JPS6355582B2 - - Google Patents
Info
- Publication number
- JPS6355582B2 JPS6355582B2 JP23703883A JP23703883A JPS6355582B2 JP S6355582 B2 JPS6355582 B2 JP S6355582B2 JP 23703883 A JP23703883 A JP 23703883A JP 23703883 A JP23703883 A JP 23703883A JP S6355582 B2 JPS6355582 B2 JP S6355582B2
- Authority
- JP
- Japan
- Prior art keywords
- right corner
- bolts
- vertical grooves
- columns
- appropriate intervals
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000009415 formwork Methods 0.000 claims description 21
- 239000000463 material Substances 0.000 claims description 14
- 238000010276 construction Methods 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Landscapes
- Revetment (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Description
【発明の詳細な説明】
本発明は防波堤等の水中コンクリート工法に関
するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an underwater concrete construction method for breakwaters and the like.
従来、水中コンクリート工法においては陸上で
水中部分の型枠を事前に製作し、クレーンにて水
中に沈設した後にコンクリートを型枠内に打設す
る方法がとられている。しかし、型枠を水中に沈
設する場合に波浪の影響を受け易く、海底の定位
置に沈設、設置が困難であり、また型枠全体が波
浪でもつて破損し易い等の欠点があつた。 Conventionally, in the underwater concrete construction method, a formwork for the underwater part is prepared in advance on land, the formwork is lowered into the water by a crane, and then concrete is poured into the formwork. However, when the formwork is submerged in water, it is susceptible to the effects of waves, making it difficult to sink and install it in a fixed position on the seabed, and the formwork as a whole is easily damaged by waves.
本発明は、上記諸欠点を解消する目的において
陸上で組立てた型枠支柱を水中に沈設固定し、各
支柱の相互にパネル型枠を挿入して水中で型枠を
組設した後にコンクリートを打設する様になした
水中コンクリート工法であつて、波浪の影響が少
なく、大きな型枠の組立も自由で、潜水士による
作業も危険が少なく、型枠の解体も容易である等
を特徴とするものである。 In order to solve the above-mentioned drawbacks, the present invention has been developed by submerging and fixing formwork columns assembled on land in water, inserting panel formwork between each support column, and pouring concrete after assembling the formwork underwater. It is an underwater concrete construction method that is designed to create concrete structures, and is characterized by being less affected by waves, allowing for free assembly of large formwork, less dangerous work by divers, and easy dismantling of formwork. It is something.
以下、実施用例図を引例しながら本発明の構成
を説明する。 Hereinafter, the structure of the present invention will be explained with reference to the drawings showing examples of the present invention.
1方側と背面との2方面に縦溝1,1を設けた
左右隅支柱2,2′を適当間隔をおいて立設し、
該左右隅支柱2,2′の間隔に、両側面に縦溝1,
1を設けた前部中間支柱3を規定間隔をおいて立
設し、各前部中間支柱3並びに左右隅支柱2,
2′の前面に上下適当間隔をおいて前部連結部材
4をボルトでもつて任意数着脱自在に固締し、左
右隅支柱2,2′の背面方向に、縦溝1,1を前
後方向となした側部中間支柱3′を規定間隔をお
いて立設し、各左右側部中間支柱3′並びに左右
隅支柱2,2′の外面に上下適当間隔をおいて左
右連結部材4′をボルトでもつて着脱自在に固締
し、左右対向した各側部中間支柱3′,3′の対向
面に上下適当間隔をおいて間隔保持材5を連設し
てボルトで着脱自在に固締し、各前部連結部材4
並びに左右連結部材4′,4′等にステー6を交差
状に着脱自在に張設した支柱枠材7を組設し、海
岸等に構築したコンクリート体8の前面に支柱枠
材7の背面を嵌合させながら支柱枠材7を海底に
沈下定着させ、支柱枠材7の前部並びに両側部に
おいて左右隅支柱2,2′や前部中間支柱3並び
に側部中間支柱3′の相互の対向面の縦溝1,1
内に型枠パネル9を任意数段嵌挿してボルトでも
つて各支柱に着脱自在に係止した後に内部にコン
クリートを充填して固化させ、コンクリートが固
化した後に型枠パネル9を取外して支柱枠材7を
移動させるべくなして成るものである。 Left and right corner supports 2, 2' with vertical grooves 1, 1 on two sides, one side and the back, are erected at appropriate intervals,
A vertical groove 1,
1 are installed at specified intervals, and each front intermediate column 3 and left and right corner columns 2,
2', a desired number of front connecting members 4 are fixed with bolts at appropriate intervals vertically and detachably. The left and right side intermediate struts 3' are erected at specified intervals, and the left and right connecting members 4' are bolted to the outer surfaces of the left and right side intermediate struts 3' and the left and right corner struts 2, 2' at appropriate vertical intervals. and fix it removably with bolts, and spacer retaining members 5 are arranged in series at appropriate intervals vertically on the opposing surfaces of the left and right opposing intermediate supports 3', 3', and are removably fastened with bolts. Each front connecting member 4
In addition, a support frame material 7 with stays 6 removably stretched across the left and right connecting members 4', 4', etc. is assembled, and the back surface of the support support frame material 7 is attached to the front surface of a concrete body 8 constructed on the coast or the like. While fitting, the column frame material 7 is lowered and fixed on the seabed, and the left and right corner columns 2, 2', the front intermediate column 3, and the side intermediate column 3' are opposed to each other at the front and both sides of the column frame material 7. Vertical grooves 1, 1 on the surface
After inserting any number of formwork panels 9 into the interior and removably locking them to each support with bolts, the inside is filled with concrete and hardened. After the concrete has hardened, the formwork panels 9 are removed and the support frame is assembled. It is made to move the material 7.
