JPH0120783B2 - - Google Patents
Info
- Publication number
- JPH0120783B2 JPH0120783B2 JP18051282A JP18051282A JPH0120783B2 JP H0120783 B2 JPH0120783 B2 JP H0120783B2 JP 18051282 A JP18051282 A JP 18051282A JP 18051282 A JP18051282 A JP 18051282A JP H0120783 B2 JPH0120783 B2 JP H0120783B2
- Authority
- JP
- Japan
- Prior art keywords
- simulation
- switch
- relay
- simulation model
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/24—Resetting means
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Feedback Control In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【発明の詳細な説明】
本発明はシミユレート装置、特にプラントの運
転員を教育訓練するためのシミユレート装置に関
する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a simulation device, and particularly to a simulation device for educating and training plant operators.
この種のシミユレート装置においては、各機
器、例えばポンプ、コンプレツサー等の作動機器
の起動、停止用のスイツチ信号及び温度、圧力、
流量等の調節計からの制御信号等をシミユレーシ
ヨンモデルに入力し、シミユレーシヨンを行ない
その結果を各表示装置に出力させることよりなつ
ている。 In this type of simulation equipment, switch signals for starting and stopping operating equipment such as pumps and compressors, as well as temperature, pressure,
The system consists of inputting control signals such as flow rate controllers into a simulation model, performing simulation, and outputting the results to each display device.
ところで、従来のシミユレート装置において
は、機器の起動、停止用のスイツチのオン−オフ
信号をそのままシミユレーシヨンモデル装置に入
力していたため、オン−オフ信号の状態変化のい
かんにかかわらず、変化対応モデルのシミユレー
シヨンをしなければならず、シミユレーシヨン用
のコンピユータの負荷が大となり、高性能のコン
ピユータが必要であつた。また、この従来のシミ
ユレート装置では、シミユレーシヨンモデル装置
から、スイツチのオン−オフ動作を行なうことが
できなかつたため、例えばトレーナのシミユレー
シヨンモデル装置に対するポンプのトラブル指令
に基いて、ポンプのシミユレーシヨンは停止動作
を行なうが対応スイツチをオフの状態にすること
はできず、被訓練者をして臨場感に欠けるところ
があつた。 By the way, in conventional simulation equipment, the on-off signal of the switch for starting and stopping the equipment was directly input into the simulation model equipment, so regardless of the state change of the on-off signal, the change A compatible model had to be simulated, which placed a heavy load on the simulation computer and required a high-performance computer. In addition, in this conventional simulation device, it was not possible to turn on and off the switch from the simulation model device, so for example, based on a pump trouble command from the trainer to the simulation model device, the pump could not be turned on or off. Although the simulation performed a stop operation, the corresponding switch could not be turned off, and the trainee lacked a sense of realism.
本発明は、かかる現状に鑑みなされたもので、
本発明の目的はコンピユータの負荷を低減し、か
つ、シミユレーシヨンモデル装置から機器の起
動、停止のスイツチを作動できるシミユレート装
置を提供するものである。 The present invention was made in view of the current situation, and
SUMMARY OF THE INVENTION An object of the present invention is to provide a simulation device that reduces the load on a computer and can operate switches for starting and stopping equipment from a simulation model device.
すなわち、本発明は、機器の起動、停止を設定
するスイツチと、当該スイツチのオン−オフ信号
に基き、プラントのシミユレーシヨンを行うとと
もに、前記機器の起動、停止を表示するランプを
点滅させるシミユレーシヨンモデル装置とから成
るシミユレート装置において、当該スイツチと直
列に第1のリレーを、また当該第1のリレーと並
列に第2のリレーを設け、第1のリレーの作動に
より、オン−オフ作動信号をシミユレーシヨンモ
デル装置に出力するとともに、前記第2のリレー
の作動により、前記ランプを点滅させることを特
徴とする。 That is, the present invention provides a switch that sets the start and stop of equipment, and a simulation that performs a plant simulation based on the on-off signal of the switch and blinks a lamp indicating the start and stop of the equipment. In a simulation device consisting of a simulation model device, a first relay is provided in series with the switch, and a second relay is provided in parallel with the first relay. is output to a simulation model device, and the lamp is made to blink by operating the second relay.
以下に図に基いて、本発明の好ましい実施態様
について述べる。 Preferred embodiments of the present invention will be described below based on the drawings.
