JPH0130371B2 - - Google Patents
Info
- Publication number
- JPH0130371B2 JPH0130371B2 JP54115590A JP11559079A JPH0130371B2 JP H0130371 B2 JPH0130371 B2 JP H0130371B2 JP 54115590 A JP54115590 A JP 54115590A JP 11559079 A JP11559079 A JP 11559079A JP H0130371 B2 JPH0130371 B2 JP H0130371B2
- Authority
- JP
- Japan
- Prior art keywords
- demand
- power
- time limit
- counter
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
【発明の詳細な説明】
本発明は発信装置付電力量計の発信パルスと需
要時限信号を出力する需要電力計の需要時限信号
を入力とし、需要電力が契約電力を超過しないよ
う監視する需要電力監視装置を組合わせた需要電
力監視計器に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention uses as input the transmission pulse of a watt-hour meter with a transmitting device and the demand time signal of a demand wattmeter that outputs a demand time signal, and monitors the demand power so that the demand power does not exceed the contract power. This invention relates to a power demand monitoring instrument combined with a monitoring device.
従来需要電力監視装置としては発信装置付電力
量計の発信パルスを入力とし、これを計数して需
要電力を計測し、ある一定時間における需要電力
の増分と需要時限の残り時間を乗算し、この値に
その時点における需要電力値を加算して需要電力
の予測値を算出し、この予測値と目標とする需要
電力の差を需要時限の残り時間で除算し、これに
換算係数を乗じて需要電力制御に必要な調整電力
を算出して前記予測値とともに表示するものがあ
つた。そして予測値が目標需要電力を起過すると
1段目の警報を発生し、調整値が制御したい電力
値を超えると2段目の警報を発生し負荷制御を行
うものであつた。需要時限は取引用の需要電力計
と同期をとるために時限合わせスイツチを備えて
おりこのスイツチにより時限合わせを行うとそれ
以降は内蔵の時計回路により例えば30分時限をつ
くり出して、この監視時限毎に需要電力監視を行
うものであつた。 Conventional power demand monitoring devices take as input pulses transmitted by a power meter with a transmitter, count these pulses to measure the power demand, multiply the increment in the power demand over a certain period of time by the remaining time of the demand time limit, and calculate this value. Calculate the predicted value of power demand by adding the power demand value at that point to the value, divide the difference between this predicted value and the target power demand by the remaining time of the demand period, and multiply this by a conversion factor to calculate the demand. There was one that calculated the adjusted power required for power control and displayed it together with the predicted value. When the predicted value exceeds the target power demand, a first stage alarm is generated, and when the adjusted value exceeds the desired power value, a second stage alarm is generated and load control is performed. The demand time limit is equipped with a time setting switch to synchronize with the electricity demand meter for transactions.When the time limit is set using this switch, from then on, the built-in clock circuit creates a time period of, for example, 30 minutes, and the time period is set for each monitoring time period. It was designed to monitor power demand.
しかるに監視時限は、内蔵の時計回路でもつて
つくるために時計回路の誤差あるいは取引用需要
電力計の需要需要時限装置との器差により需要時
限との周期が次第にズレてきて取引用需要電力計
と合わなくなる。従つて需要電力の監視も的確で
なくなる欠点があつた。 However, since the monitoring time limit is created by a built-in clock circuit, the period between the demand time limit and the demand time limit will gradually deviate due to errors in the clock circuit or instrumental differences between the demand time device of the transaction demand meter and the transaction power meter. It won't fit. Therefore, there was a drawback that the monitoring of power demand was not accurate.
本発明はかかる欠点に鑑みてなされたものであ
つて、取引用発信装置付電力量計の発信パルスを
入力とすることにより需要電力を計測し、同時に
需要電力計から出力される需要時限信号を入力と
して常に取引用需要電力計の需要時限と同期をと
ることを可能とならしめることのできる需要電力
監視装置を有した需要電力監視計器を提供するこ
とを目的とする。 The present invention has been made in view of these drawbacks, and it measures the power demand by inputting the transmission pulse of the electricity meter with a transmitting device for transactions, and at the same time measures the demand time signal output from the electricity demand meter. It is an object of the present invention to provide a power demand monitoring instrument having a power demand monitoring device capable of always synchronizing the demand time limit of a trading power demand meter as an input.
