Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0232380B2 - ITOKARYORIKINIOKERUITOKAKESOCHI - Google Patents
[go: Go Back, main page]

JPH0232380B2 - ITOKARYORIKINIOKERUITOKAKESOCHI - Google Patents

ITOKARYORIKINIOKERUITOKAKESOCHI

Info

Publication number
JPH0232380B2
JPH0232380B2 JP23070385A JP23070385A JPH0232380B2 JP H0232380 B2 JPH0232380 B2 JP H0232380B2 JP 23070385 A JP23070385 A JP 23070385A JP 23070385 A JP23070385 A JP 23070385A JP H0232380 B2 JPH0232380 B2 JP H0232380B2
Authority
JP
Japan
Prior art keywords
arm
thread
bobbin
yarn
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP23070385A
Other languages
Japanese (ja)
Other versions
JPS6290343A (en
Inventor
Kazuyasu Hirai
Yasuhiro Inoe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Priority to JP23070385A priority Critical patent/JPH0232380B2/en
Publication of JPS6290343A publication Critical patent/JPS6290343A/en
Publication of JPH0232380B2 publication Critical patent/JPH0232380B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Yarns And Mechanical Finishing Of Yarns Or Ropes (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は溶融紡出されたフイラメント糸を仮撚
加工する糸仮撚機において、該糸を上下多段に配
設された巻取装置の各糸ガイドに糸掛けするため
の装置に関する。
Detailed Description of the Invention [Industrial Application Field] The present invention relates to a yarn false twisting machine for false twisting melt-spun filament yarn. This invention relates to a device for threading a thread guide.

〔従来の技術〕[Conventional technology]

上記した糸仮撚機は通常複数本の糸を同時に仮
撚加工でき、従つて該糸を巻取るための巻取装置
を複数台有している。これらの巻取装置は糸仮撚
機の一側に上下および左右に複数列に配設され、
普通上下は2ないし4段とされる。各巻取装置に
は巻取るべき糸を案内するための糸ガイドがそれ
ぞれ設けられているが、例えば巻取装置に対し下
方から供給される場合、各巻取装置に設けられる
糸ガイドは通常次のように配設される。即ち、糸
が各巻取装置に対し下から上へと供給されるた
め、最下段の巻取装置には3つの糸ガイドが、中
段の巻取装置には2つの糸ガイドが、最上段の巻
取装置には1つの糸ガイドがそれぞれ設けられ
る。
The yarn false twisting machine described above can normally false twist a plurality of yarns at the same time, and therefore has a plurality of winding devices for winding the yarns. These winding devices are arranged in multiple rows vertically and horizontally on one side of the yarn false twisting machine.
Usually there are 2 to 4 levels above and below. Each winding device is provided with a thread guide to guide the yarn to be wound. For example, when the winding device is supplied from below, the thread guide provided in each winding device is usually as follows. will be placed in That is, since the yarn is supplied to each winding device from bottom to top, the bottom winding device has three yarn guides, the middle winding device has two yarn guides, and the top winding device has three yarn guides. The take-up devices are each provided with one thread guide.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

上記したように巻取装置が上下多段に設けられ
た場合、糸ガイドの数もそれに応じて増加し、該
糸ガイドへの糸掛けを行うには複雑な操作が必要
となる。この糸掛けを自動機で行おうとすれば動
作が複雑となり、高度な制御装置を必要とするう
えに糸掛けに要する時間が長くなるという問題が
生じる。本発明はこのような問題を解決すること
を目的とする。
As described above, when the winding devices are provided in multiple stages above and below, the number of thread guides increases accordingly, and a complicated operation is required to thread the thread onto the thread guides. If this threading is attempted to be carried out by an automatic machine, the operation will be complicated, a sophisticated control device will be required, and the time required for threading will be long. The present invention aims to solve such problems.

〔問題点を解決するための手段〕[Means for solving problems]

本発明は上記した巻取装置と糸ガイドとを上下
多段に配設した糸仮撚機において、各巻取装置に
供給される糸を複数本一括して吸引する吸引口と
該吸引口で吸引されている糸を個別に保持する糸
ガイド装置とを上記巻取装置に沿つて昇降可能に
設け、昇降の際に糸ガイド装置が各糸ガイドに糸
掛けを行うことを特徴としている。
The present invention provides a yarn false twisting machine in which the above-described winding devices and yarn guides are arranged in multiple stages above and below. The present invention is characterized in that a thread guide device for individually holding each thread is provided so as to be movable up and down along the winding device, and the thread guide device threads each thread guide when going up and down.

〔作用〕[Effect]

上記吸引口は糸を吸引したまま昇降し、糸ガイ
ド装置は該吸引口により吸引されている糸を保持
したまま昇降する。従つて糸ガイド装置が昇降の
際に作動することにより各段の糸ガイドへの糸掛
けが行われる。
The suction port moves up and down while suctioning the thread, and the thread guide device moves up and down while holding the thread being sucked by the suction port. Therefore, by operating the thread guide device when moving up and down, the thread is threaded onto the thread guides of each stage.

〔実施例〕〔Example〕

第1図は糸仮撚機の側面を示している。作業空
間1を挾む一側には長尺の第1ヒータ2が立設さ
れ、他側には複数の巻取装置3が設けられる。ま
た第1ヒータ2の背部には多数の給糸パツケージ
P1を支持したクリール4が配置され、巻取装置
3の背部には第2ヒータ5が設置される。作業空
間1の上位には糸冷却プレート6、糸ガイド装置
7および仮撚装置8が順に配設され、更に第1ヒ
ータ2の下位および第2ヒータ5の上下にはそれ
ぞれフイードローラ9,10,11が配される。
給糸パツケージP1から引出された糸Yは第1フ
イードローラ9を経て第1ヒータ2内を下から上
へ通り、ガイドピン12,13で屈曲され後糸冷
却プレート6に沿つて斜め下方に走行し、更に糸
ガイド装置7を経て仮撚装置8に導入される。仮
撚装置8を出た糸Yはガイドピン14で下方に屈
曲され第2フイードローラ10を経て第2ヒータ
5内を下降した後、第3フイードローラ11およ
び糸ガイド15を経て巻取装置3で巻取られ、巻
取パツケージP2として形成される。巻取装置3
は上下に3段、紙面前後方向に4列の合計12台設
けられ、巻取パツケージP2を支持するクレード
ルアーム16、該パツケージP2を回転駆動する
フリクシヨンローラ17、および糸Yを案内する
糸ガイド18その他の部材から構成される。19
は巻取装置の下位に設けられたサクシヨンパイプ
で、図示しないブロアに連通している。
FIG. 1 shows a side view of the yarn false twister. A long first heater 2 is provided upright on one side of the work space 1, and a plurality of winding devices 3 are provided on the other side. Further, a creel 4 supporting a large number of yarn feeding packages P1 is arranged at the back of the first heater 2, and a second heater 5 is arranged at the back of the winding device 3. A yarn cooling plate 6, a yarn guide device 7, and a false twisting device 8 are arranged in this order above the work space 1, and feed rollers 9, 10, 11 are provided below the first heater 2 and above and below the second heater 5, respectively. will be arranged.
The yarn Y pulled out from the yarn feeding package P1 passes through the first feed roller 9, passes through the first heater 2 from bottom to top, is bent by guide pins 12 and 13, and travels diagonally downward along the rear yarn cooling plate 6. The yarn is further introduced into a false twisting device 8 via a yarn guide device 7. The yarn Y leaving the false twisting device 8 is bent downward by the guide pin 14, passes through the second feed roller 10, descends in the second heater 5, passes through the third feed roller 11 and yarn guide 15, and is wound by the winding device 3. It is then taken up and formed into a rolled package P2. Winding device 3
are provided in three stages vertically and in four rows in the longitudinal direction of the paper, for a total of 12 units, including a cradle arm 16 that supports the winding package P2, a friction roller 17 that rotationally drives the package P2, and a thread guide that guides the thread Y. Consists of 18 and other members. 19
is a suction pipe provided below the winding device, and communicates with a blower (not shown).

作業空間1において第1ヒータ2の前面には平
板状のペグスタンド20が配置される。該スタン
ド20はその下面に設けたローラ21が地面に敷
設したレール22上を滑動することによつて第1
図紙面前後方向に走行できるようになつており、
通常は図示しないストツパにより巻取装置3と対
向する位置に固定されている。また該スタンド2
0の巻取装置3に向う面には上下に3段、紙面前
後方向に4列で合計12本のペグ23が上下および
前後にそれぞれ等しい間隔をあけて水平方向に植
設され、各ペグ23には空のボビンBがそれぞれ
挿着されている。ペグスタンド20と巻取装置3
との間には地面に別のレール24が敷設され、該
レール上を玉揚台車25がローラ26により紙面
前後方向に走行する。
A flat peg stand 20 is arranged in front of the first heater 2 in the work space 1 . The stand 20 has a roller 21 provided on its lower surface that slides on a rail 22 laid on the ground, so that the first
It is designed to be able to travel in the front and rear directions of the drawing surface.
Usually, it is fixed at a position facing the winding device 3 by a stopper (not shown). Also, the stand 2
A total of 12 pegs 23 are planted in the horizontal direction on the surface facing the winding device 3 of 0, in 3 rows up and down and 4 rows in the front and back direction of the paper, with equal intervals in the top and bottom and front and back. An empty bobbin B is inserted into each of the . Peg stand 20 and winding device 3
Another rail 24 is laid on the ground between the doffing cart 25 and the doffing cart 25, which is run by rollers 26 in the longitudinal direction on the paper.

