Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS648152B2 - - Google Patents
[go: Go Back, main page]

JPS648152B2 - - Google Patents

Info

Publication number
JPS648152B2
JPS648152B2 JP9449783A JP9449783A JPS648152B2 JP S648152 B2 JPS648152 B2 JP S648152B2 JP 9449783 A JP9449783 A JP 9449783A JP 9449783 A JP9449783 A JP 9449783A JP S648152 B2 JPS648152 B2 JP S648152B2
Authority
JP
Japan
Prior art keywords
steel
girder
column
scaffolding
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP9449783A
Other languages
Japanese (ja)
Other versions
JPS59220557A (en
Inventor
Yoshihiko Hasegawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HASEKO KOOHOREESHON KK
Original Assignee
HASEKO KOOHOREESHON KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HASEKO KOOHOREESHON KK filed Critical HASEKO KOOHOREESHON KK
Priority to JP9449783A priority Critical patent/JPS59220557A/en
Publication of JPS59220557A publication Critical patent/JPS59220557A/en
Publication of JPS648152B2 publication Critical patent/JPS648152B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 本発明は、SRC造建築物の骨組架構における
足場仮設方法に関し、詳しくは桁行方向に設けら
れる足場の仮設手間及び仮設費の削減を可能にす
る足場仮設方法に関するものである。
[Detailed Description of the Invention] The present invention relates to a method for temporarily constructing a scaffold in a frame structure of an SRC building, and more specifically to a method for temporarily constructing a scaffold that makes it possible to reduce the labor and cost of constructing scaffolds installed in the row direction. be.

従来、SRC造建築物の骨組架構においては、
桁行方向の足場が全て吊り足場とされていたた
め、足場の仮設に手間がかかつて、施工能率が低
下し、仮設費も高く付く欠点があつた。
Conventionally, in the frame structure of SRC buildings,
Because all the scaffolding in the girder direction was suspended, it took time and effort to temporarily erect the scaffolding, reducing construction efficiency and increasing temporary construction costs.

即ち、吊り足場は、梁鉄骨の下フランジに取り
付けるハンガーとハンガー間に掛け渡される定尺
の鋼製足場板とから構成されているので、吊り足
場を桁行梁の全長にわたつて設けるためには、梁
鉄骨の建方に先立つて、各々の梁鉄骨に多数のハ
ンガーを一定ピツチ(鋼製足場板の長さに相当す
る間隔)ごとに取り付けておかねばならず、この
取付けに非常に手間がかかり、しかも、梁鉄骨の
架設後、鋼製足場板をハンガー間に掛け渡す際に
も、ハンガー及び鋼製足場板の使用個数が多いた
め、かなりの手間を要していたのである。
In other words, a suspended scaffold consists of a hanger that is attached to the lower flange of a steel beam and a steel scaffolding plate of a fixed length that is stretched between the hangers, so in order to install a suspended scaffold over the entire length of the girder Before the steel beams are erected, a large number of hangers must be attached to each steel beam at regular pitches (at intervals corresponding to the length of the steel scaffolding boards), and this installation is extremely time-consuming. Furthermore, after the steel beams were erected, it took a considerable amount of time and effort to hang the steel scaffolding boards between the hangers, since a large number of hangers and steel scaffolding boards were used.

また、吊り足場は、かなり高価なものであり、
これが桁行方向の全長にわたつて多量に使用され
ているため、仮設備が高く付いていたのである。
In addition, suspended scaffolding is quite expensive,
Since a large amount of this was used over the entire length in the column direction, temporary equipment was expensive.

本発明は、これらの従来欠点を解消することを
目的としている。
The present invention aims to eliminate these conventional drawbacks.