以下図面により本発明の一実施例を説明する。
第1図は本発明による装置の一実施例である。9
は取引用計器盤で電力取引に必要な計器が収納さ
れ封印がほどこされている回線の電流をCT1電
圧をPT2により検出し両者から電力量を発信装
置付電力量計3により計量し、計量値を発信パル
ス4として出力する。この発信パルス4は後述の
需要電力計5に入力されここで需要電力が計量さ
れる。一方発信パルス4はパルス検出器6により
検出されて、電気的に分離された形の信号に変形
されてパルス検出器6の発信パルス8となつて出
力される。パルス検出器6は貫通形CT6aによ
り発信パルス4をピツクアツプすることにより電
気的分離を行うことができるものである。5は需
要時限装置を備えており例えば30分毎の需要時限
終了毎に需要時限信号7を出力する需要電力計で
あり、その詳細は後述する。10は後述の需要電
力監視装置で発信パルス8を入力として需要時限
毎に需要電力を計測しこれをもとに需要電力に必
要なデータを演算し警報発生負荷制御などを行
う。また需要時限信号7を入力として監視時限も
計数され、需要電力の監視はこの監視時限を一つ
の周期として行うものである。 An embodiment of the present invention will be described below with reference to the drawings.
FIG. 1 shows an embodiment of the device according to the invention. 9
is a transaction instrument panel that houses the meters necessary for power transactions and detects the current of the sealed line by CT1 voltage with PT2, measures the amount of electricity from both by wattmeter with transmitter 3, and calculates the measured value. is output as the transmission pulse 4. This transmitted pulse 4 is input to a power demand meter 5, which will be described later, and the power demand is measured there. On the other hand, the transmitted pulse 4 is detected by a pulse detector 6, transformed into an electrically separated signal, and output as a transmitted pulse 8 from the pulse detector 6. The pulse detector 6 is capable of electrically isolating the emitted pulses 4 by picking them up using a through-type CT 6a. Reference numeral 5 denotes a demand power meter which is equipped with a demand time limit device and outputs a demand time limit signal 7 every time the demand time limit ends, for example, every 30 minutes, the details of which will be described later. Reference numeral 10 denotes a power demand monitoring device to be described later, which measures the power demand for each demand period by inputting the transmission pulse 8, calculates data necessary for the power demand based on this, and performs alarm generation load control and the like. Further, a monitoring time limit is also counted using the demand time limit signal 7 as an input, and the power demand is monitored using this monitoring time limit as one cycle.
ここで上記需要電力計5を、その詳細を示す第
2図について説明する。第2図において110は
発信装置付電力量計のパルス4を受信する端子で
ある。112は取引用の需要電力カウンタで、パ
ルス4を計数する。113は需要時限を計測する
ための基準周波数発信部である。114は上記基
準周波数を計数することにより需要時限を計測す
る時計部であり、需要時限終了毎に需要時限終了
信号115を出力する。需要時限終了信号115
は需要電力カウンタ112をリセツトし、需要電
力カウンタ112は0からパルス4の計量を再開
する。116は単安定マルチバイブレータで、上
記需要時限終了信号115によりトリガされ、抵
抗117およびコンデンサ118で決まる時定数
に応じた幅のパルスを出力する。120はこのパ
ルスを増巾するトランジスタで、リレーのソレノ
イド121をドライブする。122はリレーの接
点であり、上記ソレノイド121が励磁されてい
る間閉成する。すなわち、需要時限終了時一定時
間ONし、出力端子T1,T2間から上述した需要
時限信号7を出力して第3図に示す需要電力カウ
ンタ12、基準信号発生部14及び需要時限カウ
ンタ15をそれぞれリセツトする。 Here, the power demand meter 5 will be explained with reference to FIG. 2 showing its details. In FIG. 2, 110 is a terminal for receiving the pulse 4 of the electricity meter with transmitter. Reference numeral 112 is a power demand counter for transactions, which counts pulses 4. Reference numeral 113 is a reference frequency transmitter for measuring the demand time limit. A clock section 114 measures the demand time limit by counting the reference frequency, and outputs a demand time limit end signal 115 every time the demand time limit ends. Demand time limit end signal 115
resets the demand power counter 112, and the demand power counter 112 restarts measurement of pulse 4 from 0. Reference numeral 116 denotes a monostable multivibrator which is triggered by the demand time limit end signal 115 and outputs a pulse having a width corresponding to a time constant determined by a resistor 117 and a capacitor 118. A transistor 120 amplifies this pulse and drives a solenoid 121 of the relay. 122 is a relay contact, which is closed while the solenoid 121 is energized. That is, at the end of the demand time limit, it is turned on for a certain period of time, and the above-mentioned demand time limit signal 7 is output from the output terminals T 1 and T 2 to output the demand time limit signal 7 to the demand power counter 12, reference signal generator 14, and demand time limit counter 15 shown in FIG. Reset each.
