JPH0217825B2 - - Google Patents
Info
- Publication number
- JPH0217825B2 JPH0217825B2 JP58096526A JP9652683A JPH0217825B2 JP H0217825 B2 JPH0217825 B2 JP H0217825B2 JP 58096526 A JP58096526 A JP 58096526A JP 9652683 A JP9652683 A JP 9652683A JP H0217825 B2 JPH0217825 B2 JP H0217825B2
- Authority
- JP
- Japan
- Prior art keywords
- lcu
- instruction data
- data
- computer
- label printer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
Landscapes
- Business, Economics & Management (AREA)
- Economics (AREA)
- Engineering & Computer Science (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Finance (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Accounting & Taxation (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Warehouses Or Storage Devices (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は出庫管理装置に関し、さらに詳しくは
計量ラベルプリンタを用いて作業をする商品出庫
管理装置に関する。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a product delivery management device, and more particularly to a product delivery management device that operates using a weighing label printer.
(従来技術とその課題)
スーパーマーケツト等における精肉食品を例に
従来の商品出庫管理を説明すれば、まず出庫予定
の精肉食品をあらかじめ適当個数、適宜分量のパ
ツク商品に仕分して用意し、計量ラベルプリンタ
(ラベルプリンタ付電子秤)の近傍に配置してお
く。(Prior art and its issues) To explain conventional product delivery management using meat foods in supermarkets, etc. as an example, first, the meat products scheduled to be delivered are sorted and prepared in advance into packaged products of an appropriate number and quantity, and then weighed. Place it near the label printer (electronic scale with label printer).
一方、計量ラベルプリンタを1台又は複数台コ
ンピユータに接続して出庫管理装置を構成し、こ
のコンピユータに、あらかじめ上記計量ラベルプ
リンタを作業させるための出庫指示データ、すな
わちアイテムコード(商品番号)に対応して納入
先コードパツク数、単価、風袋等を入力記憶して
おく。 On the other hand, one or more weighing label printers are connected to a computer to configure a shipping management device, and this computer is provided with shipping instruction data for operating the weighing label printer, that is, item codes (product numbers). Then input and memorize the delivery destination code pack number, unit price, tare weight, etc.
作業者は、計量ラベルプリンタの操作部から処
理予定の商品のアイテムコードを入力することに
よりコンピユータに作業指示データを要求する。
コンピユータは上記あらかじめ記憶された出庫指
示データの中から要求のあつたアイテムコードの
データを前記計量ラベルプリンタに供給する。作
業者は供給された出庫指示データに基づいて前記
パツク商品の計量値付作業を行なう。そしてその
データの処理が終了した場合に、コンピユータに
次のアイテムの出庫指示データを要求し、コンピ
ユータに記憶されたデータ全ての作業が終るまで
前記処理を繰返す。 The operator requests work instruction data from the computer by inputting the item code of the product to be processed through the operation unit of the weighing label printer.
The computer supplies the requested item code data from the pre-stored shipping instruction data to the weighing label printer. The worker performs the work of attaching a weighing value to the packaged product based on the supplied shipping instruction data. When the processing of that data is completed, the computer is requested to send out the next item's shipping instruction data, and the processing is repeated until all the data stored in the computer has been processed.
又、計量ラベルプリンタが1つのデータによる
作業が終えたとき、あるいは全てのデータ処理が
終えたときにコンピユータは各計量ラベルプリン
タから作業実績データを収集し記憶して出庫管理
をする。しかるに上記コンピユータは高価ながら
高機能を有するにもかかわらず、前記従来装置に
よれば、コンピユータは計量ラベルプリンタの管
理制御に専用されて計量ラベルプリンタを使用し
ているあいだ他の機能を用いる処理をする間がな
く、高価なコンピユータの有効利用が図れないこ
とになり、他の仕事処理をするためにコンピユー
タを別途に1台用意しなければならず極めて不経
済になる不具合がある。 Further, when the weighing label printer finishes working with one piece of data or when all data processing is finished, the computer collects and stores the work performance data from each weighing label printer and manages shipping. However, although the computer described above is expensive but has high functionality, according to the conventional device, the computer is dedicated to managing and controlling the weighing label printer, and does not perform processing using other functions while the weighing label printer is in use. Since there is no time to do this, the expensive computer cannot be used effectively, and a separate computer must be prepared to process other tasks, which is extremely uneconomical.
本発明は斯る従来事情に鑑み、計量ラベルプリ
ンタが作業している間も、コンピユータを計量ラ
ベルプリンタの制御に専用されることから解放し
て他の仕事処理に使用できるようにし、高価なコ
ンピユータの有効利用が図れる出庫管理装置を提
供することを目的とする。 In view of such conventional circumstances, the present invention frees the computer from being dedicated to controlling the weighing label printer and allows it to be used for other work processing even while the weighing label printer is working, thereby reducing the need for an expensive computer. It is an object of the present invention to provide a shipping management device that can effectively utilize the storage space.
(課題を解決するための技術的手段)
斯る本発明の出庫管理装置は、出庫指示データ
が入力記憶されるコンピユータに1台のライン制
御装置LCUを介して複数の計量ラベルプリンタ
を接続し、前記出庫指示データは前記LCUへま
とめて転送記憶され、LCUは計量ラベルプリン
タを監視して出庫指示データを要求する計量ラベ
ルプリンタへ当該出庫指示データを供給し、計量
ラベルプリンタは供給された出庫指示データに基
づいてラベルの発行作業をし、また前記LCUは
各計量ラベルプリンタから作業実績データを収集
記憶するとともに記憶した前記実績データをまと
めて前記コンピユータへ供給し、前記LCUと各
計量ラベルプリンタとの交信はオンライン・リア
ルタイム処理で行なわれることを特徴とする。(Technical means for solving the problem) The shipping management device of the present invention connects a plurality of weighing label printers via one line control device LCU to a computer into which shipping instruction data is input and stored, The shipping instruction data is collectively transferred and stored in the LCU, and the LCU monitors the weighing label printer and supplies the shipping instruction data to the weighing label printer that requests the shipping instruction data, and the weighing label printer receives the supplied shipping instruction data. The LCU issues labels based on the data, and the LCU collects and stores work performance data from each weighing label printer, and supplies the stored performance data to the computer, and the LCU and each weighing label printer This communication is characterized by being carried out in online real-time processing.
(作用)
本発明によれば、コンピユータに入力記憶され
た出庫指示データはライン制御装置LCUへ転送
記憶され、その後は前記LCUが各計量ラベルプ
リンタと交信し、出庫指示データを各プリンタへ
供給するとともに各プリンタから作業実績データ
を収集記憶し、LCUに記憶された前記実績デー
タは前記コンピユータが他の処理をしていない時
適宜に、あるいは計量ラベルプリンタの全ての作
業処理後に前記コンピユータへ供給されて管理さ
れる。(Operation) According to the present invention, the delivery instruction data input and stored in the computer is transferred to and stored in the line control unit LCU, and after that, the LCU communicates with each weighing label printer and supplies the delivery instruction data to each printer. At the same time, work performance data is collected and stored from each printer, and the performance data stored in the LCU is supplied to the computer at an appropriate time when the computer is not performing other processing, or after all work processing by the weighing label printer is completed. managed.
従つて、コンピユータは出庫指示データを
LCUへ転送した後、次にLCUから実績データを
受け取るまでの間はLCU及び計量ラベルプリン
タとの交信制御から一切解放された状態となり、
他の機能を用いた仕事処理が可能となる。 Therefore, the computer outputs the shipping instruction data.
After transferring to the LCU, until the next time performance data is received from the LCU, it is completely free from communication control with the LCU and weighing label printer.
It becomes possible to process tasks using other functions.
(実施例)
本発明の実施例を図面により説明すれば、第1
図は出庫管理装置の外観を示し、第2図はその機
能ブロツク図を示す。(Example) To explain an example of the present invention with reference to the drawings, the first example is as follows.
The figure shows the appearance of the delivery management device, and FIG. 2 shows its functional block diagram.
コンピユータCPUは入力部KEYを接続して設
け、その入力部KEYより出庫指示データを入力
記憶するとともにこのコンピユータCPUには1
台のライン制御装置LCUを介して複数の計量ラ
ベルプリンタ(ラベルプリンタ付計量器、以下単
に計量器、という)1,1…を接続する。 The computer CPU is connected to an input section KEY, and inputs and stores delivery instruction data from the input section KEY.
A plurality of weighing label printers (weighing instruments with label printers, hereinafter simply referred to as "weighing instruments") 1, 1, . . . are connected via a line control device LCU of the machine.
LCUは記憶部と制御部とを備えて前記CPUと
はバツチ処理回線Bにより接続され、CPUに記
憶した前記出庫指示データが一括して転送記憶さ
れる。 The LCU includes a storage section and a control section, and is connected to the CPU by a batch processing line B, and the delivery instruction data stored in the CPU is transferred and stored in a batch.
上記LCUは、計量器1,1…を監視し、その
交信R3はオンライン・リアルタイム処理で行な
い、出庫指示データを要求する計量器1,1…に
該データを供給する。 The LCU monitors the weighing instruments 1, 1, . . . , performs communication R3 in online real-time processing, and supplies the data to the weighing instruments 1, 1, . . . that request delivery instruction data.
計量器1は前記LCUから供給された出庫指示
データに基づいて作業を開始し、計量動作毎に値
段など所要データを印字したラベルを発行する作
業を行ない、出庫指示データに含まれた発行数
(パツク数)のラベル発行を行なうと当該データ
の処理が終了する。 The weighing machine 1 starts work based on the delivery instruction data supplied from the LCU, issues a label on which necessary data such as price is printed for each weighing operation, and issues the number of issues included in the delivery instruction data ( When the number of labels (pack number) is issued, the processing of the data ends.
そして、供給された出庫指示データの処理が終
了した場合は、前記LCUに次の出庫指示データ
を要求し、前述と同様のラベル発行作業を行な
い、LCUに記憶されている全ての出庫指示デー
タの作業処理が終了するまで前記ラベル発行作業
を繰返し行なう。 When the processing of the supplied shipping instruction data is completed, the next shipping instruction data is requested from the LCU, and the same label issuing work as described above is performed, and all shipping instruction data stored in the LCU is The label issuing work is repeated until the work processing is completed.
又、LCUは各計量器1から出庫指示データの
処理終了毎あるいは全てのデータ処理終了後に計
量器の作業実績データを収集し記憶し、この実績
データを前記CPUへ交信R4により供給する。 In addition, the LCU collects and stores work performance data of the weighing instruments each time the processing of the delivery instruction data from each weighing instrument 1 or after the processing of all data is completed, and supplies this performance data to the CPU through communication R4 .
上記実績データの交信R4はCPUが他の処理を
していない時にリアルタイム処理で行なうことも
よいが、CPUの負担軽減のために全ての実績デ
ータをバツチ処理により一括してLCUからCPU
へ供給することも可能である。 Communication of the above performance data R 4 may be performed in real time when the CPU is not doing other processing, but to reduce the burden on the CPU, all performance data can be batch processed and transferred from the LCU to the CPU.
It is also possible to supply
CPUに供給された実績データはCPUにより整
理されてデイスプレイに表示し、あるいは実績印
字用のプリンタ(図示せず)に印字し発行する。 The performance data supplied to the CPU is organized by the CPU and displayed on a display, or printed and issued on a printer (not shown) for printing results.
出庫指示データの一例を第3図により説明すれ
ば、出庫指示データの各アイテムl1,l2のアイテ
ムコードは商品の種類を示し、各納入先毎にパツ
ク数、単価、風袋、年月日等を設定したものを商
品毎にまとめて1つのアイテムとしたものであ
る。 To explain an example of shipping instruction data using FIG. 3, the item code of each item l 1 and l 2 in the shipping instruction data indicates the type of product, and the number of packs, unit price, tare weight, date, etc. for each delivery destination. etc., are grouped together for each product and made into one item.
実績データの一例を第4図により説明すれば、
各アイテム′,″のアイテムコードは納入先コ
ードと対応していて、各納入先のパツク数、総重
量、総値段を1つのアイテムとするものであり、
計量器1の実績を累積してなる。 An example of performance data can be explained using Figure 4.
The item code of each item ′,″ corresponds to the delivery destination code, and the number of packs, total weight, and total price of each delivery destination are considered to be one item.
It is obtained by accumulating the results of measuring instrument 1.
次に第5図によりコンピユータの工程順を説明
すれば、先ずコンピユータCPUをスタートし
(11)、指示データを入力するか判断し(12)、
入力しない場合は後工程17に、入力する場合は
次工程13に至る。 Next, the process sequence of the computer will be explained with reference to FIG. 5. First, the computer CPU is started (11), it is determined whether instruction data is input (12),
If no input is required, the process goes to post-process 17, and if input is required, the process goes to next process 13.
入力部KEYよりCPUに所要の指示データを入
力し(13)、CPUに指示データを各アイテム毎
に記憶しながら(14)、指示データ入力終了を
チエツクして(15)、終了していない場合は前
工程13に至り、終了後は次工程16に至る。 Input the necessary instruction data to the CPU from the input section KEY (13), and while storing the instruction data for each item in the CPU (14), check whether the instruction data input is completed (15), but if it is not completed yet. The process proceeds to the previous step 13, and after completion, the process proceeds to the next step 16.
次にCPUからLCUに指示データを一括して出
力すると(16)、その後はLCUと計量器1とが
交信して後述する計量ラベル貼付作業を行なう。 Next, the CPU outputs instruction data all at once to the LCU (16), after which the LCU and the measuring instrument 1 communicate with each other to perform a weighing label pasting operation, which will be described later.
計量した実績データの入力要求をチエツクし
(17)、無い場合は後工程22に至り、有る場合
は次工程18に至る。 A check is made for an input request for measured performance data (17), and if there is no input request, the process proceeds to the subsequent process 22, and if there is, the process proceeds to the next process 18.
各計量器1の実績データは1アイテム毎の指示
データの処理が終了する毎に逐次LCUに出力し
て記憶され、あるいはLCU内の指示データが全
て処理済になるまで一時的に計量器1内に記憶保
持しておき、その後にLCUへ出力して記憶され、
作業終了後又はCPUが他の仕事から解放されて
いる時間を利用し、前記実績データの入力要求を
指令するようにする。 The performance data of each measuring instrument 1 is sequentially output to the LCU and stored each time the processing of instruction data for each item is completed, or temporarily stored in the measuring instrument 1 until all the instruction data in the LCU has been processed. It is stored in the memory, and then output to the LCU and stored.
After the work is completed or when the CPU is free from other work, the input request for the performance data is issued.
計量実績データの入力要求のあつた場合は
LCUからCPUに実績データを入力し(18)、そ
れらの累積記憶する(19)。 If you are requested to input measurement results data,
Actual data is input from the LCU to the CPU (18) and is stored cumulatively (19).
上記の累積記憶した実績データのプリント出力
が必要かをチエツクし(20)、不要な場合は後
工程22に至り、必要な場合は実績データをプリ
ント出力する(21)。 It is checked whether it is necessary to print out the cumulatively stored performance data (20), and if it is not necessary, the process proceeds to the post-process 22, and if necessary, the performance data is printed out (21).
上記作業11乃至21が終了してからは他の仕
事を任意に行なうことができ(22)、その後別
途指示データがあれば上記作業12乃至21を繰
り返す。 After the above-mentioned tasks 11 to 21 are completed, other tasks can be performed at will (22), and thereafter, if there is separate instruction data, the above-mentioned tasks 12 to 21 are repeated.
次にLCUを第6図により説明すれば、LCUを
スタートし(31)、指示データを入力するかを
判断し(32)、入力しない場合は後工程35に
至り、入力する場合は次工程33に至る。 Next, to explain the LCU with reference to FIG. 6, the LCU is started (31), it is determined whether instruction data is to be input (32), and if no instruction data is to be input, the process proceeds to the post-process 35, and if it is to be input, the next process 33 is performed. leading to.
第5図の工程16に対応してCPUからLCUに
指示データを一括入力しながら(33)、直ちに
記憶する(34)。 Corresponding to step 16 in FIG. 5, instruction data is inputted from the CPU to the LCU at once (33) and is immediately stored (34).
次に複数台の計量器1中の何れから指示データ
要求があつたかを確認し(35)、要求無い場合
は後工程39に至り、要求有る場合は要求された
計量器1に指示データを記憶した指示データ中か
ら選択し(36)、計量器1へ選択した指示デー
タを出力する(37)。 Next, it is confirmed from which of the plurality of measuring instruments 1 the instruction data request was made (35), and if there is no request, the process proceeds to the post-process 39, and if there is a request, the instruction data is stored in the requested measuring instrument 1. The selected instruction data is selected from among the selected instruction data (36), and the selected instruction data is output to the measuring instrument 1 (37).
次にLCU内に未処理データがあるかをチエツ
クし(38)、有る場合は複数台の計量器1から
の指示データ要求を待ち、無い場合はLCUの指
示データ出力作業は終了し、計量器1からLCU
への実績データ出力要求があるかをチエツクする
(39)。 Next, it is checked whether there is any unprocessed data in the LCU (38), and if there is, it waits for instruction data requests from multiple weighing instruments 1, and if there is no unprocessed data, the LCU's instruction data output work is completed, and the 1 to LCU
Checks whether there is a request to output performance data to (39).
上記実績データ出力要求無き場合は前工程32
に至り、有る場合は計量器1からLCUへ実績デ
ータを出力する(40)。 If there is no request to output the above actual data, the previous process 32
If there is, the actual data is output from the measuring instrument 1 to the LCU (40).
次に上記実績データを記憶するかをチエツクし
(41)、記憶しない場合は後工程43に至り、記
憶する場合はLCU内のメモリーに一時記憶する
(42)。 Next, it is checked whether the above performance data is to be stored (41), and if it is not to be stored, the process proceeds to post-process 43, and if it is to be stored, it is temporarily stored in the memory in the LCU (42).
第5図の工程17に対応してCPUからLCUに
実績データの要求があるかをチエツクし(43)、
無い場合は前工程32に至り、有る場合は第5図
の工程18に対応して実績データをLCUから
CPUに出力する(44)。 Corresponding to step 17 in FIG. 5, it is checked whether there is a request for performance data from the CPU to the LCU (43);
If not, the process goes to the previous step 32, and if there is, the actual data is sent from the LCU in accordance with step 18 in Figure 5.
Output to CPU (44).
そして上記工程32乃至44を繰り返す。 Then, the above steps 32 to 44 are repeated.
次に第7図により各計量器の工程順を説明すれ
ば、先ず計量器1をスタートさせると(51)、
計量器1は作業者がLCUに指示データを要求す
るのを待ち(52)、要求無い場合は後工程57
に至り、要求有る場合は次工程53に至る。上記
工程51は第6図の工程35に対応する。 Next, to explain the process order of each measuring device with reference to FIG. 7, first, when measuring device 1 is started (51),
The measuring instrument 1 waits for the operator to request the instruction data from the LCU (52), and if there is no request, the measuring device 1 waits for the operator to request instruction data from the LCU, and if there is no request, the measuring device
If there is a request, the next step 53 is reached. The above step 51 corresponds to step 35 in FIG.
LCUより計量器1に指示データを入力してか
ら(53)、計量・ラベル印字作業を行ない(5
4)、ラベルを発行・貼付し(55)、該工程53
〜55を指示データ終了迄繰り返し、指示データ
終了後次工程57に至る(56)。 After inputting instruction data from the LCU to the measuring instrument 1 (53), weighing and label printing work is performed (53).
4), issue and attach a label (55), and the step 53
Steps 55 to 55 are repeated until the instruction data ends, and after the instruction data ends, the process proceeds to the next step 57 (56).
計量実績データの出力要求があるかをチエツク
し(57)、無い場合は上記工程52乃至56を
繰り返す。前記工程57は第6図の工程39に対
応する。 It is checked whether there is a request to output the measurement performance data (57), and if there is no request, the above steps 52 to 56 are repeated. Said step 57 corresponds to step 39 in FIG.
計量実績データの出力要求が有る場合は速やか
に計量器1からLCUに実績データを出力する
(58)。該工程58は第6図の工程40に対応す
る。 When there is a request for output of measurement performance data, the performance data is immediately output from the measuring instrument 1 to the LCU (58). Step 58 corresponds to step 40 in FIG.
そして、上記工程52〜58を繰り返す。 Then, the above steps 52 to 58 are repeated.
(効果)
本発明によれば、コンピユータと複数台の計量
ラベルプリンタとの間に安価なライン制御装置
LCUを介在させて該LCUにより計量ラベルプリ
ンタを監視制御させたことにより、コンピユータ
が計量ラベルプリンタの制御に専用されることか
ら解放し、計量ラベルプリンタが作業している間
に高価なコンピユータを出庫管理以外の他の仕事
処理に使用することができ、コンピユータを有効
に利用できる。(Effects) According to the present invention, an inexpensive line control device is provided between a computer and a plurality of weighing label printers.
By interposing the LCU and allowing the LCU to monitor and control the weighing label printer, the computer is freed from being dedicated to controlling the weighing label printer, and an expensive computer can be dispatched while the weighing label printer is working. The computer can be used for other tasks other than management, making effective use of the computer.
尚、従来装置に較べLCUを必要とすることで、
見かけ上LCUの分だけコスト高になるが、LCU
がコンピユータに較べて著しく安価であること、
及び従来装置が計量ラベルプリンタ制御用のコン
ピユータ他に他の仕事処理用のコンピユータを備
える必要があることを考慮すれば実質的にコスト
を大幅に安価ならしめる。 In addition, since it requires an LCU compared to conventional equipment,
Although the cost appears to be higher due to LCU, LCU
is significantly cheaper than a computer,
And, considering that the conventional device needs to be equipped with a computer for processing other tasks in addition to a computer for controlling the weighing label printer, the cost can be substantially reduced.
第1図は本発明実施の入出庫管理装置の外観を
示す立体図、第2図は同機能を示すブロツク図、
第3図は入出庫データの一例を示す説明図、第4
図は実績の一例を示す説明図、第5図は本発明実
施の入出庫管理装置のコンピユータのフローチヤ
ート図、第6図は同ライン制御装置のフローチヤ
ート図、第7図は同計量器のフローチヤート図で
ある。
図中、CPU……コンピユータ、LCU……ライ
ン制御装置、1……計量器、1,2,′,
′……アイテムである。
FIG. 1 is a three-dimensional diagram showing the external appearance of the storage/output management device according to the present invention, and FIG. 2 is a block diagram showing the same function.
Figure 3 is an explanatory diagram showing an example of warehouse entry and exit data;
The figure is an explanatory diagram showing an example of actual results, Figure 5 is a flowchart of the computer of the storage management device of the present invention, Figure 6 is a flowchart of the line control device, and Figure 7 is the flowchart of the same line control device. It is a flowchart diagram. In the figure, CPU...computer, LCU...line control device, 1...measuring instrument, 1 , 2 ,',
'...It is an item.
Claims (1)
タに1台のライン制御装置LCUを介して複数の
計量ラベルプリンタを接続し、前記出庫指示デー
タは前記LCUへまとめて転送記憶され、LCUは
計量ラベルプリンタを監視して出庫指示データを
要求する計量ラベルプリンタへ当該出庫指示デー
タを供給し、計量ラベルプリンタは供給された出
庫指示データに基づいてラベルの発行作業をし、
また前記LCUは各計量ラベルプリンタから作業
実績データを収集記憶するとともに記憶した前記
実績データをまとめて前記コンピユータへ供給
し、前記LCUと各計量ラベルプリンタとの交信
はオンライン・リアルタイム処理で行なわれる出
庫管理装置。1 A plurality of weighing label printers are connected via one line control unit LCU to a computer into which shipping instruction data is input and stored, and the shipping instruction data is collectively transferred and stored to the LCU, and the LCU inputs and stores the weighing label printer. The output instruction data is supplied to the weighing label printer that monitors and requests the output instruction data, and the weighing label printer issues labels based on the supplied output instruction data.
In addition, the LCU collects and stores work performance data from each weighing label printer, and supplies the stored performance data to the computer, and communication between the LCU and each weighing label printer is performed through online real-time processing. Management device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58096526A JPS59221766A (en) | 1983-05-31 | 1983-05-31 | Stock-in/out controller |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58096526A JPS59221766A (en) | 1983-05-31 | 1983-05-31 | Stock-in/out controller |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS59221766A JPS59221766A (en) | 1984-12-13 |
| JPH0217825B2 true JPH0217825B2 (en) | 1990-04-23 |
Family
ID=14167578
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP58096526A Granted JPS59221766A (en) | 1983-05-31 | 1983-05-31 | Stock-in/out controller |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS59221766A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2692017B2 (en) * | 1991-05-13 | 1997-12-17 | 株式会社イシダ | Delivery system |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52123841A (en) * | 1976-04-12 | 1977-10-18 | Tokyo Electric Co Ltd | Filling station system |
-
1983
- 1983-05-31 JP JP58096526A patent/JPS59221766A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS59221766A (en) | 1984-12-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH07165310A (en) | Logistics information system and storage support method | |
| JP3995135B2 (en) | Logistics management method | |
| JP2002284317A (en) | Product picking device | |
| JPH0217825B2 (en) | ||
| WO2004061538A1 (en) | Shipment management system and shipment management method | |
| JPH0245871A (en) | Delivery checking system | |
| JP2778962B2 (en) | Die management device in plate processing machine | |
| JP7667565B2 (en) | Online sales system and online sales method | |
| JPH0862030A (en) | Workpiece number measuring device | |
| JP2650596B2 (en) | Electronic weighing device | |
| JP2616361B2 (en) | Electronic weighing device | |
| JP2836593B2 (en) | Labeling system | |
| US20040177006A1 (en) | Parts kit production support system and program using associated parts identification data and shelf position identification data | |
| JP2975143B2 (en) | Picking inventory management system | |
| JPH0554894B2 (en) | ||
| JPH0520342A (en) | Receipt actual result management system | |
| JPS62212529A (en) | In-line weighing system | |
| JPS62220435A (en) | Weighing in-line system | |
| JPH05225204A (en) | Running schedule planning device for production machine | |
| JP2546149B2 (en) | Logistics system | |
| JP2003035594A (en) | Product information processing system and information processing device | |
| JPH06187362A (en) | Component ordering system | |
| JPH01305468A (en) | Physical distribution managing system | |
| JP2000006926A (en) | Packing management system and method | |
| JPH0962737A (en) | Cost management method and system therefor |