JPH0235095B2 JP57128088A JP12808882A JPH0235095B2 JP H0235095 B2 JPH0235095 B2 JP H0235095B2 JP 57128088 A JP57128088 A JP 57128088A JP 12808882 A JP12808882 A JP 12808882A JP H0235095 B2 JPH0235095 B2 JP H0235095B2
Authority
JP
Japan
Prior art keywords
roadbed
box culvert
box
shoulders
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP57128088A
Other languages
Japanese (ja)
Other versions
JPS5918830A (en
Inventor
Hirohisa Mizutani
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MIZUTANI KENSETSU KK
Original Assignee
MIZUTANI KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MIZUTANI KENSETSU KK filed Critical MIZUTANI KENSETSU KK
Priority to JP12808882A priority Critical patent/JPS5918830A/en
Publication of JPS5918830A publication Critical patent/JPS5918830A/en
Publication of JPH0235095B2 publication Critical patent/JPH0235095B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は狭い坑内でのボツクスカルバートの設
置方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for installing a box culvert in a narrow mine.

〔従来の技術〕[Conventional technology]

従来、地下鉄工事、共同坑工事、橋梁下での工
事等、狭い坑内におけるボツクスカルバートの敷
設は、クレーン等の重量物運搬設備が使用できな
いため、主に人力によりころ等を利用して1個づ
つ坑の奥の方から手前の方に順次設置していた。
Conventionally, box culverts have been laid one by one using rollers, etc., mainly by hand, because heavy lifting equipment such as cranes cannot be used in narrow tunnels such as subway construction, communal tunnel construction, and construction under bridges. They were installed sequentially from the back of the pit to the front.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

このため、この作業は狭い坑内での作業であ
り、設置に著しい労力と時間を要していた。
For this reason, this work had to be done in a narrow tunnel, requiring considerable labor and time for installation.

本発明において解決すべき課題は、かかる狭い
坑内で人力をかけることなく、簡単且つ確実に連
続してボツクスカルバートを設置できる方法を見
出すことにある。
The problem to be solved by the present invention is to find a method for easily and reliably installing box culverts in a continuous manner in such a narrow tunnel without requiring any manual labor.

〔課題を解決するための手段〕[Means to solve the problem]

本発明は、両肩に窪みを形成した扁平凸部表面
を有するコンクリート路床を坑道内に打設して断
面が四角のボツクスカルバートの載置場所を形成
し、上記路床の両肩の窪み内にレールを夫々敷設
し、同レールの夫々に前後に油圧ジヤツキを有
し、且つ前後の車輪によつて支持された縦長台車
を配置し、上記路床の両肩窪み内に夫々敷設した
レール上の台車上のジヤツキを上げて前記路床を
跨いだ状態で前記両台車上にボツクスカルバート
を載置支持せしめ、同台車を移動せしめてボツク
スカルバートを設置場所まで搬送し、同設置場所
において両台車上の油圧ジヤツキを下降せしめる
ことにより、前記搬送したボツクスカルバートを
前記コンクリート路床の扁平凸部表面上に順次設
置することによつて上記課題を解決したものであ
る。
In the present invention, a concrete roadbed having a flat convex surface with depressions formed on both shoulders is poured into a mine shaft to form a place for placing a box culvert having a square cross section, and the depressions on both shoulders of the roadbed are Rails are laid within the recesses of both shoulders of the roadbed, each of which has hydraulic jacks at the front and rear, and a vertically elongated truck supported by front and rear wheels is placed. Raise the jacks on the upper truck to straddle the roadbed and place and support the box culvert on both of the trucks, move the truck to transport the box culvert to the installation location, and place the box culvert at the installation location. The above problem is solved by lowering the hydraulic jacks on both trucks to sequentially install the transported box culverts on the surface of the flat convex portion of the concrete roadbed.

さらに、上記台車をコンクリート路床の両肩部
の窪み内のレール上に複数台配置することによつ
て、複数個のボツクスカルバートを連続して設置
することが可能となる。
Furthermore, by arranging a plurality of the above-mentioned carts on the rails in the recesses of both shoulders of the concrete roadbed, it becomes possible to install a plurality of box culverts in succession.

〔実施例〕〔Example〕

次に本発明を図面を参照しながら実施例につき
説明する。
Next, the present invention will be explained by way of example with reference to the drawings.

第1図は本発明に係る断面が扁平凸字形であつ
て、その扁平凸部表面がボツクスカルバートの設
置面となり、坑道内に打設されるコンクリート路
床1を示す。第2図はボツクスカルバート5をレ
ール2の台車3に設けた油圧ジヤツキ4で支持し
た状態を示す図である。
FIG. 1 shows a concrete subgrade 1 according to the present invention, which has a flat convex cross-section, the surface of the flat convex portion serving as the installation surface of a box culvert, and which is cast in a mine shaft. FIG. 2 shows a state in which the box culvert 5 is supported by a hydraulic jack 4 provided on the truck 3 of the rail 2.

