH0335481B2 (en)
JPH0126254B2 (en)
JPH0623683Y2 (en) Controller for power plant equipped with co-firing boiler
JPH0795730A (en) Inverter for power system interconnection
JPH08308234A (en) Controller of AC / DC converter
JPS6111444Y2 (en)
JPS6238936B2 (en)
JPH0159823B2 (en)
JPH04236132A (en) Method for controlling operation of loadleveling device
JPS5833928A (en) Ac/dc converter starting system
JPS5820225B2 (en) Protection device for thyristor rectifier
JPS6193210A (en) Load control device for single-shaft combined cycle power generation plant
JPH0724477B2 (en) Induction motor drive inverter device
JPS5989523A (en) Starting system for dc sole transmission system
JPS5851123B2 (en) Turbine generator control device