Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0129849B2 - - Google Patents
[go: Go Back, main page]

JPH0129849B2 - - Google Patents

Info

Publication number
JPH0129849B2
JPH0129849B2 JP20334785A JP20334785A JPH0129849B2 JP H0129849 B2 JPH0129849 B2 JP H0129849B2 JP 20334785 A JP20334785 A JP 20334785A JP 20334785 A JP20334785 A JP 20334785A JP H0129849 B2 JPH0129849 B2 JP H0129849B2
Authority
JP
Japan
Prior art keywords
raw material
bunker
blast furnace
discharge time
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP20334785A
Other languages
Japanese (ja)
Other versions
JPS6263607A (en
Inventor
Sumyuki Kishimoto
Akira Maki
Norio Saito
Tadayoshi Tamura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Kokan Ltd filed Critical Nippon Kokan Ltd
Priority to JP20334785A priority Critical patent/JPS6263607A/en
Publication of JPS6263607A publication Critical patent/JPS6263607A/en
Publication of JPH0129849B2 publication Critical patent/JPH0129849B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Blast Furnaces (AREA)

Description

【発明の詳細な説明】 〔発明の技術分野〕 この発明は、高炉のベルレス式装入装置による
高炉原料の装入方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a method for charging raw material into a blast furnace using a bellless charging device for a blast furnace.

〔従来技術とその問題点〕[Prior art and its problems]

高炉内への原料の装入装置の1つとして、ベル
レス式装入装置が知られている。ベルレス式装入
装置は、第3図に概略説明図で示すように、高炉
1の炉頂に設けられたバンカー2内に、複数の原
料貯蔵槽3内に貯蔵されているコークスおよび鉄
鉱石を、ベルトコンベア4によつて交互に供給
し、高炉1内に設けられた旋回シユート5を連続
旋回させ、バンカー2の原料排出通路6に設けら
れた流量制御弁7を開いて、バンカー2内のコー
クスおよび鉄鉱石等の原料を、連続旋回する旋回
シユート5によつて高炉1内に均一に装入する装
置である。この装置によれば、旋回シユート5の
傾斜角度および一定時間当りの旋回数によつて、
高炉1の半径方向における原料の装入分布を制御
することができる。
A bellless charging device is known as one of the devices for charging raw materials into a blast furnace. As shown in the schematic diagram in FIG. 3, the bellless charging device charges coke and iron ore stored in a plurality of raw material storage tanks 3 into a bunker 2 provided at the top of a blast furnace 1. , is supplied alternately by the belt conveyor 4, the rotating chute 5 provided in the blast furnace 1 is continuously rotated, and the flow rate control valve 7 provided in the raw material discharge passage 6 of the bunker 2 is opened to release the material in the bunker 2. This device uniformly charges raw materials such as coke and iron ore into the blast furnace 1 using a rotating chute 5 that rotates continuously. According to this device, depending on the inclination angle of the swing chute 5 and the number of turns per certain time,
The charging distribution of raw materials in the radial direction of the blast furnace 1 can be controlled.

この装置によつて、高炉1内に原料を装入する
に当り、高炉1内の半径方向における原料装入分
布を均一に保つ上で、バンカー2からの原料の排
出に要する時間を一定に保つことが必要である。
このようなバンカー2からの原料の排出時間は、
バンカー2の原料排出通路6内に設けられた流量
制御弁7によつて調節され、これによつて、バン
カー2内の原料が排出される間の旋回シユート5
の回転数を一定に保つように制御している。
With this device, when charging the raw material into the blast furnace 1, the time required for discharging the raw material from the bunker 2 is kept constant in order to maintain a uniform distribution of raw material charging in the radial direction within the blast furnace 1. It is necessary.
The time for discharging raw materials from bunker 2 is as follows:
The flow rate control valve 7 provided in the raw material discharge passage 6 of the bunker 2 controls the flow rate of the rotating chute 5 while the raw material in the bunker 2 is being discharged.
It is controlled to keep the rotation speed constant.

