JPS6366619B2 - - Google Patents
Info
- Publication number
- JPS6366619B2 JPS6366619B2 JP26347485A JP26347485A JPS6366619B2 JP S6366619 B2 JPS6366619 B2 JP S6366619B2 JP 26347485 A JP26347485 A JP 26347485A JP 26347485 A JP26347485 A JP 26347485A JP S6366619 B2 JPS6366619 B2 JP S6366619B2
- Authority
- JP
- Japan
- Prior art keywords
- isthmus
- bending
- forming
- dovetail
- roll
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000005452 bending Methods 0.000 claims description 69
- 238000000034 method Methods 0.000 claims description 33
- 238000007493 shaping process Methods 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000000465 moulding Methods 0.000 description 19
- 238000010586 diagram Methods 0.000 description 7
- 239000000463 material Substances 0.000 description 6
- 239000002131 composite material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009408 flooring Methods 0.000 description 1
- 230000008707 rearrangement Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Landscapes
- Bending Of Plates, Rods, And Pipes (AREA)
Description
【発明の詳細な説明】
[産業上の利用分野]
この発明は、山と山との間の峡辺部に鳩尾状部
を持つ断面の鋼板成形品を冷間ロール成形により
成形する方法で、例えばビル、橋りよう等の合成
床板として使用されるデツキプレート等の成形に
適用されるロール成形方法である。[Detailed Description of the Invention] [Industrial Application Field] The present invention is a method of forming a steel sheet molded product having a cross section with a dovetail portion in the isthmus between the mountains by cold roll forming, For example, this is a roll forming method applied to forming deck plates used as synthetic floor boards for buildings, bridges, etc.
[従来の技術]
第2図は合成床板に使用されるあるデツキプレ
ートの断面を示す。このデツキプレートは、コン
クリート打設の際に、打設された生コンクリート
を支持するとともに、コンクリートの硬化後はコ
ンクリートと一体になつて合成床板を構成するも
のである。BACKGROUND OF THE INVENTION FIG. 2 shows a cross section of a certain deck plate used in composite flooring. This deck plate supports the poured fresh concrete during concrete pouring, and after the concrete hardens, it is integrated with the concrete to form a composite floor plate.
従来このデツキプレートのように山1と山1と
間の峡辺部2に第3図にも折曲部を拡大して示す
ように鳩尾状部3を持つ断面の鋼板成形品を成形
する方法として、第5図a〜fに示す成形工程図
の成形方法がある。すなわち、
まず、山1を成形する(同図a)。この山1は
中央の山で、第5図a〜fは中央部から右半分を
図示し、成形は左右対称に行う。 Conventionally, like this deck plate, there is a method of forming a steel plate molded product having a cross-section with a dovetail-like part 3 in the isthmus part 2 between the peaks 1 and the bent part is shown in an enlarged view in Fig. 3. There is a molding method shown in the molding process diagrams shown in FIGS. 5a to 5f. That is, first, the mountain 1 is formed (a in the figure). This mountain 1 is the central mountain, and FIGS. 5 a to 5 f show the right half from the center, and the molding is performed symmetrically.
次いで、同図bに示すごとく、峡辺部2となる
べき部分の中央に、鳩尾状部の折曲点位置、すな
わち、上部折曲点位置M、下部折曲点位置Nと同
じ位置に折曲点を持つ角形突部4を峡辺部2の底
辺部分2aが上向き傾斜となるごとく持ち上げた
状態で成形する。持ち上げ状態の底辺部2aの中
央に角形突部4のあるこの断面形状の部分(峡辺
部2の部分)を持ち上げ突部5と仮に称する。 Next, as shown in FIG. A rectangular protrusion 4 having a curved point is formed in a raised state so that the bottom part 2a of the isthmus part 2 is inclined upward. A portion of this cross-sectional shape (a portion of the isthmus portion 2) in which the square protrusion 4 is located at the center of the bottom portion 2a in the lifted state is tentatively referred to as a lifting protrusion 5.
次いで、その外側の山1を成形する(同図c)。 Next, the outer peak 1 is formed (c in the same figure).
