JPH0144845B2 - - Google Patents
Info
- Publication number
- JPH0144845B2 JPH0144845B2 JP15090680A JP15090680A JPH0144845B2 JP H0144845 B2 JPH0144845 B2 JP H0144845B2 JP 15090680 A JP15090680 A JP 15090680A JP 15090680 A JP15090680 A JP 15090680A JP H0144845 B2 JPH0144845 B2 JP H0144845B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- bucket
- turntable
- concrete bucket
- transfer car
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 claims description 14
- 238000010276 construction Methods 0.000 claims description 10
- 230000008878 coupling Effects 0.000 claims description 8
- 238000010168 coupling process Methods 0.000 claims description 8
- 238000005859 coupling reaction Methods 0.000 claims description 8
- 239000012530 fluid Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 230000008602 contraction Effects 0.000 description 1
Description
【発明の詳細な説明】
本発明は、ダム建設時のコンクリートの搬送を
能率良く且つ安全に行い得るようにした、ダム建
設におけるコンクリート搬送方法に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for transporting concrete in dam construction, which enables efficient and safe transport of concrete during dam construction.
従来のダム建設におけるコンクリート搬送方法
としては、第1図に示すごとく、固定式ジブクレ
ーンaと機動車bに牽引されたコンクリートバケ
ツト受け台車cにより搬送する方法、あるいは、
第2図及び第3図に示すごとく、ケーブルクレー
ンfとトランスフアーカーgにより搬送する方法
等がある。 Conventional methods for transporting concrete in dam construction include transporting concrete using a fixed jib crane a and a concrete bucket receiving cart c pulled by a mobile vehicle b, as shown in Figure 1;
As shown in FIGS. 2 and 3, there is a method of transporting using a cable crane f and a transfer car g.
すなわち、第1図に示す方法では、ジブクレー
ンaがコンクリートを収納したコンクリートバケ
ツトを吊り、コンクリート打設現場にコンクリー
トを供給している間に、コンクリートバケツト受
け台車c上に載置したコンクリートバケツトdに
バツチヤープラント(コンクリート練合せ装置)
においてコンクリートを供給し、しかる後該台車
cを機動車bにより牽引してクレーン部所要位置
まで搬送し、コンクリートバケツト受け台車cが
クレーン部所要位置まで来たら、クレーンaは空
になつたコンクリートバケツトeをコンクリート
バケツト受け台車c上に置き、コンクリートの入
つたコンクリートバケツトdを吊り上げ、該バケ
ツトdをコンクリート打設現場まで運ぶ。 That is, in the method shown in Fig. 1, while a jib crane a suspends a concrete bucket containing concrete and supplies concrete to a concrete placement site, a concrete bucket placed on a concrete bucket receiving cart c is suspended. Batcher plant (concrete mixing equipment)
After that, the trolley c is towed by mobile vehicle b and transported to the required position of the crane section. When the concrete bucket receiving trolley c reaches the required position of the crane section, crane a is used to collect the empty concrete. A bucket e is placed on a concrete bucket receiving cart c, a concrete bucket d containing concrete is lifted up, and the bucket d is transported to a concrete pouring site.
しかし、このようないわゆるバケツト吊り換え
方式では、バケツト吊り換え作業用として2人、
合図マンとして1人の作業員を必要とし、しかも
バケツト吊り換えに多くの時間を要した。 However, in this so-called bucket lifting method, two people are required for the bucket lifting work.
One worker was required to act as a signal man, and it took a lot of time to rehang the bucket.
又、コンクリートバケツトのゲート開閉用エヤ
ーを、バツチヤープラント部かあるいはコンクリ
ート打設現場で供給する必要があり、能率の悪い
ものであつた。 In addition, air for opening and closing the gate of the concrete bucket must be supplied either at the bucket plant or at the concrete pouring site, which is inefficient.
一方、第2図に示す方法では、トランスフアー
カーgに取付けられたコンクリートホツパーhに
バツチヤープラントでコンクリートを受け、ケー
ブルクレーンf部まで走行して来てホツパーhを
開き、ケーブルクレーンfに吊られて段i部に載
置されているコンクリートバケツトiにコンクリ
ートを投入し、しかる後ケーブルクレーンfによ
りコンクリートバケツトjはコンクリート打設現
場へ搬送される。 On the other hand, in the method shown in Fig. 2, concrete is received at a batcher plant into a concrete hopper h attached to a transfer car g, the concrete is moved to a cable crane f, the hopper h is opened, and the concrete is hoisted to a cable crane f. concrete is poured into the concrete bucket i placed on the stage i, and then the concrete bucket j is transported to the concrete pouring site by the cable crane f.