第1図はシミユレート装置の概念図であり、1
は計装パネルを示し、この計装パネル1には、現
実のプラントの各制御箇所の温度、圧力又は流量
等を制御するための調節計、及びこれらの測定量
を表示、記録するための指示計、記録計、並びに
作動機器、例えばポンプ、コンプレツサー等の起
動、停止のためのスイツチ及び起動、停止の状態
を表示する表示ランプ等に相当する各種の調節
計、指示計、記録計、スイツチ、表示ランプ等が
配置されている。又、この計装パネル1は、現実
のプラントの運転監視のために設けられているい
わゆる計器室内の計器パネルに対応するものの他
に、フイールドにおいて、作動機器を起動、停止
するためのスイツチ類に対応したスイツチ類をパ
ネル化したものをも含むものである。 Figure 1 is a conceptual diagram of the simulation device.
indicates an instrumentation panel, and this instrumentation panel 1 includes controllers for controlling temperature, pressure, flow rate, etc. at each control point of the actual plant, and instructions for displaying and recording these measured quantities. Various controllers, indicators, recorders, switches, etc. corresponding to meters, recorders, and operating equipment such as switches for starting and stopping pumps, compressors, etc., and indicator lamps that display the status of starting and stopping; Display lamps etc. are arranged. Moreover, this instrumentation panel 1 corresponds to the so-called instrument panel in the control room provided for monitoring the operation of actual plants, and also to switches for starting and stopping operating equipment in the field. This also includes panels of compatible switches.
2はシミユレーシヨンモデル装置であり、コン
ピユータ及び補助記憶装置等から構成されてい
る。このシミユレーシヨンモデル装置には計装パ
ネル1に配置された、調節計やスイツチ類の制御
信号に基きシミユレーシヨンを行ない、現実のプ
ラントが動作した場合と同じ状態の信号を前記計
装パネル1の指示計、記録計表示ランプ、その他
トレーナ用指令装置3の表示部等に出力するシミ
ユレーシヨンモデルが組込まれている。 Reference numeral 2 denotes a simulation model device, which is composed of a computer, an auxiliary storage device, and the like. This simulation model device performs simulation based on control signals from controllers and switches placed on the instrumentation panel 1, and sends signals in the same state as when the actual plant is operating to the instrumentation panel 1. A simulation model that outputs to the indicator, recorder display lamp, and other display parts of the trainer command device 3 is incorporated.
3はトレーナ用指令装置を示し、シミユレーシ
ヨンモデル装置2に対して、シミユレーシヨンの
開始、停止、各種のトラブル、例えば、所定のポ
ンプの故障、配管の閉塞、加熱炉の失火等、の指
令信号を発し、又シミユレーシヨンの結果を表示
させるものからなり、好ましくは、キーボード付
のデイスプレイ装置が用いられる。 Reference numeral 3 indicates a trainer command device, which gives commands to the simulation model device 2 to start and stop the simulation, as well as various troubles such as failure of a specified pump, blockage of piping, misfire of the heating furnace, etc. It consists of something that emits signals and displays the results of the simulation, and preferably a display device with a keyboard is used.
本発明は特にこのような構成より成るシミユレ
ート装置の上記計装パネル1に配置された機器の
起動、停止を設定するスイツチを、このスイツチ
がオン−オフ作動の変化を生じたときに、その信
号をシミユレーシヨンモデル装置2に入力するよ
うにするとともに、計装パネル上の当該スイツチ
に対応する表示ランプを点滅させるように、ラン
プとともにリレー回路に組み込んだものである。
このリレー回路の好ましい具体例を第2図に示
す。 In particular, the present invention provides a signal for controlling a switch for setting the start and stop of equipment disposed on the instrumentation panel 1 of a simulation device having such a configuration, when the switch changes its on-off operation. is input into the simulation model device 2, and is incorporated into a relay circuit together with a lamp so as to blink an indicator lamp corresponding to the switch on the instrumentation panel.
A preferred example of this relay circuit is shown in FIG.
図において、SW1は、機器の起動スイツチに
対応する計装パネル1上のスタートスイツチ、
SW2は機器の停止スイツチに対応する計装パネ
ル1上のストツプスイツチを示す。これらのスタ
ートスイツチSW1及びストツプスイツチSW2
は、第1のリレーRY1に直列で、かつ、お互に
並列に構成されるとともに、ストツプスイツチ
SW2側には、第2のリレーRY2が無励磁のと
きオフとなる接点SW3が接続されている。ま
た、第1のリレーRY1には、その励磁及び無励
磁によりオン−オフ動作する接点SW4が設けら
れ、この信号がシミユレーシヨンモデル装置2に
出力されるようになつている。 In the figure, SW1 is a start switch on the instrumentation panel 1 corresponding to the start switch of the equipment,
SW2 indicates a stop switch on the instrumentation panel 1 that corresponds to the stop switch of the equipment. These start switch SW1 and stop switch SW2
are configured in series with the first relay RY1 and in parallel with each other, and are connected to the stop switch.
