JPS6356383B2 JP4195583A JP4195583A JPS6356383B2 JP S6356383 B2 JPS6356383 B2 JP S6356383B2 JP 4195583 A JP4195583 A JP 4195583A JP 4195583 A JP4195583 A JP 4195583A JP S6356383 B2 JPS6356383 B2 JP S6356383B2
Authority
JP
Japan
Prior art keywords
gondola
sky
tank
pump barrel
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP4195583A
Other languages
Japanese (ja)
Other versions
JPS59170366A (en
Inventor
Masanori Kokubu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Harima Heavy Industries Co Ltd
Priority to JP4195583A priority Critical patent/JPS59170366A/en
Publication of JPS59170366A publication Critical patent/JPS59170366A/en
Publication of JPS6356383B2 publication Critical patent/JPS6356383B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 本発明は、ポンプバレル及びリード管をタンク
内へ安全にしかも短期間で組立てる方法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for safely and quickly assembling a pump barrel and lead pipe into a tank.

例えばLNG、LPG等を貯蔵する大型の低温タ
ンク内にポンプバレル及びリード管を据付け、組
立てる場合、従来は、先ずタンク内に総足場を組
み、しかる後ポンプバレル及びリード管の据付
け、組立て作業を行い、該作業が終了した後で総
足場の解体を行つていた。
For example, when installing and assembling a pump barrel and lead pipe in a large low-temperature tank that stores LNG, LPG, etc., conventionally, the entire scaffolding was first constructed inside the tank, and then the pump barrel and lead pipe were installed and assembled. After the work was completed, the entire scaffolding was dismantled.

しかし、上述の作業方法にあつては、総足場の
組立て、解体に時間が掛かつて工期が長くなり、
しかも総足場上での作業は勿論総足場の組立て、
解体作業は、危険で安全性の低い作業であつた。
However, in the case of the above-mentioned work method, it takes time to assemble and dismantle the scaffolding, which increases the construction period.
Moreover, not only work on the scaffolding but also assembly of the scaffolding,
Demolition work was dangerous and unsafe work.

本発明は上述の観点に鑑み、総足場を不要に
し、短かい工期で安全にポンプバレル及びリード
管の組立てを行えるようにした方法を提供するこ
とを目的としてなしたものであり、所定の長さに
形成した複数のポンプバレル及びリード管をタン
ク外に設けたクレーンにより順次吊つてタンク屋
根開口部よりタンク内へ搬入し、各ポンプバレル
を水平部材により連結して前記タンク屋根に固定
し、前記クレーンにより前記タンク屋根開口部か
らタンク内に搬入したスカイゴンドラを前記ポン
プバレルに沿い昇降し得るよう配設し、スカイゴ
ンドラに作業員が乗ると共にスカイゴンドラを昇
降させ、ポンプバレル高さ方向へ所要の間隔で作
業員が手作業によりスカイゴンドラから水平部材
を取付けてポンプバレル同志を接続し、作業員が
スカイゴンドラに乗つて前記高さ方向へ所定の間
隔で取付けた水平部材に足場パイプを吊下げ、該
足場パイプに足場板を掛け渡し、該足場板からサ
ポートを前記ポンプバレルとリード管に取付けて
ポンプバレルとリード管を接続することを特徴と
するものである。
In view of the above-mentioned viewpoints, the present invention has been made with the object of providing a method that eliminates the need for scaffolding and enables safe assembly of pump barrels and lead pipes in a short construction period. A plurality of pump barrels and lead pipes formed in the same manner are sequentially suspended by a crane provided outside the tank and carried into the tank through the tank roof opening, and each pump barrel is connected by a horizontal member and fixed to the tank roof, A sky gondola carried into the tank through the tank roof opening by the crane is arranged so that it can be raised and lowered along the pump barrel, and as a worker gets on the sky gondola, the sky gondola is raised and lowered in the direction of the height of the pump barrel. A worker manually attaches horizontal members from the sky gondola at required intervals to connect the pump barrels, and a worker rides the sky gondola and attaches scaffolding pipes to the horizontal members attached at predetermined intervals in the height direction. The present invention is characterized in that the pump barrel is suspended, a scaffold board is spanned over the scaffold pipe, and a support is attached to the pump barrel and the lead pipe from the scaffold board to connect the pump barrel and the lead pipe.

以下、本発明の実施例を図面を参照しつつ説明
する。
Embodiments of the present invention will be described below with reference to the drawings.

第1図中1はタンク、2は屋根、3は吊りデツ
キ、4は屋根2の鉄骨に固着された吊りピースで
ある。
In FIG. 1, 1 is a tank, 2 is a roof, 3 is a hanging deck, and 4 is a hanging piece fixed to the steel frame of the roof 2.

作業に際しては、予めタンク1の外で所定の長
さに作成してある複数のポンプバレル5、及びリ
ード管6をタンク1外にあるクレーンにより例え
ば1本ずつ吊つて屋根2の開口部よりタンク1内
に搬入し、タンク1底板上に設置してある支持台
7に仮置きし、ポンプバレル5相互の間隔を決め
た後高さ調整のうえポンプバレル5の吊りデツキ
3の直上部及び支持台7の直上部の部分に第2図
及び第3図に示すごとく水平材8,9を固着し、
しかる後ポンプバレル5を屋根2に固定する。
During the work, a plurality of pump barrels 5 and lead pipes 6, which have been prepared in advance to a predetermined length outside the tank 1, are hung one by one using a crane outside the tank 1, and the tank is opened through an opening in the roof 2. 1, temporarily placed it on the support stand 7 installed on the bottom plate of the tank 1, and after determining the mutual spacing between the pump barrels 5, adjusted the height, and then placed the pump barrel 5 directly above the hanging deck 3 and the support. As shown in FIGS. 2 and 3, horizontal members 8 and 9 are fixed to the part directly above the stand 7,
After that, the pump barrel 5 is fixed to the roof 2.

前記クレーンにより複数のスカイゴンドラ10
を順次吊下げて屋根2上方開口部よりタンク1内
に搬入し、スカイゴンドラ10に搭載したウイン
チにより巻取り及び繰出しを行い得るようにした
ワイヤーロープ11の一端を前記吊りピース4に
固定し、スカイゴンドラ10のウインチにより該
ゴンドラ10がポンプバレル5に沿い昇降し得る
ようにする。スカイゴンドラ10の配置は平面的
には、例えば第4図のようにする。
The crane carries a plurality of sky gondolas 10
are sequentially suspended and carried into the tank 1 through the upper opening of the roof 2, and one end of the wire rope 11 is fixed to the hanging piece 4 so as to be able to be wound up and let out by a winch mounted on the sky gondola 10, A winch of the sky gondola 10 allows the gondola 10 to move up and down along the pump barrel 5. The sky gondola 10 is arranged as shown in FIG. 4, for example, in a plan view.

スカイゴンドラ10を昇降可能にタンク1内に
配設したら、水平材12をスカイゴンドラ10に
搭載すると共に作業員がスカイゴンドラ10に乗
り、スカイゴンドラ10を昇降させて水平材12
をスカイゴンドラ10を足場として各ポンプバレ
ル5に手作業で取付ける(第3図参照)。水平材
12は通常は下方から上方へ向けて取付ける。又
水平材12の重量のいかんによつては水平材12
はスカイゴンドラ10に搭載せず、タンク底板に
設置した図示してない別のウインチにより所定位
置に停止しているスカイゴンドラ10に吊下げる
ようにしても良い。
Once the sky gondola 10 is arranged in the tank 1 so that it can be raised and lowered, the horizontal member 12 is loaded onto the sky gondola 10, and a worker gets on the sky gondola 10 and lifts and lowers the sky gondola 10 to remove the horizontal member 12.
are manually attached to each pump barrel 5 using the sky gondola 10 as a scaffold (see Figure 3). The horizontal member 12 is normally installed from the bottom to the top. Also, depending on the weight of the horizontal member 12, the horizontal member 12
may not be mounted on the sky gondola 10, but may be suspended from the sky gondola 10 stopped at a predetermined position by another winch (not shown) installed on the tank bottom plate.