次に上記需要電力監視装置10の一実施例をブ
ロツク図により説明する。第3図において8は取
引計器盤9からの発信パルスである。12は監視
用の需要電力カウンタで前記発信パルス8を計数
することにより需要電力を計量する。この計数値
は需要電力表示部13により表示されると共に、
演算回路17に入力される。14は需要時限の経
過を計測するための基準信号発生部で一定周期の
信号を発生する。15は前記基準信号を入力とし
需要時限の残り時間を計測する需要時限カウンタ
で計数値を残り時間表示部20に表示すると共に
演算回線17に入力する。18は目標需要電力設
定部で管理したい目標の需要電力例えば契約電力
を設定する。19は制御電力設定部で、負荷制御
をしたい回路の負荷量を設定する。前記両者の設
定値は同様に演算回路17に入力される。演算回
路17は前記各々の計数値や設定値を入力として
例えば次のような演算を行うものである。需要電
力カウンタ12の計数値をP(kw)需要時限をT
(分)、需要時限が開始されt(分)経過したとき
の需要時限カウンタ15の計数値をT−t(分)、
目標需要電力の設定部18の設定値をQ1(kw)、
制御電力設定部19の設定値をQ2(kw)、t分よ
り手前の△t分間の需要電力計量数値Pの増加量
を△Pとおくと需要時限終了時に到達するであろ
う需要電力の予測値はこれをR(kw)とすれば、
予測値R(kw)=P+△P/△t(T−t)(kw)…(1
)
なる演算により求めることができる。 Next, one embodiment of the power demand monitoring device 10 will be described with reference to a block diagram. In FIG. 3, reference numeral 8 indicates a pulse transmitted from the trading instrument panel 9. Reference numeral 12 denotes a power demand counter for monitoring, which measures the power demand by counting the transmitted pulses 8. This count value is displayed by the power demand display section 13, and
The signal is input to the arithmetic circuit 17. Reference numeral 14 denotes a reference signal generating section for measuring the elapse of the demand time limit, which generates a signal with a constant period. Reference numeral 15 is a demand time limit counter that receives the reference signal and measures the remaining time of the demand time limit, and displays the counted value on the remaining time display section 20 and inputs it to the calculation line 17. 18, a target power demand setting unit sets a target power demand to be managed, for example, contract power. Reference numeral 19 denotes a control power setting section for setting the amount of load of a circuit whose load is to be controlled. Both set values are similarly input to the arithmetic circuit 17. The arithmetic circuit 17 receives the respective count values and set values as input and performs the following calculations, for example. The count value of the demand power counter 12 is P (kw), and the demand time period is T
(minutes), the count value of the demand time limit counter 15 when t (minutes) have passed since the start of the demand time limit, T-t (minutes),
The setting value of the target power demand setting unit 18 is Q 1 (kw),
Assuming that the set value of the control power setting unit 19 is Q 2 (kw) and the amount of increase in the demand power measurement value P for △t minute before t minute is △P, the demand power that will be reached at the end of the demand time period is The predicted value is R (kw), and the predicted value R (kw) = P + △P / △t (T - t) (kw)...(1
) can be calculated using the following calculation.
またこの予測値から需要電力を目標需要電力設
定値Q1に達するために必要な負荷制御量はこれ
をU(kw)とおけば
負荷制御量U(kw)=Q1−R/T−tT(kw) …(2)
なる演算により求めることができる。 Also, from this predicted value, the load control amount required to reach the target power demand setting value Q 1 is expressed as U (kw): Load control amount U (kw) = Q 1 −R/T − tT (kw) ...(2) It can be obtained by the following calculation.
そしてこれら両者の演算値は予測需要電力表示
部21および制御表示部22に各々表示される。 Both of these calculated values are displayed on the predicted power demand display section 21 and the control display section 22, respectively.