第2図は玉揚台車25をペグスタンド20の側
から見た概略正面図である。同図において玉揚台
車25は左右に駆動機構を含むボツクス27,2
8を有し、両ボツクス間に後述する各種のアーム
31,32,33,34と糸掛け装置35が設け
られている。36はローラ26を駆動するための
モータである。上記アームはいずれも上下に3個
づつ設けられ、2種のアーム33,34は左側の
駆動ボツクス27に回動可能に設けられる。他の
2種のアーム31,32はアーム支持プレート3
7の異なる面に固定される。該プレート37はス
ライドフレーム38により回動可能に支持され、
該フレーム38は右側の駆動ボツクス28に固定
したガイドバー39およびガイドレール40に沿
つて第2図紙面前後方向に走行する。
FIG. 2 is a schematic front view of the doffing truck 25 viewed from the peg stand 20 side. In the same figure, the doffing truck 25 has boxes 27 and 2 containing drive mechanisms on the left and right sides.
8, and various arms 31, 32, 33, 34 and a threading device 35, which will be described later, are provided between both boxes. 36 is a motor for driving the roller 26. Three of the above-mentioned arms are provided on the upper and lower sides, and two types of arms 33 and 34 are rotatably provided on the left drive box 27. The other two types of arms 31 and 32 are arm support plates 3
Fixed on 7 different surfaces. The plate 37 is rotatably supported by a slide frame 38,
The frame 38 runs along a guide bar 39 and a guide rail 40 fixed to the right drive box 28 in the front-rear direction in the plane of the second drawing.

第3図は前記アームのうち、ボビン供給アーム
33およびクレードル操作アーム34の駆動機構
を示している。各ボビン供給アーム33は軸41
によつて駆動ボツクス27に軸支され、各軸41
に設けたプーリ42および他のプーリ43,4
4,45に1条の無端ベルト46が巻掛けられ
る。上記プーリ45にはモータ47の軸が直結さ
れており、該モータ47が正逆転駆動されること
によりボビン供給アーム33は矢印48で示すよ
うに旋回する。一方、クレードル操作アーム34
は該アームに設けられた軸49で駆動ボツクス2
7に軸支され、該軸49に固定されたレバー50
が上下方向に延びたスライドロツド51に固定の
ピン52と嵌合している。該ロツド51は駆動ボ
ツクス27に固定した支持ブロツク53に上下摺
動自在に支持されており、下端に設けたピン54
がモータ55の軸に固定のレバー56と嵌合して
いる。従つて該モータ55の軸が所定角度内で正
逆転することによりスライドロツド51が上下動
し、クレードル操作アーム34は矢印57で示す
ように旋回する。
FIG. 3 shows a drive mechanism for the bobbin supply arm 33 and the cradle operation arm 34 among the arms. Each bobbin supply arm 33 has a shaft 41
is pivotally supported in the drive box 27 by
pulley 42 and other pulleys 43, 4 provided in
A single endless belt 46 is wound around 4 and 45. The shaft of a motor 47 is directly connected to the pulley 45, and as the motor 47 is driven in forward and reverse directions, the bobbin supply arm 33 pivots as shown by an arrow 48. On the other hand, the cradle operating arm 34
drives the drive box 2 with a shaft 49 provided on the arm.
7 and fixed to the shaft 49;
is fitted into a fixed pin 52 on a slide rod 51 extending in the vertical direction. The rod 51 is supported by a support block 53 fixed to the drive box 27 in a vertically slidable manner, and a pin 54 provided at the lower end
is fitted with a lever 56 fixed to the shaft of the motor 55. Therefore, as the shaft of the motor 55 rotates forward and backward within a predetermined angle, the slide rod 51 moves up and down, and the cradle operating arm 34 pivots as shown by arrow 57.

第4a図および第4b図にボビン供給アーム3
3のグリツプ部分を示す。該アーム33の先端に
はコ字形のプレート61が固着され、該プレート
に軸62で2つのグリツパ63,63が軸支され
ている。両グリツパ63間にはスプリング64が
張設されて該グリツパ63を閉じ方向に付勢して
いる。またプレート61には先端が両グリツパ6
3間に位置する板状のピース65が固着され、両
グリツパ63の先端内側には傾斜面66が形成さ
れている。グリツパ63が空ボビンBを支持して
いないとき両グリツパ63はスプリング64の力
によつて閉じ方向の力を受けるが、グリツパの内
側部がピース65に当接するため両グリツパ6
3,63は図示の状態より互いに少し接近した姿
勢に保たれる。空ボビンを支持していないグリツ
パ63を空ボビンBの外周面に押圧すると、該ボ
ビンBが傾斜面66を外方に押圧するため両グリ
ツパが一時的に開き、次いで該ボビンBは両グリ
ツパ間に進入して図示の如く保持される。更にこ
の状態からボビンBのみを下方に押圧すると、両
グリツパ63が開いて該ボビンBが取出される。
Figures 4a and 4b show the bobbin supply arm 3.
3 shows the grip part. A U-shaped plate 61 is fixed to the tip of the arm 33, and two grippers 63, 63 are supported by a shaft 62 on the plate. A spring 64 is stretched between both grippers 63 and biases the grippers 63 in the closing direction. Also, the plate 61 has both grippers 6 at its tips.
A plate-shaped piece 65 located between the two grippers 63 is fixed, and an inclined surface 66 is formed inside the tips of both grippers 63. When the grippers 63 are not supporting the empty bobbin B, both grippers 63 receive a force in the closing direction due to the force of the spring 64, but since the inner parts of the grippers abut against the piece 65, both grippers 6
3 and 63 are maintained in positions slightly closer to each other than in the illustrated state. When the gripper 63 that does not support the empty bobbin is pressed against the outer peripheral surface of the empty bobbin B, the bobbin B presses the inclined surface 66 outward, so both grippers temporarily open, and then the bobbin B is moved between the grippers. and held as shown. Furthermore, when only the bobbin B is pressed downward from this state, both grippers 63 are opened and the bobbin B is taken out.

第5図には前記クレードル操作アーム34の更
に別の駆動機構がが示される。該アーム34は左
側駆動ボツクス27に軸49を介して支持された
L字形のブロツク71に軸72で旋回自在に支持
されている。軸49にはスライドピン73が挿通
されており、該ピン73の一端はクレードル操作
アーム34の基端部に当接し、他端は次に述べる
旋回ブロツク74に当接している。該旋回ブロツ
ク74は左側駆動ボツクス27に支持され前記ス
ライドロツド51と平行に即ち上下方向に延びる
旋回ロツド75に固定されている。76は上記ボ
ツクス27内に設けたモータであり、該モータ7
6の軸77に固着したカム78が旋回ロツド75
に固定した別の旋回ブロツク79上のカムフオロ
ア80に当接している。従つて上記モータ76の
軸77が回転すればカム78とカムフオロア80
との当接によつて旋回ブロツク79が旋回ロツド
75と共に旋回し、更に該ロツド75に固定の別
の旋回ブロツク74が旋回してスライドピン73
を押し、該ピン73がクレードル操作アーム34
の基端部を押圧することによつて該アーム34が
軸72を中心に所定角度旋回する。81は該アー
ム34をスライドピン73に対して押圧付勢する
スプリング、82はアーム34に当接してその姿
勢を規制するストツパである。
FIG. 5 shows yet another drive mechanism for the cradle operating arm 34. The arm 34 is rotatably supported by a shaft 72 on an L-shaped block 71 which is supported by the left drive box 27 through a shaft 49. A slide pin 73 is inserted through the shaft 49, and one end of the pin 73 abuts against the base end of the cradle operating arm 34, and the other end abuts against a pivot block 74, which will be described below. The swing block 74 is supported by the left drive box 27 and is fixed to a swing rod 75 that extends parallel to the slide rod 51, that is, in the vertical direction. 76 is a motor provided in the box 27, and the motor 7
The cam 78 fixed to the shaft 77 of 6 is the rotating rod 75
It abuts against a cam follower 80 on another pivot block 79 fixed to. Therefore, when the shaft 77 of the motor 76 rotates, the cam 78 and the cam follower 80
The rotating block 79 rotates together with the rotating rod 75 due to the contact with the rotating rod 75, and another rotating block 74 fixed to the rod 75 rotates to rotate the slide pin 73.
, and the pin 73 connects to the cradle operating arm 34.
By pressing the base end of the arm 34, the arm 34 pivots around the shaft 72 by a predetermined angle. 81 is a spring that presses the arm 34 against the slide pin 73, and 82 is a stopper that comes into contact with the arm 34 to restrict its posture.

クレードルアーム16は軸85で旋回自在に支
持され、またボビンBを支持するための回転自在
のボビンホルダー86を有している。一方のアー
ム16aは軸87によつてアーム本体16bに旋
回自在に支持され、該アーム16aの先端には下
方に屈曲したL字形の係止具88が設けられてい
る。従つてクレードル操作アーム34の先端がこ
の係止具88と係合した状態において該アーム3
4が上述の如く旋回すれば、クレードルアーム1
6の一方のアーム16aが軸87を中心として1
点鎖線で示すように外方に開き、支持していたボ
ビンBを解放する。
The cradle arm 16 is rotatably supported by a shaft 85, and has a rotatable bobbin holder 86 for supporting the bobbin B. One arm 16a is rotatably supported by the arm body 16b by a shaft 87, and a downwardly bent L-shaped locking tool 88 is provided at the tip of the arm 16a. Therefore, when the tip of the cradle operating arm 34 is engaged with the locking tool 88, the arm 3
4 rotates as described above, the cradle arm 1
One arm 16a of 6 is centered on the axis 87.
Open outward as shown by the dotted chain line to release the supported bobbin B.

第6図はクレードル操作アーム34の側面を第
3図とは逆の方向から示している。該アーム34
の先端には2枚のプレート91,92が互いに間
隔をあけて設けられており、一方のプレート91
はアーム34に固定され、他方のプレート92は
該プレートに形成した長孔93にアーム34に固
定のボルト94が嵌合することによつて摺動自在
に支持されている。固定プレート91は他方の可
動プレート92より先端が長く突出しており、可
動プレート92の先端上面には傾斜面95が形成
されている。96はクレードル操作アーム本体と
可動プレート92との間に張設されたスプリング
で、該プレート92をその先端が突出する方向に
付勢している。破線34aはクレードル操作アー
ム34の非作動時における姿勢を示しており、該
アーム34はこの姿勢から前記したように上方へ
と旋回する。クレードルアーム16に支持されて
いるパツケージP2が満巻となつたとき、クレー
ドル操作アーム34が34a位置から旋回を開始
すれば、1点鎖線で示す34b位置まで旋回した
とき可動プレート92の傾斜面95が係止具88
の下部に当接し、これによりクレードルアーム1
6は実線で示す位置34cまで引上げられる。こ
のときパツケージP2はフリクシヨンローラ17
から離反するため、その回転が停止される。次い
でクレードル操作アーム34は実線位置34cか
ら前記したように第6図の紙面手前方向に旋回
し、クレードルアーム16からパツケージP2を
解放して落下させる。その後前記したボビン供給
アーム33によつてクレードルアーム16に空の
ボビンBが供給され、クレードル操作アーム34
が紙面裏側方向へと旋回復帰することによつて該
ボビンBがクレードルアーム16に支持される。
更にその後クレードル操作アーム34は元の34
a位置まで復帰するが、その途次における2点鎖
線位置34dにおいて空ボビンBがフリクシヨン
ローラ17に接触し、クレードル操作アーム34
に係止具88から離反する。なお、上記34b位
置において係止具88は可動プレート92の傾斜
面95と当接するが、その後該プレート92はス
プリング96の力に抗して軸49方向へと摺動す
るため、34c位置に達するまでに係止具88は
両プレート91,92間に位置する。このためク
レードル操作アーム34が下方に施回するとき可
動プレート92が係止具88を押圧し、クレード
ルアーム16を押下げることができる。
FIG. 6 shows the side surface of the cradle operating arm 34 from a direction opposite to that shown in FIG. The arm 34
Two plates 91 and 92 are provided at a distance from each other at the tip of the plate.
is fixed to the arm 34, and the other plate 92 is slidably supported by fitting a bolt 94 fixed to the arm 34 into a long hole 93 formed in the plate. The fixed plate 91 has a distal end that protrudes longer than the other movable plate 92, and an inclined surface 95 is formed on the upper surface of the distal end of the movable plate 92. A spring 96 is stretched between the main body of the cradle operating arm and the movable plate 92, and urges the plate 92 in a direction in which its tip protrudes. The broken line 34a shows the posture of the cradle operating arm 34 when it is not in operation, and the arm 34 pivots upward from this posture as described above. When the package P2 supported by the cradle arm 16 is fully wound, if the cradle operating arm 34 starts turning from the 34a position, when the cradle operating arm 34 turns to the 34b position shown by the dashed line, the inclined surface 95 of the movable plate 92 is the locking tool 88
cradle arm 1.
6 is pulled up to position 34c shown by a solid line. At this time, the package P2 is moved to the friction roller 17.
The rotation is stopped because it separates from the Next, the cradle operating arm 34 pivots from the solid line position 34c toward the front of the paper in FIG. 6 as described above, releasing the package P2 from the cradle arm 16 and allowing it to fall. Thereafter, the empty bobbin B is supplied to the cradle arm 16 by the bobbin supply arm 33 described above, and the cradle operating arm 34
The bobbin B is supported by the cradle arm 16 as the bobbin B rotates back toward the back side of the paper.
Furthermore, the cradle operating arm 34 is then replaced with the original 34.
The empty bobbin B comes into contact with the friction roller 17 at the two-dot chain line position 34d, and the cradle operating arm 34 returns to the position a.
It separates from the locking tool 88. Note that at the 34b position, the locking tool 88 comes into contact with the inclined surface 95 of the movable plate 92, but after that, the plate 92 slides in the direction of the shaft 49 against the force of the spring 96, so that it reaches the 34c position. By now, the locking tool 88 is located between both plates 91 and 92. Therefore, when the cradle operating arm 34 is rotated downward, the movable plate 92 presses the locking tool 88, and the cradle arm 16 can be pushed down.

パツケージ支持アーム31およびボビン支持ア
ーム32の構造は第2図および第5図に示され
る。パツケージ支持アーム31は相互の間隔がボ
ビンBの長さより少し短い2枚のアーム31a,
31aを有し、各アーム31a上部にはボビビン
Bを支承するための凹部101が形成されてい
る。ボビン支持アーム32のグリツプ部分の構造
は前記したボビン供給アーム33と略同一であ
り、従つて詳述しないが、両グリツパ間の間隔1
02が上記ボビン供給アーム33の場合より充分
小さく設定され、またグリツパの開口部103が
下方を向くように設定されている。更に、上記し
たパツケージ支持アーム31およびボビン支持ア
ーム32は、その凹部101にボビンBを載置し
グリツパに別のボビンBを支持させたとき、両ボ
ビンBが互いに平行となり、しかも両ボビン間隔
がスタンド20の横に隣接するペグ23上のボビ
ン間隔に等しくなるようにアーム支持プレート3
7に固定される。
The structures of the package support arm 31 and bobbin support arm 32 are shown in FIGS. 2 and 5. The package support arm 31 consists of two arms 31a whose mutual interval is slightly shorter than the length of the bobbin B.
31a, and a recess 101 for supporting the bobbin B is formed in the upper part of each arm 31a. The structure of the grip portion of the bobbin support arm 32 is substantially the same as that of the bobbin supply arm 33 described above, so although it will not be described in detail, the gap between both grippers is 1.
02 is set to be sufficiently smaller than that of the bobbin supply arm 33, and the opening 103 of the gripper is set to face downward. Furthermore, when a bobbin B is placed in the recess 101 of the package support arm 31 and the bobbin support arm 32 and another bobbin B is supported by the gripper, both bobbins B become parallel to each other and the distance between the bobbins is set. The arm support plate 3 is arranged so as to be equal to the bobbin interval on the peg 23 adjacent to the side of the stand 20.
It is fixed at 7.

次に、アーム支持プレート37の支持機構につ
いて第7a図および第7b図で説明する。
Next, the support mechanism of the arm support plate 37 will be explained with reference to FIGS. 7a and 7b.

右側駆動ボツクス28の内側面には前記ガイド
バー39およびガイドレール40が水平に固定さ
れており、スライドフレーム38はこれらによつ
て摺動自在に支持される。該フレーム38には上
下方向に1本のガイドロツド105が2つの支持
ブロツク106,107によつて回転自在に支持
されると共に、該ロツド105に2つのブロツク
108が固定され、両ブロツク108間に螺子ロ
ツド109がガイドロツド105と平行となるよ
う回転自在に支持される。更にガイドロツド10
5に対し上下摺動自在で螺子ロツド109と螺合
する昇降ブロツク110が設けられ、該ブロツク
110に上記アーム支持プレート37が固定され
る。従つて螺子ロツド109が回転すれば昇降ブ
ロツク110と共にアーム支持プレート37が昇
降する。更に詳述すると、111はガイドバー3
9と平行になるよう右側駆動ボツクス28に回転
自在に支持された螺子ロツドで、該ロツド111
の端部に固着したプーリ112とモータ113の
軸に設けたプーリ114との間に無端ベルト11
5が巻掛けられる。またスライドフレーム38に
は螺子ロツド111と螺合するブロツク116と
ガイドバー39と摺動自在に係合するブロツク1
17が固定されており、従つてモータ113が回
転駆動されることにより螺回ロツド111が回転
し、スライドフレーム38はガイドバー39に沿
つて摺動する。更にスライドフレーム38に設け
たモータ118の軸に固定したギア119がガイ
ドロツド105上端に固定のギア120と噛合し
ており、該モータ118が回転駆動されることに
よりガイドロツド105がブロツク108と共に
回転し、従つて螺子ロツド109がガイドロツド
105を中心に旋回するので昇降ブロツク110
も旋回し、該ブロツク110に固定のアーム支持
プレート37が旋回する。121はアーム支持プ
レート37に設けられたモータで、該モータ12
1の軸に固定のプーリ122と螺子ロツド109
上端に固定のプーリ123との間に無端ベルト1
24が巻掛けられており、該モータ121が回転
駆動されることにより螺子ロツド109が回転
し、アーム支持プレート37が昇降ブロツク11
0と共に昇降する。S1〜S4は右側駆動ボツク
ス28の上部側面に設けたセンサであり、各セン
サS1〜S4がスライドフレーム上端に設けたピ
ース130を検出することにより、スライドフレ
ーム38の位置が確認される。またS5〜S8は
スライドフレーム38に設けられたセンサで、各
センサS5〜S8がアーム支持プレート37に固
定されると共にガイドロツド105に上下摺動自
在に支持されたデイスク126を検出することに
より、アーム支持プレート37の上下位置が確認
される。該デイスク126は平面視において扇形
に形成されており、従つてデイスク126がアー
ム支持プレート37と共に所定角度旋回してもセ
ンサS5〜S8が該デイスクを検出できるように
なつている。更にS9は駆動ボツクス28の上部
に設けたセンサで、前記ギア120に互いに90度
向きを変えて固定されたピース127,128を
検出することにより、アーム支持プレート37の
旋回位置で確認できるようになつている。
The guide bar 39 and guide rail 40 are horizontally fixed to the inner surface of the right drive box 28, and the slide frame 38 is slidably supported by these. One guide rod 105 is rotatably supported in the vertical direction by two support blocks 106 and 107 on the frame 38, and two blocks 108 are fixed to the rod 105, and a screw is inserted between the two blocks 108. A rod 109 is rotatably supported parallel to the guide rod 105. Furthermore, guide rod 10
5 is provided with a lifting block 110 that is vertically slidable and screwed into the screw rod 109, and the arm support plate 37 is fixed to the block 110. Therefore, when the screw rod 109 rotates, the arm support plate 37 moves up and down together with the lifting block 110. To explain in more detail, 111 is the guide bar 3
A screw rod is rotatably supported on the right drive box 28 so as to be parallel to the rod 111.
The endless belt 11 is connected between a pulley 112 fixed to the end of the motor 113 and a pulley 114 provided on the shaft of the motor 113.
5 is wrapped. The slide frame 38 also includes a block 116 that is threadedly engaged with the screw rod 111 and a block 1 that is slidably engaged with the guide bar 39.
17 is fixed, therefore, when the motor 113 is rotationally driven, the screw rod 111 rotates, and the slide frame 38 slides along the guide bar 39. Further, a gear 119 fixed to the shaft of a motor 118 provided on the slide frame 38 meshes with a gear 120 fixed to the upper end of the guide rod 105, and when the motor 118 is rotationally driven, the guide rod 105 rotates together with the block 108. Therefore, since the screw rod 109 turns around the guide rod 105, the lifting block 110
The arm support plate 37 fixed to the block 110 also pivots. 121 is a motor provided on the arm support plate 37;
Pulley 122 and screw rod 109 fixed on shaft 1
The endless belt 1 is connected between the pulley 123 fixed at the upper end.
When the motor 121 is driven to rotate, the screw rod 109 is rotated, and the arm support plate 37 is attached to the lifting block 11.
It goes up and down with 0. Sensors S1 to S4 are provided on the upper side surface of the right drive box 28, and the position of the slide frame 38 is confirmed by each sensor S1 to S4 detecting a piece 130 provided at the upper end of the slide frame. Further, S5 to S8 are sensors provided on the slide frame 38, and each sensor S5 to S8 is fixed to the arm support plate 37 and detects the disk 126 that is vertically slidably supported by the guide rod 105. The vertical position of the support plate 37 is confirmed. The disk 126 is fan-shaped in plan view, so that even if the disk 126 rotates by a predetermined angle together with the arm support plate 37, the sensors S5 to S8 can detect the disk. Furthermore, S9 is a sensor provided at the upper part of the drive box 28, and by detecting the pieces 127 and 128 fixed to the gear 120 with their orientations changed by 90 degrees, it is possible to check the rotation position of the arm support plate 37. It's summery.

上記した諸機構の動作を互いに関連付けて次に
説明する。
The operations of the various mechanisms described above will be explained below in relation to each other.

糸仮撚機から玉揚指令が発せられると、玉揚台
車25はレール24上を走行して所定位置に停止
する。ここでスタンド20上の各ペグ23には全
て空のボビビンBが挿着されているものとする。
また、各ペグ23前方の地面にはそれぞれピース
131a〜131dが敷設されると共に、第8図
に示すように玉揚台車25の矢印132で示す走
行方向においてペグ間隔133に等しい距離を置
いて5つ目のピース131eが固定され、更に玉
揚台車にはこれらの各ピースを検出するためのセ
ンサS10が第1図においてボビン支持アーム3
2の下方位置に設けられる。玉揚台車25の最初
の停止位置はセンサS10が上記ピース131a
〜131dを検出し、その検出信号のカウント値
が5に達した時点、即ちセンサS10がピース1
31aを検出した時点でモータ36が停止される
ことによつて定められる。玉揚台車25が停止す
ると同時にモータ113が駆動されてスライドフ
レーム38が第7a図の矢印135方向に移動
し、第4センサS4がピース130を検出した段
階で停止する。このときボビン支持アーム32は
第8図における空ボビンBaの直上に位置してい
る。次いでモータ121が駆動されてアーム支持
プレート37が下降し、第8センサS8がデイス
ク126を検出した時点で停止する。このときボ
ビン支持アーム32はペグ23上の空ボビンBa
を上方から把持した状態となる。次いでモータ1
13が駆動されてスライドフレーム38が矢印1
36方向に移動し、これにより空ボビンBaがペ
グ23aから抜き去られ、第2センサS2がピー
ス130を検出した時点で停止する。次いでモー
タ121が駆動され、アーム支持プレート37は
第6センサS6がデイスク126を検出するまで
上昇し、またモータ118が駆動されてアーム支
持プレート37は第9センサS9がピース127
を検出するまで即ち90度だけ旋回する。同時にモ
ータ47が駆動されてボビン供給アーム33が旋
回し、該アーム33のグリツパ部分がボビン支持
アーム32の上位に達した段階で停止する。次い
でモータ55が駆動されてクレードル操作アーム
34が上方へ旋回し、クレードルアーム16を持
上げて満巻のパツケージP2をフリクシヨンロー
ラ17から離反される。更に次いでモータ113
が駆動され、スライドフレーム38は第1センサ
S1がピース130を検出するまで矢印136方
向に移動する。このときパツケージ支持アーム3
1は上記パツケージP2のボビン両端の下位に進
入する。次いでモータ121が駆動されてアーム
支持プレート37は第5センサS5がデイスク1
26を検出するまで少し上昇する。これによりパ
ツケージ支持アーム31の凹部101内に上記パ
ツケージP2のボビン両端が位置する。このとき
の状態は第9図に実線で示される。次いでモータ
76が駆動されてクレードル操作アーム34がク
レードルアーム16を開き、パツケージP2をパ
ツケージ支持アーム31の凹部101上に支承さ
せる。次いでモータ113が駆動されてスライド
フレーム38が矢印135方向に移動し、第3セ
ンサS3がピース130を検出して停止する。こ
のときボビン支持アーム32とボビン供給アーム
33との関係は第10図に実線で示されるように
なり、パツケージ支持アーム31の位置は第9図
に2点鎖線で示すようになる。その後モータ47
が駆動されてボビン供給アーム33が旋回し、ボ
ビン支持アーム32が支持している空ボビンBa
を上方から受取ると共に該ボビンBaをクレード
ルアーム16間に位置させる。第11図はこのと
きの状態を示している。次いでモータ76が駆動
されてクレードル操作アーム34がクレードルア
ーム16を閉じ、これにより空のボビンBaはク
レードルアーム16に支持される。次いで、ボビ
ン供給アーム33は第2図で示す元の位置まで旋
回復帰し、またクレードル操作アーム34も第2
図に示す位置まで旋回復帰し、更にアーム支持プ
レート37が旋回して両支持アーム31,32も
第9図に1点鎖線で示す元の位置に復帰し、また
更にアーム支持プレート37は第7センサS7が
デイスク126を検出する位置まで下降し、これ
により各アーム31,32,33,34は本玉揚
操作開始前の状態に戻る。以上の操作によつて第
1列目のパツケージp2a3個の玉揚げと、空ボ
ビンBa3個の供給とが終了する。
When a doffing command is issued from the yarn false twister, the doffing cart 25 travels on the rail 24 and stops at a predetermined position. Here, it is assumed that empty bobbins B are all inserted into each peg 23 on the stand 20.
In addition, pieces 131a to 131d are laid on the ground in front of each peg 23, and as shown in FIG. A second piece 131e is fixed to the doffing truck, and a sensor S10 for detecting each of these pieces is installed on the bobbin support arm 3 in FIG.
2 at a lower position. At the first stop position of the doffing truck 25, the sensor S10 is located at the piece 131a.
~131d and when the count value of the detection signal reaches 5, that is, sensor S10 detects piece 1.
31a is detected, the motor 36 is stopped. At the same time as the doffing truck 25 stops, the motor 113 is driven to move the slide frame 38 in the direction of the arrow 135 in FIG. 7a, and stops when the fourth sensor S4 detects the piece 130. At this time, the bobbin support arm 32 is located directly above the empty bobbin Ba in FIG. Next, the motor 121 is driven to lower the arm support plate 37, and stops when the eighth sensor S8 detects the disk 126. At this time, the bobbin support arm 32 is attached to the empty bobbin Ba on the peg 23.
is held from above. Then motor 1
13 is driven and the slide frame 38 moves in the direction of arrow 1.
36 directions, thereby removing the empty bobbin Ba from the peg 23a, and stopping when the second sensor S2 detects the piece 130. Next, the motor 121 is driven, and the arm support plate 37 is raised until the sixth sensor S6 detects the disk 126, and the motor 118 is driven, and the arm support plate 37 is raised until the ninth sensor S9 detects the piece 127.
In other words, it rotates by 90 degrees until it detects. At the same time, the motor 47 is driven to rotate the bobbin supply arm 33 and stop when the gripper portion of the arm 33 reaches the upper part of the bobbin support arm 32. Next, the motor 55 is driven to rotate the cradle operating arm 34 upward, lifting the cradle arm 16 and separating the fully wound package P2 from the friction roller 17. Furthermore, the motor 113
is driven, and the slide frame 38 moves in the direction of the arrow 136 until the first sensor S1 detects the piece 130. At this time, the package support arm 3
1 enters the lower part of both ends of the bobbin of the package P2. Next, the motor 121 is driven and the arm support plate 37 is moved so that the fifth sensor S5 is connected to the disk 1.
It rises a little until it detects 26. As a result, both ends of the bobbin of the package P2 are positioned within the recess 101 of the package support arm 31. The state at this time is shown by the solid line in FIG. Next, the motor 76 is driven to cause the cradle operating arm 34 to open the cradle arm 16 and support the package P2 on the recess 101 of the package support arm 31. Next, the motor 113 is driven to move the slide frame 38 in the direction of the arrow 135, and the third sensor S3 detects the piece 130 and stops. At this time, the relationship between the bobbin support arm 32 and the bobbin supply arm 33 is shown by the solid line in FIG. 10, and the position of the package support arm 31 is shown by the two-dot chain line in FIG. Then motor 47
is driven, the bobbin supply arm 33 turns, and the empty bobbin Ba supported by the bobbin support arm 32 is
is received from above, and the bobbin Ba is positioned between the cradle arms 16. FIG. 11 shows the state at this time. Next, the motor 76 is driven to cause the cradle operating arm 34 to close the cradle arm 16, so that the empty bobbin Ba is supported by the cradle arm 16. The bobbin supply arm 33 then pivots back to its original position shown in FIG.
The arm support plate 37 pivots and returns to the position shown in the figure, and both support arms 31 and 32 return to their original positions as indicated by the dashed line in FIG. The sensor S7 descends to the position where it detects the disk 126, and thereby each arm 31, 32, 33, 34 returns to the state before starting the main doffing operation. By the above operations, the doffing of the three package cages P2A in the first row and the supply of the three empty bobbins Ba are completed.

その後で後述する糸掛け装置35による糸掛け
操作が行われ、次いで玉揚台車25は2列目のピ
ース131b位置まで後退し、次に述べるように
してパツケージ支持アーム31上の満巻パツケー
ジP2のスタンド20への排出と、該スタンド2
0からの新たな空ボビンBの受取りを行う。即
ち、まずモータ113の駆動によりスライドフレ
ーム38が矢印135方向に移動し、第4センサ
S4がピース130を検出して停止する。両支持
アーム31,32は互いに平行であり、かつ両者
のボビンを支持し得る部分の間隔がスタンド20
において横方向に隣接するペグ23上のボビン間
隔と互いに等しく設定されており、更にボビン支
持アーム32がパツケージ支持アーム31より上
位に設けられているため、このときの両支持アー
ム31,32とペグ23との関係は第12a図の
ようになる。即ち、パツケージ支持アーム31は
支持しているパツケージP2aのボビン中心を第
1列目の空のペグ23aに挿着し、ボビン支持ア
ーム32は第2列目の空ボビンBbを有している
ペグ23bの直上に位置している。次いでモータ
121が駆動され第8センサS8がデイスク12
6を検出するまでアーム支持プレート37が下降
する。このときの両支持アーム31,32は第1
2b図に示すような位置となる。即ちパツケージ
支持アーム31に支承されていた満巻パツケージ
P2aは空になつていた第1列目のペグ23a上
に載置され、該アーム31はパツケージP2aの
下位まで下降する。またボビン支持アーム32は
2列目のボビンBbを上方から把持した状態とな
る。次いでモータ113が駆動されてスライドフ
レーム38は第2センサS2がピース130を検
出する位置まで矢印136方向に移動する。その
後の玉揚台車25の動作は前述した説明と同様で
あり、第2列目の巻取装置16から満巻のパツケ
ージP2bを受け取り、その代わりに支持した空
ボビンBbを供給し、糸掛操作を行う。即ち玉揚
台車25は第1列目のパツケージP2aの玉揚操
作についてはスタンド20から第1例目の空ボビ
ンBaを抜き取る作業に始まり、上記パツケージ
P2aを受取つた後空ボビンBaを供給する。次
いで玉揚台車25が2番目のピース131b位置
まで走行した後、支持しているパツケージP2a
を空となつた第1列目のペグ23aに与え、同時
に第2列目のペグ23bから空ボビンBbを受取
る。玉揚台車25は上述した動作を繰返し行い、
糸仮撚機の全パツケージP2a〜P2dを玉揚げ
すると共に全空ボビンBa〜Bdの供給を行い、最
後に第5番目のピース131e位置において第4
列目のパツケージP2dを第4列目のペグ23d
に供給した後、元の位置まで走行して全玉揚操作
を終了する。この段階で全ての満巻パツケージP
2a〜P2dは対応する各ペグ23a〜23d上
に移り、また全空ボビンBa〜Bdは対応する巻取
機上に移されて巻取が再開される。
Thereafter, a threading operation is performed by the threading device 35, which will be described later, and the doffing cart 25 is then retreated to the second row piece 131b position, and the fully wound package P2 on the package support arm 31 is placed on the package support arm 31 as described below. Discharge to stand 20 and stand 2
A new empty bobbin B is received from 0. That is, first, the slide frame 38 is moved in the direction of the arrow 135 by the drive of the motor 113, and the fourth sensor S4 detects the piece 130 and stops. Both support arms 31 and 32 are parallel to each other, and the distance between the parts that can support both bobbins is equal to that of the stand 20.
The interval between the bobbins on the pegs 23 adjacent to each other in the lateral direction is set to be equal to each other, and since the bobbin support arm 32 is provided above the package support arm 31, the distance between both support arms 31 and 32 and the peg at this time is set to be equal to each other. The relationship with 23 is as shown in FIG. 12a. That is, the package support arm 31 inserts the center of the bobbin of the package P2a it supports into the empty peg 23a in the first row, and the bobbin support arm 32 inserts the center of the bobbin of the package cage P2a it supports into the empty peg 23a in the second row. It is located directly above 23b. Next, the motor 121 is driven and the eighth sensor S8 detects the disk 12.
The arm support plate 37 descends until 6 is detected. At this time, both support arms 31 and 32 are
The position will be as shown in Figure 2b. That is, the fully wound package P2a supported by the package support arm 31 is placed on the peg 23a of the empty first row, and the arm 31 is lowered to a position below the package P2a. Further, the bobbin support arm 32 is in a state where it grips the second row bobbin Bb from above. Next, the motor 113 is driven and the slide frame 38 moves in the direction of the arrow 136 to a position where the second sensor S2 detects the piece 130. The subsequent operation of the doffing cart 25 is similar to that described above, in which it receives the fully wound package P2b from the winding device 16 in the second row, supplies the supported empty bobbin Bb in its place, and performs the threading operation. I do. That is, the doffing truck 25 starts the operation of doffing the first row of packages P2a by pulling out the first empty bobbin Ba from the stand 20, and after receiving the package P2a, supplies the empty bobbins Ba. Next, after the doffing cart 25 travels to the second piece 131b position, the supporting package P2a
is given to the empty peg 23a in the first row, and at the same time an empty bobbin Bb is received from the peg 23b in the second row. The doffing truck 25 repeats the above-mentioned operation,
All package cages P2a to P2d of the yarn false twisting machine are doffed and all empty bobbins Ba to Bd are doffed, and finally, the fourth piece is placed at the fifth piece 131e position.
Connect the package cage P2d in the row to the peg 23d in the fourth row.
After supplying the machine, it travels back to its original position and completes the doffing operation. At this stage, all the full package P
2a to P2d are transferred onto the corresponding pegs 23a to 23d, and the empty bobbins Ba to Bd are transferred onto the corresponding winders to resume winding.

次に、前記した糸掛装置35について説明す
る。
Next, the threading device 35 mentioned above will be explained.

糸掛装置35は玉揚台車25に位置固定された
ホース支持装置135および糸切断装置136
と、台車25上で昇降する糸ガイド装置137お
よび糸寄せ装置138とから基本的に構成され
る。
The thread hooking device 35 includes a hose support device 135 and a thread cutting device 136 fixed in position to the doffing cart 25.
It basically consists of a thread guide device 137 and a thread shifting device 138 that move up and down on the trolley 25.

ホース支持装置135は第13図および第14
図に示されるように、玉揚台車25の底板141
上に回転自在に支持されたドラム142の周囲に
柔軟なホース143を巻回したもので、該ホース
143の先端は後述する基板144上に固定さ
れ、基端はパイプ145を経て外部に開口してい
る。この開口部146は前記したサクシヨンパイ
プ19の前面に摺接している。サクシヨンパイプ
19の前面には第15図に示すように吸引孔14
7が開口され、該孔147を軸148で旋回自在
に支持された蓋板149が覆つている。ホース1
43のパイプ開口部146が玉揚台車25の走行
により吸引口147の前面に達すると、該開口部
146との当接によつて蓋板149が旋回し、開
口部146と吸引孔147とが連通するため、ホ
ース143内に吸引空気流が作用する。またドラ
ム142はホース143を引出すことによつて自
由に回転するが、該ドラム142の一端にはワイ
ヤ151が巻回されると共にそのワイヤ先端が固
定されており、ワイヤ基端は図示しないスプリン
グによつて回転付勢されたローラ152に固定さ
れている。従つてホース143をドラム142か
ら引出した後解放すると、該ワイヤはワイヤ15
1によつて回転するドラム142上に巻戻され
る。
The hose support device 135 is shown in FIGS.
As shown in the figure, the bottom plate 141 of the doffing truck 25
A flexible hose 143 is wound around a drum 142 that is rotatably supported on the drum 142.The tip of the hose 143 is fixed on a substrate 144, which will be described later, and the base end is opened to the outside through a pipe 145. ing. This opening 146 is in sliding contact with the front surface of the suction pipe 19 described above. The front surface of the suction pipe 19 has a suction hole 14 as shown in FIG.
7 is opened, and a cover plate 149 rotatably supported by a shaft 148 covers the hole 147. hose 1
When the pipe opening 146 of 43 reaches the front surface of the suction port 147 as the doffing truck 25 travels, the cover plate 149 rotates due to contact with the opening 146, and the opening 146 and the suction hole 147 are connected. Due to the communication, a suction air flow acts within the hose 143. The drum 142 can be freely rotated by pulling out the hose 143, but a wire 151 is wound around one end of the drum 142 and the tip of the wire is fixed, and the base end of the wire is attached to a spring (not shown). Therefore, it is fixed to a roller 152 which is urged to rotate. Therefore, when the hose 143 is released after being pulled out of the drum 142, the wire 15
1 onto a rotating drum 142.

糸切断装置136は第13図および第16図に
示され、底板141上に回転自在に支持された第
1および第2の糸寄せ板152,153からな
る。両糸寄せ板152,153はその回転軸15
4,155に固定したプーリ156,157と底
板141上のモータ158のプーリ159との間
に無端ベルト161が巻掛けられ、、該モータ1
58が駆動されることによつて両糸寄せ板152
は矢印162,163のように旋回する。第1の
糸寄せ板152は矢印162,163のように旋
回する。第1の糸寄せ板152には第17b図に
示すようなカツタ164が設けられており、両糸
寄せ板152,153が第17a図に示す如く互
いに交差したとき該カツタ164が作動する。即
ち第1の糸寄せ板152には軸165によつて可
動刃166が旋回自在に支持され、また固定刃1
67が固定される。両糸寄せ板152,153が
交差すると当接板169がフリーローラ168に
当接するため可動刃166が旋回し、第2の糸寄
せ板153の凹部171内にある糸Yを切断す
る。
The yarn cutting device 136 is shown in FIGS. 13 and 16, and consists of first and second yarn shifting plates 152 and 153 rotatably supported on a bottom plate 141. Both thread shifting plates 152 and 153 are connected to their rotating shafts 15.
An endless belt 161 is wound between the pulleys 156, 157 fixed to the motor 155 and the pulley 159 of the motor 158 on the bottom plate 141.
58 is driven, both thread shifting plates 152
turns as shown by arrows 162 and 163. The first yarn shifting plate 152 pivots as shown by arrows 162 and 163. The first yarn shifting plate 152 is provided with a cutter 164 as shown in FIG. 17b, and the cutter 164 is activated when both yarn shifting plates 152, 153 cross each other as shown in FIG. 17a. That is, a movable blade 166 is rotatably supported on the first yarn shifting plate 152 by a shaft 165, and a fixed blade 166 is rotatably supported on the first yarn shifting plate 152.
67 is fixed. When both yarn shifting plates 152 and 153 intersect, the contact plate 169 contacts the free roller 168, so the movable blade 166 rotates and cuts the yarn Y in the recess 171 of the second yarn shifting plate 153.

糸ガイド装置137は第13図および第18図
に示される。糸ガイド装置137は基板144,
172間に回転自在に支持される2枚の糸ガイド
板173,174から成り、該基板144,17
2は玉揚台車25に垂直に設けた2本のガイドレ
ール175,175に摺動自在に支持されると共
に、該台車25の上下にそれぞれ設けたプーリ1
76,176間に巻掛けられた無端ベルト177
に連結されている。下側のプーリ176の軸には
モータ178が直結されており、該モータ178
が駆動されることによつて糸ガイド装置137は
基板144,172と共に昇降する。下側基板1
72上にはその軸に2枚のカム板181,182
を固着したモータ183が固定されており、該カ
ム板には基板172上に旋回自在に支持した揺動
板184のカムフオロア185が接触している。
また該揺動板184と上記各糸ガイド板173,
174とはそれぞれ連結ロツド186で連結され
ており、従つてモータ183が駆動されることよ
り、各糸ガイド板173,174はそれぞれカム
板181,182の形状に応じて軸187,18
8を中心に旋回する。
Thread guide device 137 is shown in FIGS. 13 and 18. The thread guide device 137 includes a substrate 144,
It consists of two thread guide plates 173, 174 rotatably supported between the substrates 144, 17.
2 is slidably supported by two guide rails 175, 175 provided perpendicularly to the doffing cart 25, and pulleys 1 provided at the top and bottom of the doffing cart 25, respectively.
Endless belt 177 wrapped between 76 and 176
is connected to. A motor 178 is directly connected to the shaft of the lower pulley 176.
As the thread guide device 137 is driven, the thread guide device 137 moves up and down together with the substrates 144 and 172. Lower board 1
72 has two cam plates 181 and 182 on its shaft.
A motor 183 is fixed thereto, and a cam follower 185 of a swing plate 184 rotatably supported on a base plate 172 is in contact with the cam plate.
In addition, the swing plate 184 and each of the thread guide plates 173,
174 by connecting rods 186, and since the motor 183 is driven, each thread guide plate 173, 174 is connected to the shaft 187, 18 according to the shape of the cam plate 181, 182, respectively.
Rotate around 8.

糸寄せ装置138は第13図、第19図および
第20図に示される。該装置138は下側基板1
72上に軸支された第1レバー191および第2
レバー192、更にこれら両レバー191,19
2に軸193,194で連結された第3レバー1
95とから成る。第1レバー191の一端には連
結ロツド196が連結されており、該ロツド19
6の他端は基板172上に固定のモータ197の
軸に固着されたデイスク198に連結されてい
る。各レバー191,192,195は非作動時
にはそれぞれ第19図に1点鎖線で示す位置にあ
り、モータ197の駆動によつて第1レバー19
1が軸201を中心にして旋回し、これに伴つて
第2レバー192が軸202を中心に旋回し、こ
れによつて第3レバー195は巻取装置16にお
けるボビンBの端部にまで進出する。
The thread shifting device 138 is shown in FIGS. 13, 19, and 20. The device 138 is connected to the lower substrate 1
A first lever 191 and a second lever 191 pivotally supported on
Lever 192, and both levers 191, 19
The third lever 1 is connected to the third lever 1 by shafts 193 and 194.
It consists of 95. A connecting rod 196 is connected to one end of the first lever 191.
The other end of 6 is connected to a disk 198 fixed to the shaft of a motor 197 fixed on the substrate 172. When the levers 191, 192, and 195 are not in operation, they are in the positions shown by the dashed lines in FIG.
1 pivots around the shaft 201, and accordingly, the second lever 192 pivots around the shaft 202, whereby the third lever 195 advances to the end of the bobbin B in the winding device 16. do.

次に上述した糸掛装置35の作用について説明
する。
Next, the operation of the thread hooking device 35 described above will be explained.

まず、前述した玉揚操作の開始に際し、次に述
べる糸切断と切断された糸を保持する操作が行わ
れる。なお、このとき糸ガイド装置137および
糸寄せ装置138は第13図に実線で示すよう
に、最下位置即ち糸ガイド15,18の間の位置
にある。またこの説明を行うに当り、糸仮撚機に
おける糸ガイド18の配置を第21図に示してお
く。即ち、最下段の巻取装置16には3つの糸ガ
イド18a,18b,18cが、中段では2つの
糸ガイド18b,18cが、最上段では1つの糸
ガイド18cがそれぞれ配設される。玉揚台車2
5が所定位置に停止すると、サクシヨンパイプ1
9とホース143とが連通し、ホース吸引口20
5に吸引力が働く。同時にモータ183が駆動さ
れ、糸ガイド板173,174は第18図の矢印
206,207に示すように所定角度だけ旋回し
て当該列における3本の糸Y1,Y2,Y3のう
ち外側の2本の糸Y2,Y3を凹部208,20
9内にキヤツチする。更にモータ158が駆動さ
れて糸寄せ板152,153がそれぞれ旋回し、
糸ガイド板173,174で中央部に寄せられた
糸を第22図に示すように1まとめにしてホース
吸引口205まで移動させた後、前記カツタ16
4によつて一括して切断し、その後両糸寄せ板1
52,153は元の位置へ復帰する。これにより
パツケージP2側の糸は該パツケージの回転によ
つて引込まれるが、糸ガイド15より上方に向う
下側の糸は全て吸引口205に吸引される。この
とき両側の糸Y2,Y3は第23a図に示すよう
に上記凹部208,209と係合した状態で吸引
される。
First, at the start of the doffing operation described above, the following operations of cutting the thread and holding the cut thread are performed. At this time, the thread guide device 137 and the thread shifting device 138 are at the lowest position, that is, between the thread guides 15 and 18, as shown by solid lines in FIG. Further, in explaining this, the arrangement of the yarn guide 18 in the yarn false twisting machine is shown in FIG. 21. That is, three thread guides 18a, 18b, 18c are arranged in the winding device 16 at the bottom stage, two thread guides 18b, 18c are arranged at the middle stage, and one thread guide 18c is arranged at the top stage. Doffing cart 2
5 stops at the predetermined position, the suction pipe 1
9 and the hose 143 communicate with each other, and the hose suction port 20
5 has an attractive force. At the same time, the motor 183 is driven, and the yarn guide plates 173 and 174 are rotated by a predetermined angle as shown by arrows 206 and 207 in FIG. The threads Y2, Y3 are inserted into the recesses 208, 20
Catch within 9. Further, the motor 158 is driven to rotate the thread shifting plates 152 and 153, respectively.
After the threads gathered in the center by the thread guide plates 173 and 174 are bundled together and moved to the hose suction port 205 as shown in FIG.
4, and then cut both threads together with the thread shifting plate 1.
52 and 153 return to their original positions. As a result, the thread on the package P2 side is drawn in by the rotation of the package, but all the threads on the lower side extending upward from the thread guide 15 are sucked into the suction port 205. At this time, the yarns Y2 and Y3 on both sides are sucked while being engaged with the recesses 208 and 209, as shown in FIG. 23a.

玉揚台車25による当該列のパツケージP2の
玉揚げと空ボビンBの供給とが終了した時点でモ
ータ178が駆動され、糸ガイド装置137およ
び糸寄せ装置138を第13図に1点鎖線で示す
如く上昇させ、最下段の巻取装置16に対応する
所定位置で停止する。このとき糸ガイド板17
3,174は糸ガイド18に当接しないよう少し
だけ旋回する。この停止位置決めはモータ178
の回転数を公知の手段でカウントしても良く、ま
たガイドレール175の所定位置に適当なピース
を固着してこれを糸ガイド装置137等に設けた
センサで検出するようにしても良い。停止後、モ
ータ197が駆動されて糸寄せ装置138が第1
9図に実線で示す如く作動し、第3レバー195
はその前方に位置している中央の糸Y1を最下段
の糸ガイド18cに係合させると共に巻取装置1
6のボビンBに糸掛けする。この糸掛けは第3レ
バー195で移動せられた糸Y1をボビンBに形
成したスリツトに係合させるようにしても良く、
ボビンBとボビンホルダー86との間に係合させ
る等のようにしても良い。次いで糸寄せ装置13
8は元の位置に復し、再びモータ178が駆動さ
れて両装置137,138は中段の巻取装置16
位置ま上昇する。この上昇中にモータ183が駆
動され、両糸ガイド板173,174は糸Y2,
Y3と係合したままカム板181,182の形状
に応じて旋回し、第23b図に示すように糸Y2
を最下段の糸ガイド18bに、他方の糸Y3を最
下段の糸ガイド18aにそれぞれ係合させる。即
ち両糸Y2,Y3は糸ガイド18a,18bから
糸ガイド板173,174を経て吸引口205に
導かれる。このとき一方の糸Y2はガイド板17
3と吸引口205との間において糸寄せ装置13
8の第3レバー195の直前に位置し、他方の糸
Y3は該レバー195に係合しないよう退避した
位置にある。上昇後、糸寄せ装置138が再び上
記と同様にして作動されることにより、糸ガイド
板173で係合されている糸Y2は該ガイド板1
73から外れて中段の糸ガイド18cに係合され
ると共に中段の巻取装置におけるボビンBに糸掛
けされる。その後糸寄せ装置138が元の位置に
復帰し、モータ178の駆動により糸ガイド装置
137等は最上段の巻取装置16位置まで上昇す
る。この上昇中に糸ガイド板173,174が更
に旋回し、第23c図に示すように糸Y3を中段
の糸ガイド18bに係合させる。またこの糸Y3
は同時に上記第3レバー195の前方に位置され
る。次いで糸寄せ装置138が作動され、上記糸
Y3は糸ガイド板174から解放されて最上段の
糸ガイド15cに係合され、最上位のボビンBに
係合される。こうして各段の糸ガイド18a,1
8b,18cおよびボビンBへの糸掛けが終了
し、次いで糸ガイド装置137および糸寄せ装置
138が元の状態に復した後モータ178が駆動
され、吸引口205、糸ガイド装置137および
糸寄せ装置138は元の最下位置まで下降する。
When the doffing cart 25 finishes doffing the package P2 of the row and supplying the empty bobbin B, the motor 178 is driven, and the thread guide device 137 and thread shifting device 138 are shown by the dashed line in FIG. and stops at a predetermined position corresponding to the winding device 16 at the lowest stage. At this time, the thread guide plate 17
3,174 turns a little so as not to contact the thread guide 18. This stop positioning is done by motor 178.
The number of rotations may be counted by known means, or a suitable piece may be fixed to a predetermined position on the guide rail 175 and detected by a sensor provided on the thread guide device 137 or the like. After stopping, the motor 197 is driven and the thread shifting device 138 moves to the first position.
The third lever 195 operates as shown by the solid line in Figure 9.
engages the central yarn Y1 located in front of the yarn guide 18c at the lowest stage, and the winding device 1
Thread the thread onto bobbin B (No. 6). This threading may be done by engaging the thread Y1 moved by the third lever 195 with a slit formed in the bobbin B.
Alternatively, the bobbin B and the bobbin holder 86 may be engaged with each other. Next, the thread pulling device 13
8 returns to its original position, the motor 178 is driven again, and both devices 137 and 138 are moved to the middle winding device 16.
rise to position. During this upward movement, the motor 183 is driven, and both yarn guide plates 173, 174 move the yarn Y2,
While engaged with Y3, the cam plates 181 and 182 turn according to the shapes of the cam plates 181 and 182, and as shown in FIG. 23b, the thread Y2
is engaged with the lowermost thread guide 18b, and the other thread Y3 is engaged with the lowermost thread guide 18a. That is, both yarns Y2 and Y3 are guided from yarn guides 18a and 18b to suction port 205 via yarn guide plates 173 and 174. At this time, one thread Y2 is connected to the guide plate 17.
3 and the suction port 205.
8, and the other thread Y3 is in a retracted position so as not to engage with the lever 195. After the lift, the thread shifting device 138 is operated again in the same manner as described above, so that the thread Y2 engaged with the thread guide plate 173 is moved to the guide plate 1.
73 and is engaged with the thread guide 18c in the middle stage, and is threaded onto the bobbin B in the winding device in the middle stage. Thereafter, the thread shifting device 138 returns to its original position, and the motor 178 drives the thread guide device 137 and the like to rise to the position of the winding device 16 at the top stage. During this upward movement, the yarn guide plates 173, 174 further rotate to engage the yarn Y3 with the middle yarn guide 18b, as shown in FIG. 23c. Also this thread Y3
is located in front of the third lever 195 at the same time. Next, the thread shifting device 138 is activated, and the thread Y3 is released from the thread guide plate 174, engaged with the uppermost thread guide 15c, and then engaged with the uppermost bobbin B. In this way, each stage of thread guides 18a, 1
8b, 18c and the bobbin B are completed, and then the thread guide device 137 and the thread shifting device 138 are returned to their original states, and then the motor 178 is driven, and the suction port 205, the thread guiding device 137, and the thread shifting device 138 is lowered to its original lowest position.

以上が糸掛け装置35による糸掛操作の説明で
あり、これにより各糸Yは全てのボビンBに確実
に糸掛けされ、また各糸ガイド18への係合が行
われる。糸ガイド装置137および糸寄せ装置1
38は多段のボビンBの高さに応じて昇降し、ま
た糸Yを吸引するホース吸引口205も同時に昇
降するので単純な動作によつて容易に糸掛けを行
うことができ、従つて迅速な糸掛けが可能とな
る。
The above is a description of the threading operation by the threading device 35, whereby each thread Y is reliably threaded onto all the bobbins B and engaged with each thread guide 18. Thread guide device 137 and thread shifting device 1
38 is raised and lowered according to the height of the multi-stage bobbin B, and the hose suction port 205 that sucks the thread Y is also raised and lowered at the same time, so threading can be done easily with a simple operation, and therefore, it can be done quickly. Threading becomes possible.

〔発明の効果〕〔Effect of the invention〕

本発明によれば糸の吸引口と糸ガイド装置とが
共に昇降するので、糸ガイド装置は上記吸引口で
吸引される糸を常に保持することができ、更に各
段の糸ガイドに対し好適な高さ位置から糸掛けを
することができる。
According to the present invention, since the thread suction port and the thread guide device move up and down together, the thread guide device can always hold the thread sucked by the suction port. Threading can be done from a height position.

従つて本発明によれば糸ガイド装置による糸掛
け操作が単純化され、複雑な制御を必要としない
うえに該操作に要する時間が短縮され、糸仮撚機
の稼動率を向上できる。
Therefore, according to the present invention, the yarn threading operation by the yarn guide device is simplified, does not require complicated control, and the time required for this operation is shortened, so that the operating rate of the yarn false twisting machine can be improved.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は糸仮撚機の側面図、第2図は玉揚台車
の正面図、第3図はボビン供給アーム33および
クレードル操作アーム34の各駆動機構を示す
図、第4a図および第4b図はボビン供給アーム
33のグリツパ部分を示す図、第5図はクレード
ル操作アーム34の駆動機構を示す図、第6図は
該アーム34の作用を示す図、第7a図および第
7b図はアーム支持プレート37の駆動機構を示
す図、第8図は玉揚台車の停止位置を説明するた
めの平面図、第9図は玉揚動作を説明するための
平面図、第10図および第11図は巻取装置への
空ボビンの供給動作を説明するための図、第12
a図および第12b図はスタンド上のペグへのパ
ツケージ供給と空ボビン受取り動作を説明するた
めの図、第13図は糸掛装置35を示す正面図、
第14図はホース支持装置135を示す図、第1
5図はサクシヨンパイプ19の正面図、第16図
は糸切断装置136の平面図、第17a図および
第17b図はカツタ164を示す図、第18図は
糸ガイド装置137の平面図、第19図および第
20図は糸寄せ装置138を示す平面図および側
面図、第21図は糸ガイド15の配置を示す正面
図、第22図は糸切断装置136の動作を説明す
るための平面図、第23a図ないし第23c図は
糸ガイド装置137の動作を説明するための平面
図である。 16……巻取装置、18,18a,18b,1
8c……糸ガイド、137……糸ガイド装置、2
05……吸引口、Y,Y1,Y2,Y3……糸。
FIG. 1 is a side view of the yarn false twister, FIG. 2 is a front view of the doffing truck, FIG. 3 is a diagram showing the drive mechanisms of the bobbin supply arm 33 and the cradle operating arm 34, and FIGS. 4a and 4b. 5 shows the gripper portion of the bobbin supply arm 33, FIG. 5 shows the drive mechanism of the cradle operating arm 34, FIG. 6 shows the action of the arm 34, and FIGS. 7a and 7b show the arm. A diagram showing the drive mechanism of the support plate 37, FIG. 8 is a plan view for explaining the stop position of the doffing truck, FIG. 9 is a plan view for explaining the doffing operation, and FIGS. 10 and 11. 12 is a diagram for explaining the operation of supplying an empty bobbin to the winding device.
Figures a and 12b are diagrams for explaining the operation of supplying the package to the peg on the stand and receiving an empty bobbin, and Figure 13 is a front view showing the threading device 35.
FIG. 14 is a diagram showing the hose support device 135, the first
5 is a front view of the suction pipe 19, FIG. 16 is a plan view of the thread cutting device 136, FIGS. 17a and 17b are views showing the cutter 164, and FIG. 18 is a plan view of the thread guide device 137. 19 and 20 are a plan view and a side view showing the thread shifting device 138, FIG. 21 is a front view showing the arrangement of the thread guide 15, and FIG. 22 is a plan view for explaining the operation of the thread cutting device 136. , 23a to 23c are plan views for explaining the operation of the thread guide device 137. 16... Winding device, 18, 18a, 18b, 1
8c... Thread guide, 137... Thread guide device, 2
05... Suction port, Y, Y1, Y2, Y3... Thread.

Claims (1)

【特許請求の範囲】[Claims] 1 仮撚加工された糸を巻取る巻取装置と該糸を
巻取装置に案内する糸ガイドとを上下複数段に配
設した糸仮撚機において上記各糸ガイドに糸掛け
を行う装置であつて、各巻取装置に供給される複
数本の糸を一括して吸引する吸引口と該吸引口で
吸引される糸を個別に保持する糸ガイド装置とを
巻取装置に沿つて昇降可能に設け、昇降の際に糸
ガイド装置が各糸ガイドに糸掛けを行うようにし
たことを特徴とする糸仮撚機における糸掛け装
置。
1. A device for threading each yarn guide in a yarn false twisting machine in which a winding device for winding a false twisted yarn and a yarn guide for guiding the yarn to the winding device are arranged in multiple stages above and below. A suction port that collectively suctions a plurality of threads supplied to each winding device and a thread guide device that individually holds the threads sucked by the suction port can be moved up and down along the winding device. 1. A thread threading device for a yarn false twisting machine, characterized in that the thread guide device threads each thread guide when the thread guide device is moved up and down.
JP23070385A 1985-10-15 1985-10-15 ITOKARYORIKINIOKERUITOKAKESOCHI Expired - Lifetime JPH0232380B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23070385A JPH0232380B2 (en) 1985-10-15 1985-10-15 ITOKARYORIKINIOKERUITOKAKESOCHI

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23070385A JPH0232380B2 (en) 1985-10-15 1985-10-15 ITOKARYORIKINIOKERUITOKAKESOCHI

Publications (2)

Publication Number Publication Date
JPS6290343A JPS6290343A (en) 1987-04-24
JPH0232380B2 true JPH0232380B2 (en) 1990-07-19

Family

ID=16911990

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23070385A Expired - Lifetime JPH0232380B2 (en) 1985-10-15 1985-10-15 ITOKARYORIKINIOKERUITOKAKESOCHI

Country Status (1)

Country Link
JP (1) JPH0232380B2 (en)

Also Published As

Publication number Publication date
JPS6290343A (en) 1987-04-24

Similar Documents

Publication Publication Date Title
US3695017A (en) Automatic yarn piecing apparatus for spindleless spinning machine
US4630435A (en) System for automatically changing spools of a spinning machine
US3295775A (en) Method and apparatus for readying the winding operation of yarn supply coils on coil winding machines
GB1117490A (en) Automatic apparatus for binding broken yarns on spinning machines
JPH082828A (en) Yarn winding tube feed device for winder
US4742967A (en) System for delivering packages to an automatic winder
JP3031092B2 (en) How to replace yarn feed
US3031149A (en) Method and means for readying a yarn coil to be unwound
US5273224A (en) Doffing method and paper tube supply system for an automatic winder
GB1074854A (en) Bobbin autodoffing machine
JPH0232378B2 (en) ITOKARYORIKINIOKERUPATSUKEEJINOTAMAAGEHOHOOYOBISOCHI
EP1616829B1 (en) Yarn guide device of revolving type automatic winder
JPH0232380B2 (en) ITOKARYORIKINIOKERUITOKAKESOCHI
US3421705A (en) Machine for the continuous manufacture or handling of yarn cops
JPH0232379B2 (en) ITOKARYORIKINIOKERUKARABOBINHENOITOKAKESOCHI
US5363637A (en) Method of threading in a false twisting machine and an apparatus for carrying out the same
JPH08169537A (en) Conveyor to return empty bobbin
US3335476A (en) Method and apparatus for controlling defects
JP7425694B2 (en) Splicer for synthetic yarn
JPH02216244A (en) Apparatus and method for automatically repairing ruptured warp in loom
US5184453A (en) Robot for a double twister
JPH09323868A (en) Winding device
JPH0524250B2 (en)
JPH02229229A (en) Production of yarn and production unit
JPS5912051A (en) Conveying system of different-type cops

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term