斯かる方法は、バケツトの吊り換えがないので
第1図の方法より優れているが、トランスフアー
カーgの走行路全長にわたつてバケツトを置くた
め、段iも走行路全長に設ける必要があり、多く
の設備費を要した。又、この場合も、段i部かあ
るいはコンクリート打設現場でバケツトのゲート
開閉用エヤーを供給する必要があり、能率が上ら
なかつた。 This method is superior to the method shown in Fig. 1 because there is no need to change the suspension of the bucket, but since the bucket is placed over the entire length of the travel path of the transfer car g, it is necessary to provide the stage i along the entire length of the travel path. It required a lot of equipment costs. Also in this case, it was necessary to supply air for opening and closing the bucket gate at the stage i section or at the concrete pouring site, which did not improve efficiency.
本発明は、従来手段が有する前述の欠点を除去
することを目的としてなしたもので、バンカー線
上所要位置に、ターンテーブルを備えたコンクリ
ートバケツト受け台車を位置せしめ、クレーンフ
ツクにバケツト吊金具用ワイヤーロープを介して
吊り下げられているコンクリートバケツトを前記
ターンテーブル所定位置に置き、該コンクリート
バケツトにゲート開閉用のエヤーを自動的に供給
し、次いでターンテーブルをコンクリートバケツ
トと一緒に回転させてコンクリートバケツトに取
付けたバケツト吊金具用ワイヤーロープがトラン
スフアーカーのホツパーとゲートと干渉しない位
置に位置せしめ、コンクリートの供給を受けたト
ランスフアーカーがコンクリートバケツト受け台
車の近くまで来たら該トランスフアーカーを停止
させ、コンクリートをコンクリートバケツトに投
入し、しかる後コンクリートバケツトをクレーン
で吊り上げて所要位置へ搬送することを特徴とす
るものである。 The present invention has been made with the aim of eliminating the above-mentioned drawbacks of the conventional means, and involves positioning a concrete bucket receiving cart equipped with a turntable at a required position on the bunker line, and attaching a bucket hanging fixture to a crane hook. A concrete bucket suspended via a wire rope is placed in a predetermined position on the turntable, air for opening and closing the gate is automatically supplied to the concrete bucket, and then the turntable is rotated together with the concrete bucket. Then, position the wire rope for the bucket hanging bracket attached to the concrete bucket in a position where it will not interfere with the hopper and gate of the transfer car, and when the transfer car that has received concrete comes close to the concrete bucket receiving truck, This method is characterized by stopping the arker, pouring concrete into a concrete bucket, and then lifting the concrete bucket with a crane and transporting it to a desired location.
以下、本発明の実施例を図面を参照しつつ説明
する。 Embodiments of the present invention will be described below with reference to the drawings.
第4図〜第8図は本発明の一実施例を示し、第
4図及び第5図中1はコンクリートを打設するダ
ム、2は所要位置に配設された固定式ジブクレー
ン、3はコンクリート練り合せを行うバツチヤー
プラント、4はバツチヤープラント3から所要位
置まで敷設されたバンカー線(軌条)、5はバン
カー線4上をバツチヤープラント3から所要位置
までコンクリートを収納して搬送するトランスフ
アーカー、6はバンカー線上を移動し得且つトラ
ンスフアーカー5よりコンクリートを受けるよう
にしたコンクリートバケツト受け台車である。 Figures 4 to 8 show an embodiment of the present invention. In Figures 4 and 5, 1 is a dam for pouring concrete, 2 is a fixed jib crane installed at a required position, and 3 is a concrete 4 is a bunker line (railway) laid from the batcher plant 3 to the required position; 5 is a transfer station that stores and transports concrete from the batcher plant 3 to the required position on the bunker line 4; The anchor 6 is a concrete bucket receiving truck that can move on the bunker line and receive concrete from the transfer anchor 5.
トランスフアーカー5の全体構成は第7図に示
してあり、駆動エンジン7の駆動により自走可能
な走行台車8上にホツパー支持台9を配設し、該
ホツパー支持台9と走行台車8との間に流体圧シ
リンダ10の伸縮動により昇降し得るリフター1
1を設け、前記ホツパー支持台9の先端部にコン
クリートホツパー12をピン13枢着し、ホツパ
ー支持台9とコンクリートホツパー12との間に
流体圧シリンダ14を取付けて該コンクリートホ
ツパー12がピン13を中心に前方へ下り傾斜に
傾動し得るよう構成し、コンクリートホツパー1
2先端部に流体圧シリンダ15の作動により開閉
するホツパーゲート16を配設し、ホツパー支持
台9上に流体圧ポンプユニツト17、運転室18
を配設し、図示してないが車輪にはパーキングブ
レーキを取付け、トランスフアーカー5が所定位
置に停止し得るよう構成する。 The overall structure of the transfer car 5 is shown in FIG. A lifter 1 that can be raised and lowered by the expansion and contraction movement of the fluid pressure cylinder 10 between
1, a concrete hopper 12 is pivotally attached to the tip of the hopper support 9 by a pin 13, and a fluid pressure cylinder 14 is installed between the hopper support 9 and the concrete hopper 12, so that the concrete hopper 12 is Concrete hopper 1 is constructed so that it can be tilted forward and downward around pin 13.