以上により所定の最終山ピツチPの2つの山
1,1の間に前記持ち上げ突部5を持つ断面の成
形を終えた後、突き曲げ竪ロールによる突き曲げ
力と、上下水平ロールによる底辺部水平戻しの際
の材料内の作用力とで鳩尾状部を成形する。すな
わち、上下水平ロールスタンド間で、同図d,
e,fに示すごとく、上側の左右の突き曲げ竪ロ
ール6,6、および、下側の片方のみの突き曲げ
竪ロール7により、下側折曲点Nが内に入るよう
に突き曲げて角形突部4の側辺部4bを傾斜さ
せ、上下水平ロール間では、持ち上げ突部5を順
次押し下げていく。この場合、下側の突き曲げ竪
ロール7は、2個配置するスペースはないので、
同図d,e,fに示すごとく交互に配置する。 After completing the forming of the cross section with the lifting protrusion 5 between the two peaks 1, 1 of the predetermined final peak pitch P as described above, the thrust bending force by the vertical thrust rolls and the horizontal bottom part by the upper and lower horizontal rolls are applied. A dovetail is formed by the forces acting within the material during return. In other words, between the upper and lower horizontal roll stands,
As shown in e and f, the upper left and right vertical bending rolls 6, 6 and only one of the lower vertical bending rolls 7 bend the lower bending point N into a square shape. The side part 4b of the protrusion 4 is inclined, and the lifting protrusion 5 is successively pushed down between the upper and lower horizontal rolls. In this case, there is no space to arrange two lower vertical bending rolls 7, so
They are arranged alternately as shown in d, e, and f in the figure.
なお、第5図の成形工程図は主要な成形ロール
のみを表したもので、実際にはさらに多数段の成
形ロールにより成形する。 Note that the forming process diagram in FIG. 5 shows only the main forming rolls, and in reality, the forming process is performed using multiple stages of forming rolls.
[発明が解決しようとする問題点]
上記の鳩尾状部3は、下部折曲点Nが上部折曲
点Mより内側に入り込んで水平ロールによつては
接触し得ないブラインドコーナーをもつものであ
るから、その成形は通常の方法では不可能で、
種々工夫されるところであり、上記従来の成形方
法もその一つである。[Problems to be Solved by the Invention] The above dovetail portion 3 has a blind corner where the lower bending point N goes inside the upper bending point M and cannot come into contact with the horizontal roll. Because of this, it is impossible to mold it using normal methods.
Various methods are being devised, and the above-mentioned conventional molding method is one of them.
上記の成形方法は、鳩尾状部3の曲げ部が比較
的緩やかな曲げ形状であれば問題ないが、急激な
曲げ形状を要求される場合には問題となる。すな
わち、第3図において、鳩尾状部3の曲げ部の奥
行き寸法W、および、高さ寸法Hが小さくて、上
下の折曲点M,Nの間隔が著しく狭く、かつ、曲
げアールRが小さく、かつ、曲げ角度αが90゜よ
りかなり大きな曲げ形状の場合、次のような問題
がある。すなわち、
(i) 第5図d,e,fに図示のごとき竪ロール
6,7の支持機構に充分大きな剛性を持たせる
ことは困難なので、この竪ロール6,7の剛性
不足により、鳩尾状部3の曲げ部に所定の小さ
な曲げアールR、大きな曲げ角度αを確保する
ことが困難である。 The above-mentioned forming method has no problem if the bent portion of the dovetail portion 3 has a relatively gentle bending shape, but it becomes a problem if a sharp bending shape is required. That is, in FIG. 3, the depth dimension W and height dimension H of the bent portion of the dovetail portion 3 are small, the interval between the upper and lower bending points M and N is extremely narrow, and the bending radius R is small. , and in the case of a bent shape in which the bending angle α is considerably larger than 90°, the following problems occur. That is, (i) It is difficult to provide a sufficiently large rigidity to the support mechanism of the vertical rolls 6, 7 as shown in Figures 5d, e, and f. It is difficult to ensure a predetermined small bending radius R and a large bending angle α in the bent portion of the portion 3.
(ii) 下側の突き曲げ竪ロール7は、スペースが狭
いため鳩尾状部3の曲げ部の片方にしか配置で
きず。交互成形となるので、作用力のアンバラ
ンスにより、傾斜角θが大きくなる戻り変形が
生じ、所望の形状に成形することができない。(ii) The lower vertical bending roll 7 can only be placed on one side of the bent portion of the dovetail portion 3 due to the narrow space. Since the molding is performed alternately, the unbalance of the acting force causes return deformation in which the inclination angle θ increases, making it impossible to mold into the desired shape.