A contact SW3 is connected to the SW2 side, which is turned off when the second relay RY2 is not energized. Further, the first relay RY1 is provided with a contact SW4 that turns on and off depending on its energization and de-energization, and this signal is output to the simulation model device 2.
また、第1のリレーRY1とは並列に第2のリ
レーRY2が設けられ、この第2のリレーRY2
と直列に、シミユレーシヨンモデル装置2からの
信号によりオン−オフする機能を有するプロセス
I/Oの出力端であるロツクスイツチSW7が結
線されている。 Further, a second relay RY2 is provided in parallel with the first relay RY1, and this second relay RY2
A lock switch SW7, which is an output terminal of a process I/O and has a function of being turned on and off by a signal from the simulation model device 2, is connected in series with the control switch SW7.
さらに上記第1及び第2のリレーRY1,RY
2と並列に機器の起動又は停止を表示するランプ
に対応する計装パネル1上のランプLA1が又、
このランプと直列に、第2のリレーRY2の励磁
又は無励磁によりオン−オフ作動をする接点SW
5が結線されている。第2図は表示ランプを2ケ
設けた例であり、2ケ目のランプLA2及び接点
SW6が前記ランプLA2及び接点SW5と並列し
て設けられている。もちろん、表示ランプが1ケ
の場合は、後者は不要であり、2ケ以上必要とす
る場合は、前述のように並列にランプと接点を追
加することにより行ない得る。 Furthermore, the first and second relays RY1 and RY mentioned above
In parallel with 2, the lamp LA1 on the instrumentation panel 1 corresponding to the lamp indicating start or stop of the equipment is also
In series with this lamp, there is a contact SW that turns on and off depending on whether the second relay RY2 is energized or not energized.
5 is connected. Figure 2 is an example where two indicator lamps are installed, and the second lamp LA2 and the contact
SW6 is provided in parallel with the lamp LA2 and contact SW5. Of course, if there is only one indicator lamp, the latter is not necessary; if two or more indicator lamps are required, it can be done by adding lamps and contacts in parallel as described above.
以上のように構成された本発明のシミユレート
装置の作動態様を以下に説明する。 The operating mode of the simulation device of the present invention configured as described above will be explained below.
計装パネル1から発信される調節計及びスイツ
チ等の制御信号はシミユレーシヨンモデル装置2
に入力され、シミユレーシヨンモデルによるシミ
ユレーシヨンの結果が、シミユレーシヨンモデル
装置2から出力され、計装パネル1上の指示計及
び記録計等に表示される。 Control signals such as controllers and switches transmitted from the instrumentation panel 1 are sent to the simulation model device 2.
The results of the simulation using the simulation model are output from the simulation model device 2 and displayed on the indicator, recorder, etc. on the instrumentation panel 1.
一方、教官がトレーナ用指令装置3から、シミ
ユレーシヨンモデル装置2に対して、トラブルの
設定指令を出すことによりシミユレーシヨンモデ
ルは、当該トラブルに応じたシミユレーシヨンを
行ない、この結果が、シミユレーシヨンモデル装
置2から計装パネル1上の指示計及び記録計に表
示される。訓練生は、この計装パネル1上の計器
の表示を見て、各自判断により調節計又は、スイ
ツチ等の設定を変更し、トラブルの収拾に務め
る。この過程を通じて訓練を行なう。 On the other hand, when the instructor issues a trouble setting command from the trainer command device 3 to the simulation model device 2, the simulation model performs a simulation according to the trouble, and the result is The information is displayed from the simulation model device 2 on the indicator and recorder on the instrumentation panel 1. The trainees look at the displays on the instrument panel 1 and change the settings of controllers, switches, etc. according to their own judgment, and try to resolve the problem. Provide training throughout this process.
ところで、この訓練の過程において、ある特定
の機器の起動を試みるために、計装パネル上のス
タートスイツチSW1を押すと、RY1が励磁さ
れ、その結果接点SW4がオンとなる。 By the way, in the course of this training, when the start switch SW1 on the instrumentation panel is pressed in order to try to start a particular device, RY1 is energized, and as a result, contact SW4 is turned on.
このとき、シミユレーシヨンモデル装置2に、
オン動作の信号が入力される。この信号に基き、
シミユレーシヨンモデルにおいて、該当機器が起
動できるか否か例えば、故障中、修理中など起動
が不可能でないかどうかの論理判断がなされ、起
動できるとき、ロツクスイツチSW7をオンとす
る。これにより第2のリレーRY2が励磁され、
接点SW3がオンとなる。従つてスタートスイツ
チSW1を離しても、機器は起動状態を呈し、
又、再度スタートスイツチSW1を誤つて押して
も、シミユレーシヨンモデル装置2には、何ら信
号が出力されない。また、第2のリレーRY2の
励磁は、接点SW5及びSW6をそれぞれオンと
するため、表示ランプLA1及びLA2は起動を示
すべく点灯する。 At this time, in the simulation model device 2,
A signal for ON operation is input. Based on this signal,
In the simulation model, a logical judgment is made as to whether or not the device in question can be started, for example, if it is out of order or under repair, and if it is possible to start, the lock switch SW7 is turned on. This energizes the second relay RY2,
Contact SW3 turns on. Therefore, even if you release the start switch SW1, the device will remain in the starting state.
Further, even if the start switch SW1 is pressed again by mistake, no signal is output to the simulation model device 2. Moreover, since the excitation of the second relay RY2 turns on the contacts SW5 and SW6, respectively, the indicator lamps LA1 and LA2 light up to indicate activation.
次に本機器を停止すべく、ストツプスイツチ2
を押すと、第1のリレーRY1が無励磁となり、
接点SW4をオフとするこの信号が、シミユレー
シヨンモデル装置2に入力され、該当する機器が
停止し得るか否かの論理判断がなされ、停止でき
るときロツクスイツチSW7をオフとする。 Next, turn the stop switch 2 to stop the device.
When you press , the first relay RY1 becomes de-energized and
This signal that turns off the contact SW4 is input to the simulation model device 2, and a logical judgment is made as to whether or not the corresponding equipment can be stopped, and when it can be stopped, the lock switch SW7 is turned off.
これにより第2のリレーRY2が、無励磁状態
となり、この結果接点SW3がオフとなり、スト
ツプスイツチSW2を押すのを止めても、ストツ
プの状態が保たれ、また、接点SW5及びSW6
もオフとなるため、表示ランプLA1及びLA2が
消灯する。 As a result, the second relay RY2 becomes a non-energized state, and as a result, the contact SW3 turns off, and even if you stop pressing the stop switch SW2, the stopped state is maintained, and the contacts SW5 and SW6 are turned off.
Since the display lamps LA1 and LA2 are also turned off, the display lamps LA1 and LA2 are turned off.
また、訓練途中で、機器のトラブルを想定し
て、機器を停止したい場合は、トレーナ用指令装
置3からシミユレーシヨンモデル装置2に指令信
号を与える。これによりロツクスイツチSW7が
オフとなり、第2のリレーRY2が無励磁状態と
なり接点SW3,SW5,SW6がオフ状態とな
り、機器の停止状態が呈される。 Further, during training, if it is desired to stop the equipment in case of trouble with the equipment, a command signal is given from the trainer command device 3 to the simulation model device 2. As a result, lock switch SW7 is turned off, second relay RY2 is de-energized, contacts SW3, SW5, and SW6 are turned off, and the device is brought to a halt state.
さらに、本発明では、機器が起動状態にある場
合に、スタートスイツチSW1を、又逆に機器が
停止状態にある場合に、ストツプスイツチSW2
を押しても、シミユレーシヨンモデル装置へ信号
は出力されず、誤操作に基くシミユレーシヨンを
行なうことなく、現実のプラントの雰囲気を保持
することができる。 Furthermore, in the present invention, the start switch SW1 is activated when the device is in a starting state, and conversely, the stop switch SW2 is activated when the device is in a stopped state.
Even if you press , no signal is output to the simulation model device, and the atmosphere of the actual plant can be maintained without performing simulations based on erroneous operations.