A hopper gate 16 that opens and closes by the operation of a fluid pressure cylinder 15 is disposed at the tip of 2, and a fluid pressure pump unit 17 and a driver's cab 18 are mounted on the hopper support base 9.
Although not shown, parking brakes are attached to the wheels so that the transfer car 5 can be stopped at a predetermined position.
コンクリートバケツト受け台車6の全体構成
は、第6図及び第7図に示してあり、ジブクレー
ン2の運転室から無線操縦することにより駆動し
得るようにした駆動エンジン19を走行台車20
上に載置し、該駆動エンジン19により走行台車
20を走行せしめ得るようにし、該走行台車20
上に、駆動エンジン19により回転し得るように
したターンテーブル21を配設し、該ターンテー
ブル21上に内面がテーパー状のコンクリートバ
ケツト案内用ガイド22を配設し、コンクリート
バケツト23の位置決めを容易に行い得るよう、
該コンクリートバケツト23の横断面形状を小判
形とすると共に前記ターンテーブル21上に配設
したコンクリートバケツト案内用ガイド22も横
断面形状を小判形とし、ターンテーブル21所要
位置にじようご状のコンクリートバケツト案内用
受け24を設け、コンクリートバケツト23下面
に突設した円錐状のつめ25が案内用受け24に
嵌合し得るように構成し、前記走行台車20上に
前記駆動エンジン19で駆動するようにしたエヤ
ーコンプレツサ26を設置し、該エヤーコンプレ
ツサ26に接続したエヤー配管27を走行台車2
0下部に配設した下部自動給気カツプリング28
に接続する。 The overall structure of the concrete bucket receiving truck 6 is shown in FIGS. 6 and 7, in which a drive engine 19 that can be driven by radio control from the driver's cab of the jib crane 2 is connected to the traveling truck 20.
The driving engine 19 is placed on top of the vehicle so that the traveling vehicle 20 can be driven by the driving engine 19.
A turntable 21 that can be rotated by a drive engine 19 is disposed above the turntable 21, and a concrete bucket guiding guide 22 having a tapered inner surface is disposed on the turntable 21 to position the concrete bucket 23. To make it easier to
The concrete bucket 23 has an oval cross-sectional shape, and the concrete bucket guiding guide 22 disposed on the turntable 21 also has an oval cross-sectional shape, and the turntable 21 is shaped like a rainbow funnel at a desired position. A concrete bucket guiding receiver 24 is provided, a conical pawl 25 protruding from the lower surface of the concrete bucket 23 can be fitted into the guiding receiver 24, and the drive engine 19 is mounted on the traveling truck 20. An air compressor 26 that is driven by
Lower automatic air supply coupling 28 located at the bottom of 0
Connect to.
コンクリートバケツト23下部に、エヤーレシ
ーバー29及びゲートを設けると共に、コンクリ
ートバケツト23下部所要位置に上部自動給気カ
ツプリング30を配設し前記コンクリートバケツ
ト23をコンクリートバケツト受け台車6のター
ンテーブル21所要位置に載置することにより、
上下部自動給気カツプリング30,28が連通
し、エヤーコンプレツサ26のエヤーが前記エヤ
ーレシーバー29に供給されるように構成する。
上下部自動給気カツプリング30,28の詳細は
本願出願人が昭和54年10月31日付で出願した実願
昭54−151362号明細書に詳細に記載されているの
で説明は省略する。 An air receiver 29 and a gate are provided at the lower part of the concrete bucket 23, and an upper automatic air supply coupling 30 is provided at a required position below the concrete bucket 23, and the concrete bucket 23 is connected to the turntable 21 of the concrete bucket receiving cart 6. By placing it in the required position,
The upper and lower automatic air supply couplers 30 and 28 communicate with each other so that air from the air compressor 26 is supplied to the air receiver 29.
The details of the upper and lower automatic air supply couplings 30, 28 are described in detail in the specification of Japanese Utility Model Application No. 151362/1985 filed by the applicant on October 31, 1982, and therefore the explanation thereof will be omitted.
前記ジブクレーン2のジブ31先端より巻上下
自在なワイヤーロープ32を吊り下げ、該ワイヤ
ーロープ32下端に図示してないクロスヘツドに
より水平方向へ回転自在となつているフツク33
を吊り下げ、該フツク33にバケツト吊金具34
を取付け、該バケツト吊金具34の両端に取付け
たバケツト吊金具用ワイヤーロープ35を前記コ
ンクリートバケツト23上端の長手方向両側に固
定する。 A wire rope 32 that can be wound up and down is suspended from the tip of the jib 31 of the jib crane 2, and a hook 33 is attached to the lower end of the wire rope 32 and is rotatable in the horizontal direction by a crosshead (not shown).
and attach the bucket hanging bracket 34 to the hook 33.
are attached, and wire ropes 35 for bucket hanging fittings attached to both ends of the bucket hanging fittings 34 are fixed to both sides of the upper end of the concrete bucket hanging fitting 23 in the longitudinal direction.
次に本発明の作用について説明する。 Next, the operation of the present invention will be explained.
ダムのコンクリート打設を行う場合にはコンク
リート打設位置に応じてコンクリートバケツト受
け台車6をジブクレーン2の運転席より遠隔操縦
してバンカー線4上の所定の位置(例えば第4図
の位置X)に位置させ、トランスフアーカー5を
コンクリートホツパー12が水平で且つリフター
11を下降させた状態でバツチヤープラント3所
要位置に位置させ、バツチヤープラント3よりコ
ンクリートをコンクリートホツパー12内に供給
し、運転室18での運転により前記トランスフア
ーカー5をバンカー線4に沿い、コンクリートバ
ケツト受け台車6側へ走行させる。トランスフア
ーカー走行時には、走行安定性を保つため、リフ
ター11を降し、コンクリートホツパー12を低
位置にしておく。 When pouring concrete for a dam, the concrete bucket receiving cart 6 is remotely controlled from the driver's seat of the jib crane 2 to a predetermined position on the bunker line 4 (for example, position X in Fig. 4) according to the concrete pouring position. ), and with the concrete hopper 12 horizontal and the lifter 11 lowered, the transfer car 5 is positioned at the required position of the batcher plant 3, and concrete is supplied from the batcher plant 3 into the concrete hopper 12. The transfer car 5 is driven along the bunker line 4 toward the concrete bucket receiving truck 6 by operation in the driver's cab 18. When the transfer car is running, the lifter 11 is lowered and the concrete hopper 12 is kept at a low position in order to maintain running stability.
一方、前記作業の間に、コンクリート打設現場
へコンクリートを打設したコンクリートバケツト
23をジブクレーン2に吊つたままジブ31を旋
回させると共にワイヤーロープ32を繰り出し、
しかしてコンクリートバケツト23をコンクリー
トバケツト受け台車6のターンテーブル21上に
載置する。空のコンクリートバケツト23がター
ンテーブル21上に置かれる場合には、コンクリ
ートバケツト23はコンクリートバケツト案内用
ガイド22にガイドされ、コンクリートバケツト
23下面に取付けた円錐状のつめ25がターンテ
ーブル21に設けたじようご状のコンクリートバ
ケツト案内用受け24は嵌合するため、コンクリ
ートバケツト23は正確に位置決めされる。又、
コンクリートバケツト23はフツク33部の水平
方向に回転自在なクロスヘツドのため、作業中に
旋回し、従つてコンクリートバケツト23の長手
方向位置とコンクリートバケツト案内用ガイド2
2の長手方向とが一致しているとは限らない。こ
の場合には、コンクリートバケツト23をターン
テーブル21へ載置するに際し、ジブクレーン2
の運転室より遠隔操作にてターンテーブル21を
回転させ、コンクリートバケツト23の長手方向
とターンテーブル21上のコンクリートバケツト
案内用ガイド22の長手方向とを一致せしめ、し
かる後コンクリートバケツト23をターンテーブ
ル21上に置く。 Meanwhile, during the above-mentioned work, the jib 31 is rotated while the concrete bucket 23 with concrete poured at the concrete casting site is suspended from the jib crane 2, and the wire rope 32 is let out.
The concrete bucket 23 is then placed on the turntable 21 of the concrete bucket receiving cart 6. When the empty concrete bucket 23 is placed on the turntable 21, the concrete bucket 23 is guided by the concrete bucket guiding guide 22, and the conical pawl 25 attached to the lower surface of the concrete bucket 23 is placed on the turntable. Since the funnel-shaped concrete bucket guiding receiver 24 provided at 21 is fitted, the concrete bucket 23 is accurately positioned. or,
Since the concrete bucket 23 has a horizontally rotatable crosshead on the hook 33, it rotates during work, and therefore the longitudinal position of the concrete bucket 23 and the guide 2 for guiding the concrete bucket can be adjusted.
The two longitudinal directions are not necessarily the same. In this case, when placing the concrete bucket 23 on the turntable 21, the jib crane 2
The turntable 21 is rotated by remote control from the operator's cab to align the longitudinal direction of the concrete bucket 23 with the longitudinal direction of the concrete bucket guiding guide 22 on the turntable 21, and then the concrete bucket 23 is rotated. Place it on turntable 21.
コンクリートバケツト23がターンテーブル2
1上の所定位置に載置されると、対になつている
上下部自動給気カツプリング30,28が連結さ
れ、お互の弁が自動的に開かれ、エヤーコンプレ
ツサ26からエヤーがコンクリートバケツト23
のエヤーレシーバー29に送られて貯えられる。 Concrete bucket 23 is turntable 2
1, the upper and lower automatic air supply couplings 30 and 28 are connected, each valve is automatically opened, and air is supplied from the air compressor 26 to the concrete bucket. G23
The air is sent to the air receiver 29 and stored there.
又、前記コンクリートバケツト23がターンテ
ーブル21に載置された際に、該コンクリートバ
ケツト23の長手方向が平面から見てバンカー線
4の直角方向に位置していない場合は、バケツト
吊金具34の向きが正規の向きからずれ、該バケ
ツト吊金具34がトランスフアーカー5に対して
直角の向きとはならない。これでは、トランスフ
アーカー5のコンクリートホツパー12がバケツ
ト吊金具用ワイヤーロープ35と干渉することに
なり、作業に支障を来たす。そこで、ジブクレー
ン2の運転室より遠隔操作にてターンテーブル2
1を回転させ、クロスヘツドで水平方向に回転自
在になつているフツク33の下から全てを回転さ
せることにより、バケツト吊金具34の位置を修
正する。この際クロスヘツドが回転するためワイ
ヤーロープ32がねじれたりすることはない。 Furthermore, when the concrete bucket 23 is placed on the turntable 21, if the longitudinal direction of the concrete bucket 23 is not located in the direction perpendicular to the bunker line 4 when viewed from above, the bucket hanging fitting 34 direction is deviated from the normal direction, and the bucket hanging fitting 34 is not oriented at right angles to the transfer car 5. In this case, the concrete hopper 12 of the transfer car 5 will interfere with the wire rope 35 for the bucket hanging fixture, which will hinder the work. Therefore, from the operator's cab of jib crane 2, turntable 2 was
The position of the bucket hanger 34 is corrected by rotating everything from below the hook 33, which is horizontally rotatable with a crosshead. At this time, since the crosshead rotates, the wire rope 32 will not be twisted.
バケツト吊金具34や正規の位置に位置し、ト
ランスフアーカー5がコンクリートバケツト受け
台車6の数メートル手前まで走行して停止した
ら、流体圧シリンダ10を作動させてリフター1
1によりコンクリートホツパー12をホツパー支
持台9と共に上昇させ、続いてトランスフアーカ
ー5が、コンクリートバケツト受け台車6の前面
所定位置まで走行し、停止したら、パーキングブ
レーキを作動させてトランスフアーカー5が移動
しないようにし、次に流体圧シリンダ14を作動
させて該コンクリートホツパー12をピン13を
中心として傾動させ、流体圧シリンダ15によつ
てゲート16を開き、コンクリートホツパー12
内のコンクリートをコンクリートバケツト23内
に投入する。このように、トランスフアーカー5
と同一レベルに置かれたコンクリートバケツト2
3にコンクリートを投入できるため、従来方式の
ようなバケツトの吊り換えが不要となり、又、バ
ケツトを置くための一段低い段を設ける必要もな
くなる。 When the bucket lifting bracket 34 and the transfer car 5 are in the correct position and the transfer car 5 travels several meters before the concrete bucket receiving cart 6 and stops, the fluid pressure cylinder 10 is activated to lift the lifter 1.
1, the concrete hopper 12 is raised together with the hopper support 9, and then the transfer car 5 travels to a predetermined position in front of the concrete bucket receiving cart 6, and when it stops, the parking brake is activated and the transfer car 5 is moved. Then, the hydraulic cylinder 14 is actuated to tilt the concrete hopper 12 about the pin 13, the gate 16 is opened by the hydraulic cylinder 15, and the concrete hopper 12 is
The concrete inside is put into the concrete bucket 23. In this way, transfer car 5
Concrete bucket 2 placed on the same level as
3, concrete can be poured into the container, so there is no need to change the suspension of the bucket as in the conventional method, and there is no need to provide a lower step for placing the bucket.
コンクリートバケツト23へのコンクリート投
入の間に、コンクリートバケツト23のエヤーレ
シーバー29には、エヤーコンプレツサ26から
エヤーが自動的に供給されているが、コンクリー
トの投入が終了したコンクリートバケツト23を
ジブクレーン2で吊り上げると、上下部自動給気
カツプリング30,28内の弁は自動的に閉止
し、エヤーコンプレツサ26よりのエヤーの流れ
は停止し、エヤーレシーバー29内のエヤーが漏
洩することもない。 While concrete is being poured into the concrete bucket 23, air is automatically supplied from the air compressor 26 to the air receiver 29 of the concrete bucket 23. When lifted by the jib crane 2, the valves in the upper and lower automatic air supply couplings 30 and 28 are automatically closed, the flow of air from the air compressor 26 is stopped, and the air in the air receiver 29 does not leak. .
コンクリートが投入されジブクレーン2のワイ
ヤーロープ32で吊り上げられたコンクリートバ
ケツト23はジブクレーン2の旋回によりコンク
リート打設現場まで搬送され、コンクリートバケ
ツト23のエヤーレシーバー29に貯えられたエ
ヤーでコンクリートバケツト23のゲートの開閉
が行われる。コンクリートバケツト23の打設現
場までの搬送をジブクレーン2の旋回と巻上げ下
げで行ない、ジブ31の起伏で行わないのは、一
般に起伏には時間がかかり、荷の揺れが大きくな
り勝ちであるからである。 The concrete bucket 23 loaded with concrete and lifted by the wire rope 32 of the jib crane 2 is transported to the concrete placement site by the rotation of the jib crane 2, and the concrete bucket 23 is lifted by the air stored in the air receiver 29 of the concrete bucket 23. gates will be opened and closed. The concrete bucket cart 23 is transported to the casting site by turning and hoisting and lowering the jib crane 2, and not by raising and lowering the jib 31, because raising and lowering generally takes time and tends to cause the load to shake significantly. It is.
又、同一地点にコンクリートを打設する場合に
は、ジブクレーン2のジブの起伏角度はそのまま
で旋回のみを行ない、平面から見てバンカー線4
に交叉する位置に停止しているコンクリートバケ
ツト受け台車6上にコンクリートバケツト23を
降す。この場合、トランスフアーカー5に対して
コンクリートバケツト23を一度正位置にセツト
しておけば、同一地点のコンクリートの打設に対
しては、次回はターンテーブル21を回転させる
必要はない。しかし、位置Xから位置Yへコンク
リートバケツト台車6が移動した場合には、ター
ンテーブル21は再び回転させなければならな
い。 In addition, when pouring concrete at the same point, the jib crane 2 only rotates while keeping the jib angle the same, and the bunker line 4 is
The concrete bucket 23 is lowered onto the concrete bucket receiving cart 6 which is stopped at a position intersecting the concrete bucket. In this case, once the concrete bucket cart 23 is set in the correct position with respect to the transfer car 5, there is no need to rotate the turntable 21 next time when pouring concrete at the same point. However, when the concrete bucket cart 6 moves from position X to position Y, the turntable 21 must be rotated again.
第9図〜第11図は本発明の他の実施例を示
し、ジブクレーンのかわりにケーブルクレーン3
6を使用する以外は前記実施例と全く同じであ
る。 9 to 11 show another embodiment of the present invention, in which a cable crane 3 is used instead of a jib crane.
This example is completely the same as the previous example except that 6 is used.
図中37はケーブルクレーン36の固定塔、3
8は同移動塔、39はメインケーブル、40はト
ロリー、41は移動塔38の走行路であり、図中
第4図〜第8図に示す符号と同一の符号のものは
同一のものを示す。この場合は、コンクリートバ
ケツト受け台車6のターンテーブルは設けなくと
も良いが、バンカー線4が曲つていることが多い
ので装備しておく方が良い。 In the figure, 37 is the fixed tower of the cable crane 36;
8 is the mobile tower, 39 is the main cable, 40 is the trolley, and 41 is the running path of the mobile tower 38. In the figure, the same symbols as those shown in Figures 4 to 8 indicate the same thing. . In this case, it is not necessary to provide a turntable for the concrete bucket receiving cart 6, but since the bunker wire 4 is often curved, it is better to provide one.
コンクリートバケツト受け台車6の走行とター
ンテーブル21の回転は、ジブクレーンの場合と
同様、ケーブルクレーン36の運転室から無線操
縦で行うようにするか、あるいは、ケーブルクレ
ーン36の固定塔37から移動塔38に張り渡さ
れたメインケーブル39の上下流方向の位置を検
出し、その真下にコンクリートバケツト受け台車
6が来るように自動制御しても良い。 The running of the concrete bucket receiving cart 6 and the rotation of the turntable 21 can be carried out by radio control from the operator's cab of the cable crane 36, as in the case of a jib crane, or by radio control from the fixed tower 37 of the cable crane 36. The vertical position of the main cable 39 stretched over the main cable 38 may be detected, and the concrete bucket receiving cart 6 may be automatically controlled so as to come directly below it.
なお、本発明は前述の実施例に限定されるもの
ではなく、本発明の要旨を逸脱しない範囲内で
種々変更を加え得ることは勿論である。 It should be noted that the present invention is not limited to the above-described embodiments, and it goes without saying that various changes can be made without departing from the gist of the present invention.
本発明のダム建設におけるコンクリート搬送方
法及びその装置は前述のごとき構成であるから、
下記のごとき種々の優れた効果を奏し得る。 Since the method and apparatus for conveying concrete in dam construction of the present invention have the above-described configuration,
Various excellent effects can be achieved as described below.
I) 従来の、いわゆるバケツト吊り換え方式で
必要であつたコンクリートバケツト吊り換え用
作業員2人と合図マン1人を削減でき、省人化
に貢献する。I) It is possible to reduce the number of 2 workers and 1 signal man needed for concrete bucket hoisting, which were required in the conventional so-called bucket hoisting method, contributing to labor savings.
) コンクリートバケツトへのエヤー供給にお
いてエヤー供給管の連結作業等が不要となるた
め、省力化が可能となる。) When supplying air to the concrete bucket, there is no need to connect the air supply pipes, so labor can be saved.
) 従来のトランスフアーカー方式で必要であ
つたコンクリートバケツトを置く段が不要とな
るため、設備が簡単になる。) The equipment becomes simpler because there is no need for a stage for placing concrete buckets, which was necessary in the conventional transfer car method.
) コンクリートバケツトを吊り換える必要が
なく、バケツトへのエヤーも自動的に供給し得
るため、作業能率が向上する。) There is no need to rehang the concrete bucket, and air can be automatically supplied to the bucket, improving work efficiency.
第1図は従来のダム建設におけるコンクリート
搬送方式の一例の説明図、第2図は従来のダム建
設におけるコンクリート搬送方式の他の例の説明
図、第3図は第2図の−方向矢視図、第4図
は本発明のダム建設におけるコンクリート搬送方
法及びその装置の一実施例の平面図、第5図は第
4図のV−V方向矢視図、第6図は本発明に使用
するコンクリートバケツト受け台車の斜視図、第
7図は本発明においてトランスフアーカーのホツ
パーからコンクリートバケツト受け台車のコンク
リートバケツトへコンクリートを投入する場合の
説明図、第8図は第7図の−方向矢視図、第
9図は本発明のダム建設におけるコンクリート搬
送方法及びその装置の他の実施例の平面図、第1
0図は第9図のX−X方向矢視図、第11図は第
9図及び第10図に示すものを斜め上方から見た
場合の斜視図である。
図中1はダム、2は固定式ジブクレーン、3は
バツチヤープラント、4はバンカー線、5はトラ
ンスフアーカー、6はコンクリート受け台車、1
2はコンクリートホツパー、16はホツパーゲー
ト、21はターンテーブル、28は下部自動給気
カツプリング、29はエヤーレシーバー、30は
上部自動給気カツプリング、34はバケツト吊金
具、35はバケツト吊金具用ワイヤーロープ、3
6はケーブルクレーンを示す。
Figure 1 is an explanatory diagram of an example of a concrete conveyance system in conventional dam construction, Figure 2 is an explanatory diagram of another example of a concrete conveyance system in conventional dam construction, and Figure 3 is viewed from the - direction arrow in Figure 2. Figure 4 is a plan view of an embodiment of the concrete conveying method and apparatus for dam construction of the present invention, Figure 5 is a view taken along the V-V direction of Figure 4, and Figure 6 is used in the present invention. FIG. 7 is an explanatory diagram of the case where concrete is poured from the hopper of the transfer car to the concrete bucket of the concrete bucket receiving vehicle in the present invention, and FIG. 8 is a perspective view of the concrete bucket receiving vehicle shown in FIG. 7. 9 is a plan view of another embodiment of the method and apparatus for conveying concrete in dam construction according to the present invention;
0 is a view taken along the line X--X in FIG. 9, and FIG. 11 is a perspective view of what is shown in FIGS. 9 and 10 as viewed diagonally from above. In the figure, 1 is a dam, 2 is a fixed jib crane, 3 is a butcher plant, 4 is a bunker line, 5 is a transfer car, 6 is a concrete support truck, 1
2 is a concrete hopper, 16 is a hopper gate, 21 is a turntable, 28 is a lower automatic air supply coupling, 29 is an air receiver, 30 is an upper automatic air supply coupling, 34 is a bucket hanging bracket, and 35 is a wire rope for the bucket hanging bracket. ,3
6 indicates a cable crane.
Claims (1)
備えたコンクリートバケツト受け台車を位置せし
め、クレーンフツクにバケツト吊金具用ワイヤー
ロープを介して吊り下げられているコンクリート
バケツトを前記ターンテーブル所定位置に置き、
該コンクリートバケツトにゲート開閉用のエヤー
を自動的に供給し、次いでターンテーブルをコン
クリートバケツトと一緒に回転させてコンクリー
トバケツトに取付けたバケツト吊金具用ワイヤー
ロープがトランスフアーカーのホツパーのゲート
と干渉しない位置に位置せしめ、コンクリートの
供給を受けたトランスフアーカーがコンクリート
バケツト受け台車の近くまで来たら該トランスフ
アーカーを停止させ、コンクリートをコンクリー
トバケツトに投入し、しかる後コンクリートバケ
ツトをクレーンで吊り上げて所要位置へ搬送する
ことを特徴とするダム建設におけるコンクリート
搬送方法。 2 コンクリートバケツトを吊り下げ搬送するク
レーンを所要位置に設け、所要位置に敷設したバ
ンカー線上に、昇降及び傾動可能なコンクリート
ホツパーを有するトランスフアーカーと水平方向
に回転自在なターンテーブルを有するコンクリー
トバケツト受け台車とを走行自在に配設し、前記
コンクリートバケツトとエヤー供給源とを連結す
る自動給気カツプリングを前記ターンテーブルと
コンクリートバケツトとの間に設けたことを特徴
とするダム建設におけるコンクリート搬送装置。[Scope of Claims] 1. A concrete bucket receiving cart equipped with a turntable is positioned at a required position on the bunker line, and the concrete bucket, which is suspended from a crane hook via a wire rope for a bucket hanging fixture, is moved to the turn table. Place the table in place,
Air for opening and closing the gate is automatically supplied to the concrete bucket, and then the turntable is rotated together with the concrete bucket, and the wire rope for the bucket hanging bracket attached to the concrete bucket is connected to the gate of the hopper of the transfer car. When the transfer car that has been supplied with concrete comes close to the concrete bucket receiving truck, the transfer car is stopped, concrete is poured into the concrete bucket, and the concrete bucket is then moved with a crane. A method of transporting concrete in dam construction, which is characterized by lifting and transporting it to a required location. 2 A crane for suspending and transporting the concrete bucket is installed at the required position, and a transfer car with a concrete hopper that can be raised and lowered and tilted, and a concrete bucket equipped with a horizontally rotatable turntable are installed on the bunker line laid at the required position. In the dam construction, a turntable and a turntable are movably disposed, and an automatic air supply coupling for connecting the concrete bucket and an air supply source is provided between the turntable and the concrete bucket. Concrete conveyance equipment.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15090680A JPS5774422A (en) | 1980-10-28 | 1980-10-28 | Concrete conveying method for dam construction and eevice thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15090680A JPS5774422A (en) | 1980-10-28 | 1980-10-28 | Concrete conveying method for dam construction and eevice thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5774422A JPS5774422A (en) | 1982-05-10 |
| JPH0144845B2 true JPH0144845B2 (en) | 1989-09-29 |
Family
ID=15506965
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP15090680A Granted JPS5774422A (en) | 1980-10-28 | 1980-10-28 | Concrete conveying method for dam construction and eevice thereof |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5774422A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2019044500A (en) * | 2017-09-04 | 2019-03-22 | 鹿島建設株式会社 | Method for constructing dam |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2601108B2 (en) * | 1992-09-25 | 1997-04-16 | 株式会社大林組 | Bucket bottom positioning device |
| CN116040544B (en) * | 2023-04-03 | 2023-06-06 | 四川蜀道建筑科技有限公司 | Self-pushing lifting reset equipment |
-
1980
- 1980-10-28 JP JP15090680A patent/JPS5774422A/en active Granted
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2019044500A (en) * | 2017-09-04 | 2019-03-22 | 鹿島建設株式会社 | Method for constructing dam |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5774422A (en) | 1982-05-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0144845B2 (en) | ||
| CN116101892A (en) | A vertical prefabricated box culvert lifting and turning system and its construction method | |
| CN110356953A (en) | A kind of suspender that aerial automatic synchronization breaks off relations | |
| CN210393401U (en) | A hoisting and positioning device for a column | |
| CN209797302U (en) | An integrated hoisting and pouring device for prefabricated buildings | |
| CN109322674A (en) | a transport device | |
| JPS6133937B2 (en) | ||
| CN207364438U (en) | Spread line apparatus | |
| JPS5849644B2 (en) | Concrete transport method and device in dam construction | |
| CN218754698U (en) | Automatic loading and unloading railway device | |
| JP3176462B2 (en) | Dam concrete transport vehicle and dam concrete transport method using the transport vehicle | |
| CN215635352U (en) | Municipal drainage pipeline laying device | |
| KR100259602B1 (en) | Exclusive use crane for constructing fume-pipe | |
| CN222454313U (en) | Portable concrete culvert pipe hoist device | |
| JPS6116308Y2 (en) | ||
| JPH0668165B2 (en) | Concrete transport method and device | |
| JPS638530Y2 (en) | ||
| JPS58207225A (en) | Bridge unloader | |
| JPS59227689A (en) | Crane boom mounting method | |
| JP2001199674A (en) | Long material lifting equipment | |
| RU121801U1 (en) | DEVICE FOR UNLOADING BULK CARGOES FROM GANWAGONS | |
| JPS61196069A (en) | Casting of concrete by utilizing crane | |
| CN211112951U (en) | Portable magnetism floats section of track system of pouring | |
| CN117738716A (en) | Large-oblique-angle ventilation inclined shaft construction device and construction method for long and large tunnel | |
| CN117284946A (en) | Cable suspension system for anchorage foundation and anchorage system construction and construction method |