(iii) 山が高かつたり、山が鳩尾状部3に接近して
いる断面であると、第6図に示すごとく、上側
の突き曲げ竪ロール6が山に当たり成形不可能
となる。(iii) If the ridges are high or the ridges are close to the dovetail portion 3 in the cross section, the upper vertical bending roll 6 will hit the ridges, making forming impossible, as shown in FIG.
このようなことから、鳩尾状部3の曲げ部に所
定の形状寸法W,H,R,θを確保することが極
めて困難であつた。 For this reason, it has been extremely difficult to ensure the predetermined dimensions W, H, R, and θ in the bent portion of the dovetail portion 3.
本発明は上記背景の下になされたもので、急激
な曲げ形状の鳩尾状部であつても、その所定の寸
法が確保できるロール成形方法を提供することを
目的とする。 The present invention was made against the above background, and an object of the present invention is to provide a roll forming method that can ensure a predetermined dimension even if the dovetail portion has a sharply bent shape.
[問題点を解決するための手段]
本発明では上記問題点を解決するために、第1
図を参照して述べる次の(i)〜(iv)の手順の工程によ
り、山と山との間の峡辺部に鳩尾状部を持つ断面
を成形するものとした。[Means for Solving the Problems] In order to solve the above problems, the present invention provides the first
By the following steps (i) to (iv) described with reference to the drawings, a cross-section with a dovetail-like part was formed in the isthmus between the mountains.
(i) 峡辺部位置の両側に山を成形し、かつ、峡辺
部位置の中央に、鳩尾状部の折曲点位置と同じ
位置に折曲点を持ち、上辺が下に凸の円弧状を
なす角形突部を、峡辺部の底辺部分が下向き傾
斜となるごとく引き下げ状態で成形する工程、
(ii) 峡辺部位置の両側の山の間隔を所定の最終山
ピツチPに保ちつつ、前記角形突部の円弧状に
された上辺を下側のサポートロールにより突き
上げるとともに、引き下げ状態の峡辺部を上下
のフラツトロールにより押し上げ圧下して、そ
の底辺部分を水平に戻す工程。(i) A circle with mountains formed on both sides of the isthmus position, a bending point at the same position as the dovetail bending point in the center of the isthmus position, and whose upper side is convex downward. (ii) forming an arcuate square protrusion by pulling it down so that the bottom part of the isthmus slopes downward; (ii) while maintaining the interval between the peaks on both sides of the isthmus at a predetermined final peak pitch P; , the step of pushing up the arcuate upper side of the rectangular protrusion with a lower support roll, and pushing up and lowering the lowered isthmus part with upper and lower flat rolls to return the bottom part to horizontal.
なお、第1図において、Tは上側の水平ロー
ル、Bは下側の水平ロールを示す。 In FIG. 1, T indicates an upper horizontal roll, and B indicates a lower horizontal roll.
[作用]
角形突部4の上辺4aを下に凸の円弧状に成形
すれば、上側折曲点Mの曲げ角度αが90゜以上と
なる。しかも、この曲げは、充分強い圧下をかけ
られる上下水平ロールによるものであるから、充
分小さな曲げアールRを得ることができる。すな
わち、ブラインドコーナにする以前に、上側の折
曲点M位置における、小さな曲げアールRと90゜
以上の曲げ角度が達成され、後の工程での成形を
容易にする。[Operation] If the upper side 4a of the square protrusion 4 is formed into a downwardly convex arc shape, the bending angle α of the upper bending point M will be 90° or more. Moreover, since this bending is performed by upper and lower horizontal rolls that can apply a sufficiently strong rolling force, a sufficiently small bending radius R can be obtained. That is, a small bending radius R and a bending angle of 90° or more are achieved at the upper bending point M position before forming the blind corner, which facilitates forming in the subsequent process.
底辺部2aを下向き傾斜となるように引き下げ
ると、下側折曲点Nの曲げ角度αが90゜以上とな
る。しかも、この曲げは、上下水平ロールよるも
のであるから、充分小さな曲げアールRが得られ
る。すなわち、ブラインドコーナにする以前に、
下側の折曲点N位置における、小さな曲げアール
Rと90゜以上の曲げ角度が達成され、後の工程で
の成形を容易にする。 When the bottom part 2a is pulled down so as to be inclined downward, the bending angle α of the lower bending point N becomes 90° or more. Moreover, since this bending is performed using upper and lower horizontal rolls, a sufficiently small bending radius R can be obtained. In other words, before making it a blind corner,
A small bending radius R and a bending angle of 90° or more at the lower bending point N position are achieved, which facilitates shaping in subsequent steps.
サポートロール17は鳩尾状部において左右対
称に作用するから、従来のような曲げ部の片方に
のみ突き曲げ竪ロールを当てるごとき作用力のア
ンバランスがなく、傾斜角θが大きくなる戻り変
形のない成形が可能である。 Since the support rolls 17 act symmetrically on the dovetail portion, there is no unbalance of the acting force as in the conventional case where a vertical roll is applied only to one side of the bent portion, and there is no return deformation that increases the inclination angle θ. Can be molded.
山ピツチPを固定して峡辺部を上下のフラツト
ロール19,20で押し上げ圧下すると、下側折
曲点Mの曲げ角度、および、下側折曲点Nの曲げ
角度が既に90゜より大となつてシヤープ化されて
いるため、突き曲げ竪ロールを使用せずとも、材
料内の作用力により座屈的変形が生じて、鳩尾状
部3の下部折曲点Nが上部折曲点Mより内側に入
り込み、所定の鳩尾形状に成形される。 When the mountain pitch P is fixed and the isthmus part is pushed up and down by the upper and lower flat rolls 19, 20, the bending angle of the lower bending point M and the bending angle of the lower bending point N are already larger than 90°. Because it is sharpened, buckling deformation occurs due to the acting force within the material even without using vertical rolls, and the lower bending point N of the dovetail portion 3 changes to the upper bending point M. It goes further inside and is formed into a predetermined dovetail shape.
[実施例]
以下に説明する実施例は、第2図に示した断面
のデツキプレートの成形についてのものである。
すなわち、3つの台形状の山1を持ち、各台形山
1の斜辺部6にカギ形段部7を持ち、台形山1と
台形山1との間の峡辺部2の中央に鳩尾状部3を
持つ断面である。このデツキプレートは第4図
〜の成形工程により成形される。この成形工程
を概略的に説明すると、
() まず、第4図〜の工程でカギ形段部
7を持つ中央の台形山1を成形し、
() 第4図〜の工程で、峡辺部2となる
べき位置の中央に角形突部4を成形)、
() 第4図〜の工程で端縁側の台形山1
の概略の成形を行い、
() 第4図〜の工程で角形突部4を所定
の形状の鳩尾状部3に成形する。[Example] The example described below concerns the molding of a deck plate having the cross section shown in FIG.
That is, it has three trapezoidal peaks 1, a hook-shaped step 7 on the oblique side 6 of each trapezoidal peak 1, and a dovetail-shaped part in the center of the isthmus 2 between the trapezoidal peaks 1. It is a cross section with 3. This deck plate is molded by the molding process shown in FIG. To roughly explain this forming process, () First, the central trapezoidal peak 1 having the key-shaped stepped portion 7 is formed in the steps shown in FIG. Form a square protrusion 4 in the center of the position where it should become 2), () In the process shown in Figure 4~, trapezoid ridge 1 on the edge side
The square protrusion 4 is formed into a dovetail portion 3 having a predetermined shape in the steps shown in FIG.
なお、図示の工程〜は、成形スタンドの一
部を省略して示したもので、実際の成形スタンド
数については、通常さらに多くなる。また、図中
のTは上側水平ロール、Bは下側水平ロールを示
す。 Note that the illustrated steps are shown with some of the molding stands omitted, and the actual number of molding stands is usually much larger. Further, T in the figure indicates an upper horizontal roll, and B indicates a lower horizontal roll.
以下詳細を説明する。 Details will be explained below.
()の工程 (〜)
この工程はカギ形段部7を持つ中央の台形山1
を成形する工程である。() process (~) This process consists of the central trapezoidal peak 1 with the key-shaped step 7.
This is the process of molding.