しかしながら、バンカー2からの原料の排出時
間は、原料の粒度、水分、表面性状等の多くの要
因に影響されるため、流量制御弁7により原料の
排出時間を一定に保つことは困難である。第4図
はコークスおよび鉄鉱石の、バンカーからの排出
時間を示すグラフで、所定の目標排出時間に対し
各装入チヤージ毎に変動しており、特にコークス
の変動幅は大きい。
However, since the discharge time of the raw material from the bunker 2 is influenced by many factors such as the particle size, moisture content, and surface properties of the raw material, it is difficult to keep the raw material discharge time constant using the flow rate control valve 7. FIG. 4 is a graph showing the discharge time of coke and iron ore from the bunker, which varies for each charging charge with respect to a predetermined target discharge time, and the fluctuation range of coke is particularly large.

第5図は高炉1内に装入されたコークスおよび
鉄鉱石の、炉内半径方向における分布状態を示す
説明図である。図面に示すように例えばコークス
のバンカーからの排出時間即ち高炉1内への装入
時間が所定の目標時間よりも短い場合には、実線
aで示す目標分布に比べて、点線bで示すように
炉心に向けて低い分布となり、一方、目標時間よ
りも長い場合には、実線aで示す目標分布に比べ
て、点線cで示すように炉心に向けて高い分布と
なる。
FIG. 5 is an explanatory diagram showing the distribution state of coke and iron ore charged into the blast furnace 1 in the radial direction inside the furnace. As shown in the drawing, for example, if the time for discharging coke from the bunker, that is, the time for charging into the blast furnace 1, is shorter than a predetermined target time, the distribution will be as shown by dotted line b, compared to the target distribution shown by solid line a. The distribution becomes lower toward the core, and on the other hand, when the time is longer than the target time, the distribution becomes higher toward the core, as shown by the dotted line c, compared to the target distribution shown by the solid line a.

このように、ベルレス式装入装置の場合は、原
料の粒度、水分、表面性状等によつて、バンカー
からの原料の排出時間にバラツキが生ずる結果、
高炉の炉心部におけるコークスと鉄鉱石との層厚
比が装入チヤージ毎に変化し、順調な高炉操業を
妨げる問題があつた。
In this way, in the case of a bellless charging device, the time taken to discharge the raw material from the bunker varies depending on the particle size, moisture content, surface texture, etc. of the raw material.
The layer thickness ratio between coke and iron ore in the core of the blast furnace changes with each charging charge, which poses a problem that hinders smooth blast furnace operation.

〔発明の目的〕[Purpose of the invention]

従つて、この発明の目的は、ベルレス式高炉原
料装入装置によつて高炉内に原料を装入するに当
り、バンカーからの原料の排出時間をほぼ一定と
なし、炉内に安定した分布状態で原料を装入する
ための、ベルレス式高炉原料装入装置による高炉
原料の装入方法を提供することにある。
Therefore, an object of the present invention is to make the discharge time of the raw material from the bunker almost constant and to maintain a stable distribution state in the furnace when charging raw material into the blast furnace using a bellless type blast furnace raw material charging device. An object of the present invention is to provide a method for charging raw material into a blast furnace using a bellless type blast furnace raw material charging device.

〔発明の概要〕[Summary of the invention]

本発明者等は、上述した問題を解決すべく鋭意
研究を重ねた。その結果、本発明者等は、バンカ
ーからの原料の排出時間を一定に保つように、バ
ンカーの原料排出通路に設けられた流量制御弁の
開度を定めるためには、原料の排出特性を予測す
る必要があること、および、原料貯蔵槽からの原
料の排出時間と、前記原料のバンカーからの排出
時間との間には、前記原料の排出特性に基づいて
一定の相関関係があることを知見した。
The inventors of the present invention have conducted extensive research in order to solve the above-mentioned problems. As a result, the inventors found that it is necessary to predict the discharge characteristics of the raw material in order to determine the opening degree of the flow control valve provided in the raw material discharge passage of the bunker so as to keep the discharge time of the raw material from the bunker constant. and that there is a certain correlation between the discharge time of the raw material from the raw material storage tank and the discharge time of the raw material from the bunker based on the discharge characteristics of the raw material. did.