而して、本発明は、H型鋼よりなる梁鉄骨の周
囲に梁主筋及びスターラツプよりなる篭状の梁鉄
筋が取り付けられた桁行梁先組体を地組みし、前
記梁鉄筋の上面に足場板を載置固定すると共に、
前記梁鉄骨の下フランジには梁鉄骨両端部にのみ
ハンガーを1個ずつ取り付けておき、以上の工程
を経た桁行梁先組体の複数個を所定間隔おきに立
設された柱鉄骨間に架設し、各柱鉄骨の両側に位
置した桁行梁先組体の端部のハンガー間に夫々定
尺の鋼製足場板を掛け渡して、柱梁仕口周りにの
み吊り足場を形成し、各桁行梁先組体の上方には
柱鉄骨間に親網を張り渡すことによつて、上述し
た目的を達成したのである。
Therefore, the present invention assembles a girder beam pre-assembly in which cage-shaped beam reinforcing bars made of beam main reinforcements and stirrups are attached around a beam steel frame made of H-shaped steel, and a scaffold board is placed on the top surface of the beam reinforcing bars. In addition to placing and fixing the
One hanger is attached to the lower flange of the steel beam at each end of the steel beam, and a plurality of girder girder end assemblies that have undergone the above steps are erected between the column steel frames erected at predetermined intervals. Then, steel scaffolding boards of a fixed length were hung between the hangers at the ends of the girder and girder front assemblies located on both sides of each column steel frame, and suspended scaffolding was formed only around the column and beam joints, and each girder row The above objective was achieved by extending a parent net between the steel columns above the beam end assembly.

以下、本発明によるSRC造建築物の骨組架構
における足場仮設方法を、図面に示す実施例に基
づいて説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a method for temporarily constructing a scaffold in a frame structure of an SRC building according to the present invention will be explained based on an embodiment shown in the drawings.

第1図は桁行方向の足場の仮設が完了した状態
を示し、Aは柱鉄骨、Bは桁行梁先組体、Cは張
間方向梁先組体、Dは柱梁仕口周りにのみ設けら
れた吊り足場、Eは足場板、Fは親網である。
Figure 1 shows the state in which the temporary construction of scaffolding in the girder direction has been completed, where A is the column steel frame, B is the girder beam end assembly, C is the beam end assembly in the span direction, and D is the construction only around the column and beam joints. E is a scaffolding board, and F is a parent net.

上記の足場は、次のようにして仮設されたもの
である。
The scaffold mentioned above was temporarily erected as follows.

(1) 第2図及び第3図に示すように、H型鋼より
なる梁鉄骨1の周囲に、所要本数の梁主筋2と
スパイラル筋を用いたスターラツプ3とで形成
した篭状の梁鉄筋4が取り付けられた桁行梁先
組体Bを地組みする。そして、前記梁鉄筋4の
上面には、木板や合板など安価な材料よりなる
足場板5を載置し、番線(図示せず)を巻き付
けて固定しておく。この足場板5は、少なくと
も両端が前述した吊り足場Dの端部と重なり合
うような長さに設定される。また、前記梁鉄骨
1の下フランジ1aには、当該梁鉄骨1の両端
部にのみハンガー6,6′を1個ずつ取り付け
ておく。
(1) As shown in Figures 2 and 3, a basket-shaped beam reinforcing bar 4 is formed around a beam steel frame 1 made of H-beam steel by a required number of beam main bars 2 and stirrups 3 using spiral bars. Assemble the girder end assembly B to which the girder is attached. Then, a scaffold board 5 made of an inexpensive material such as a wooden board or plywood is placed on the upper surface of the beam reinforcing bar 4, and fixed by wrapping a wire (not shown) around it. This scaffolding board 5 is set to a length such that at least both ends thereof overlap the ends of the above-mentioned hanging scaffolding D. Moreover, one hanger 6, 6' is attached to the lower flange 1a of the beam steel frame 1 only at both ends of the beam steel frame 1.

(2) 上記の工程を経た桁行梁先組体Bの複数個を
予め所定間隔おきに立設された柱鉄骨A間に架
設する。尚、第1図に示した定尺の鋼製足場板
7は、この作業に先立つて、柱鉄骨Aの片側に
来る桁行梁先組体Bの足場板5に載せて、番線
等により仮止めしておく。尚、張間方向梁先組
体Cは、通常、桁行梁先組体Bに先行して柱鉄
骨A間に架設され、柱鉄骨Aには予めスパイラ
ルフープ筋8がセツトされる。
(2) A plurality of girder and beam end assemblies B that have undergone the above steps are erected between the column steel frames A that are erected at predetermined intervals. Prior to this work, the steel scaffolding board 7 of the fixed length shown in Fig. 1 is placed on the scaffolding board 5 of the girder beam end assembly B that comes to one side of the column steel A, and is temporarily secured with grid lines, etc. I'll keep it. Incidentally, the span direction beam end assembly C is usually constructed between the column steel frames A prior to the girder beam front assembly B, and the spiral hoop reinforcements 8 are set on the column steel A in advance.

(3) 以上の工程によつて骨組を架構した後、各柱
鉄骨Aの両端に位置した桁行梁先組体Bの端部
のハンガー6,6′間に、一方の桁行梁先組体
Bに載せておいた前記鋼製足場板7を掛け渡し
て、柱梁仕口周りにのみ吊り足場Dを形成す
る。この作業と前後して、各桁行梁先組体Bの
上方には、柱鉄骨A間に前記親網Fを張り渡た
す。
(3) After constructing the frame according to the above process, one of the girder beam front assemblies B The above-mentioned steel scaffolding board 7 placed on the frame is hung over to form a hanging scaffold D only around the column and beam joints. Before and after this work, the main net F is stretched between the column steel frames A above each girder-beam end assembly B.

以上によつて、足場の仮設が完了するのであ
る。従つて、柱梁仕口で行なわれるボルト・ナツ
トの本締め、柱鉄骨Aと梁鉄骨1の溶接作業等
は、吊り足場Dを用いて安全に行なうことができ
る。また、桁行方向への作業員の移動(吊り足場
Dから別の吊り足場Dへの移動)は足場板5を歩
行して行なわれるが、親網Fを手摺りとし、さら
には各作業員が装備している命網を親網Fに係止
させ、親網Fによつて安全を確保しつつ桁行方向
への移動を行なうことができる。
With the above steps, the temporary construction of the scaffolding is completed. Therefore, final tightening of bolts and nuts, welding work between the column steel frame A and the beam steel frame 1, etc. performed at the column-beam joint can be safely performed using the suspended scaffold D. In addition, the movement of workers in the row direction (movement from one suspended scaffold D to another suspended scaffold D) is performed by walking on the scaffolding board 5, but the main net F is used as a handrail, and each worker The equipped life net is locked to the main net F, and the main net F allows movement in the row direction while ensuring safety.

本発明は、以上の構成よりなり、作業上必要な
柱梁仕口周りにのみ吊り足場を設け、吊り足場間
の移動は、桁行梁先組体の架設前に予め梁鉄筋上
面に載置固定しておいた足場板と柱鉄骨間に張り
渡した親網を用いて行なうようにしたので、高価
な吊り足場の使用個数が激減して、仮設費が削減
されるばかりでなく、地組みした桁行梁先組体の
梁鉄骨に対するハンガーの取付け位置の割出し等
の手間ならびにハンガー間に鋼製足場板を掛け渡
す手間が大幅に削減され、施工能率を向上し得る
効果がある。
The present invention has the above-mentioned configuration, and suspending scaffolds are provided only around the column and beam joints necessary for the work, and movement between the suspended scaffolds is achieved by placing and fixing them on the top surface of the beam reinforcing bars in advance before the girder beam end assembly is erected. Since this work was carried out using a main net stretched between the scaffolding boards and the steel columns, the number of expensive hanging scaffolds used was drastically reduced, which not only reduced temporary construction costs, but also made it easier to assemble on the ground. The time and effort involved in determining the mounting position of the hanger with respect to the beam steel frame of the girder girder end assembly and the time and effort required to span the steel scaffolding boards between the hangers are greatly reduced, and this has the effect of improving construction efficiency.

【図面の簡単な説明】[Brief explanation of drawings]

図面は本発明の実施例を示し、第1図は足場の
仮設が完了した状態を示す斜視図、第2図は桁行
梁先組体に足場板及びハンガーを取り付けた状態
を示す斜視図、第3図は同上縦断面図である。 A……柱鉄骨、B……桁行梁先組体、D……吊
り足場、F……親網、1……梁鉄骨、4……梁鉄
筋、5……足場板、6,6′……ハンガー、7…
…定尺の鋼製足場板。
The drawings show an embodiment of the present invention, and FIG. 1 is a perspective view showing a state in which temporary scaffolding has been completed, FIG. Figure 3 is a longitudinal sectional view of the same as above. A...Column steel frame, B...Girder beam end assembly, D...Hanging scaffold, F...Main net, 1...Beam steel frame, 4...Beam reinforcing bar, 5...Scaffold board, 6, 6'... ...Hanger, 7...
...Standard length steel scaffolding board.