(i) 左右のカギ形段部位置に、カギ形段部7の上
下の折曲点E,Fの位置と同じ位置に折曲点
E,Fを持ち、かつ、下部折曲点Fの曲げ角度
が直角、上部折曲点Eの曲げ角度がその最終曲
げ角度より大きな三角状突部8を上下水平ロー
ル9,10によりそれぞれ成形する(第4図
(〜)。(i) The left and right key-shaped steps have bending points E and F at the same positions as the upper and lower bending points E and F of the key-shaped step 7, and the lower bending point F is bent. A triangular protrusion 8 having a right angle and a bending angle at the upper bending point E larger than the final bending angle is formed by upper and lower horizontal rolls 9 and 10, respectively (FIG. 4(-)).
(ii) 左右のカギ形段部位置の中間部11を下水平
ロール12で押し上げて、前記上部折曲点Eが
下部折曲点Fより外側に張り出すように前記三
角丈突部8の直角辺を傾斜させる(第4図)。(ii) Push up the intermediate portions 11 at the left and right key-shaped stepped portions with the lower horizontal roll 12, and align the triangular protrusion 8 at right angles so that the upper bending point E extends outward from the lower bending point F. Slant the sides (Figure 4).
(iii) 下側水平フラツトロール13により左右のカ
ギ形段部位置を支えた状態で、前記中間部11
を上側水平フラツトロール14で圧下して、所
定の最終折曲点曲げ角度より大なる折曲点曲げ
角度でカギ形段部7を形成する(第4図)。(iii) With the left and right key-shaped stepped portions supported by the lower horizontal flat rolls 13, move the intermediate portion 11
is rolled down by the upper horizontal flat roll 14 to form a hook-shaped step 7 with a bending angle larger than a predetermined final bending angle (FIG. 4).
(iv) カギ形段部7を成形した後、上下水平ロール
により台形山1の上下の折曲点位置D,Gで折
り曲げ成形して、カギ形段部7が斜辺にくるよ
うに台形山1を成形する(第4図(,)。(iv) After forming the hook-shaped step 7, bend the trapezoid ridge 1 at the upper and lower bending point positions D and G using upper and lower horizontal rolls so that the trapezoid ridge 1 is bent so that the hook-shaped step 7 is on the oblique side. (Figure 4(,)).
この場合、三角形突条8を成形した時の中央側
の折曲点Dは、折り曲げの向きが逆にされて台形
山1の上部折曲点Dとなるが、一度逆に折り曲げ
られたものでも外観上特に問題となることはな
い。 In this case, the bending point D on the center side when forming the triangular protrusion 8 is reversed in the direction of bending and becomes the upper bending point D of the trapezoidal peak 1. There is no problem in terms of appearance.
()の工程 (第4図〜)
峡辺部2位置の中央に、鳩尾状部3の折曲点位
置M,Nと同じ位置に折曲点M,Nを持つ角形突
部4を成形する。Step () (Fig. 4~) Form a square protrusion 4 in the center of the isthmus 2 position with bending points M and N at the same positions as the bending points M and N of the dovetail portion 3. .
()の工程 (第4図A〜)
次いで、端縁側の台形山1の成形を行う。この
工程は、中央の台形山1の成形工程(第4図〜
)と若干の差異はあるが、基本的には同じであ
る。この工程で台形山1を最終形状まで成形せ
ず、その後の工程と並行して最終形状に成形して
もよい。なお、この工程では前記角形突部4の形
状はそのまま維持されている。Step () (Fig. 4A~) Next, the trapezoidal peak 1 on the edge side is formed. This process is the forming process of the central trapezoidal peak 1 (Fig. 4~
) There are some differences, but they are basically the same. The trapezoidal peak 1 may not be formed into the final shape in this step, but may be formed into the final shape in parallel with the subsequent steps. Note that in this step, the shape of the square protrusion 4 is maintained as it is.
()の工程 (第4図〜)
この工程は、角形突部4を鳩尾状部に成形する
工程である。Step () (Fig. 4~) This step is a step of forming the square protrusion 4 into a dovetail-shaped portion.