この発明は、上記知見に基づいてなされたもの
であつて、 高炉炉頂に設けられたバンカー内に原料貯蔵槽
内の原料を供給し、前記バンカーの原料排出口に
設けられた流量制御弁を通して、前記バンカーか
ら前記原料を排出し、このようにして排出された
前記原料を、高炉内に、その上部に設けられた旋
回シユートによつて分配装入する、ベルレス式高
炉原料装置による高炉原料の装入方法において、 前記原料貯蔵槽からの原料の実績排出時間と、
前記バンカーからの原料の目標排出時間とによつ
て、前記流量制御弁の開度を定め、かくして、前
記バンカーからの原料の排出時間を一定に保つよ
うにしたことに特徴を有するものである。
This invention has been made based on the above knowledge, and involves supplying the raw material in the raw material storage tank into a bunker installed at the top of the blast furnace, and passing the raw material in the raw material storage tank through the flow rate control valve installed at the raw material outlet of the bunker. , the raw material is discharged from the bunker, and the thus discharged raw material is distributed and charged into the blast furnace through a rotating chute provided at the upper part of the blast furnace. In the charging method, the actual discharge time of the raw material from the raw material storage tank;
The present invention is characterized in that the opening degree of the flow rate control valve is determined based on the target discharge time of the raw material from the bunker, and thus the discharge time of the raw material from the bunker is kept constant.

〔発明の構成〕[Structure of the invention]

第3図に示す、バンカー2の原料排出通路6に
設けられた流量制御弁7の開度と、コークスおよ
び鉄鉱石の原料貯蔵槽3の排出口の開度を一定に
すると、バンカー2からの原料の排出時間と、原
料貯蔵槽3からの原料の排出時間は、一次関数で
表わされる。
If the opening degree of the flow rate control valve 7 provided in the raw material discharge passage 6 of the bunker 2 and the opening degree of the discharge port of the raw material storage tank 3 for coke and iron ore are kept constant as shown in FIG. The raw material discharge time and the raw material discharge time from the raw material storage tank 3 are expressed by linear functions.

そこで、原料貯蔵槽の排出口の開度を一定とな
し、流量制御弁の開度を例えばA、B、C、D、
E、Fの6段階に変化させて、各開度毎にバンカ
ーからの原料排出時間と、原料貯蔵槽からの原料
排出時間との関係をグラフに表わすと第1図イ,
ロのようになる。
Therefore, the opening degree of the discharge port of the raw material storage tank is made constant, and the opening degree of the flow rate control valve is set to, for example, A, B, C, D, etc.
The relationship between the raw material discharge time from the bunker and the raw material discharge time from the raw material storage tank for each opening is changed to 6 stages E and F, and the relationship between the raw material discharge time from the bunker and the raw material storage tank is shown in Fig.
Become like Ro.

第1図イにおいて、横軸は原料貯蔵槽からの原
料実績排出時間(但しその排出口開度は一定)で
あり、縦軸はバンカーからの原料排出時間であ
る。また第1図ロにおいて横軸は原料貯蔵槽から
の原料実績排出時間であり、縦軸は流量制御弁開
度である。第1図イ,ロから、バンカーからの原
料の排出時間を一定にするための流量制御弁の開
度が、原料貯蔵槽からの原料の実績排出時間に基
づいて求めることができる。
In FIG. 1A, the horizontal axis is the actual time for discharging raw materials from the raw material storage tank (however, the opening degree of the discharge port is constant), and the vertical axis is the time for discharging raw materials from the bunker. In FIG. 1B, the horizontal axis represents the actual discharge time of the raw material from the raw material storage tank, and the vertical axis represents the opening degree of the flow rate control valve. From FIGS. 1A and 1B, the opening degree of the flow rate control valve for making the discharge time of the raw material from the bunker constant can be determined based on the actual discharge time of the raw material from the raw material storage tank.

