JPS645305B2 JP17639681A JP17639681A JPS645305B2 JP S645305 B2 JPS645305 B2 JP S645305B2 JP 17639681 A JP17639681 A JP 17639681A JP 17639681 A JP17639681 A JP 17639681A JP S645305 B2 JPS645305 B2 JP S645305B2
Authority
JP
Japan
Prior art keywords
plant
time axis
simulated
calculation
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP17639681A
Other languages
Japanese (ja)
Other versions
JPS5879278A (en
Inventor
Mitsuyoshi Okazaki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP17639681A priority Critical patent/JPS5879278A/en
Publication of JPS5879278A publication Critical patent/JPS5879278A/en
Publication of JPS645305B2 publication Critical patent/JPS645305B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Feedback Control In General (AREA)

Description

【発明の詳細な説明】 1 発明の技術分野 本発明はプラントの運転訓練を受ける運転員の
操作あるいは指導員コンソールからの指導員の操
作に応じて、実プラントと同様の模擬演算を行
い、その結果をプラント状態信号として模擬制御
盤上の各種ランプ指示計等に表示出力するプラン
ト模擬装置に関する。
[Detailed Description of the Invention] 1. Technical Field of the Invention The present invention performs simulated calculations similar to those in an actual plant in response to the operations of an operator undergoing plant operation training or the operations of an instructor from an instructor console, and displays the results. This invention relates to a plant simulator that displays and outputs plant status signals to various lamp indicators on a simulating control panel.

2 従来技術 第1図は従来のプラント模擬装置の概略構成を
示したもので、模擬制御盤1は実プラントの制御
盤と同型、同機能を有するもので、運転訓練員は
この模擬制御盤1上の各種ランプ、指示計等によ
りプラントの状態を把握する。訓練員の操作する
模擬制御盤1からの操作信号Utは接点・アナロ
グ量として入力装置2を介して演算制御装置3に
読み込まれる。この演算制御装置3は上記操作信
号Utと、記憶装置4に記憶されている前回のプ
ラント状態信号Ct-1とに基づき、実プラントと同
様の挙動を行うようにプラント状態駆動信号Dt
を発生させる制御装置模擬部31と、プラントの
動特性を模擬するプラント状態信号Ctを発生さ
せるプラント特性模擬演算部32より構成され
る。そして、このプラント状態信号Ctは出力装
置5を介して、前記模擬制御盤1上の各種ラン
プ、指示計等にプラント状態表示信号Atとして
表示出力される。また、指導員コンソール6を介
して受け付けられる指導員の操作は制御情報Itと
して入力装置2から演算制御装置3に読み込ま
れ、模擬演算の実行開始、停止あるいはプラント
異常状態の模擬等が行われる。
2. Prior Art Figure 1 shows the schematic configuration of a conventional plant simulator.The simulated control panel 1 is the same type and has the same functions as the control panel of the actual plant. The status of the plant can be grasped using the various lamps and indicators above. The operation signal Ut from the simulated control panel 1 operated by the trainee is read into the arithmetic and control unit 3 via the input device 2 as a contact/analog quantity. Based on the operation signal Ut and the previous plant state signal C t-1 stored in the storage device 4, this arithmetic and control device 3 generates a plant state drive signal Dt so as to perform the same behavior as the actual plant.
The system is comprised of a control device simulating section 31 that generates a signal Ct, and a plant characteristic simulation calculating section 32 that generates a plant status signal Ct that simulates the dynamic characteristics of the plant. Then, this plant status signal Ct is displayed and outputted to various lamps, indicators, etc. on the simulated control panel 1 as a plant status display signal At via the output device 5. In addition, the instructor's operations received via the instructor console 6 are read as control information It from the input device 2 to the arithmetic and control device 3, and execution of simulation operations is started or stopped, or an abnormal state of the plant is simulated.

上記構成によりプラントの模擬が可能となる。
しかしながら、上記従来装置においては、このと
きのプラント模擬動作の時間軸を縮小あるいは拡
大する機能が設けられていなかつた。
The above configuration makes it possible to simulate a plant.
However, the conventional device described above is not provided with a function to reduce or enlarge the time axis of the simulated plant operation at this time.

このため、訓練上あまり意味のないプラント状
態が長時間にわたつて模擬されたり、訓練上ゆつ
くり模擬したいプラント状態が急速に変化するな
ど、訓練を効率良く行うことができない不具合が
あつた。
As a result, there were problems in which training could not be carried out efficiently, such as plant conditions that were not very meaningful for training purposes to be simulated for long periods of time, and plant conditions to be simulated for training purposes to change rapidly.

このようなプラント模擬装置における不具合を
除くには、運転員の操作に対するプラント応答時
間を実プラント応答時間の1/N倍、あるいは、
N倍にする時間軸縮小拡大機能を持つことが考え
られ、時間軸縮小を行うことによりプラント状態
の推移待ち等の待ち時間短縮化やリプレイ機能
(過去に訓練員が操作した内容や、それに応じた
プラント状態の推移を模擬操作盤上に再現する機
能)使用時の読み飛ばしが可能となり、運転訓練
の高速化による効率向上が計られ、また時間軸拡
大を行うことにより、細部操作の正確な訓練や着
実なプラント状態把握またリプレイ機能使用時の
微細部の解析等に利用することが可能となる。
In order to eliminate such defects in the plant simulator, the plant response time to operator operations should be set to 1/N times the actual plant response time, or
It is possible to have a time axis reduction/enlargement function that increases the time axis by N times. A function that reproduces plant status transitions on a simulated operation panel) enables skipping during use, improving efficiency by speeding up operation training, and expanding the time axis allows for accurate detailed operations. It can be used for training, steady understanding of plant status, and analysis of minute parts when using the replay function.

更に、その時間軸の縮小拡大を行うに当つて
は、例えば時間軸1/N縮小模擬について考える
と、制御装置模擬部31内のPID要素をもつ演算
部分及びプラント特性模擬演算部32では、処理
周期ΔTを1/N倍に縮めるか、その処理周期
ΔTを使用した上で対演算周期ΔtをN倍にするこ
とにより得られる修正演算周期ΔT=N・Δtを用
いるかのいずれかの方式が考えられる。しかし、
処理周期ΔTを1/Nに縮めることはハードウエ
アの演算処理能力からして極めて困難であり、対
演算周期ΔtをN倍した修正演算周期N・Δtを用
いる方が有効であると考えられる。
Furthermore, when scaling down the time axis, for example, considering a 1/N reduction simulation of the time axis, the calculation part with the PID element in the control device simulation unit 31 and the plant characteristic simulation calculation unit 32 perform processing. There are two methods: either shorten the period ΔT by 1/N times, or use the modified calculation period ΔT=N・Δt obtained by using the processing period ΔT and multiplying the pair calculation period Δt by N times. Conceivable. but,
It is extremely difficult to reduce the processing period ΔT to 1/N in terms of the calculation processing capacity of the hardware, and it is considered more effective to use a modified calculation period N·Δt that is N times the paired calculation period Δt.

ところが、プラント特性模擬演算部32や制御
装置模擬部31内のPID要素を持つ演算部の各物
理モデルや制御モデルは、通常、数秒から数10分
のさまざまな時定数や積分定数を持つている。そ
のために、前記修正演算周期N・Δtを用いた時
間軸縮小方式によると、これら時定数、積分定数
との大小関係から系の安定が損われ、プラント模
擬が不安定となり、実時間運転においては正常に
機能を果してきたものが異常となり、運転訓練に
支障をきたすこととなる。
However, the physical models and control models of the calculation units with PID elements in the plant characteristic simulation calculation unit 32 and the control device simulation unit 31 usually have various time constants and integration constants ranging from several seconds to several tens of minutes. . Therefore, according to the time axis reduction method using the modified calculation period N・Δt, the stability of the system is impaired due to the magnitude relationship with these time constants and integral constants, making the plant simulation unstable, and in real-time operation. Something that has been functioning normally now becomes abnormal, causing problems in driving training.

例えば、積分演算は下記(1)式 Yo=Yo-1+Δt/TXo ……(1) (ここで、Yo:今回出力値、Yo-1:前回出力
値、Xo:入力値、T:積分定数、Δt:演算周期) で行われるが、第2図aに示すように実時間処理
において得られる積分値が、同図bに示すように
計算定数を4倍した修正演算周期を用いた1/4時
間軸縮小時には常にYo′=0となり積分値が全く
得られず、プラント特性模擬演算部32に対し制
御信号が加えられないことになる。また、第3図
に示すように入力値Xoを一定としてその積分値
が制限値Lを超えたとき制限範囲内に引き戻す如
き修正動作を考えると、実時間処理においては微
小制御信号ΔYoが、1/4時間軸縮小時にはその4
倍に達する制御信号ΔYo′となり、このような大
きな制御信号により修正動作が加えられる結果、
プラント模擬が不安定となるおそれがある。
For example, the integral calculation is the following equation (1): Y o = Y o-1 + Δt/TX o ...(1) (where, Y o : current output value, Y o-1 : previous output value, X o : input value, T: integral constant, Δt: calculation period), but as shown in Figure 2a, the integral value obtained in real-time processing is modified by multiplying the calculation constant by 4 as shown in Figure 2b. When the time axis is reduced to 1/4 using the period, Y o '=0, no integral value is obtained at all, and no control signal is applied to the plant characteristic simulation calculation section 32. Furthermore, if we consider a correction operation in which the input value X o is kept constant and the integral value exceeds the limit value L, it is pulled back within the limit range as shown in Fig. 3. In real-time processing, the minute control signal ΔY o , Part 4 when reducing the time axis by 1/4
The control signal ΔY o ' doubles, and as a result of the correction action added by such a large control signal,
Plant simulation may become unstable.

3 発明の目的 本発明は、以上の点に鑑み、プラント模擬装置
における時間軸縮小拡大を可能にすると共に、更
に、時間軸縮小時におけるプラント模擬動作の不
安定さを取り除き、運転訓練と実プラントとの相
違をなくし、効率的な訓練を可能とするプラント
模擬装置を提供することを目的とする。
3. Purpose of the Invention In view of the above points, the present invention makes it possible to reduce and expand the time axis in a plant simulator, and further eliminates the instability of the plant simulation operation when the time axis is reduced. The purpose of the present invention is to provide a plant simulator that eliminates the differences between the two and enables efficient training.

4 発明の構成 この目的を達成するため、本発明は、時間軸縮
小時、プラント特性を表わす物理モデルあるいは
制御モデルの対演算周期ΔtをN倍とすることに
より得られる修正演算周期N・Δtによりプラン
ト模擬動作を実行させると共に、モデルが有する
各種時定数即ちモデルの変動周期に応じて上記修
正演算周期N・Δtに制限を加える時間軸管理装
置を設けるようにしたことを特徴とする。
4. Structure of the Invention In order to achieve this object, the present invention uses a modified calculation period N·Δt obtained by multiplying the pair calculation period Δt of a physical model or control model representing plant characteristics by N times when the time axis is reduced. The present invention is characterized in that it is provided with a time axis management device that executes a plant simulation operation and limits the correction calculation period N·Δt according to various time constants of the model, that is, the fluctuation period of the model.

5 発明の実施例 以下、本発明を図の実施例を参照して説明す
る。
5 Embodiments of the Invention The present invention will be described below with reference to embodiments shown in the drawings.

(a) 構成 第4図は本発明の一実施例に係るプラント模擬
装置を示したもので、図中、第1図と同一符号は
同一または相当部分を示し、更に、7は時間軸管
理装置である。
(a) Configuration FIG. 4 shows a plant simulator according to an embodiment of the present invention. In the figure, the same reference numerals as in FIG. 1 indicate the same or corresponding parts, and 7 indicates a time axis management device. It is.

この時間軸管理装置7は、第5図に示すよう
に、時間軸縮小模擬時、縮小比Nを設定する縮小
比設定部71、時間軸縮小サンプリングタイム信
号bを発生する乗算部72、各モデルに対してそ
のモデルが安定に動作する最大演算周期をそれぞ
れ設定する制限値設定部73、時間軸縮小サンプ
リングタイム信号bとその制限値fとを比較し、
bfならば接点S3を図示状態に切り替える比
較部74、時間軸縮小模擬切替信号dにより図示
状態に切り替えられる接点S1,S2より成り、各
物理モデル、制御モデルに対し、それぞれ独立に
作用し、かつ、時間軸縮小を実施しないものに対
しては実時間処理を実施し、制限をかけずに走ら
せることが可能に構成されている。
As shown in FIG. 5, this time axis management device 7 includes a reduction ratio setting section 71 that sets a reduction ratio N during time axis reduction simulation, a multiplication section 72 that generates a time axis reduction sampling time signal b, and each model. A limit value setting unit 73 that sets the maximum calculation period at which the model operates stably for each, compares the time axis reduction sampling time signal b and its limit value f,
If it is bf, it consists of a comparison unit 74 that switches the contact S3 to the illustrated state, and contacts S1 and S2 that are switched to the illustrated state by the time axis reduction simulation switching signal d, which act independently on each physical model and control model, and For those that do not perform time axis reduction, real-time processing is performed and the system is configured to be able to run without restrictions.

また、縮小比設定部71の縮小比Nは、例えば
指導員の操作により指導員コンソール6を介して
入力される時間軸縮小時指令信号eにより変化さ
せることができる。一方、制限値設定部73の各
制限値fは、予め、その縮小比Nを変化させなが
らプラント模擬動作をい、その結果、各モデルが
安定動作し得る最大演算周期を求めて設定記憶し
ておく。
Further, the reduction ratio N of the reduction ratio setting section 71 can be changed by, for example, a time axis reduction command signal e inputted via the instructor console 6 by the instructor's operation. On the other hand, each limit value f of the limit value setting unit 73 is set and stored in advance by performing a plant simulation operation while changing the reduction ratio N, and as a result, determining the maximum calculation cycle at which each model can operate stably. put.

(b) 作用 以上の構成で、時間軸管理装置7は第6図に示
すように動作し、プラント模擬が行われる。即
ち、指導員の操作により、実時間処理を実施させ
る場合は、接点S1,S2が図示反対位置に切り替
えられ、演算周期信号aはそのまま信号Cとして
演算制御装置3に加えられ、通常の演算周期で従
来同様のプラント模擬が行われる。
(b) Effect With the above configuration, the time axis management device 7 operates as shown in FIG. 6, and a plant simulation is performed. That is, when real-time processing is to be performed by the instructor's operation, contacts S1 and S2 are switched to the opposite positions as shown in the figure, and the calculation period signal a is directly applied to the calculation control device 3 as the signal C, and is processed at the normal calculation period. A plant simulation similar to the conventional one will be performed.

一方、時間軸縮小模擬を実施させる場合は、指
導員は、時間軸縮小模擬切替信号dにより接点
S1,S2を図示状態に切り替えると共に、時間軸
縮小指令信号eにより縮小比設定部71の縮小比
Nを選択設定する。これにより、乗算部72にて
時間軸縮小サンプリングタイム信号b=N・aが
生成され、制限値設定部73にて設定された制限
値fと比較部74にて比較される。この結果、も
し、b<fならばbを修正演算周期信号Cとし、
また、bfならばfを修正演算周期信号Cとし
て演算制御装置3に加えられる。このとき、演算
制御装置3で行われる実際の処理周期はハードウ
エアで決まり一定であるが、処理されるデータの
サンプリング周期例えばプラント状態信号Ctは
そのN倍のCNt周期で処理される結果、N倍のス
ピードでプラント模擬が行われる。
On the other hand, when performing a time axis reduction simulation, the instructor uses the time axis reduction simulation switching signal d to
While switching S1 and S2 to the illustrated state, the reduction ratio N of the reduction ratio setting section 71 is selected and set by the time axis reduction command signal e. As a result, the multiplier 72 generates a reduced time axis sampling time signal b=N·a, which is compared with the limit value f set by the limit value setting unit 73 in the comparator 74 . As a result, if b<f, let b be the modified calculation cycle signal C,
Moreover, if it is bf, f is added to the arithmetic and control unit 3 as a modified arithmetic cycle signal C. At this time, the actual processing cycle performed by the arithmetic and control unit 3 is determined by the hardware and is constant, but the sampling cycle of the processed data, for example, the plant status signal Ct is processed at a cycle C Nt that is N times that of the sampling cycle. Plant simulation is performed N times faster.

(c) 効果 このように、各モデルに対して時間軸縮小模擬
を施すことにより、プラント模擬の高速化を計
り、モデルの安定性を得た効率的なプラント模擬
が可能となる。
(c) Effects In this way, by performing time axis reduction simulation on each model, it is possible to speed up plant simulation and to achieve efficient plant simulation with model stability.

例えば、火力発電プラントを考えた場合、ボイ
ラの加熱、加圧あるいは復水器の真空上昇等の実
時間処理にはかなりの時間を要し、また著しい変
化も見られないため、特に重要な訓練でもなく、
これらを模擬する演算制御装置のモデルに関して
は時間軸縮小模擬を実施することにより訓練の高
速化につながる。
For example, when considering a thermal power plant, real-time processing such as boiler heating, pressurization, and condenser vacuum raising takes a considerable amount of time, and no significant changes are observed, so training is particularly important. But not,
Regarding the arithmetic and control unit model that simulates these, implementing time axis reduction simulation will lead to faster training.

尚、上記実施例においては、時間軸縮小模擬に
ついて説明したが、時間軸拡大模擬は、例えば、
演算制御装置3での実際の処理周期をN倍にする
ことにより、簡単に実施し得る。
In addition, in the above embodiment, the time axis reduction simulation was explained, but the time axis expansion simulation is, for example,
This can be easily implemented by increasing the actual processing cycle in the arithmetic and control unit 3 by N times.

6 発明の効果 以上のように、本発明によれば、プラント模擬
動作の時間軸縮小拡大機能が得られると同時に、
時間軸縮小時に発生する不安定要素を取り除くこ
とができ、特に運転訓練には好適な使用範囲の広
いプラント模擬装置が得られる。
6 Effects of the Invention As described above, according to the present invention, it is possible to obtain the function of reducing and enlarging the time axis of plant simulation operations, and at the same time,
Unstable elements that occur when the time axis is reduced can be removed, and a plant simulator that can be used over a wide range of applications, particularly suitable for operation training, can be obtained.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来のプラント模擬装置の構成図、第
2図a,b及び第3図は時間軸縮小模擬時に発生
する問題点を説明するための説明図、第4図は本
発明の一実施例に係るプラント模擬装置の構成
図、第5図はその時間軸管理装置の詳細図、第6
図はその時間軸管理動作説明図である。 1……模擬制御盤、2……入力装置、3……演
算制御装置、4……記憶装置、5……出力装置、
6……指導員コンソール、7……時間軸管理装
置、31……制御装置模擬部、32……プラント
特性模擬演算部、71……縮小比設定部、72…
…乗算部、73……制限値設定部、74……比較
部。
Figure 1 is a configuration diagram of a conventional plant simulation device, Figures 2a, b, and 3 are explanatory diagrams for explaining problems that occur during time axis reduction simulation, and Figure 4 is an implementation of the present invention. A configuration diagram of the plant simulation device according to the example, FIG. 5 is a detailed diagram of the time axis management device, and FIG. 6 is a detailed diagram of the time axis management device.
The figure is an explanatory diagram of the time axis management operation. 1... Simulation control panel, 2... Input device, 3... Arithmetic control device, 4... Storage device, 5... Output device,
6...Instructor console, 7...Time axis management device, 31...Control device simulation section, 32...Plant characteristic simulation calculation section, 71...Reduction ratio setting section, 72...
. . . Multiplication section, 73 . . . Limit value setting section, 74 . . . Comparison section.

Claims (1)