また演算回路17において予測需要電力R
(kw)は目標需要電力設定値Q1(kw)と比較較
され前者が後者を超過しているときは第一段警報
を発生し、警報接点23をオンする。同様に負荷
制御量U(kw)は、制御電力設定値Q2(kw)と
比較され第一段警報が発生してかつ前者か後者が
超過しているとき第2段警報を発生し、警報接点
24をオンする。 In addition, in the arithmetic circuit 17, the predicted power demand R
(kw) is compared with the target power demand set value Q 1 (kw), and if the former exceeds the latter, a first stage alarm is generated and the alarm contact 23 is turned on. Similarly, the load control amount U (kw) is compared with the control power set value Q 2 (kw), and when the first stage alarm is generated and either the former or the latter exceeds, the second stage alarm is generated and the alarm is activated. Turn on contact 24.
7は需要電力計5から出力される需要時限信号
で、この信号により基準信号発生部14、需要時
限カウンタ15、需要電力カウンタ12は各々リ
セツトされその時点から新しく需要時限が開始さ
れる。このように、基準信号発生部14からの1
つの基準信号に基づいて、予測電力、制御量およ
び残り時間が決定されるので、各表示部21,2
2,20の表示値が時間的ズレのない正確なもの
となる。演算回路17は以上のような動作をする
ものであるが例えばマイクロコンピユータを使用
すると比較的廉価でしかも簡単に構成することが
できる。 Reference numeral 7 denotes a demand time limit signal output from the demand wattmeter 5. This signal causes the reference signal generator 14, demand time limit counter 15, and demand power counter 12 to be reset, and a new demand time limit is started from that point. In this way, the 1
Since the predicted power, control amount, and remaining time are determined based on the two reference signals, each display section 21, 2
The displayed values of 2 and 20 are accurate without any time lag. Although the arithmetic circuit 17 operates as described above, it can be constructed relatively inexpensively and easily by using a microcomputer, for example.
また本発明の一実施例は以上のような構成であ
るが、無論他の方式による構成であつてもさしつ
かえない。要するに需要時限の周期を自分自身で
つくり出して周期毎にリセツトしてそこから新し
く時限を開始するのでなくて、需要時限は需要電
力計からの信号で定められるのである。すなわ
ち、発信装置付電力量計から電力量パルスを入力
し、需要電力計から需要時限を入力して動作する
需要電力監視装置であればよいのである。 Further, although one embodiment of the present invention has the above-mentioned configuration, it goes without saying that a configuration based on another system may also be used. In other words, instead of creating the cycle of the demand time limit yourself, resetting it for each cycle, and starting a new time limit from there, the demand time limit is determined by the signal from the electricity demand meter. That is, any power demand monitoring device that operates by inputting a power pulse from a power meter with a transmitting device and inputting a demand time limit from a power demand meter is sufficient.
なお需要電力計の時限信号は第1図に示すよう
にパルス検出器を使用しないで取出すよう構成し
たか、パルス検出器を使用して取出すことも無論
可能である。 It should be noted that the time signal of the power demand meter can be taken out without using a pulse detector as shown in FIG. 1, or it is of course possible to take out the time signal using a pulse detector.
本発明は以上のように構成されているために従
来装置のように需要電力監視装置の監視時限と取
引用需要電力の需要時限の周期がずれて需要電力
監視が的確でなくなるという欠点が除去でき、需
要電力監視の信頼性が向上する等効果がある。 Since the present invention is configured as described above, it is possible to eliminate the disadvantage of conventional devices in that the cycle of the monitoring time limit of the power demand monitoring device and the demand time limit of the demand power for trading is different and the power demand monitoring becomes inaccurate. This has the effect of improving the reliability of power demand monitoring.
第1図は本発明の一実施例を示すブロツク図、
第2図は第1図に示される需要電力計の詳細を示
すブロツク図、第3図は第1図に示される需要電
力監視装置の詳細を示すブロツク図である。
図において3は発信装置付電力量計、5は需要
電力計、6はパルス検出器、10は需要電力監視
装置、15は需要時限カウンタ、17は演算回
路、20は残り時間表示部、21は予測需要電力
表示部(データ表示部)、22は制御量表示部
(データ表示部)である。なお図中同一符号は同
一または相当部分を示す。
FIG. 1 is a block diagram showing one embodiment of the present invention;
FIG. 2 is a block diagram showing details of the power demand meter shown in FIG. 1, and FIG. 3 is a block diagram showing details of the power demand monitoring device shown in FIG. 1. In the figure, 3 is a power consumption meter with transmitter, 5 is a demand power meter, 6 is a pulse detector, 10 is a demand power monitoring device, 15 is a demand time limit counter, 17 is an arithmetic circuit, 20 is a remaining time display section, and 21 is a A predicted power demand display section (data display section), 22 is a control amount display section (data display section). Note that the same reference numerals in the figures indicate the same or corresponding parts.