(i) 上下の水平ロールスタンド15,16により
角形突部4の上辺4aを下に凸の円弧状に成形
し、かつ、峡辺部2の底辺部2aが下向き傾斜
となるごとく引き下げる(第4図)。引き下
げ状態の底辺部2aの中央に角形突部4のある
この断面形状の部分(峡辺部2の部分)を引き
下げ突部5と仮に称する。この段階で山の間隔
を所定の最終山ピツチPにする。(i) The upper and lower horizontal roll stands 15 and 16 form the upper side 4a of the rectangular protrusion 4 into a downwardly convex arc shape, and the lower side 2a of the isthmus 2 is pulled down so that it slopes downward. figure). A portion of this cross-sectional shape (the portion of the isthmus portion 2) having the rectangular protrusion 4 at the center of the bottom portion 2a in the pulled-down state is tentatively referred to as a pull-down protrusion 5. At this stage, the interval between the peaks is set to a predetermined final peak pitch P.
この第4図の形状に成形する過程について
は、実施例のものに限らない。例えば、底辺部
2aを傾斜させる成形と、角形突部4を設ける
成形と、その上辺4aを円弧状にする成形とを
並行して行う方法でもよい。また、一般に広幅
材のロール成形では、中央部を先に成形し順次
端縁側を成形していくので、実施例の場合、第
4図〜の工程のごとく、中央の台形山1、
その隣の角形突部4、端縁側の台形山1の順で
あるが、例えば鳩尾状部3が材料の中央にある
断面の場合には、角形突部4を先に、次いで、
その両側の台形山1を成形することになる。ま
た、台形山1、角形突部4、台形山1の形状を
個々に完成させていくのでなく、それらを並行
して成形し、同時に完成させるものでもよい。 The process of forming into the shape shown in FIG. 4 is not limited to that of the embodiment. For example, a method may be employed in which forming the bottom side 2a to be inclined, forming the square protrusion 4, and forming the upper side 4a into an arc shape are carried out in parallel. In addition, in general, in roll forming of wide material, the center part is formed first and the edge sides are formed sequentially.
The order is the square protrusion 4 next to it, and the trapezoidal peak 1 on the edge side. For example, if the dovetail part 3 is a cross section in the center of the material, the square protrusion 4 is first, then the trapezoid ridge 1 on the edge side.
The trapezoidal peaks 1 on both sides thereof will be formed. Further, instead of completing the shapes of the trapezoidal peak 1, the square protrusion 4, and the trapezoidal peak 1 individually, they may be formed in parallel and completed at the same time.
(ii) 次いで、山1の間隔を所定の最終山ピツチP
に保ちつつ、前記角形突部4の円弧状にされた
上辺4aを下側のサポートロール17により突
き上げるとともに、引き下げ状態の峡辺部2、
すなわち、前述の引き下げ突部5を上下のフラ
ツトロール19,20により押し上げ圧下し
て、その底辺部分2aを水平に戻す(第4図
)。この底辺部水平戻し工程においては、山
ピツチPが固定されているので、押し上げ圧下
の際の材料内部に生じた応力による座屈的変形
で、鳩尾状部3の下部折曲点Nが上部折曲点M
より充分深く内側に入り込み、鳩尾形状の成形
が行なわれる。そして、最終工程でさらに形決
めを行う(第4図)。(ii) Next, set the interval between peaks 1 to a predetermined final peak pitch P.
while keeping the arcuate upper side 4a of the square protrusion 4 pushed up by the lower support roll 17, and the isthmus part 2 in the lowered state;
That is, the above-mentioned lowering protrusion 5 is pushed up and down by the upper and lower flat rolls 19, 20 to return the bottom portion 2a to the horizontal position (FIG. 4). In this bottom horizontal return process, since the peak pitch P is fixed, the buckling deformation due to the stress generated inside the material during up-pressing causes the lower bending point N of the dovetail portion 3 to change to the upper bending point. Curved point M
It penetrates deeper inside and forms a dovetail shape. Then, in the final process, further shaping is performed (Figure 4).
なお実施例は、山の斜辺部にカギ形段部7をも
つものであるが、カギ形段部7のない単なる山で
ある場合に適用できることは勿論である。また、
山が材料の幅方向中央にある場合に限らず、鳩尾
状部が中央にある場合でも勿論適用できる。 Although the embodiment has a hook-shaped stepped portion 7 on the oblique side of the mountain, it is of course applicable to a simple mountain without the hook-shaped stepped portion 7. Also,
Of course, it can be applied not only when the peak is located at the center in the width direction of the material, but also when the dovetail portion is located at the center.
[発明の効果]
以上説明したように本発明によれば、次のよう
な効果を奏する。[Effects of the Invention] As explained above, according to the present invention, the following effects are achieved.
