Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6365768B2 - - Google Patents
[go: Go Back, main page]

JPS6365768B2 - - Google Patents

Info

Publication number
JPS6365768B2
JPS6365768B2 JP12140283A JP12140283A JPS6365768B2 JP S6365768 B2 JPS6365768 B2 JP S6365768B2 JP 12140283 A JP12140283 A JP 12140283A JP 12140283 A JP12140283 A JP 12140283A JP S6365768 B2 JPS6365768 B2 JP S6365768B2
Authority
JP
Japan
Prior art keywords
ground
wall
soil
retaining
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP12140283A
Other languages
Japanese (ja)
Other versions
JPS6013110A (en
Inventor
Juko Ikuta
Masao Maruoka
Masamichi Aoki
Takafumi Mitoma
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP12140283A priority Critical patent/JPS6013110A/en
Publication of JPS6013110A publication Critical patent/JPS6013110A/en
Publication of JPS6365768B2 publication Critical patent/JPS6365768B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 この発明は、軟弱地盤における山止め切梁掘削
工法に係り、さらにいえば、山止め壁に囲まれた
地盤中に地盤改良壁を設け、地盤の受働抵抗を高
めたソイルストラツトプレローデイング工法に関
する。
[Detailed Description of the Invention] The present invention relates to a method for excavating a pile sill in soft ground, and more specifically, a soil improvement wall is provided in the ground surrounded by a pile wall to increase the passive resistance of the ground. Regarding soil strut preloading method.

(背景技術) 構造物の基礎や地下室等を構築するため地盤を
掘削するいわゆる根切り工事は、 掘削部位の四周に山止め壁を設けると共にこ
れを内側から支持する切梁、腹起し等を設置し
た山止め切梁工法。
(Background technology) So-called root cutting work, in which the ground is excavated to construct the foundation of a structure or a basement, etc., requires the installation of retaining walls around the excavated area, as well as struts, sills, etc. to support it from the inside. Installed mountain stop beam construction method.

逆打ち躯体等により山崩れを防止しながら所
期の深さまで掘り進むさか打ち工法。
This method uses an inverted concrete structure to prevent landslides while excavating to the desired depth.

等により行なうのが一般的である。This is generally done by, etc.

この場合、掘削によつて起る地盤の不均衡は、
主に山止め壁に作用する土圧、水圧等の主働側側
圧として発生する。
In this case, the ground imbalance caused by excavation is
It mainly occurs as active side pressure such as earth pressure and water pressure that acts on the retaining wall.

ところで、山止め切梁工法において、前記主働
側側圧を支えるのは、第1図に示した腹起し1、
切梁2等である。いま一つは、山止め壁3の根入
れ部の受働抵抗部分の土圧等受働側側圧によるも
のである。
By the way, in the mountain stop beam construction method, what supports the above-mentioned active side pressure is the upright 1 shown in Fig. 1,
It is a strut beam 2nd class. The other reason is due to the passive side pressure such as the earth pressure of the passive resistance part of the embedded part of the retaining wall 3.

従つて、山止めの安定は、上述の釣合いが十分
保たれることによつて実現する。上記力の相互関
係によつて、周辺に起る現象(地盤の沈下、すべ
き等)、及び架構の大小が決つてくる。
Therefore, the stability of the mountain stop is achieved by sufficiently maintaining the above-mentioned balance. The mutual relationship of the above forces determines the phenomena that occur in the surrounding area (ground subsidence, slope, etc.) and the size of the frame.

地盤の安定性が高い場合は、山止めも軽微なも
ので済む。が、安定性が低い場合は、周辺部への
影響も出やすく、山止めもむずかしくなる。特に
後者の場合、根入れ部分の安定性が低いために、
周辺部への影響も出やすく、その対策が重要とな
つてくる。
If the ground is highly stable, only a minor amount of heaping is required. However, if the stability is low, it will easily affect the surrounding areas and it will be difficult to stop the mountain. Especially in the latter case, because the stability of the embedded part is low,
It is also likely to have an impact on surrounding areas, making countermeasures important.

従来、上記の対策として、下記する方法、手段
が採用実施される。
Conventionally, the following methods and means have been adopted and implemented as the above-mentioned countermeasures.