【特許請求の範囲】[Claims] 1 運転訓練員が操作する模擬制御盤と、訓練の
指導員がプラント模擬を制御するために操作する
指導員コンソールと、前記模擬制御盤及び指導員
コンソールの操作信号を入力する入力装置と、前
記入力装置から情報を入力し各種モデルを用いて
プラント制御装置の機能の模擬演算及びプラント
の物理的特性の模擬演算を行う演算制御装置と、
前記演算制御装置から必要な情報を受け取り、前
記模擬制御盤及び指導員コンソールへその情報を
表示出力する出力装置と、前記演算制御装置の情
報を必要に応じて記憶する記憶装置とを備えたプ
ラント模擬装置において、少なくとも時間軸縮小
比を設定する縮小比設定部と、その設定された縮
小比の演算周期信号を出力する乗算部と、前記各
種モデルに対応する各最大演算周期が予め記憶さ
れた制限値設定部とを備え、前記制限値設定部に
設定された最大演算周期以下の演算周期信号を前
記演算制御装置に出力することにより前記演算制
御装置で処理される前記各模擬演算の対演算周期
をN倍にして時間軸を縮小すると共に、そのとき
の最大演算周期を前記各種モデルの特性に応じて
制限する時間軸管理装置を設け、プラント模擬動
作の時間軸を縮小拡大可能としたことを特徴とす
るプラント模擬装置。
1. A simulated control panel operated by an operator trainee, an instructor console operated by a training instructor to control the plant simulation, an input device for inputting operation signals of the simulated control panel and the instructor console, and an input device from the input device. an arithmetic and control device that inputs information and uses various models to simulate the functions of the plant control device and simulate the physical characteristics of the plant;
A plant simulation comprising: an output device that receives necessary information from the arithmetic and control device and displays and outputs the information to the simulated control panel and instructor console; and a storage device that stores information of the arithmetic and control device as necessary. The apparatus includes at least a reduction ratio setting section that sets a time axis reduction ratio, a multiplication section that outputs an operation cycle signal of the set reduction ratio, and a limit in which each maximum operation cycle corresponding to the various models is stored in advance. a value setting section, and a pair calculation period of each of the simulated calculations processed by the calculation control device by outputting a calculation period signal equal to or less than the maximum calculation period set in the limit value setting portion to the calculation control device. In addition to reducing the time axis by multiplying by N, a time axis management device is provided that limits the maximum calculation cycle at that time according to the characteristics of the various models, thereby making it possible to reduce or expand the time axis of the simulated plant operation. Features of plant simulation equipment.
JP17639681A 1981-11-05 1981-11-05 Plant simulator Granted JPS5879278A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17639681A JPS5879278A (en) 1981-11-05 1981-11-05 Plant simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17639681A JPS5879278A (en) 1981-11-05 1981-11-05 Plant simulator

Publications (2)

Publication Number Publication Date
JPS5879278A JPS5879278A (en) 1983-05-13
JPS645305B2 true JPS645305B2 (en) 1989-01-30

Family

ID=16012927

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17639681A Granted JPS5879278A (en) 1981-11-05 1981-11-05 Plant simulator

Country Status (1)

Country Link
JP (1) JPS5879278A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3370783B2 (en) * 1994-06-27 2003-01-27 マツダ株式会社 Device control device and control method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55166676A (en) * 1979-06-14 1980-12-25 Mitsubishi Electric Corp Simulator device
JPS5688165A (en) * 1979-12-20 1981-07-17 Mitsubishi Electric Corp Simulator

Also Published As

Publication number Publication date
JPS5879278A (en) 1983-05-13

Similar Documents

Publication Publication Date Title
JPS645305B2 (en)
CN111651922A (en) Method, system, device and storage medium for simulated hand calculation analysis of force calculation
US6062715A (en) Computer implemented aircraft simulation method and apparatus
Beukeboom et al. Simulation of mixed bond graphs and block diagrams on personal computers using TUTSIM
JPS60149076A (en) Plant simulator
JP2000200026A (en) Simulator for plant operation training
JPS6388588A (en) Plant simulator
JPH05146071A (en) Power system operation training simulator
JP2513710B2 (en) Plant simulator
JP2637343B2 (en) Plant simulator
JP3203601B2 (en) Plant control rule creation method, its creation device, and plant control device
Sokoloff GPIB instrument control
JPS63128389A (en) Time constant processing system for training simulator
JPH01177585A (en) Operation training support device
JPS60149075A (en) Plant simulator
JPH0575775U (en) Training simulator
JPH09212077A (en) Simulator for plant operator training
JPS61140978A (en) Plant simulator
JPH03288882A (en) Operation training simulator device
JPS61231607A (en) Simulation system for iron and steel rolling control system
JPH01253666A (en) Tester for lsi containing arithmetic circuit
JPS60247705A (en) Plant simulating device
JPH07296053A (en) Production simulator
JPH0244073B2 (en) UNTENKUNRENYOSHIMYUREETA
Williges et al. Manual versus automatic adaptive skill training