Claims (1)

【特許請求の範囲】[Claims] 1 H型鋼よりなる梁鉄骨の周囲に梁主筋及びス
ターラツプよりなる篭状の梁鉄筋が取り付けられ
た桁行梁先組体を地組みし、前記梁鉄筋の上面に
足場板を載置固定すると共に、前記梁鉄骨の下フ
ランジには梁鉄骨両端部にのみハンガーを1個ず
つ取り付けておき、以上の工程を経た桁行梁先組
体の複数個を所定間隔おきに立設された柱鉄骨間
に架設し、柱鉄骨の両側に位置した桁行梁先組体
の端部のハンガー間に夫々定尺の鋼製足場板を掛
け渡して柱梁仕口周りにのみ吊り足場を形成し、
桁行梁先組体の上方には柱鉄骨間に親網を張り渡
すことを特徴とするSRC造建造物の骨組架構に
おける足場仮設方法。
1. Assembling the girder girder end assembly in which cage-shaped beam reinforcing bars made of beam main bars and stirrups are attached around a beam steel frame made of H-shaped steel, and placing and fixing a scaffold board on the top surface of the beam reinforcing bars, One hanger is attached to the lower flange of the steel beam at each end of the steel beam, and a plurality of girder girder end assemblies that have undergone the above steps are erected between the column steel frames erected at predetermined intervals. Then, a fixed-length steel scaffolding board was hung between the hangers at the ends of the girder and girder front assemblies located on both sides of the column steel frame to form a hanging scaffold only around the column and beam joints.
A temporary scaffolding method for the frame structure of an SRC building, characterized by stretching a parent net between the steel columns above the girder and beam end assembly.
JP9449783A 1983-05-27 1983-05-27 Temporary construction of scaffold in skeletal housing of src building Granted JPS59220557A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9449783A JPS59220557A (en) 1983-05-27 1983-05-27 Temporary construction of scaffold in skeletal housing of src building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9449783A JPS59220557A (en) 1983-05-27 1983-05-27 Temporary construction of scaffold in skeletal housing of src building

Publications (2)

Publication Number Publication Date
JPS59220557A JPS59220557A (en) 1984-12-12
JPS648152B2 true JPS648152B2 (en) 1989-02-13

Family

ID=14111937

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9449783A Granted JPS59220557A (en) 1983-05-27 1983-05-27 Temporary construction of scaffold in skeletal housing of src building

Country Status (1)

Country Link
JP (1) JPS59220557A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS626063A (en) * 1985-07-01 1987-01-13 大成建設株式会社 Beam construction method for steel reinforced concrete structures

Also Published As

Publication number Publication date
JPS59220557A (en) 1984-12-12

Similar Documents

Publication Publication Date Title
JPH10280669A (en) Scaffolding unit
US20050066609A1 (en) Preassembled roof and floor deck panel system
JPS648152B2 (en)
JP3247749B2 (en) Construction method of long span truss beams
KR200213539Y1 (en) Frame of safety workbench
JP2654935B2 (en) Construction method of ribbed slab and spacer for rib reinforcement
JPH0517996A (en) Building constructing method
JPH0754480A (en) Prefabricated scaffolding and assembling and disassembling method thereof
JP2004270377A (en) Column-beam preassembled reinforcement body, and preassembled reinforcement method using the same
JPS603844Y2 (en) reinforced concrete structure
JPH05263526A (en) Construction method of rc construction beam
JPH07217230A (en) Suspended stairs and temporary construction method
JPS6137426B2 (en)
JPS6133172Y2 (en)
JPH0115800Y2 (en)
JP2733536B2 (en) Beam rebar preassembly method and beam rebar suspension device
JP2808448B2 (en) Roof construction method
JPH0447107B2 (en)
JPS61158537A (en) Building of iron skeletal
JP2709155B2 (en) ALC floor panel mounting method
JPS6065869A (en) Iron wire pre-fabricating unit construction method for construction wall body
KR20260024910A (en) Weldless Mezzanine construction and it's construction method
JPH0740029Y2 (en) Work scaffold mounting jig to steel column
JPS6035602Y2 (en) Girders with pre-set under-girder suspension scaffolding
JPH0522023B2 (en)