第1図を参照して、コンクリート路床1の両肩
には窪み部分が設けられており、同両肩のそれぞ
れの窪み部分には第2図に示すように、台車3を
支持するためのレール2を敷設する。同台車3は
第3d図に示すように、前後の車輪によつて窪み
部分内を移動できるように支持された細長い形態
を有し、ギヤモードモーターにより上記モーター
と車輪間に取付けられたチエーンによつてそれぞ
れ窪み内のレール2上を走行する自走型構造にす
ることができる。また、同台車3は第2図に示す
ように、コンクリート路床1の扁平凸部表面より
低い高さを有し、且つ上記路床1の肩の窪みの幅
より幾らか小さい幅を有する。また台車3には油
圧ポンプの操作により、ボツクスカルバートを支
持昇降する油圧ジヤツキ4が固設されている。
Referring to FIG. 1, depressions are provided on both shoulders of the concrete roadbed 1, and as shown in FIG. Lay rail 2. As shown in Fig. 3d, the trolley 3 has an elongated shape that is supported by front and rear wheels so that it can move within the recessed part, and a chain attached between the motor and the wheels by a gear mode motor. This allows a self-propelled structure that runs on the rails 2 in the recesses. Further, as shown in FIG. 2, the bogie 3 has a height lower than the surface of the flat convex portion of the concrete roadbed 1, and a width somewhat smaller than the width of the shoulder depression of the roadbed 1. . Further, a hydraulic jack 4 is fixed to the truck 3 for supporting and raising and lowering the box culvert by operating a hydraulic pump.

以下、第3a〜3e図に基づいて、その設置工
程を説明する。
Hereinafter, the installation process will be explained based on FIGS. 3a to 3e.

まず、第3a図に示すように、坑道外まで延長
して打設した断面が扁平凸字形のコンクリート路
床1に、ボツクスカルバート5を、クレーン等に
より載置する。ついで、油圧ジヤツキ4を台車3
内に収納した状態で両肩部の窪み内のレール2上
を移動せしめて、第3b図に示すように、上記ボ
ツクスカルバート5の下に、台車3を移動させ
る。さらに、この位置で、第3c図で示す如く、
台車3内のジヤツキ4を駆動して、ボツクスカル
バート5をコンクリート路床1の扁平凸部表面か
ら離間させ持ち上げて跨いだ状態で支持する。第
3d図はその支持状態を側面から見た図である。
First, as shown in FIG. 3a, a box culvert 5 is placed by a crane or the like on a concrete roadbed 1 which has been cast to extend outside the tunnel and has a flat convex cross section. Next, move the hydraulic jack 4 to the trolley 3.
The box culvert 3 is moved under the box culvert 5 by moving it on the rails 2 in the recesses of both shoulders, as shown in FIG. 3b. Furthermore, at this position, as shown in Figure 3c,
A jack 4 in the truck 3 is driven to lift the box culvert 5 away from the flat convex surface of the concrete roadbed 1 and support it in a straddling state. FIG. 3d is a side view of the supported state.

この状態でボツクスカルバート5を支持した台
車3をレール2上を設置位置まで移動させる。
In this state, the cart 3 supporting the box culvert 5 is moved on the rails 2 to the installation position.

設置位置において、ジヤツキ4を再度駆動して
下降せしめて、坑道内の設置位置まで予め設けた
コンクリート路床1の凸状表面上に載置する。
At the installation position, the jack 4 is driven again to descend and is placed on the convex surface of the concrete roadbed 1 previously provided to the installation position in the mine shaft.

第3e図は、既に設置されている複数個のボツ
クスカルバート5の後端に、新たなボツクスカル
バート5を隣接させた状態を示す。
FIG. 3e shows a state in which a new box culvert 5 is placed adjacent to the rear end of a plurality of box culverts 5 that have already been installed.

このようにして、人手を掛けることもなく、連
続してボツクスカルバート5をコンクリート路床
1上に確実に設置することができる。
In this way, the box culverts 5 can be continuously and reliably installed on the concrete roadbed 1 without requiring any human effort.

〔発明の効果〕〔Effect of the invention〕

本発明によつて、坑道内に格別の空間と設備を
設けることなく、人手によらないで連続して能率
良く、しかも確実にボツクスカルバートを設置で
きるという効果を奏することができる。
According to the present invention, box culverts can be installed continuously, efficiently, and reliably without requiring special space and equipment in the tunnel and without relying on human labor.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明に係るコンクリート路床の斜視
図、第2図はコンクリート路床、ボツクスカルバ
ート及び自走台車の関係を示す正面図である。第
3a〜3e図は本発明の作業工程を示す説明図で
ある。 1……コンクリート路床、2……レール、3…
…自走台車、4……油圧ジヤツキ、5……ボツク
スカルバート。
FIG. 1 is a perspective view of a concrete roadbed according to the present invention, and FIG. 2 is a front view showing the relationship among the concrete roadbed, box culvert, and self-propelled truck. Figures 3a to 3e are explanatory diagrams showing the working steps of the present invention. 1... Concrete roadbed, 2... Rail, 3...
...Self-propelled trolley, 4...Hydraulic jack, 5...Box culvert.

Claims (1)

【特許請求の範囲】 1 両肩に窪みを形成した扁平凸部表面を有する
コンクリート路床を坑道内に打設して断面が四角
のボツクスカルバートの載置場所を形成し、 上記路床の両肩の窪み内にレールを夫々敷設
し、 同レールの夫々に前後に油圧ジヤツキを有し、
且つ前後の車輪によつて支持された縦長台車を配
置し、 上記路床の両肩窪み内に夫々敷設したレール上
の台車上のジヤツキを上げた状態で前記路床を跨
いだ状態で前記台車上にボツクスカルバートを載
置支持せしめ、 同台車を移動せしめてボツクスカルバートを設
置場所まで搬送し、 同設置場所において両台車上の油圧ジヤツキを
下降せしめることにより、 前記搬送したボツクスカルバートを前記コンク
リート路床の扁平凸部表面上に順次設置すること
を特徴とするボツクスカルバートの設置方法。
[Scope of Claims] 1. A concrete roadbed having a flat convex surface with depressions formed on both shoulders is cast in a mine shaft to form a place for placing a box culvert with a square cross section, Rails are laid in the recesses of the shoulders, and hydraulic jacks are installed at the front and rear of each rail.
In addition, a vertically elongated bogie supported by front and rear wheels is arranged, and the bogie is straddled over the roadbed with the jacks on the bogie on rails laid respectively in both shoulder depressions of the roadbed raised. A box culvert is placed and supported on top of the cart, the box culvert is moved to the installation location, and the hydraulic jacks on both carts are lowered at the same installation location, whereby the transported box culvert is placed in the concrete. A method for installing box culverts, which is characterized by sequentially installing box culverts on the surface of flat convex portions of a roadbed.
JP12808882A 1982-07-21 1982-07-21 Installation of box culvert Granted JPS5918830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12808882A JPS5918830A (en) 1982-07-21 1982-07-21 Installation of box culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12808882A JPS5918830A (en) 1982-07-21 1982-07-21 Installation of box culvert

Publications (2)

Publication Number Publication Date
JPS5918830A JPS5918830A (en) 1984-01-31
JPH0235095B2 true JPH0235095B2 (en) 1990-08-08

Family

ID=14976102

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12808882A Granted JPS5918830A (en) 1982-07-21 1982-07-21 Installation of box culvert

Country Status (1)

Country Link
JP (1) JPS5918830A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068642A (en) * 2003-08-21 2005-03-17 Asahi Concrete Works Co Ltd Concrete product installation method and box culvert

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2655762B2 (en) * 1991-05-09 1997-09-24 鶴見コンクリート株式会社 How to install concrete blocks

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5833956B2 (en) * 1978-12-29 1983-07-23 彌太郎 寶来 Large pipe laying method in tunnels and large pipe laying trolley used in the method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068642A (en) * 2003-08-21 2005-03-17 Asahi Concrete Works Co Ltd Concrete product installation method and box culvert

Also Published As

Publication number Publication date
JPS5918830A (en) 1984-01-31

Similar Documents

Publication Publication Date Title
JP3121223B2 (en) Rebar assembly / arrangement device
JP2009052306A (en) Bridge girder replacement method
GB2189281A (en) A travelling machine for taking up or laying and transporting track panels
JP4134104B2 (en) Bridge removal method
JPH0235095B2 (en)
JP2814432B2 (en) Concrete product installation method and installation device
CN210439082U (en) Complicated district magnetic levitation track section laying system
CN221400526U (en) Large-gradient-adaptive tunnel trolley with variable size
CN118895980A (en) A construction method for treating damaged inverts in highway tunnels
JPH06185106A (en) Undercarriage installation trolley and underdrain installation method
KR101213377B1 (en) A bridge deck lift-launching contruction method and a lift-launching device for the same
JP3233724B2 (en) How to lay portal culverts
JPH06173574A (en) Excavation method for bottom floor in tunnel
JP5133146B2 (en) Railway girder moving installation method and railway girder removal method
JP7654331B2 (en) How to lay railway tracks
JPH05295787A (en) Laying method of box culvert
JP6556553B2 (en) Rail hoisting device
JP2726982B2 (en) Concrete block conveying device and concrete block conveying method using the same
JP2808179B2 (en) Mobile bogie device such as arched mobile form device
JPS586651B2 (en) Freight car loading and unloading equipment for electrical equipment
JP3940587B2 (en) Construction method of divided bridge type traffic route
CN220844192U (en) Transportation of precast road slope blocks
JPH0111825Y2 (en)
JP7660445B2 (en) Self-propelled crane
CN111395077A (en) Rail transport vehicle