(i) 角形突部4の上辺4aを上下水平ロールによ
つて下に凸の円弧状に成形するので、ブライン
ドコーナにする以前に、上側の折曲点M位置に
おける、小さな曲げアールRと90゜以上の曲げ
角度が達成され、後の工程での成形を容易にす
る。(i) Since the upper side 4a of the square protrusion 4 is formed into a downwardly convex arc shape by upper and lower horizontal rolls, a small bending radius R and 90° are formed at the upper bending point M position before forming the blind corner. A bending angle of more than 100° can be achieved, facilitating shaping in subsequent steps.
(ii) 上下水平ロールによつて底辺部2aが下向き
傾斜となるように引き下げるので、ブラインド
コーナにする以前に、下側の折曲点N位置にお
ける、小さな曲げアールRと90゜以上の曲げ角
度が達成され、後の工程での成形を容易にす
る。(ii) Since the bottom part 2a is lowered so as to be tilted downward by the vertical horizontal rolls, a small bending radius R and a bending angle of 90° or more are required at the lower bending point N position before forming a blind corner. is achieved and facilitates molding in subsequent steps.
(iii) サポートロール17は鳩尾状部において左右
対称に作用するから、従来のような曲げ部の片
方にのみ突き曲げ竪ロールを当てるごとき作用
力のアンバランスがなく、傾斜角θが大きくな
る戻り変形のない成形が可能である。(iii) Since the support rolls 17 act symmetrically on the dovetail portion, there is no unbalance in the acting force that occurs when a vertical roll is applied to only one side of the bending portion, as in the conventional case, and the return angle θ increases. Molding without deformation is possible.
(iv) 突き曲げ竪ロールを使用しないので、突き曲
げ竪ロールが山に当たり成形不可能となるよう
な不都合は生じない。(iv) Since no vertical roll is used, there is no problem such as the vertical roll hitting a mountain and making it impossible to form.
以上のごとく従来の問題点が解消され、鳩尾
状部の曲げ部の奥行き寸法W、高さ寸法Hが小
さく、急激な曲げ形状の鳩尾状部であつても、
所定の形状寸法どおりに確実に成形することが
可能となる。 As mentioned above, the conventional problems have been solved, and even if the dovetail part has a small depth dimension W and height dimension H of the bent part of the dovetail part and has a sharp bending shape,
It becomes possible to reliably mold the product to a predetermined shape and size.
(iv) また、鳩尾状部の成形に、付帯設備となる竪
ロールを必要としないから、ロール配列が単純
化され、ロール組み替え、あるいは、ロール調
整等に関して作業性が向上する。(iv) Furthermore, since no vertical rolls as incidental equipment are required for forming the dovetail portion, the roll arrangement is simplified and the workability with respect to roll rearrangement, roll adjustment, etc. is improved.
第1図は本発明方法を説明する成形工程図、第
2図は本発明の実施例の成形対象であるデツキプ
レートの断面図、第3図は第2図におけるA部の
拡大図、第4図(その1)、(その2)、(その3)
は第2図のデツキプレートを成形する本発明の一
実施例を示す成形工程図、第5図は従来の成形方
法を示す成形工程図、第6図は従来の成形法にお
ける問題点の説明図である。
1……山(台形山)、2……峡辺部、2a……
底辺部分、3……鳩尾状部、4……角形突部、4
a……上辺、4b……側辺部、5……引き下げ突
部、17……サポートロール、18……突き曲げ
竪ロール、19,20……上下水平フラツトロー
ル、M……上部折曲点、N……下部折曲点、P…
…山ピツチ。
Fig. 1 is a molding process diagram explaining the method of the present invention, Fig. 2 is a sectional view of a deck plate that is the object of molding in an embodiment of the present invention, Fig. 3 is an enlarged view of part A in Fig. 2, and Fig. 4 Diagrams (Part 1), (Part 2), (Part 3)
2 is a molding process diagram showing an embodiment of the present invention for molding the deck plate, FIG. 5 is a molding process diagram showing a conventional molding method, and FIG. 6 is an explanatory diagram of problems in the conventional molding method. It is. 1...Mountain (trapezoidal mountain), 2...Isthmus, 2a...