以上のような本発明は、機器の起動、停止のた
めのスイツチ及びその表示ランプを所定のリレー
回路に組込みオン−オフ信号の状態変化があつた
ときのみシミユレーシヨンモデル装置に信号が入
力されるため、シミユレーシヨン用のコンピユー
タの負荷が低減でき、又、シミユレーシヨンモデ
ル装置から、教官の指示信号に基いて、前記スイ
ツチ、ランプをオン−オフでき、訓練者に臨場感
を与える等、格別の効果を有するものである。 The present invention as described above incorporates a switch for starting and stopping equipment and its indicator lamp into a predetermined relay circuit, and a signal is input to a simulation model device only when the state of an on-off signal changes. Therefore, the load on the computer for simulation can be reduced, and the switches and lamps can be turned on and off based on instruction signals from the instructor from the simulation model device, giving the trainee a sense of realism. , which has a special effect.
第1図はシミユレート装置の概念図であり、第
2図は、本発明のリレー回路の一実施態様を示す
回路図である。第1図において1は計装パネル、
2はシミユレーシヨンモデル装置、3はトレーナ
用の指令装置である。
FIG. 1 is a conceptual diagram of a simulation device, and FIG. 2 is a circuit diagram showing one embodiment of a relay circuit of the present invention. In Fig. 1, 1 is an instrumentation panel;
2 is a simulation model device, and 3 is a command device for a trainer.
Claims (1)
該スイツチのオン−オフ信号に基き、プラントの
シミユレーシヨンを行うとともに、前記機器の起
動、停止を表示するランプを点滅させるシミユレ
ーシヨンモデル装置とから成るシミユレート装置
において、当該スイツチと直列に第1のリレー
を、また当該第1のリレーと並列に第2のリレー
を設け、第1のリレーの作動により、オン−オフ
作動信号をシミユレーシヨンモデル装置に出力す
るとともに、シミユレーシヨンモデル装置からの
出力信号に基いて上記第2のリレーを作動させる
ことにより、前記ランプを点滅させることを特徴
とするシミユレート装置。1 A switch that sets the start and stop of equipment, and a simulation model device that simulates the plant based on the on-off signal of the switch and flashes a lamp that indicates the start and stop of the equipment. In the simulation device, a first relay is provided in series with the switch, and a second relay is provided in parallel with the first relay, and the on-off operation signal is simulated by the operation of the first relay. A simulation device characterized in that the lamp is made to blink by outputting it to a model device and activating the second relay based on an output signal from the simulation model device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP57180512A JPS5969860A (en) | 1982-10-14 | 1982-10-14 | Simulating device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP57180512A JPS5969860A (en) | 1982-10-14 | 1982-10-14 | Simulating device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5969860A JPS5969860A (en) | 1984-04-20 |
| JPH0120783B2 true JPH0120783B2 (en) | 1989-04-18 |
Family
ID=16084542
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP57180512A Granted JPS5969860A (en) | 1982-10-14 | 1982-10-14 | Simulating device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5969860A (en) |
-
1982
- 1982-10-14 JP JP57180512A patent/JPS5969860A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5969860A (en) | 1984-04-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201113293Y (en) | Simulation panel for power transmission and distribution control | |
| JPH0234888A (en) | Training or service kits and simulators | |
| US3146533A (en) | Personnel training apparatus | |
| JPH0120783B2 (en) | ||
| JP3397006B2 (en) | Input/Output Display Unit | |
| CN114822133A (en) | Exercise control platform, exercise control method and electronic equipment for space launch site | |
| CN217386526U (en) | Nuclear power station sound alarm system training device | |
| JP2524631B2 (en) | Inspection equipment for remote monitoring system | |
| JPH0816092A (en) | Training simulator device | |
| JPS5946676A (en) | Plant simulator | |
| JP2531669B2 (en) | Driving training simulator device | |
| JPS5814386Y2 (en) | Graphic Hiyouji Souchi | |
| JPH0583911B2 (en) | ||
| CN209822133U (en) | DK-2 type electro-pneumatic brake training device | |
| JPS61101807A (en) | Plant operation operating device | |
| JPS5969776A (en) | Plant training simulator | |
| JPH0434603A (en) | Digital control device | |
| JPH0536790B2 (en) | ||
| JPH0575775U (en) | Training simulator | |
| JPS5847482Y2 (en) | Graphic Hiyouji Souchi | |
| JPH0525467U (en) | Training simulator instructor support device | |
| JPS63184779A (en) | Plant operation training simulator | |
| JPS62125386A (en) | Operation training simulator system | |
| JPS6275707A (en) | Simulate equipment | |
| JPH06231109A (en) | System for supporing operation of real machine plant |