一方、リード管6は本実施例の場合、ポンプバ
レル5により形成される三角形状の区域の真中に
あるため、リード管6のポンプバレル5に対する
サポート13,14(第5図参照)の取付け及び
中間サポート15(第6図参照)の取付けは、ス
カイゴンドラ10から行うことができない。この
ため、作業員がスカイゴンドラ10に乗つたまま
例えば第7図に示すように前記水平材12等に吊
り足場のチエーン16を介して足場パイプ17を
吊下げ、該足場パイプ17にリード管6を包囲す
るよう足場板18を掛け渡して固定するか、水平
材12等の上にリード管6を包囲するよう直線足
場板を掛け渡して固定する等し、これら足場を利
用してサポート13,14、中間サポート15等
の取付けを行う。
On the other hand, in this embodiment, since the lead pipe 6 is located in the middle of the triangular area formed by the pump barrel 5, the supports 13 and 14 (see FIG. 5) are attached to the lead pipe 6 and the pump barrel 5. The intermediate support 15 (see FIG. 6) cannot be attached from the sky gondola 10. For this purpose, while riding the sky gondola 10, the worker suspends the scaffold pipe 17 from the horizontal member 12 etc. via the chain 16 of the suspended scaffold, as shown in FIG. Scaffolding boards 18 are stretched over and fixed to surround the lead pipe 6, or straight scaffolding boards are stretched over the horizontal members 12 and the like to surround the lead pipe 6. 14. Attach the intermediate support 15, etc.

ポンプバレル5の水平材間に固着する斜材19
の取付けは、スカイゴンドラ10を下降させて上
から順に下へ向けて行う。
Diagonal members 19 fixed between the horizontal members of the pump barrel 5
The installation is performed by lowering the sky gondola 10 and working downward from the top.

ポンプバレル5の周囲に螺旋状に配設される内
部階段20を設置する場合には、先ず第8図に示
すごとく、プラツトホーム21を前記タンク底板
上に設置したウインチにより吊下げてスカイゴン
ドラ10から取付け作業を行い、プラツトホーム
21を第9図に示すごとく複数個取付けたら、ウ
インチにより階段22を吊り、該階段22の上下
端をプラツトホーム21に乗せ、作業員がプラツ
トホームに乗つて階段22をプラツトホーム21
に固定する。内部階段の取付けは、通常は上方か
ら下方へ向けて行う。
When installing the internal staircase 20 spirally arranged around the pump barrel 5, first, as shown in FIG. 8, the platform 21 is suspended from the sky gondola 10 by a winch installed on the tank bottom plate. After the installation work is carried out and a plurality of platforms 21 are installed as shown in FIG. 9, the stairs 22 are suspended using a winch, the upper and lower ends of the stairs 22 are placed on the platform 21, and the worker gets on the platform and lifts the stairs 22 onto the platform 21.
Fixed to. The installation of internal stairs is usually carried out from the top to the bottom.

その他の付属品も適宜、前記スカイゴンドラや
足場に乗つて取付け作業を行う。所定の据付け作
業が終了したら、スカイゴンドラ10により容易
且つ迅速に解体し、又支持台7も作業の所定の段
階で撤去する。
Other accessories are also installed on the sky gondola or scaffolding, as appropriate. When the predetermined installation work is completed, it is easily and quickly dismantled by the sky gondola 10, and the support stand 7 is also removed at a predetermined stage of the work.

なお、本発明は、LNG、LPG等の低温タンク
だけではなく、種々のタンクに適用可能であるこ
と、その他、本発明の要旨を逸脱しない範囲内で
種々変更を加え得ること、等は勿論である。
It goes without saying that the present invention is applicable not only to low-temperature tanks such as LNG and LPG, but also to various other tanks, and that various other changes may be made without departing from the gist of the present invention. be.

本発明のポンプバレル及びリード管の組立方法
によれば、スカイゴンドラと足場を利用してポン
プバレル及びリード管の取付けが可能となり、総
足場が不要となるため、危険のない迅速な作業が
可能となり、従つて安全性が向上し工期の短縮を
図ることができる、等種々の優れた効果を奏し得
る。
According to the method for assembling the pump barrel and lead pipe of the present invention, the pump barrel and lead pipe can be installed using the sky gondola and scaffolding, eliminating the need for any scaffolding, allowing for quick work without danger. Therefore, various excellent effects can be achieved, such as improving safety and shortening the construction period.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明のポンプバレル及びリード管の
組立方法の説明図、第2図は本発明の組立方法に
おいてポンプバレルを据付ける場合の説明図、第
3図は同ポンプバレルに水平材を取付ける場合の
説明図、第4図は同スカイゴンドラの配置状態を
示す説明図、第5図は同ポンプバレルにリード管
をサポートさせる場合の説明図、第6図は同ポン
プバレルの水平材にリード管の中間サポートを取
付ける場合の説明図、第7図は同中間サポート取
付け用の吊り足場の説明図、第8図はポンプバレ
ルに内部階段のプラツトホームを取付ける場合の
説明図、第9図はプラツトホーム間に階段を取付
ける場合の説明図である。 図中1はタンク、2は屋根、5はポンプバレ
ル、6はリード管、8,9は水平材、10はスカ
イゴンドラ、12は水平材、13,14はサポー
ト、17は足場パイプ、18は足場板を示す。
Fig. 1 is an explanatory diagram of the pump barrel and lead pipe assembly method of the present invention, Fig. 2 is an explanatory diagram of the case where the pump barrel is installed in the assembling method of the present invention, and Fig. 3 is an explanatory diagram of the pump barrel with a horizontal member. Figure 4 is an explanatory diagram showing the arrangement of the sky gondola, Figure 5 is an explanatory diagram when the lead pipe is supported by the pump barrel, and Figure 6 is an explanatory diagram showing the arrangement of the sky gondola. Figure 7 is an illustration of the hanging scaffold for attaching the lead pipe intermediate support, Figure 8 is an illustration of the installation of the internal staircase platform to the pump barrel, and Figure 9 is an illustration of the installation of the internal staircase platform to the pump barrel. FIG. 3 is an explanatory diagram of a case where stairs are installed between platforms. In the figure, 1 is a tank, 2 is a roof, 5 is a pump barrel, 6 is a lead pipe, 8 and 9 are horizontal members, 10 is a sky gondola, 12 is a horizontal member, 13 and 14 are supports, 17 is a scaffolding pipe, and 18 is Scaffolding board shown.

Claims (1)