Base portion, 3... Dovetail portion, 4... Square protrusion, 4
a...Top side, 4b...Side part, 5...Pulling down protrusion, 17...Support roll, 18...Vertical bending roll, 19, 20...Vertical horizontal flat roll, M...Top bending point , N...lower bending point, P...
...Yamapitsuchi.
Claims (1)
の鋼板成形品を冷間ロール成形により成形する方
法であつて、 (i) 峡辺部位置の両側に山を成形し、かつ、峡辺
部位置の中央に、鳩尾状部の折曲点位置と同じ
位置に折曲点を持ち、上辺が下に凸の円弧状を
なす角形突部を、峡辺部の底辺部分が下向き傾
斜となるごとく引き下げ状態で成形する工程、 (ii) 峡辺部位置の両側の山の間隔を所定の最終山
ピツチPに保ちつつ、前記角形突部の円弧状に
された上辺を下側のサポートロールにより突き
上げるとともに、引き下げ状態の峡辺部を上下
のフラツトロールにより押し上げ圧下して、そ
の底辺部分を水平の戻す工程、 よりなることを特徴とする峡辺部に鳩尾状部を持
つ断面のロール成形方法。[Scope of Claims] 1. A method of forming a steel plate molded product having a cross-section with a dovetail-shaped part in the isthmus between the mountains by cold roll forming, comprising: (i) both sides of the isthmus; At the same time, in the center of the isthmus part, a rectangular protrusion having a bending point at the same position as the bending point of the dovetail part and an arc shape with the upper side convex downward is formed. (ii) Forming in a pulled down state so that the bottom part of the side part slopes downward; (ii) While maintaining the interval between the peaks on both sides of the isthmus position at a predetermined final peak pitch P, shaping the square protrusion into an arc shape; The isthmus part is characterized by the step of pushing up the upper side of the lower part by a lower support roll, pushing up and lowering the lowered part of the isthmus part by upper and lower flat rolls, and returning the bottom part to the horizontal level. A method of roll forming a cross section with a dovetail.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26347485A JPS62124029A (en) | 1985-11-22 | 1985-11-22 | Forming method for cross sectional roll having dovetail part on narrow side part |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26347485A JPS62124029A (en) | 1985-11-22 | 1985-11-22 | Forming method for cross sectional roll having dovetail part on narrow side part |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62124029A JPS62124029A (en) | 1987-06-05 |
| JPS6366619B2 true JPS6366619B2 (en) | 1988-12-21 |
Family
ID=17390012
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP26347485A Granted JPS62124029A (en) | 1985-11-22 | 1985-11-22 | Forming method for cross sectional roll having dovetail part on narrow side part |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS62124029A (en) |
-
1985
- 1985-11-22 JP JP26347485A patent/JPS62124029A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62124029A (en) | 1987-06-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4407480A (en) | Textured brick form | |
| US3979868A (en) | Composite concrete and steel floor construction | |
| US3945168A (en) | Reusable spanner bar | |
| US5655345A (en) | Curved wall glass block assembly | |
| US3818083A (en) | Building method | |
| US3397858A (en) | Concrete slab form panel-supporting bracket | |
| KR100949785B1 (en) | Mold for making PC beam | |
| JPS6366619B2 (en) | ||
| EP0022543B1 (en) | Improvements in or relating to a formwork system | |
| JPS6366618B2 (en) | ||
| US3630479A (en) | Monolithic slab for roofs, floors, platforms, and the like | |
| EP0225090A2 (en) | Floor panels | |
| JPS6366620B2 (en) | ||
| US1434242A (en) | Concrete floor or slab-forming means | |
| EP1715118A2 (en) | Fully recoverable shuttering system for cast floors | |
| KR200493864Y1 (en) | Blocking board | |
| CN216076401U (en) | Build horizontal mortar joint, skin number pole, horse tooth raft composite set by laying bricks or stones | |
| US1883192A (en) | Concrete floor construction | |
| JPS6243767B2 (en) | ||
| US2941276A (en) | Concrete core form | |
| JP2551338Y2 (en) | Formwork device for dam with masonry pattern | |
| DE2941853A1 (en) | Tiled stove wall construction method - presses tiles into resilient mat and pours concrete over rear faces | |
| JP3689277B2 (en) | Skid panel warpage prevention device | |
| CN119243985A (en) | A non-standard layer aluminum formwork support system | |
| US2196158A (en) | Concrete construction |