つぎに、実施例図により本発明の作用効果を説
明する。 Next, the effects of the present invention will be explained with reference to embodiment figures.
本発明になる水中コンクリート工法において
は、支柱枠材7を陸上で組立した後にクレーン等
で吊り下げながらコンクリート体8の前面等に嵌
合定着させるもので、支柱枠材7の沈下定着中に
は波浪の影響もなく、支柱がゆれることなく容易
に定着し得ると共に、型枠パネルを装着していな
いため形状の割には軽量で危険度も低いものであ
る。そして、海底に定着した支柱の相対向した縦
溝1,1内に型枠パネル9の両端の嵌合突条を上
端より嵌合させてスライドさせながら任意数段積
層し、そして各支柱に装着したボルトでもつて型
枠パネル9の嵌合突条を係止して内部にコンクリ
ートを打設するものである。コンクリートの側圧
は型枠パネル9自体でも耐え得るため、間隔保持
材5が少なくてよく、型枠パネル9の挿入とコン
クリートの打設作業とを並行してなし得るために
打設継目が出来ず、波浪の影響が少ないために工
期を大巾に短縮し得るものであり、コンクリート
が固化した後には型枠パネル9を抜き取りすると
共に、側部中間支柱3′,3′と隔保持材5とを連
結したボルトを抜き取りした後に支柱枠材7をク
レーンで吊り上げて更に前部へと移動して再び海
水中に定着してゆくものであり、水中コンクリー
ト工法における省力化を企図し得る等、前記した
様な顕著な諸効果を奏するものである。 In the underwater concrete construction method of the present invention, the support frame material 7 is assembled on land and then fitted and fixed to the front surface of the concrete body 8 while being suspended by a crane or the like. It is not affected by waves and can be easily fixed without shaking the support, and because it does not have formwork panels, it is lightweight considering its shape and has a low risk of danger. Then, the fitting protrusions at both ends of the formwork panel 9 are fitted into the opposing vertical grooves 1, 1 of the pillars fixed on the seabed from the upper end, and stacked in any number of layers while sliding, and then attached to each pillar. The fitted bolts are used to lock the fitting protrusions of the formwork panel 9, and concrete is poured inside. Since the lateral pressure of the concrete can be withstood by the formwork panel 9 itself, the number of spacing members 5 can be reduced, and since the insertion of the formwork panel 9 and the concrete pouring work can be done in parallel, there is no need to create a pouring joint. , because the influence of waves is small, the construction period can be greatly shortened, and after the concrete has hardened, the formwork panel 9 is removed, and the side intermediate supports 3', 3' and the spacing material 5 are removed. After removing the bolts that connected the support frame 7, the support frame material 7 is lifted up by a crane, moved further to the front, and fixed in seawater again, which can be used to save labor in the underwater concrete method, etc. It has many remarkable effects.
第1図は本発明工法の実施を示した平面図、第
2図はその右側面図、第3図は型枠パネルの正面
図、第4図はその平面図、第5図は組立した型枠
の一部拡大平面図である。
1……縦溝、2,2′……左右隅支柱、3,
3′……中間支柱、4,4′……連結部材、5……
間隔保持材、6……ステー、7……支柱枠材、8
……コンクリート体、9……型枠パネル。
Fig. 1 is a plan view showing the implementation of the method of the present invention, Fig. 2 is a right side view thereof, Fig. 3 is a front view of the formwork panel, Fig. 4 is a plan view thereof, and Fig. 5 is an assembled mold. FIG. 3 is a partially enlarged plan view of the frame. 1... Vertical groove, 2, 2'... Left and right corner supports, 3,
3'... Intermediate support, 4, 4'... Connecting member, 5...
Spacing material, 6... Stay, 7... Support frame material, 8
...Concrete body, 9...Formwork panel.
Claims (1)
隅支柱を適当間隔をおいて立設し、両側面に縦溝
を設けた前部中間支柱を左右隅支柱の間隔に任意
数立設し、該前部中間支柱並びに左右隅支柱の前
面に上下適当間隔をおいて前部連結部材をボルト
でもつて着脱自在に連設し、左右隅支柱の背面方
向に縦溝を前後方向となした側部中間支柱を任意
数立設し、該側部中間支柱並びに左右隅支柱の外
面に上下適当間隔をおいて左右連結部材をボルト
でもつて着脱自在に連設し、左右対向した各側部
中間支柱の対向面に上下適当間隔をおいて間隔保
持材をボルトで着脱自在に連設した支柱枠材を組
設し、海岸等に構築したコンクリート体の前面に
支柱枠材の背面を嵌合させて海底に沈下定着し、
該支柱枠材の各支柱の間隔において相対向した縦
溝内に型枠パネルを嵌挿してボルトでもつて係止
した後に内部にコンクリートを充填固化すること
を特徴として成る、水中コンクリート工法。1 Left and right corner posts with vertical grooves on two sides, one side and the back, are erected at appropriate intervals, and an arbitrary number of front middle posts with vertical grooves on both sides are placed between the left and right corner posts. The front intermediate pillar and the left and right corner pillars are vertically erected, and the front connecting members are removably connected with bolts at appropriate intervals vertically in front of the front intermediate pillar and the left and right corner pillars, and vertical grooves are formed in the backs of the left and right corner pillars in the front-rear direction. An arbitrary number of side intermediate columns are erected, and left and right connecting members are removably connected with bolts at appropriate intervals vertically on the outer surfaces of the side intermediate columns and left and right corner columns, and each of the left and right opposing sides Assemble a support frame material with interval retaining materials removably attached using bolts at appropriate intervals vertically on the opposing surface of the middle support column, and fit the back side of the support frame material to the front of a concrete body constructed on the coast, etc. Together they sink and settle on the ocean floor,
An underwater concrete construction method characterized by inserting formwork panels into vertical grooves facing each other at intervals between the columns of the support frame material and locking them with bolts, and then filling and hardening concrete inside.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23703883A JPS60129359A (en) | 1983-12-14 | 1983-12-14 | Underwater concrete construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23703883A JPS60129359A (en) | 1983-12-14 | 1983-12-14 | Underwater concrete construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60129359A JPS60129359A (en) | 1985-07-10 |
| JPS6355582B2 true JPS6355582B2 (en) | 1988-11-02 |
Family
ID=17009472
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23703883A Granted JPS60129359A (en) | 1983-12-14 | 1983-12-14 | Underwater concrete construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60129359A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4547081B2 (en) * | 2000-10-06 | 2010-09-22 | 明星産商株式会社 | Immersion sealed container |
| JP4918187B2 (en) * | 2000-10-06 | 2012-04-18 | リスパック株式会社 | Packaging container comprising a container body and a lid |
-
1983
- 1983-12-14 JP JP23703883A patent/JPS60129359A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60129359A (en) | 1985-07-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2032803C1 (en) | Formwork for walls erection | |
| DE69022604T2 (en) | Process for the manufacture of underwater structures. | |
| CN107002376A (en) | Floating gate or island and method of manufacture | |
| US3166037A (en) | Flotation and structural units and building structures | |
| US20180202120A1 (en) | Boat dock and method of installation | |
| JPS6355582B2 (en) | ||
| JPS6322910A (en) | Pile vertical leg-type structure and its construction | |
| JPH0860900A (en) | Constructing method of fence and fence | |
| US5050290A (en) | Process for manufacturing of a lost casing from modular frames | |
| JPH056601B2 (en) | ||
| JP2915135B2 (en) | Caisson and its manufacturing method | |
| JPS6355583B2 (en) | ||
| JPH02296915A (en) | Construction method for steel pipe pile head connection part | |
| KR100320071B1 (en) | An assembling - form upright breakwater equiped with artificial nests for fish | |
| JPH0674590B2 (en) | Block for building legal framework and method for building legal framework | |
| JP2000212969A (en) | Caisson footing of honeycomb structure | |
| JPS60129361A (en) | Extension controller of mold frame support for underwater concrete | |
| JPS605063Y2 (en) | floating structure | |
| JP3841496B2 (en) | Manufacturing method for fish reef with window | |
| JPS5850860Y2 (en) | floating fish reef | |
| LU87620A1 (en) | LAMINATED STEEL-CONCRETE SUPPORT CONSTRUCTION, METHOD FOR REALIZING THE SAME AND PRECAST STEEL CONCRETE PART, SHUTTER BENCH AND METHOD FOR THE PRODUCTION OF PRE-STEEL CONCRETE PRECAST PARTS, E.g. | |
| JP2004339809A (en) | Mounting form for concrete structure | |
| JPH0319732Y2 (en) | ||
| BE1006458A6 (en) | Shuttering construction system | |
| JPH0427333B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |