Info

Publication number
JPH0144952B2
JPH0144952B2 JP59019735A JP1973584A JPH0144952B2 JP H0144952 B2 JPH0144952 B2 JP H0144952B2 JP 59019735 A JP59019735 A JP 59019735A JP 1973584 A JP1973584 A JP 1973584A JP H0144952 B2 JPH0144952 B2 JP H0144952B2
Authority
JP
Japan
Prior art keywords
pipe
hole
grout
mesh
mesh pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP59019735A
Other languages
Japanese (ja)
Other versions
JPS60164088A (en
Inventor
Masao Kunichika
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP59019735A priority Critical patent/JPS60164088A/en
Publication of JPS60164088A publication Critical patent/JPS60164088A/en
Publication of JPH0144952B2 publication Critical patent/JPH0144952B2/ja
Granted legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

【発明の詳細な説明】 産業上の利用分野 この発明は原子炉建屋、放射線管理建屋等の電
気、設備配管の厚い壁、床等における躯体貫通部
のグラウト方法およびそのグラウト施工において
使用される装置に関するものである。
[Detailed Description of the Invention] Industrial Application Field The present invention relates to a method for grouting a penetration part of a building frame in a thick wall, floor, etc. of electrical and equipment piping in a nuclear reactor building, a radiation control building, etc., and an apparatus used in the grouting process. It is related to.

発明の解決しようとする問題点 原子炉建屋、放射線管理建屋の躯体を貫通して
電気、設備配管を設けることが屡々ある。ところ
でこれらの躯体は遮蔽構造をなすため壁の場合で
1500〜2000mmに及ぶものであり、また配管の貫通
部周辺は遮蔽機能を損じないよう重量モルタル等
を完全にグラウト注入することが要求される。
Problems to be Solved by the Invention Electricity and equipment piping are often installed through the frames of nuclear reactor buildings and radiation control buildings. By the way, these frameworks form a shielding structure, so in the case of walls,
The length ranges from 1,500 to 2,000 mm, and it is required to completely grout the area around the piping penetration with heavy mortar etc. so as not to impair the shielding function.

この発明は前記要望に対処すべく開発した方法
および装置である。
The present invention is a method and apparatus developed to address the aforementioned needs.

発明の構成およびその実施例 この発明の要旨とする構成は特許請求の範囲の
欄に記載の通りであり、その主要部とするところ
は貫通孔内にメツシユ管を配置しておき配管周囲
の貫通孔内に一次グラウトを注入し、メツシユ管
よりエアー抜きし、かつ注入状態を確認し、次い
でメツシユ管内に二次グラウトを注入するところ
にある。
Structure of the Invention and Embodiments The gist of the invention is as described in the claims, and its main part is that a mesh pipe is arranged in a through hole, and a mesh pipe is arranged in a through hole, The primary grout is injected into the hole, air is removed from the mesh pipe, the injection status is confirmed, and then the secondary grout is injected into the mesh pipe.

以下その詳細を図示した実施例によつて説明す
る。
The details will be explained below with reference to illustrated embodiments.

第1図、第2図はこの発明の方法の実施状態の
概要を示したものであり、コンクリート壁等から
なる躯体1に貫通孔2を形成し、この貫通孔2の
中央部に配管Aを配置し、かつグラウト材の注入
管3を下面に配置し、および金網から形成された
メツシユ管4を貫通孔2の上部壁に沿つて配置し
この貫通孔2の両端部を型枠5,5で閉塞する。
次いで注入管3より無収縮性重量モルタルからな
る一次グラウト6を注入する。その際メツシユ管
4は型枠5,5を貫通して外部に開口しているの
でそこからエヤー抜きがなされ、一次グラウト6
が充満してくるとメツシユ管4内に一次グラウト
材が浸透してくるので注入状態、注入の完了を目
で見て確認することができる。
1 and 2 show an outline of the implementation state of the method of the present invention, in which a through hole 2 is formed in a frame 1 made of a concrete wall, etc., and a pipe A is installed in the center of this through hole 2. A grout injection pipe 3 is arranged on the lower surface, a mesh pipe 4 made of wire mesh is arranged along the upper wall of the through hole 2, and both ends of the through hole 2 are connected to the formwork 5, 5. occlusion.
Next, a primary grout 6 made of non-shrinkable gravimetric mortar is injected through the injection pipe 3. At this time, the mesh pipe 4 passes through the formworks 5 and opens to the outside, so air is removed from there, and the primary grout 6
When the mesh pipe 4 is filled, the primary grout material permeates into the mesh pipe 4, so that the state of the injection and the completion of the injection can be visually confirmed.

次いでメツシユ管4の両端部にそれぞれホツパ
ー7,7を取付け、一方のホツパー7から一次グ
ラウトと同様材料からなる二次グラウトを自重圧
による流し込み方法によりメツシユ管4内に注入
し、他方のホツパー7からオーバーフロする状態
まで注入することにより注入作業を完了し、ホツ
パー7を撤去する。
Next, hoppers 7, 7 are attached to both ends of the mesh pipe 4, and secondary grout made of the same material as the primary grout is injected into the mesh pipe 4 from one hopper 7 by the pouring method using its own weight, and then from the other hopper 7. The pouring work is completed by pouring from to overflow, and the hopper 7 is removed.

以上の方法を実施する型枠等の装置が第3図、
第4図に示してある。そして型枠5は硬質ゴム5
−1と耐水ベニヤ5−2を重ねてなり、躯体貫通
孔2に配置した配管A、注入管3およびメツシユ
管4が型枠5を貫通している。貫通孔2の両外側
に位置するリング8はリング8を貫通して放射状
に配したジヤツキ9により配管Aに取付けてあ
る。
The equipment such as formwork for carrying out the above method is shown in Figure 3.
It is shown in FIG. And the formwork 5 is made of hard rubber 5
-1 and water-resistant veneer 5-2 are overlapped, and the pipe A, the injection pipe 3, and the mesh pipe 4 arranged in the frame through hole 2 penetrate the formwork 5. The rings 8 located on both outer sides of the through hole 2 are attached to the pipe A by jacks 9 that penetrate the rings 8 and are arranged radially.

またこのリング8の周辺に配したジヤツキ10
の先端押圧板11は型枠5を貫通孔2の周囲躯体
1に圧着する。ホツパー7はメツシユ管4に対し
て着脱自在としてあり、注入管3よりの一次グラ
ウト6の注入後二次グラウトの注入に際して取付
ける。
Also, a jack 10 placed around this ring 8
The front end pressing plate 11 presses the formwork 5 to the surrounding frame 1 of the through hole 2. The hopper 7 is detachably attached to the mesh pipe 4, and is attached when the secondary grout is injected after the primary grout 6 is injected from the injection pipe 3.

発明の効果 この発明は以上の構成からなり、相当の厚さを
有する躯体貫通孔へのグラウト注入であるがメツ
シユ管を貫通孔内に配置することにより、両端を
型枠で閉塞してもこのメツシユ管を通じてエヤ抜
きをなし、またメツシユ管内にグラウト材が浸透
することによりグラウトの注入状況を確認でき
る。最後にこのメツシユ管内に二次グラウトを注
入することにより躯体貫通孔の完全な閉塞がなさ
れ、遮蔽構造物としての機能を損じない。
Effects of the Invention This invention has the above-mentioned configuration, and although grout is injected into a through-hole of a building frame having a considerable thickness, by placing a mesh pipe in the through-hole, it is possible to inject grout even if both ends are closed with formwork. Air is removed through the mesh pipe, and the grout injection status can be checked as the grout material permeates into the mesh pipe. Finally, by injecting secondary grout into the mesh pipe, the through holes in the frame are completely closed, so that the function as a shielding structure is not impaired.

また型枠は配管に取付けたリング周辺のジヤツ
キにより貫通孔周辺に確実に圧着することができ
グラウト注入作業を容易確実とすることができ
る。
Furthermore, the formwork can be reliably crimped around the through hole by jacking around the ring attached to the pipe, making grout injection work easy and reliable.

【図面の簡単な説明】[Brief explanation of drawings]

第1図、第2図はこの発明の方法の実施態様の
概要を示した断面図、第3図、第4図は前記方法
を実施する装置の断面図と正面図である。 A……配管、1……躯体、2……貫通孔、3…
…注入管、4……メツシユ管、5……型枠、6…
…一次グラウト、7……ホツパー、8……リン
グ、9……ジヤツキ、10……ジヤツキ、11…
…押圧板。
FIGS. 1 and 2 are sectional views showing an outline of an embodiment of the method of the present invention, and FIGS. 3 and 4 are sectional views and front views of an apparatus for carrying out the method. A...Piping, 1...Structure, 2...Through hole, 3...
...Injection pipe, 4...Mesh pipe, 5...Formwork, 6...
...Primary grout, 7... Hopper, 8... Ring, 9... Jacket, 10... Jacket, 11...
...Press plate.