○

Claims (1)

【特許請求の範囲】 1 軟弱地盤における山止め切梁掘削工法におい
て、 山止め壁3に囲まれた地盤6中に、平面形状が
井桁形状もしくは櫛形状もしくは放射形状等の配
置で連続する地盤改良壁4を設け、 各地盤改良壁4と山止め壁3との間を膨脹性地
盤改良柱5により内的反発力を発揮する状態に当
接させ、 しかる後に根切り工事を行なうことを特徴とす
るソイルストラツトプレローデイング工法。
[Scope of Claims] 1. In the method of excavating a retaining beam on soft ground, ground improvement in which the planar shape is continuous in the ground 6 surrounded by the retaining wall 3 in a parallel cross-shaped, comb-shaped, radial shape, etc. A wall 4 is provided, each soil improvement wall 4 and a retaining wall 3 are brought into contact with each other in a state where an internal repulsive force is exerted by an inflatable soil improvement column 5, and then root cutting work is performed. Soil strut preloading method.
JP12140283A 1983-07-04 1983-07-04 Soil strut preloading work Granted JPS6013110A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12140283A JPS6013110A (en) 1983-07-04 1983-07-04 Soil strut preloading work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12140283A JPS6013110A (en) 1983-07-04 1983-07-04 Soil strut preloading work

Publications (2)

Publication Number Publication Date
JPS6013110A JPS6013110A (en) 1985-01-23
JPS6365768B2 true JPS6365768B2 (en) 1988-12-16

Family

ID=14810287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12140283A Granted JPS6013110A (en) 1983-07-04 1983-07-04 Soil strut preloading work

Country Status (1)

Country Link
JP (1) JPS6013110A (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60226917A (en) * 1984-04-26 1985-11-12 Tokyo Electric Power Co Inc:The Underground excavation method
JPS6414425A (en) * 1987-07-07 1989-01-18 Shimizu Construction Co Ltd Landslide protection wall method
JPH0274715A (en) * 1988-09-07 1990-03-14 Kajima Corp Construction method of self-standing retaining wall
FR2642776B1 (en) * 1989-02-07 1992-05-29 Sif Entreprise Bachy FLOOR ELEMENTS WITH RELAXABLE PRE-STRESS AND METHOD OF PERFORMING A SEARCH BY THE MOLDED WALL TECHNIQUE USING THE SAME
JP2536798Y2 (en) * 1993-02-16 1997-05-28 株式会社鈴木商館 Balloon vending machine
JP6460713B2 (en) * 2014-10-10 2019-01-30 株式会社竹中工務店 Construction method of underground beam
CN113700006A (en) * 2021-10-08 2021-11-26 兰州理工大学 Lime nail composite tension-compression anti-floating anchor rod construction process for layered rock and soil
CN117431970B (en) * 2023-12-22 2024-04-09 四川交通职业技术学院 Intelligent supporting device and supporting method for roadbed pit

Also Published As

Publication number Publication date
JPS6013110A (en) 1985-01-23

Similar Documents

Publication Publication Date Title
CN108360547B (en) A bridge composite foundation suitable for deep water and strong earthquake conditions
CN109024662A (en) Method of the anchor pile underpinning without basement building underground space increasing layer
CN108984924A (en) A kind of Design Methods of Anchored Sheet Pile Wall For Supporting applied to the finite width soil body after wall
JPS6365768B2 (en)
CN205975658U (en) Steel platform tower crane foundation
JP2868651B2 (en) Earth retaining method above existing underground structure
CN113293798A (en) Construction method of shallow-buried open-cut tunnel penetrating urban road obliquely
CN216664144U (en) Downward-penetrating tunnel structure for preventing lateral deformation of overpass pile foundation
JPS62215727A (en) Foundation work for structure
JP3921677B2 (en) Seismic isolation structure in soft ground
JP3590842B2 (en) Construction method of self-standing mountain retaining wall
CN114250780A (en) Underpass tunnel structure for preventing lateral deformation of overpass pile foundation and construction method
CN214883816U (en) An anchor pier type transmission line tower foundation structure suitable for goaf
CN110685290B (en) A cofferdam combining permanent structure pile foundation and temporary steel sheet pile and its construction method
CN211973118U (en) A new type of separate frame foundation for suspension bridge gravity anchorage
JP3451934B2 (en) Seismic underground structure of structure
CN113389578A (en) Supporting structure of shallow open cut tunnel that buries
JP7469608B2 (en) Support structure, gravity breakwater and construction method of gravity breakwater
CN219157783U (en) Foundation pit damping supporting structure
CN216615934U (en) A structure for maintaining the lateral pressure balance of the overpass pile foundation during the construction of the underpass tunnel
JP3449279B2 (en) Construction method of underwater substructure
JPH01226921A (en) Earthquake-proof reinforced revetment construction
JP3360061B2 (en) Preceding plate-shaped beam of mountain retaining frame
JP3065228B2 (en) How to build a building foundation
JP3858251B2 (en) Seismic reinforcement structure for structures