Claims (1)
る発信装置付電力量計、上記パルス信号を計量し
て需要電力を計測する取引用の需要電力カウンタ
と、需要時限終了毎に需要時限信号を出力する需
要時限装置とを有する需要電力計、上記需要時限
信号を受けて上記パルス信号を計量して需要電力
を計測する監視用の需要電力カウンタと、上記需
要時限信号を受けて需要時限を計数する需要時限
カウンタと、この需要時限カウンタ及び上記監視
用の需要電力カウンタの計数値に基づいて需要電
力監視に必要なデータを演算する演算回路と、こ
の演算結果を表示するデータ表示部とを有する需
要電力監視装置を備えたことを特徴とする需要電
力監視計器。1. A watt-hour meter with a transmitting device that generates a pulse signal according to the measured value of electric energy, a demand power counter for transactions that measures the above-mentioned pulse signal to measure the demand power, and a demand time limit signal that outputs a demand time limit signal every time the demand time limit ends. a demand power meter having a demand time limit device for outputting; a monitoring power demand counter that receives the demand time limit signal and measures the pulse signal to measure the demand power; and a demand power counter that receives the demand time limit signal and counts the demand time limit. a demand time limit counter, a calculation circuit that calculates data necessary for power demand monitoring based on the count values of the demand time limit counter and the monitoring power demand counter, and a data display unit that displays the calculation results. A power demand monitoring instrument characterized by comprising a power demand monitoring device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11559079A JPS5641723A (en) | 1979-09-07 | 1979-09-07 | Demanded power monitor instruments |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11559079A JPS5641723A (en) | 1979-09-07 | 1979-09-07 | Demanded power monitor instruments |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5641723A JPS5641723A (en) | 1981-04-18 |
| JPH0130371B2 true JPH0130371B2 (en) | 1989-06-19 |
Family
ID=14666362
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11559079A Granted JPS5641723A (en) | 1979-09-07 | 1979-09-07 | Demanded power monitor instruments |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5641723A (en) |
-
1979
- 1979-09-07 JP JP11559079A patent/JPS5641723A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5641723A (en) | 1981-04-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4345311A (en) | Electronic kilowatt-hour meter for measuring electrical energy consumption | |
| EP0240102A2 (en) | Power meter having self-test function | |
| JP2007327764A (en) | System for measuring instrumental error of watt-hour meter | |
| US4920312A (en) | Multiplier | |
| JPH0130371B2 (en) | ||
| GB2418992A (en) | Rechargeable Powering System For Electricity Meter | |
| JP2001183478A (en) | Microcomputer system and electronic watt-hour meter | |
| JP3561187B2 (en) | Inductive watt-hour meter with average power measurement function | |
| KR0174036B1 (en) | Self-Check and Warning Method for Multifunction Power Supply | |
| JP3383437B2 (en) | Time measurement method and clock | |
| RU2801431C1 (en) | Method for monitoring metrological characteristics of multifunctional electric energy meters and device for its implementation | |
| SU111121A1 (en) | AC Frequency Measurement Device | |
| SU1163279A1 (en) | Device for determining standard deviation of phase fluctuation | |
| Pepper et al. | A meter for ultraviolet dose and irradiance | |
| RU1778717C (en) | Dose rate meter | |
| JPS6331024Y2 (en) | ||
| JPS6154474A (en) | Testing device for watthour meter | |
| JPH0324414A (en) | Divided-type watthour meter | |
| JPS5842914Y2 (en) | temperature detection device | |
| JPH0792209A (en) | Integrated wattmeter | |
| SU1038941A1 (en) | Random pulse generator | |
| RU2520428C1 (en) | Microprocessor data recorder for ermakov-gorobets energy audit | |
| SU1439676A1 (en) | Device for inspecting magnetic disks | |
| RU1800422C (en) | Device for electric defects of insulation of underground pipelines | |
| JPS6128948B2 (en) |