【特許請求の範囲】[Claims] 1 所定の長さに形成した複数のポンプバレル及
びリード管をタンク外に設けたクレーンにより順
次吊つてタンク屋根開口部よりタンク内へ搬入
し、各ポンプバレルを水平部材により連結して前
記タンク屋根に固定し、前記クレーンにより前記
タンク屋根開口部からタンク内に搬入したスカイ
ゴンドラを前記ポンプバレルに沿い昇降し得るよ
う配設し、スカイゴンドラに作業員が乗ると共に
スカイゴンドラを昇降させ、ポンプバレル高さ方
向へ所要の間隔で作業員が手作業によりスカイゴ
ンドラから水平部材を取付けてポンプバレル同志
を接続し、作業員がスカイゴンドラに乗つて前記
高さ方向へ所定の間隔で取付けた水平部材に足場
パイプを吊下げ、該足場パイプに足場板を掛け渡
し、該足場板からサポートを前記ポンプバレルと
リード管に取付けてポンプバレルとリード管を接
続することを特徴とするポンプバレル及びリード
管の組立方法。
1. A plurality of pump barrels and lead pipes formed to a predetermined length are sequentially lifted by a crane installed outside the tank and carried into the tank through the tank roof opening, and the pump barrels are connected by a horizontal member to the tank roof. A sky gondola is carried into the tank through the tank roof opening by the crane and is arranged so that it can be raised and lowered along the pump barrel, and when a worker gets on the sky gondola, the sky gondola is raised and lowered, and the sky gondola is moved up and down the pump barrel. A worker manually attaches horizontal members from the sky gondola at required intervals in the height direction to connect the pump barrels, and a worker rides on the sky gondola and attaches the horizontal members at prescribed intervals in the height direction. A pump barrel and a lead pipe, characterized in that a scaffolding pipe is suspended from the scaffolding pipe, a scaffolding board is hung over the scaffolding pipe, and a support is attached to the pump barrel and the lead pipe from the scaffolding board to connect the pump barrel and the lead pipe. How to assemble.
JP4195583A 1983-03-14 1983-03-14 Assembling of accessories in tank Granted JPS59170366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4195583A JPS59170366A (en) 1983-03-14 1983-03-14 Assembling of accessories in tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4195583A JPS59170366A (en) 1983-03-14 1983-03-14 Assembling of accessories in tank

Publications (2)

Publication Number Publication Date
JPS59170366A JPS59170366A (en) 1984-09-26
JPS6356383B2 true JPS6356383B2 (en) 1988-11-08

Family

ID=12622614

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4195583A Granted JPS59170366A (en) 1983-03-14 1983-03-14 Assembling of accessories in tank

Country Status (1)

Country Link
JP (1) JPS59170366A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3492299B2 (en) 2000-07-28 2004-02-03 松下電器産業株式会社 Vacuum container and display device
JP6497936B2 (en) * 2014-12-26 2019-04-10 川崎重工業株式会社 Nozzle reinforcement structure for low temperature storage tank
JP7356406B2 (en) * 2020-07-22 2023-10-04 鹿島建設株式会社 Bridge construction method and gondola structure

Also Published As

Publication number Publication date
JPS59170366A (en) 1984-09-26

Similar Documents

Publication Publication Date Title
US4738335A (en) Scaffolding system for performing a work on an outer wall surface of a building
US4253549A (en) Method and a system for the erection of high buildings
CN104675171B (en) Construction method for single-piece hoisting of aluminum alloy vault of large vertical storage tank
CN118855211A (en) A method for installing a hanging basket
JPS6356383B2 (en)
CN105951599B (en) High column mould bases integrated construction technique
JP3950800B2 (en) Suspension scaffold
CN207620384U (en) Jack device for discharging
CN220167447U (en) Portable high-altitude safety operation device
CN219059723U (en) Wet joint connection module
JPH09177070A (en) Method and apparatus for constructing rebar cage for deep foundation
JPH10299290A (en) Top removal method and scaffold for removal work of ultra-high tubular structure
CN213832009U (en) Cabin shed pre-outfitting unit
CN104612060B (en) Construction working stand under prefabricated side bar lateral roof
CN212249126U (en) Sliding platform for large-size cornice aluminum plate construction
CN209924407U (en) Combined working platform for steel structure high-altitude installation
JPH04237761A (en) Method for constructing high place facility
CN110409791A (en) Construction method for mounting climbing frame attached wall by utilizing embedded high-strength bolt
CN1081999C (en) Method for assembling canopy in oil station
JPS5846993B2 (en) Method of constructing a steel tower using a lifting crane
JPH035567A (en) Temporary installation method for working suspension scaffold
JPH11117523A (en) Elevating work platform for elevator parking and construction method using it
CN109944428A (en) Combined working platform for high-altitude installation of steel structure and its installation method
JPH06248808A (en) Disassembly method of outside curing coated body
JPS5927817B2 (en) Scaffold erection method