JPS6323117B2 JP16370080A JP16370080A JPS6323117B2 JP S6323117 B2 JPS6323117 B2 JP S6323117B2 JP 16370080 A JP16370080 A JP 16370080A JP 16370080 A JP16370080 A JP 16370080A JP S6323117 B2 JPS6323117 B2 JP S6323117B2
Authority
JP
Japan
Prior art keywords
rope
stay
block
stay rope
jib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP16370080A
Other languages
Japanese (ja)
Other versions
JPS5790385A (en
Inventor
Haruo Komatsu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Harima Heavy Industries Co Ltd
Priority to JP16370080A priority Critical patent/JPS5790385A/en
Publication of JPS5790385A publication Critical patent/JPS5790385A/en
Publication of JPS6323117B2 publication Critical patent/JPS6323117B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【発明の詳細な説明】 本発明は例えばクレーンのジブを空中で組み立
てて行くときのステーロープのかけ換え方法及び
装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method and apparatus for changing stay ropes when, for example, a crane jib is assembled in the air.

ジブを地上で予め組み立ててクレーン旋回体に
取り付けることができないような場所、例えば山
岳地帯等でクレーン本体にジブを取り付ける場合
は、ケーブルクレーンを利用して空中でジブを運
びクレーン本体に取り付けることが考えられてい
る。
When attaching the jib to the crane body in locations where it is not possible to pre-assemble the jib on the ground and attach it to the crane revolving body, such as in mountainous areas, it is possible to use a cable crane to carry the jib in the air and attach it to the crane body. It is considered.

ところが、ジブは組み立てられると大重量にな
るため、通常のケーブルクレーンでは運搬し得ら
れない。そのため、ジブをケーブルクレーンで運
搬できる重量のブロツクとし、ブロツクを単体で
運び空中で組み付けて行く方法が考えられる。
However, once assembled, the jib is so heavy that it cannot be transported using a regular cable crane. Therefore, one possible method is to make the jib a heavy block that can be transported by a cable crane, and to transport the block alone and assemble it in the air.

この方法によると、ジブのブロツク同志を空中
で連結するが、ブロツクが数個連結されると、ジ
ヨイント部の強度のみでは支え切れなくなるた
め、ステーロープが張つてステーロープで支持さ
せてやる必要がある。この場合、ブロツクの継ぎ
足し長さが長くなつて行くに従いステーロープを
張らねばならないため、ステーロープのかけ換え
の必要がある。
According to this method, the blocks of the jib are connected in the air, but when several blocks are connected, the strength of the joints alone cannot support them, so the stay ropes are stretched and it is necessary to support them with the stay ropes. be. In this case, as the length of the block increases, the stay ropes must be tightened, so it is necessary to replace the stay ropes.

本発明は、かかるステーロープのかけ換えを容
易、迅速、確実に行うことを目的としてなしたも
ので、構造物のブロツクを空中ジヨイントする際
に該ブロツクに装着したステーロープの先端を、
ウインチに巻いたワイヤロープで連結ブラケツト
を介し支持し、ブロツクをジヨイント後ウインチ
によりブロツクを引寄せた後固定のステーロープ
を前記連結ブラケツトに連結し、次にワイヤロー
プを繰出し固定ステーロープを介してブロツクを
支持した後前記ワイヤロープを前記連結ブラケツ
トより外してステーロープのかけ換えを行うこと
を特徴とするステーロープかけ換え方法及び装置
に係るものである。
The present invention was made for the purpose of easily, quickly and reliably changing the stay ropes, and when a block of a structure is jointed in the air, the tip of the stay rope attached to the block
A wire rope wound around a winch is used to support the block through a connecting bracket, and after the block is jointed, the block is pulled together by the winch, a fixed stay rope is connected to the connecting bracket, and then the wire rope is let out and passed through the fixed stay rope. This invention relates to a method and apparatus for replacing stay ropes, characterized in that after supporting a block, the wire rope is removed from the connection bracket and the stay ropes are replaced.

以下、本発明の実施例を図面を参照して説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

第1図及び第2図は本発明の装置の概略的説明
図を示すもので、クレーン本体の頂部フレーム1
の上端面左右両側部に、ブラケツト2をそれぞれ
固定し、該各ブラケツト2の前面にステーロープ
用ブラケツト3を左右方向へ首振自在に且つ上下
に別々に取り付けると共に、上記左右のブラケツ
ト3よりも内側に複数個の頂部シーブ4を取り付
ける。上記ステーロープ用ブラケツト3には、後
述するステーロープの連結が変えられる連結ブラ
ケツト5に先端がピンにて連結されるようにした
ステーロープ6の末端を、上下方向に回動自在に
取り付け、又両端にアーム8をピン9にて取り付
けると共に複数のシーブ10を取り付け且つアー
ム8の先端に前記連結ブラケツト5をピン11に
て着脱自在に取り付け得るようにしてある吊ビー
ム7を用意し、クレーンのもつウインチ(例えば
起伏ウインチ)あるいは別に設けたウインチ12
に巻いた左右別々のワイヤロープ13を、前記頂
部シーブ4にかけて吊ビーム7のシーブ10と上
記頂部シーブ4間に第3図の如くかけた後、クレ
ーン本体に固定のロープガイド14を経て各ワイ
ヤロープ13の端同志を結着させ、ウインチ12
によりワイヤロープ13を巻き込むことにより吊
ビーム7が頂部シーブ4側へ引き寄せられるよう
にする。前記連結ブラケツト5は、例えば、三角
形状の板状部材で、3個所にピンの差込み孔5a
を有してなる構成としてあり、1つの孔5aには
前記吊ビーム7のアーム8先端のピン11が差込
まれ、他の孔5aには前記ステーロープ6先端の
ピン15が差込まれ、残りの孔5aには別のステ
ーロープ16の先端のピン17が差込まれる関係
になつており、ステーロープ16と吊ビーム7の
連結状態(第2図の二点鎖線の状態)から、ステ
ーロープ6先端を連結ブラケツト5に連結して吊
ビーム7のピン11を外すことによりステーロー
プ16がステーロープ6との連結にかけ換えられ
るようにしてある。
1 and 2 are schematic explanatory diagrams of the device of the present invention, and show the top frame 1 of the crane body.
Brackets 2 are respectively fixed to the left and right sides of the upper end surface, and stay rope brackets 3 are separately attached to the front of each bracket 2 so as to be swingable in the left and right direction and up and down. A plurality of top sheaves 4 are attached inside. Attached to the stay rope bracket 3 is the end of a stay rope 6 whose tip is connected with a pin to a connection bracket 5, which will be described later, to change the connection of the stay rope, so as to be rotatable in the vertical direction. A suspension beam 7 is prepared, on which an arm 8 is attached to both ends with pins 9 and a plurality of sheaves 10 are attached, and the connecting bracket 5 can be detachably attached to the tip of the arm 8 with a pin 11. A winch (for example, a luffing winch) or a separate winch 12
Separate left and right wire ropes 13 are wrapped around the top sheave 4 and are placed between the sheave 10 of the suspension beam 7 and the top sheave 4 as shown in FIG. Tie the ends of the rope 13 together and connect the winch 12
By winding the wire rope 13, the suspension beam 7 is pulled toward the top sheave 4 side. The connection bracket 5 is, for example, a triangular plate-like member, and has three pin insertion holes 5a.
The pin 11 at the tip of the arm 8 of the suspension beam 7 is inserted into one hole 5a, and the pin 15 at the tip of the stay rope 6 is inserted into the other hole 5a. A pin 17 at the tip of another stay rope 16 is inserted into the remaining hole 5a, and the stay rope 16 and the hanging beam 7 are connected from the connected state (the state indicated by the two-dot chain line in FIG. 2) to the stay rope 16. By connecting the tip of the rope 6 to the connecting bracket 5 and removing the pin 11 of the hanging beam 7, the stay rope 16 can be replaced with the stay rope 6.

尚、左右別々の上記ステーロープ16の末端
は、ブロツクとしてあるジブ体18に装着される
ジブ据付用部材19の左右両側に別々に上下方向
へ回動自在に結着されている。20は巻上シーブ
である。
The ends of the left and right stay ropes 16 are separately tied to the left and right sides of a jib installation member 19 attached to a jib body 18 so as to be rotatable in the vertical direction. 20 is a hoisting sheave.

上記構成としてあるので、例えば、今、第4図
の如く、ジブ体18に装着されたジブ据付用部材
19に結着してあるステーロープ16が、連結ブ
ラケツト5を介して吊ビーム7のアーム8の先端
につながれている状態では、ジブ体18及びこれ
まで継ぎ足されている全ジブ体18の重量はジブ
据付用部材19、ステーロープ16、吊ビーム
7、ワイヤロープ13を介して支えられる。この
状態から更に継ぎ足されて行くジブ体の支持のた
めステーロープ16をかけ換える場合は、ウイン
チ12を駆動させてワイヤロープ13を巻き込
み、連結ブラケツト5にステーロープ6の先端が
連結できるまでジブ体を起立させる。次いで予め
準備されているステーロープ6の先端を連結ブラ
ケツト5の余つている孔5aに第5図の如くピン
15を差し込む。しかる後、ワイヤロープ13を
少し繰り出し、ステーロープ6が直線状に張られ
たところでウインチ12を停止させ、且つ吊ビー
ム7のアーム8先端のピン11を連結ブラケツト
5より離脱させ(第6図参照)、ステーロープ6
と16で支持させる。
With the above configuration, for example, as shown in FIG. 8, the weight of the jib body 18 and all the jib bodies 18 that have been joined up to now is supported via the jib installation member 19, the stay rope 16, the hanging beam 7, and the wire rope 13. If the stay rope 16 is to be changed from this state to support additional jib bodies, the winch 12 is driven to reel in the wire rope 13, and the jib body is moved until the tip of the stay rope 6 can be connected to the connection bracket 5. stand up. Next, the tip of the stay rope 6 prepared in advance is inserted into the remaining hole 5a of the connecting bracket 5 with a pin 15 as shown in FIG. After that, the wire rope 13 is let out a little, the winch 12 is stopped when the stay rope 6 is stretched in a straight line, and the pin 11 at the tip of the arm 8 of the hanging beam 7 is released from the connection bracket 5 (see Fig. 6). ), stay rope 6
and 16 to support it.

次に、適数のジブ体18が順次空中ジヨイント
され、ジブ据付用部材19の装着されているジブ
体18が空中でジヨイントされると、このジブ据
付用部材19に結着してあるステーロープ16の
先端に予め連結された連結ブラケツト5に吊ビー
ム7のアーム8先端をピン11にて結合し、前記
操作を繰り返して頂部フレーム1側のステーロー
プ6との連結にかけ換える。
Next, an appropriate number of jib bodies 18 are sequentially jointed in the air, and when the jib body 18 to which the jib installation member 19 is attached is jointed in the air, the stay rope attached to this jib installation member 19 is The end of the arm 8 of the hanging beam 7 is connected to the connecting bracket 5, which has been connected in advance to the end of the stay rope 16, using the pin 11, and the above operation is repeated to change the connection to the stay rope 6 on the top frame 1 side.

この際、組み立てられるジブの長さによりジブ
の1個所をステーロープで支えれば充分な場合
は、前記かけ換え要領において先に支持用として
張つたステーロープは取り外し、又ジブが長いと
きは必要な2個所をステーロープで支持させるよ
うにする。この場合は、頂部フレーム1側のステ
ーロープ6は2本必要となる。又ブロツクとした
個々のジブ体18の重量は予めわかつているの
で、何個のジブ体を空中ジヨイントすればステー
ロープのかけ換えの必要があるかは事前にわかつ
ている事柄である。
At this time, if it is sufficient to support one part of the jib with a stay rope due to the length of the jib to be assembled, remove the stay rope that was previously tensioned for support in the above replacement procedure. The two locations should be supported by stay ropes. In this case, two stay ropes 6 on the top frame 1 side are required. Furthermore, since the weight of each block of jib bodies 18 is known in advance, it is known in advance how many jib bodies must be jointed in the air to replace the stay rope.

次に、上記したかけ換え要領でジブ体を順次空
中ジヨイントでジブの組立ての一例を第7図A〜
Hについて説明する。
Next, an example of how to assemble the jib using the above-mentioned replacement procedure using an aerial joint is shown in Figure 7A~
Let us explain about H.

先ず、ブロツクとした根本のジブ体A1をケー
ブルクレーンで吊つて来てクレーン本体の旋回フ
レーム21に起伏自在に取り付け、ジブ体A1
先端側を旋回フレーム21のジブ受台22上に置
いた木材23に載せる(第7図A)。次に第2乃
至第4のジブ体A2〜A4をケーブルクレーンで空
中ジヨイントし(第7図B)、第4ジブ体A4に取
り付けられているジブ据付用部材19に連結した
第1のステーロープ16a先端の連結ブラケツト
5に、吊ビーム7のアーム8先端をピンにて連結
してステーロープ16aをかけ、ウインチ12を
駆動させてワイヤロープ13を巻き込み、ステー
ロープ16a及びワイヤロープ13でジブの支持
を行わせる(第7図C)。更にこの状態でワイヤ
ロープ13を巻き込んでステーロープ16aを、
頂部フレーム1側のステーロープ6にかけ換え
る。このかけ換え操作は、前記した第4図乃至第
6図の要領と同じである。
First, the base jib body A1 , which is a block, is lifted by a cable crane and attached to the swing frame 21 of the crane body so that it can be raised and lowered freely, and the tip side of the jib body A1 is placed on the jib cradle 22 of the swing frame 21. Place it on the wooden piece 23 (Fig. 7A). Next, the second to fourth jib bodies A2 to A4 are jointed in the air using a cable crane (Fig. 7B), and the first jib body connected to the jib installation member 19 attached to the fourth jib body A4 is Connect the end of the arm 8 of the suspension beam 7 with a pin to the connecting bracket 5 at the end of the stay rope 16a, hang the stay rope 16a, drive the winch 12 to wind in the wire rope 13, and then connect the stay rope 16a and the wire rope 13. to support the jib (Fig. 7C). Furthermore, in this state, the wire rope 13 is wound around the stay rope 16a,
Replace it with the stay rope 6 on the top frame 1 side. This switching operation is the same as that shown in FIGS. 4 to 6 described above.

次に、第5、第6ジブA5,A6をケーブルクー
ンで吊つてそれぞれ空中ジヨイントし(第7図
D)、第6ジブ体A6に取り付けたジブ据付用部材
19に結着してある第2のステーロープ16b
を、前記ステーロープ16aから切り離した吊ビ
ーム7のアーム8先端にかける。この要領は第7
図Cの場合と同様である。次いでワイヤロープ1
3を巻き込んで、既にこれまでジブの支持をして
いたステーロープ6,16aを緩め、且つ頂部フ
レーム1側の別のステーロープ6に第6ジブ体
A6からのステーロープ16bとかけ換える(第
7図E)。次に、緩められたステーロープ6,1
6aを取り外す。
Next, the fifth and sixth jibs A 5 and A 6 are suspended by cable cranes and jointed in the air (Fig. 7D), and tied to the jib installation member 19 attached to the sixth jib body A 6 . A certain second stay rope 16b
is hung on the tip of the arm 8 of the suspension beam 7 separated from the stay rope 16a. This point is the seventh
This is the same as in Figure C. Then wire rope 1
3, loosen the stay ropes 6, 16a that have been supporting the jib up to now, and attach the sixth jib body to another stay rope 6 on the top frame 1 side.
Replace with the stay rope 16b from A6 (Fig. 7E). Next, the loosened stay ropes 6, 1
Remove 6a.

更に同様にして第7乃至第10のジブ体A7,A8
A9,A10をそれぞれ空中ジヨイントし(第7図
F)、第10のジブ体A10のジブ据付用部材19に
取り付けた第3のステーロープ16cの先端の連
結ブラケツト5に吊ビーム7のアーム8先端をピ
ンにて連結して該ステーロープ16cをかけ、更
に前記と同様な操作で頂部フレーム1側のステー
ロープ6に上記第3のステーロープ16cとかけ
換えるが、第2のステーロープ16bはそのまま
取り付けておく(第7図G)。しかる後、ジブ体
A11,A12を空中ジヨイントしてジブの組み立て
を完了し(第7図H)、吊ビーム7の如きジブ組
み立てに用いた部材を解体し、起伏ワイヤロー
プ、巻上ワイヤロープをかける。
Furthermore, in the same manner, the seventh to tenth jib bodies A 7 , A 8 ,
A 9 and A 10 are jointed in the air (Fig. 7F), and the hanging beam 7 is attached to the connecting bracket 5 at the tip of the third stay rope 16c attached to the jib installation member 19 of the tenth jib body A 10. Connect the tips of the arms 8 with pins and hang the stay rope 16c, and then replace the stay rope 6 on the top frame 1 side with the third stay rope 16c by the same operation as described above, except that the second stay rope 16b is attached as is (Fig. 7G). After that, the jib body
A 11 and A 12 are jointed in the air to complete the assembly of the jib (Fig. 7H), the members used for assembling the jib such as the hanging beam 7 are dismantled, and the undulating wire rope and hoisting wire rope are applied.

以上本発明を説明したが、吊ビーム7は左右を
一体につなぐことなく別体としてもよい。又本発
明はステーロープのかけ換えのある構造物、例え
ば橋梁等にも使用可能である。
Although the present invention has been described above, the suspension beam 7 may be formed as a separate body without connecting the left and right sides together. The present invention can also be used in structures where stay ropes are replaced, such as bridges.

以上述べた如く、本発明によれば、ステーロー
プのかけ換えを連結ブラケツトを介して行うの
で、非常に簡単に且つ迅速に行うことができると
共に、かけ換えが確実であり、従つて、限られた
ポイント部分にステーロープをかけかえさせるこ
とができる。
As described above, according to the present invention, since the stay ropes are replaced via the connecting bracket, the stay ropes can be replaced very easily and quickly, and the replacement is reliable. The stay rope can be replaced at the fixed point.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の装置の説明用側面図、第2図
は第1図の平面図、第3図は吊ビームに対するワ
イヤロープのかけ方を示す説明図、第4図乃至第
6図は本発明のステーロープのかけ換え要領を示
す平面図、第7図A乃至Hはジブの組立順序を示
す説明図である。 1…頂部フレーム、2,3…ブラケツト、5…
連結ブラケツト、6…ステーロープ、7…吊ビー
ム、12…ウインチ、13…ワイヤロープ、1
6,16a,16b,16c…ステーロープ、1
8…ジブ体、19…ジブ据付用部材。
FIG. 1 is an explanatory side view of the device of the present invention, FIG. 2 is a plan view of FIG. FIGS. 7A to 7H are plan views showing how to replace the stay ropes of the present invention, and are explanatory diagrams showing the order of assembling the jib. 1...Top frame, 2, 3...Bracket, 5...
Connection bracket, 6... Stay rope, 7... Hanging beam, 12... Winch, 13... Wire rope, 1
6, 16a, 16b, 16c...stay rope, 1
8... Jib body, 19... Jib installation member.

Claims (1)

【特許請求の範囲】 1 構造物のブロツクを空中ジヨイントする際に
該ブロツクに装着したステーロープの先端を、ウ
インチに巻いたワイヤロープで連結ブラケツトを
介し支持し、ブロツクをジヨイント後ウインチに
よりブロツクを引寄せた後固定のステーロープを
前記連結ブラケツトに連結し、次にワイヤロープ
を繰出し固定ステーロープを介しブロツクを支持
した後前記ワイヤロープを前記連結ブラケツトよ
り外してステーロープのかけ換えを行うことを特
徴とするステーロープかけ換え方法。 2 クレーンの頂部フレームにシーブを設けると
共に、複数本のステーロープを取り付け吊ビーム
に設けたシーブと前記頂部フレームのシーブとの
間にウインチより繰出したワイヤロープを掛回し
て吊ビームを前記頂部フレーム側に保持せしめ、
且つ構造物のブロツクに支持させたステーロープ
の先端と前記頂部フレーム側ステーロープの先端
及び吊ビームを着脱自在に結合可能な少なくとも
3つのピン差込孔を有し、吊ビームとブロツク側
ステーロープとの連結又は頂部フレーム側ステー
ロープとブロツク側ステーロープとの連結を可能
とする連結ブラケツトを備えてなることを特徴と
するステーロープかけ換え装置。
[Claims] 1. When a block of a structure is jointed in the air, the tip of a stay rope attached to the block is supported via a connecting bracket with a wire rope wound around a winch, and after the block is jointed, the block is moved by the winch. After pulling the block, the fixed stay rope is connected to the connection bracket, and then the wire rope is fed out to support the block via the fixed stay rope, and then the wire rope is removed from the connection bracket to replace the stay rope. A stay rope replacement method featuring: 2. A sheave is provided on the top frame of the crane, and a plurality of stay ropes are attached. A wire rope fed out from a winch is routed between the sheave provided on the suspension beam and the sheave on the top frame, and the suspension beam is attached to the top frame. hold it to the side,
It also has at least three pin insertion holes that can detachably connect the tip of the stay rope supported by the block of the structure, the tip of the stay rope on the top frame side, and the suspension beam, and the suspension beam and the stay rope on the block side. 1. A stay rope changing device characterized by comprising a connection bracket that enables connection with a top frame side stay rope and a block side stay rope.
JP16370080A 1980-11-20 1980-11-20 Method and apparatus for replacing stay rope Granted JPS5790385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16370080A JPS5790385A (en) 1980-11-20 1980-11-20 Method and apparatus for replacing stay rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16370080A JPS5790385A (en) 1980-11-20 1980-11-20 Method and apparatus for replacing stay rope

Publications (2)

Publication Number Publication Date
JPS5790385A JPS5790385A (en) 1982-06-05
JPS6323117B2 true JPS6323117B2 (en) 1988-05-14

Family

ID=15778946

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16370080A Granted JPS5790385A (en) 1980-11-20 1980-11-20 Method and apparatus for replacing stay rope

Country Status (1)

Country Link
JP (1) JPS5790385A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61110690U (en) * 1984-12-22 1986-07-12

Also Published As

Publication number Publication date
JPS5790385A (en) 1982-06-05

Similar Documents

Publication Publication Date Title
JP5693031B2 (en) Assembly method of mobile lift crane
CN101186266A (en) Crane
CN106103332A (en) For the system and method that crane suspension is connected on support column
JP2004075294A (en) Jib strut self-assembling method for tower crane
JP6638434B2 (en) Crane boom mounting method
JPH10102823A (en) Derrick device for replacing arm of power transmission tower and method of replacing arm using this
CN106414305A (en) Adjustable length tensioning member
JP2855014B2 (en) Disassembled jib crane
JP6969281B2 (en) Crane and crane disassembly method
JP4011659B2 (en) How to hang back tension wire rope in luffing jib back tension device
JP3009375B2 (en) Jib attachment / detachment device for crane beam
JPS6323117B2 (en)
JP3571424B2 (en) Luffing jib back tension device
JP3399356B2 (en) crane
JP2547044B2 (en) Jib loading and unloading method and device in crane
WO2016017512A1 (en) Crane
JP7136143B2 (en) Crane upper spreader retraction method and crane upper spreader retraction device
JP7163607B2 (en) Crane and crane assembly method
JP7224189B2 (en) Crane and wiring method
JP6658020B2 (en) Crane and crane assembling method
JPH07291587A (en) Tower crane
JPH1160167A (en) Tower crane
JPS6323118B2 (en)
JPH10120371A (en) Bridle moving device
JP2008303004A (en) Winding drum wire winding method at crane installation