従つて、原料貯蔵槽からの原料の実績排出時間
から、上記第1図イ,ロのグラフに基づいて、バ
ンカーからの原料の排出時間を目標一定時間にす
るための流量制御弁の開度を求め、流量制御弁を
上記により求められた開度に制御すれば、バンカ
ーからの原料の排出時間を、上記一定時間に保つ
ことができる。
Therefore, based on the actual discharge time of the raw material from the raw material storage tank and based on the graphs in A and B of Figure 1 above, the opening degree of the flow control valve is determined to make the discharge time of the raw material from the bunker the target constant time. By determining this and controlling the flow rate control valve to the opening degree determined above, the time for discharging the raw material from the bunker can be maintained at the constant time described above.

第2図は、この発明の方法によつて流量制御弁
の開度を定め、バンカーからコークスを排出した
ときの排出時間を従来と比較して示したグラフで
ある。第2図に示すように、この発明の方法によ
れば、特にバンカーからの排出時間の変動が大き
いコークスの場合に、上記変動が4分の1以下に
減少し、従つて、高炉内にコークスを安定した分
布状態で装入することができた。
FIG. 2 is a graph showing a comparison of the discharge time when coke is discharged from a bunker by determining the opening degree of the flow control valve according to the method of the present invention. As shown in FIG. 2, according to the method of the present invention, especially in the case of coke whose discharge time from the bunker fluctuates greatly, the fluctuation is reduced to less than one-fourth, and therefore, the coke discharge time in the blast furnace is reduced to less than one quarter. was able to be charged in a stable distribution state.

〔発明の効果〕〔Effect of the invention〕

以上述べたように、この発明によれば、ベルレ
ス式高炉原料装入装置によつて高炉内に原料を装
入するに当り、原料の粒度、水分、表面性状等の
変動にかかわらず、バンカーからの原料の排出時
間をほぼ一定に保ち、高炉内に安定した分布状態
で原料を装入して、順調な高炉操業を行なうこと
ができる工業上優れた効果がもたらされる。
As described above, according to the present invention, when charging raw material into a blast furnace using a bellless type blast furnace raw material charging device, it is possible to By keeping the discharge time of the raw materials almost constant and charging the raw materials into the blast furnace in a stable distribution state, an excellent industrial effect is brought about in which the blast furnace can be smoothly operated.

【図面の簡単な説明】[Brief explanation of drawings]

第1図イ,ロは原料貯蔵槽からの原料排出時間
およびバンカーからの原料排出時間をバンカーの
流量制御弁の開度との関係において示すグラフ、
第2図はこの発明の方法による各チヤージ毎のバ
ンカーからのコークス排出時間を従来と比較して
示すグラフ、第3図はベルレス式高炉原料装入装
置の概略説明図、第4図は従来の各チヤージ毎の
バンカーからの原料排出時間を示すグラフ、第5
図は高炉内に装入された原料の炉内半径方向にお
ける分布状態を示す説明図である。図面におい
て、 1……高炉、2……バンカー、3……原料貯蔵
槽、4……ベルトコンベア、5……旋回シユー
ト、6……原料排出通路、7……流量制御弁。
1A and 1B are graphs showing the raw material discharge time from the raw material storage tank and the raw material discharge time from the bunker in relation to the opening degree of the flow control valve of the bunker,
Fig. 2 is a graph showing the coke discharge time from the bunker for each charge according to the method of the present invention in comparison with the conventional method, Fig. 3 is a schematic explanatory diagram of a bellless type blast furnace raw material charging device, and Fig. 4 is a graph showing the conventional method. Graph showing material discharge time from bunker for each charge, 5th
The figure is an explanatory diagram showing the distribution state of raw materials charged into the blast furnace in the radial direction inside the furnace. In the drawings, 1... blast furnace, 2... bunker, 3... raw material storage tank, 4... belt conveyor, 5... rotating chute, 6... raw material discharge passage, 7... flow rate control valve.

Claims (1)

【特許請求の範囲】 1 高炉炉頂に設けられたバンカー内に原料貯蔵
槽内の原料を供給し、前記バンカーの原料排出口
に設けられた流量制御弁を通して、前記バンカー
から前記原料を排出し、このようにして排出され
た前記原料を、高炉内に、その上部に設けられた
旋回シユートによつて分配装入する、ベルレス式
高炉原料装入装置による高炉原料の装入方法にお
いて、 前記原料貯蔵槽からの原料の実績排出時間と、
前記バンカーからの原料の目標排出時間とによつ
て、前記流量制御弁の開度を定め、かくして、前
記バンカーからの原料の排出時間を一定に保つこ
とを特徴とする、ベルレス式高炉原料装入装置に
よる高炉原料の装入方法。
[Claims] 1. The raw material in the raw material storage tank is supplied into a bunker provided at the top of the blast furnace, and the raw material is discharged from the bunker through a flow rate control valve provided at the raw material outlet of the bunker. In a method of charging blast furnace raw material using a bellless type blast furnace raw material charging device, the raw material discharged in this manner is distributed and charged into the blast furnace through a rotating chute provided at the upper part of the blast furnace. The actual discharge time of raw materials from the storage tank,
Bell-less type blast furnace raw material charging, characterized in that the opening degree of the flow rate control valve is determined depending on the target discharge time of the raw material from the bunker, and thus the discharge time of the raw material from the bunker is kept constant. Method of charging blast furnace raw materials using equipment.
JP20334785A 1985-09-17 1985-09-17 Method for charging blast furnace raw materials using a bellless blast furnace raw material charging device Granted JPS6263607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20334785A JPS6263607A (en) 1985-09-17 1985-09-17 Method for charging blast furnace raw materials using a bellless blast furnace raw material charging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20334785A JPS6263607A (en) 1985-09-17 1985-09-17 Method for charging blast furnace raw materials using a bellless blast furnace raw material charging device

Publications (2)

Publication Number Publication Date
JPS6263607A JPS6263607A (en) 1987-03-20
JPH0129849B2 true JPH0129849B2 (en) 1989-06-14

Family

ID=16472520

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20334785A Granted JPS6263607A (en) 1985-09-17 1985-09-17 Method for charging blast furnace raw materials using a bellless blast furnace raw material charging device

Country Status (1)

Country Link
JP (1) JPS6263607A (en)

Also Published As

Publication number Publication date
JPS6263607A (en) 1987-03-20

Similar Documents

Publication Publication Date Title
JPH0129849B2 (en)
JPH046761B2 (en)
JPS62290809A (en) Raw material charging method for blast furnace
JP4608906B2 (en) Raw material charging method for bell-less blast furnace
JPS61227109A (en) Charging method for blast furnace charge
JPS63100113A (en) Bell-less charging apparatus in blast furnace
JPS6017005A (en) Charging method of raw material in bell-less type blast furnace
JPH0128086B2 (en)
JPH0421814Y2 (en)
JP3995380B2 (en) Raw material charging method to blast furnace
JPS61227108A (en) Method for charging raw material to blast furnace
JPS61157604A (en) Introducting method of raw material for blast furnace
JPH0354388Y2 (en)
JPH02401B2 (en)
SU1300035A1 (en) Method for charging blast furnace
JPH06228618A (en) Blast furnace raw material charging device
JPH05179320A (en) Raw material charging method for bell-less blast furnace
RU1770369C (en) Method of blast furnace loading
JP4139578B2 (en) Raw material charging method to blast furnace
JPH04308012A (en) Blast furnace raw material charging method and equipment
JPH04304305A (en) Blast furnace raw material charging method
JPS6220805A (en) Method for charging raw material to blast furnace having bell-less type charger
JP2725318B2 (en) Blast furnace raw material charging method
JP2000219903A (en) Central coke injection control method in bellless blast furnace
JPH01290707A (en) Method of charging raw material to blast furnace