Claims (1)

【特許請求の範囲】 1 躯体貫通孔内に配管を設置し、かつ注入管お
よびメツシユ管を配置し、前記貫通孔の両端部を
型枠で閉塞し、前記注入管より配管周囲の貫通孔
内に一次グラウトを注入し、メツシユ管により一
次グラウトの注入完了を確認し、次いでメツシユ
管内に二次グラウトを注入することを特徴とする
配管貫通部のグラウト方法。 2 躯体貫通孔内に配管を設置し、かつ注入管お
よびメツシユ管を配置し、前記貫通孔の両端部を
型枠で閉塞し、貫通孔外のリングは放射状に配し
たジヤツキにより配管に取付けてあり、かつ前記
リングに型枠の押圧固定ジヤツキを設け、前記メ
ツシユ管にはホツパーを連結自在としてあること
を特徴とする配管貫通部のグラウト施工装置。
[Scope of Claims] 1 Piping is installed in the through-hole of the building frame, and an injection pipe and a mesh pipe are arranged, both ends of the through-hole are closed with formwork, and the injection pipe is inserted into the through-hole around the piping. A method for grouting a pipe penetration part, characterized by injecting primary grout into the mesh pipe, confirming completion of the injection of the primary grout through a mesh pipe, and then injecting secondary grout into the mesh pipe. 2. Install piping inside the building frame through-hole, arrange the injection pipe and mesh pipe, close both ends of the through-hole with formwork, and attach the ring outside the through-hole to the piping using jacks arranged radially. A grouting apparatus for a pipe penetrating part, characterized in that the ring is provided with a jack for pressing and fixing the formwork, and the mesh pipe is capable of connecting a hopper.
JP59019735A 1984-02-06 1984-02-06 Grout method of piping penetrating section and executing device thereof Granted JPS60164088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59019735A JPS60164088A (en) 1984-02-06 1984-02-06 Grout method of piping penetrating section and executing device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59019735A JPS60164088A (en) 1984-02-06 1984-02-06 Grout method of piping penetrating section and executing device thereof

Publications (2)

Publication Number Publication Date
JPS60164088A JPS60164088A (en) 1985-08-27
JPH0144952B2 true JPH0144952B2 (en) 1989-10-02

Family

ID=12007579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59019735A Granted JPS60164088A (en) 1984-02-06 1984-02-06 Grout method of piping penetrating section and executing device thereof

Country Status (1)

Country Link
JP (1) JPS60164088A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013170671A (en) * 2012-02-22 2013-09-02 Toshiba Corp Apparatus and method for closing penetration portion of wall surface

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4481521B2 (en) * 2000-03-30 2010-06-16 東芝プラントシステム株式会社 Opening closing method and opening closing structure
JP7208840B2 (en) * 2019-03-22 2023-01-19 鹿島建設株式会社 Method for shear reinforcement of reinforced concrete walls

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013170671A (en) * 2012-02-22 2013-09-02 Toshiba Corp Apparatus and method for closing penetration portion of wall surface

Also Published As

Publication number Publication date
JPS60164088A (en) 1985-08-27

Similar Documents

Publication Publication Date Title
CN109026065B (en) Tunnel secondary lining zero-defect construction method
CA1050291A (en) Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided
CN106703292A (en) Prefabricated concrete column of assembly strip steel connector and construction method thereof
CN109680722B (en) Construction method for directly reserving external building access port on basement outer wall
CN106760851A (en) The construction method of the newly-increased Seismic Isolation of Isolation Layer of existing brick mix structure
JPH0144952B2 (en)
JP5585953B2 (en) Radiation control area penetration processing method in nuclear facility
CN212453096U (en) Assembled building interface structure
CN210086514U (en) Basement post-cast strip waterproof construction
CN204570749U (en) Underground anti-seepage jointing and sealed underground percolator
KR100379740B1 (en) Framework
EP1482098B1 (en) Water-impermeable cellar and method of its construction
CN106638618B (en) Ground-connecting-wall goes along with sb. to guard him the construction method of foundation pit reinforced concrete support construction
JPS57123325A (en) Reinforcing work for head of ready-made concrete pile
JPS6224673Y2 (en)
KR102771961B1 (en) Electrical Die Sorting equipment base construction method using precast concrete member
JPH0232755Y2 (en)
JPH04370797A (en) Constuction of lined tank
JPH0130706Y2 (en)
KR940004440Y1 (en) Phosphorus and handicraft
DE3007511C2 (en) Process for liquid-exposed solid ceilings of buildings
JPS57108330A (en) Construction of underground structure
JPS57116835A (en) Construction of structure with basement
JPH0130705Y2 (en)
CA1062482A (en) Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided