JPH0241624B2 - - Google Patents
Info
- Publication number
- JPH0241624B2 JPH0241624B2 JP5559484A JP5559484A JPH0241624B2 JP H0241624 B2 JPH0241624 B2 JP H0241624B2 JP 5559484 A JP5559484 A JP 5559484A JP 5559484 A JP5559484 A JP 5559484A JP H0241624 B2 JPH0241624 B2 JP H0241624B2
- Authority
- JP
- Japan
- Prior art keywords
- penetration
- sliding formwork
- load
- rod
- poured concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 230000035515 penetration Effects 0.000 claims description 181
- 238000009415 formwork Methods 0.000 claims description 125
- 238000003780 insertion Methods 0.000 claims description 33
- 230000037431 insertion Effects 0.000 claims description 33
- 230000007246 mechanism Effects 0.000 claims description 23
- 238000000034 method Methods 0.000 claims description 14
- 238000001514 detection method Methods 0.000 claims description 6
- 230000000149 penetrating effect Effects 0.000 description 48
- 238000005259 measurement Methods 0.000 description 18
- 230000001133 acceleration Effects 0.000 description 10
- 238000010586 diagram Methods 0.000 description 8
- 230000007423 decrease Effects 0.000 description 7
- 230000005284 excitation Effects 0.000 description 7
- 230000006870 function Effects 0.000 description 6
- 238000006243 chemical reaction Methods 0.000 description 4
- 238000002156 mixing Methods 0.000 description 4
- 238000013459 approach Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【発明の詳細な説明】
〔発明の属する技術分野〕
この発明は、滑動型枠の制御方式に関するもの
であり、特に、滑動型枠工法等において、打設コ
ンクリートが自重分を支えるのに十分な強度を備
えている状態がどこまでの範囲かを測定して、打
設コンクリートの強度に応じて滑動型枠を適切な
速度で移動するか又は適切な位置に移動すること
ができるような滑動型枠の制御方式に係る。[Detailed description of the invention] [Technical field to which the invention pertains] The present invention relates to a control method for sliding formwork, and in particular, in sliding formwork construction methods, etc., the poured concrete has sufficient strength to support its own weight. Sliding formwork that can be moved at an appropriate speed or to an appropriate position depending on the strength of the poured concrete by measuring the extent to which it has strength. This relates to the control method.
打設コンクリートの強度の状態を測定して、そ
の強度に応じてコンクリートを順次打設する工法
としては、例えば、滑動型枠工法がある。
As a method of measuring the strength of poured concrete and sequentially pouring concrete according to the strength, there is, for example, a sliding formwork method.
この工法では、滑動型枠内に打ち込まれた打設
コンクリートが自重分を支えるのに十分な強度に
達した時点で滑動型枠を徐々に移動する制御をし
て、その移動方向に同時にコンクリートを連続し
て打ち込み、所定のコンクリート構造体を形成し
て行く。 In this construction method, once the poured concrete poured into the sliding formwork reaches sufficient strength to support its own weight, the sliding formwork is controlled to move gradually, and concrete is simultaneously poured in the direction of movement. Continuous pouring is performed to form a predetermined concrete structure.
ここで、滑動型枠の移動速度は、所要の強度に
達した打設コンクリートが型枠内のどの深さにあ
るかで大きく左右され、その判断の仕方次第で作
業能率が悪くなる。 Here, the moving speed of the sliding formwork is greatly influenced by the depth within the formwork at which the poured concrete that has reached the required strength is located, and work efficiency may deteriorate depending on how this is determined.
従来、この滑動型枠の移動速度を効率よく制御
するのために、打設コンクリートの種々の場所の
強度を測定して、その強度に応じてこれを制御し
ている。この場合の強度測定方法として、打設コ
ンクリートの配合(調合)状態と打ち込み時間と
の関係から若令強度を推定する方法や固定式の圧
縮型強度検定機(強度試験機)により測定する方
法が採用されている。 Conventionally, in order to efficiently control the moving speed of this sliding formwork, the strength of poured concrete at various locations has been measured and the strength has been controlled in accordance with the measured strength. In this case, the strength can be measured by estimating the young strength from the relationship between the mixture (blending) state of the poured concrete and the pouring time, or by using a fixed compression type strength tester (strength tester). It has been adopted.
ところで、打設コンクリートが自重分を支える
のに十分な強度は、所定の硬化状態になつたとき
に発生する。この打設コンクリートの硬化状態
は、気温や湿度によつて大きく変動し、構造体の
日当たり側や日陰側、風上側や風下側などで著し
い差異を生じる。このため、型枠の移動に際して
は、打設コンクリート壁の各部にわたつて打設コ
ンクリートの強度の状況を把握した上で適切な滑
動型枠の移動速度を決める必要がある。しかも、
打設コンクリートの外側と内部とは、その強度が
異なる場合もある。 By the way, the strength of poured concrete to support its own weight is generated when it reaches a predetermined hardening state. The hardening state of this poured concrete varies greatly depending on temperature and humidity, and there are significant differences between the sunny side, the shaded side, the windward side, and the leeward side of the structure. Therefore, when moving the formwork, it is necessary to determine the appropriate moving speed of the sliding formwork after understanding the strength of the poured concrete in each part of the poured concrete wall. Moreover,
The outside and inside of poured concrete may have different strengths.
そこで、前記のような推定する方法にあつて
は、現実の打設コンクリートの強度を把握しきれ
ない不具合があ。また、従来の固定式の圧縮型強
度検定機では、強度検出位置が固定されているた
め、外気温度、打設コンクリートの配合状態、打
ち込み時間などが変化した場合、それぞれの位置
で硬化状態が相違して、その強度が異なるため、
適切な判断が下し難い欠点がある。さらに、サン
プルを採取して強度試験機によりその強度を測定
することも行われるが、サンプルと実際の状態と
が相違するという問題が生じる。 Therefore, the estimation method described above has a problem in that it cannot grasp the actual strength of poured concrete. In addition, with conventional fixed compression type strength testers, the strength detection position is fixed, so if the outside temperature, mix of poured concrete, pouring time, etc. change, the hardening state will differ at each position. and their strength is different,
It has the disadvantage of making it difficult to make appropriate decisions. Furthermore, a sample is taken and its strength is measured using a strength testing machine, but there is a problem that the sample and the actual state are different.
しかも、これらの強度測定方法による場合に
は、滑動型枠移動時点の実際の打設コンクリート
の強度と測定時点の強度とが相違し、さらに、打
設コンクリートの外側と内部とでその強度が異な
るために適切な状態での滑動型枠移動が十分にで
きないというのが現状である。 Moreover, when these strength measurement methods are used, the actual strength of the poured concrete at the time of sliding formwork movement differs from the strength at the time of measurement, and furthermore, the strength differs between the outside and inside of the poured concrete. Therefore, the current situation is that the sliding formwork cannot be moved sufficiently in an appropriate condition.
この発明は、このような従来技術の欠点乃至問
題にかんがみてなされたものであつて、このよう
な従来技術の欠点又は問題を除去するとともに、
打設コンクリートの実際の強度に応じて適切な滑
動型枠の移動制御ができるような滑動型枠の制御
方式を提供することを目的とする。
The present invention has been made in view of the drawbacks and problems of the prior art, and eliminates the drawbacks and problems of the prior art, and
The purpose of the present invention is to provide a control method for sliding formwork that can appropriately control the movement of sliding formwork depending on the actual strength of poured concrete.
しかして、このような目的を達成するために、
この滑動型枠の制御方式の特徴は、コンクリート
が順次打設される滑動型枠と、貫入棒に荷重をか
けて表面部が硬化前の打設コンクリートにこの貫
入棒を挿入する貫入棒挿入手段と、前記滑動型枠
を所定方向に移動する滑動型枠移動機構と、制御
装置とを備え、該制御装置は、前記滑動型枠にお
ける前記打設コンクリートに対して前記貫入棒の
挿入抵抗が所定値にある貫入深さを測定する貫入
量測定手段と、この貫入量から所定の硬化状態に
ある打設コンクリートの前記滑動枠内での打設方
向における厚さを算出する算出手段と、同じ硬化
状態にある打設コンクリートの前記滑動枠内での
打設方向における適切な厚さを定めた設定値と前
記算出値とを比較して、両者間のずれ量を決定す
る手段と、このずれ量に応じて、このずれ量が生
じない方向に前記滑動型枠が移動するように前記
滑動型枠移動機構を制御するというものである。
However, in order to achieve this purpose,
The characteristics of this sliding formwork control system are the sliding formwork in which concrete is placed in sequence, and the penetration rod insertion means that applies a load to the penetration rod and inserts the penetration rod into the poured concrete whose surface portion has not yet hardened. a sliding formwork moving mechanism that moves the sliding formwork in a predetermined direction; and a control device, the control device being configured to control the insertion resistance of the penetration rod against the poured concrete in the sliding formwork to a predetermined value. A penetration amount measuring means for measuring the penetration depth at a value, and a calculation means for calculating the thickness of poured concrete in a predetermined hardening state in the pouring direction within the sliding frame from this penetration amount, and the same hardening means for determining the amount of deviation between the two by comparing the calculated value with a set value that determines the appropriate thickness of the poured concrete in the pouring direction within the sliding frame, and the amount of deviation; According to this, the sliding formwork moving mechanism is controlled so that the sliding formwork moves in a direction in which this amount of deviation does not occur.
このように貫入抵抗をもつて測定することによ
り、所定の硬化状態にある打設コンクリートの位
置が貫入棒の貫入量という形で得られ、滑動型枠
の長さからこの貫入量を減算すると、所定の硬化
状態にある打設コンクリートの滑動型枠内での打
設方向厚さ(実測値)を演算することができる。 By measuring the penetration resistance in this way, the position of the poured concrete in a predetermined hardening state can be obtained in the form of the penetration amount of the penetration rod, and by subtracting this penetration amount from the length of the sliding formwork, It is possible to calculate the thickness (actually measured value) of poured concrete in a predetermined hardened state in the pouring direction within the sliding formwork.
そして、予め設定してある適切な滑動型枠の位
置〔同じ硬化状態にある打設コンクリートの前記
滑動枠内での打設方向における適切な厚さ(目標
値)に相当〕と前記実測値とを演算又は表示等に
よつて比較することによりこれらの間のずれ量を
得て、このずれ量がなくなるように滑動型枠を適
切な速度で上方に移動するか又は適切な位置に移
動させる制御が可能となる。 Then, the preset position of the appropriate sliding form [corresponding to the appropriate thickness (target value) of poured concrete in the same hardening state in the pouring direction within the sliding frame] and the actual measured value are calculated. The amount of deviation between these is obtained by comparing them by calculation or display, etc., and the sliding formwork is moved upward at an appropriate speed or to an appropriate position so as to eliminate this amount of deviation. becomes possible.
その結果、外気温等の不確定要因を全く無視し
て確実に実際の強度状態を捉えて、滑動型枠を移
動することができる。 As a result, the sliding formwork can be moved while completely ignoring uncertain factors such as outside temperature and reliably capturing the actual strength state.
次に、この発明の原理について滑動型枠工法に
例を採り説明すると、滑動型枠に対して打設され
るコンクリートは、滑動型枠内に層状に、ある時
間をおいて複数の層に分けて順次打ち込まれる。
ある位置に打ち込まれた打設コンクリートの強度
の発現は、第1図のグラフに見るごとく、時間
〔H:hour〕の経過とともに、次第に増加し、や
がて、一定の強度〔Kg/cm2〕となる。 Next, to explain the principle of this invention using the sliding formwork method as an example, the concrete poured into the sliding formwork is divided into multiple layers at certain intervals in layers within the sliding formwork. are entered in sequence.
As can be seen from the graph in Figure 1, the strength of poured concrete poured at a certain location gradually increases with the passage of time (H: hour), and eventually reaches a constant strength (Kg/cm 2 ). Become.
一方、滑動型枠内に打ち込まれた打設コンクリ
ートは、打ち込まれた時間差により型枠上部と下
部とでは、強度に差が生じ、型枠内の強度分布
は、第2図に見るごとくなる。図中、aは、打設
コンクリート、bは滑動型枠である。 On the other hand, the poured concrete poured into the sliding formwork has a difference in strength between the upper and lower parts of the formwork due to the difference in pouring time, and the strength distribution within the formwork is as shown in Figure 2. In the figure, a indicates poured concrete, and b indicates sliding formwork.
第3図に見るごとく、このような状態の打設コ
ンクリートに上から貫入棒cを挿入すると、挿入
する力と貫入棒cの深さとは、一定の関係があ
る。 As shown in FIG. 3, when the penetrating rod c is inserted from above into the poured concrete in this state, there is a certain relationship between the insertion force and the depth of the penetrating rod c.
すなわち、打設コンクリートの強度は、打設コ
ンクリートの硬化状態と関係し、この硬化状態
は、貫入棒cの貫入抵抗に関係する。そこで、貫
入棒に対する貫入抵抗を打設コンクリート表面か
らの貫入深さとの関係で測定すると、第4図乃至
第6図のごとくなる。 That is, the strength of the poured concrete is related to the hardening state of the poured concrete, and this hardening state is related to the penetration resistance of the penetration rod c. Therefore, when the penetration resistance against the penetration rod is measured in relation to the penetration depth from the surface of the poured concrete, the results are shown in FIGS. 4 to 6.
すなわち、第4図は、打設コンクリート表面か
らの貫入深さM〔cm〕と貫入荷重P〔Kg〕との関係
を示すグラフ図であり、第5図は、打設コンクリ
ート表面からの貫入深さMと荷重Pc〔Kg〕及び振
動を貫入棒に加えた場合の加振時間T〔min〕と
の関係を示すグラフ図、そして、第6図は、打設
コンクリート表面からの貫入深さMと打撃荷重
Pk〔Kg〕を貫入棒に加えた場合の打撃回数Nとの
関係を示すグラフ図である。 That is, Fig. 4 is a graph showing the relationship between penetration depth M [cm] from the surface of poured concrete and penetration load P [Kg], and Fig. 5 shows the relationship between penetration depth M [cm] from the surface of poured concrete and penetration depth from the surface of poured concrete. A graph showing the relationship between depth M, load Pc [Kg] and vibration time T [min] when vibration is applied to the penetration rod, and Figure 6 shows the relationship between penetration depth M from the surface of the poured concrete. and impact load
It is a graph diagram showing the relationship with the number of blows N when Pk [Kg] is applied to the penetrating rod.
さて、貫入棒の貫入抵抗を貫入荷重Pとの関係
で考えてみると、貫入荷重Pと貫入量Mとは、第
4図のごとく、荷重Pの増加に応じて徐々に増加
し、限界値P1〔Kg〕を越えると荷重が増加しても
貫入量はほぼ一定値M1〔cm〕となり、その後、さ
らに、荷重が増加すると、荷重P2〔Kg〕におい
て、所定の状態に硬化した打設コンクリートの層
が破壊して、再び、荷重に応じて貫入量が増加し
て行くことになる。 Now, if we consider the penetration resistance of the penetration rod in relation to the penetration load P, the penetration load P and the penetration amount M gradually increase as the load P increases, as shown in Figure 4, and reach the limit value. When P 1 [Kg] is exceeded, even if the load increases, the penetration amount becomes a nearly constant value M 1 [cm], and when the load increases further, it hardens to the specified state at a load of P 2 [Kg]. The layer of poured concrete is destroyed, and the amount of penetration increases again in accordance with the load.
ここで、貫入量Mがほぼ一定値M1となる値は、
自重分を支えるのに十分な強度に達した硬化状態
に対応している。 Here, the value at which the penetration amount M becomes a nearly constant value M1 is:
It corresponds to the hardened state where it has reached sufficient strength to support its own weight.
なお、限界値P1に対する貫入量M1の値は、点
線で示すごとく、コンクリートが打ち込まれた時
間の経過及び配合状態と関係し、時間の経過とと
もに小さくなる。 Note that the value of the penetration amount M 1 with respect to the limit value P 1 is related to the elapsed time when concrete is poured and the mixing state, and decreases with time, as shown by the dotted line.
次に、貫入棒の貫入抵抗を荷重と振動との関係
で考えてみると、第5図のごとくなる。 Next, if we consider the penetration resistance of the penetration rod in terms of the relationship between load and vibration, it will be as shown in Figure 5.
この図に見るごとく、加振を行うと、加振時間
Tの経過に従つて、初期の貫入量Mは、大きい
が、その後、徐々に増加し、次第に貫入量Mの増
加率が減少し、一定値に向かう曲線を描く。な
お、前記と同様に、貫入量Mが暫時一定値になる
ところの値は、自重分を支えるのに十分な強度に
達した硬化状態に対応していて、コンクリートが
打ち込まれた時間の経過及び配合状態と関係し、
点線で示すごとく、時間の経過とともに小さくな
る。 As shown in this figure, when vibration is performed, as the vibration time T passes, the initial penetration amount M is large, but then it gradually increases, and the rate of increase in the penetration amount M gradually decreases. Draw a curve that approaches a constant value. As mentioned above, the value at which the penetration amount M becomes a constant value for a while corresponds to the hardening state in which the concrete has reached sufficient strength to support its own weight, and depends on the elapse of time that the concrete is poured and In relation to the blending condition,
As shown by the dotted line, it decreases over time.
次に、貫入棒の貫入抵抗を荷重と打撃回数Nと
の関係で考えみると、第6図のごとくなる。この
図に見るごとく、打撃を行う回数を重ねるにつれ
て貫入量Mは、徐々に増加し、次第に貫入量Mの
増加率が減少し、一定値に向かう曲線を描く。な
お、前記と同様に、貫入量Mが暫時一定値になる
ところの値は、自重分を支えるのに十分な強度に
達した硬化状態に対応していてコンクリートが打
ち込まれた時間の経過及び配合状態と関係し、点
線で示すごとく、時間の経過とともに小さくな
る。 Next, when considering the penetration resistance of the penetration rod in terms of the relationship between the load and the number of strikes N, the result is as shown in FIG. As seen in this figure, the penetration amount M gradually increases as the number of strikes increases, and the rate of increase in the penetration amount M gradually decreases, drawing a curve that approaches a constant value. As mentioned above, the value at which the penetration amount M becomes constant for a while corresponds to the hardening state in which the concrete has reached sufficient strength to support its own weight, and depends on the elapsed time that the concrete was poured and the mix. It is related to the state and decreases over time, as shown by the dotted line.
ここで、各図のグラフの貫入量Mは、貫入抵抗
に対応するものであり、各図のグラフは、貫入抵
抗に読み替えて見ることができる。 Here, the penetration amount M in the graph of each figure corresponds to the penetration resistance, and the graph of each figure can be read as the penetration resistance.
以上の測定結果から打設コンクリートが硬化す
るにつれて貫入抵抗が増加することが判る。そし
て、打設コンクリートが自重分を支えるのに十分
な強度に達した硬度状態になつたときには、貫入
抵抗は、ほぼ一定値に近づくことになる。そこ
で、打設コンクリートの貫入抵抗を測定して、打
設コンクリートの強度の状態を知ることができ
る。その結果、所定の強度状態にある打設コンク
リートの厚さを測定して、滑動型枠を移動するあ
らかじめ定められた目標の厚さと比較して制御す
れば、滑動型枠を実際の強度状態に合わせて適切
な状態で移動することができる。 From the above measurement results, it can be seen that the penetration resistance increases as the poured concrete hardens. When the poured concrete reaches a hardness state that is strong enough to support its own weight, the penetration resistance approaches a substantially constant value. Therefore, by measuring the penetration resistance of the poured concrete, it is possible to know the state of the strength of the poured concrete. As a result, the thickness of the poured concrete at a given strength state can be measured and controlled by comparing it with a predetermined target thickness for moving the sliding formwork to the actual strength state. You can move in an appropriate manner.
以下、この出願の一実施例について図面に基づ
いて説明する。
An embodiment of this application will be described below based on the drawings.
第7図は、この発明を適用した一実施例の滑動
型枠の制御方式の構成図である。 FIG. 7 is a block diagram of a control system for a sliding formwork according to an embodiment to which the present invention is applied.
1は、滑動型枠の制御システムであつて、貫入
棒挿入装置3と、荷重状態検出器4と、駆動制御
信号に応じて所定の駆動電力を貫入棒挿入装置3
に送出する駆動回路5と、貫入棒2の移動量を検
出する移動量検出器6と、制御装置7と、デイス
プレイ8と、キーボード9と、打設コンクリート
11の枠としての滑動型枠10、そして、滑動型
枠移動機構12とを備えていて、貫入棒挿入装置
3は、貫入棒2を備えていて、この貫入棒2に対
して駆動電力に応じて荷重をかける。 1 is a control system for the sliding formwork, which includes a penetrating rod insertion device 3, a load state detector 4, and a predetermined driving power to the penetrating rod insertion device 3 according to a drive control signal.
a drive circuit 5, a movement amount detector 6 for detecting the amount of movement of the penetration rod 2, a control device 7, a display 8, a keyboard 9, a sliding formwork 10 as a frame for the concrete 11, The penetrating rod insertion device 3 includes a sliding formwork moving mechanism 12, and a penetrating rod 2, and applies a load to the penetrating rod 2 according to driving power.
ここで、処理装置7(以下、CPU7)は、い
わゆるマイクロコンピユータによる情報処理装置
であつて、マイクロプロセツサとメモリとインタ
フエース等からなり、荷重制御手段71と貫入深
さ算出手段72とずれ量算出手段73と設定値記
手段74と制御手段75とで構成され、プログラ
ムにてこれらの機能が実現されるものである。 Here, the processing device 7 (hereinafter referred to as CPU 7) is an information processing device using a so-called microcomputer, and is composed of a microprocessor, a memory, an interface, etc., and includes a load control means 71, a penetration depth calculation means 72, and a deviation amount. It is composed of a calculation means 73, a setting value recording means 74, and a control means 75, and these functions are realized by a program.
荷重制御手段71は、駆動回路5に所定の駆動
制御信号を送出し、駆動電力が所定の負荷を発生
する値になつたとにき前記駆動回路5に駆動停止
信号を発生するものであつて、貫入深さ算出手段
72には、移動量検出器6からの信号を受けて、
貫入棒2の挿入抵抗が所定値にある滑動型枠10
の上側を基準とした貫入深さを算出する。また、
ずれ量算出手段73は、滑動型枠10に対して下
側を基準とした所定の硬化状態にあるコンクリー
トの厚さを算出して、算出した厚さとあらかじめ
設定された打設コンクリート11の厚さとの差値
を滑動型枠10のずれ量として算出する。 The load control means 71 sends a predetermined drive control signal to the drive circuit 5, and generates a drive stop signal to the drive circuit 5 when the drive power reaches a value that generates a predetermined load. The penetration depth calculation means 72 receives the signal from the movement amount detector 6, and
A sliding formwork 10 in which the insertion resistance of the penetration rod 2 is at a predetermined value
Calculate the penetration depth based on the upper side of. Also,
The deviation amount calculating means 73 calculates the thickness of concrete in a predetermined hardened state with respect to the lower side of the sliding formwork 10 as a reference, and compares the calculated thickness with the preset thickness of the poured concrete 11. The difference value is calculated as the amount of shift of the sliding formwork 10.
一方、設定値記手段74は、キーボード9から
入力された滑動型枠10の長さKと移動の基準と
なるあれかじめ設定された打設コンクリート11
の所定の硬化状態の厚さとしての目標値Snとを
記憶するものである。そして、制御手段75は、
ずれ量算出手段73から得たずれ量に応じて、滑
動型枠10の下側を基準とした所定の硬化状態に
あるコンクリート11の厚さが目標値Snになる
方向に滑動型枠10が移動するように滑動型枠移
動機構12を制御する。なお、この場合、滑動型
枠移動機構12の移動制御は、このずれ量に応じ
てずれ量がなくなるように滑動型枠10の速度を
増加又は減少するか、所定の位置に滑動型枠10
を移動するかである。 On the other hand, the setting value recording means 74 records the length K of the sliding formwork 10 inputted from the keyboard 9 and the poured concrete 11 set in advance as a reference for movement.
The target value Sn as the thickness of a predetermined cured state is stored. Then, the control means 75
In accordance with the deviation amount obtained from the deviation amount calculation means 73, the sliding formwork 10 moves in a direction in which the thickness of the concrete 11 in a predetermined hardened state with respect to the lower side of the sliding formwork 10 becomes the target value Sn. The sliding formwork moving mechanism 12 is controlled so as to. In this case, the movement control of the sliding formwork moving mechanism 12 increases or decreases the speed of the sliding formwork 10 so that the amount of deviation disappears according to the amount of deviation, or moves the sliding formwork 10 to a predetermined position.
It's up to you to move.
ここで、荷重状態検出器4は、駆動回路5と貫
入棒挿入装置3との間に挿入された電流計4aと
この電流計4aの出力電圧値をデイジタル信号に
変換してCPU7に入力するA/D変換器4bと
を備えている。また、CPU7の荷重制御手段7
1は、前記荷重状態検出器4からの信号を受ける
とともに、キーボード9から測定位置の番号と負
荷荷重値の情報を受け、さらに貫入棒挿入装置3
から貫入棒2の上限位置、下限位置を示す所定の
信号を受ける。そして、貫入深さ算出手段72
は、移動量検出器6からの信号を受け、さらに貫
入棒挿入装置3から貫入棒2の上限位置、下限位
置を示す所定の信号を受けて、算出した貫入深さ
の情報をデイスプレイ8に送出してグラフの形で
各測定位置に対応して表示する。 Here, the load state detector 4 includes an ammeter 4a inserted between the drive circuit 5 and the penetrating rod insertion device 3, and an A that converts the output voltage value of the ammeter 4a into a digital signal and inputs it to the CPU 7. /D converter 4b. In addition, the load control means 7 of the CPU 7
1 receives the signal from the load state detector 4, and also receives the measurement position number and applied load value information from the keyboard 9, and also receives the penetration rod insertion device 3.
A predetermined signal indicating the upper limit position and lower limit position of the penetration rod 2 is received from. Then, the penetration depth calculation means 72
receives a signal from the movement amount detector 6 and further receives a predetermined signal from the penetration rod insertion device 3 indicating the upper limit position and lower limit position of the penetration rod 2, and sends information on the calculated penetration depth to the display 8. and display it corresponding to each measurement position in the form of a graph.
一方、貫入棒挿入装置3は、貫入棒2を収納し
ているほか、荷重負荷機構20と、この荷重負荷
機構20の筐体20aにブラケツト22,22を
介して取付けられた固定アーム21,21とを備
えていて、滑動型枠10の上部に設置される。 On the other hand, the penetration rod insertion device 3 houses the penetration rod 2, and also includes a load loading mechanism 20 and fixed arms 21, 21 attached to a housing 20a of the load loading mechanism 20 via brackets 22, 22. and is installed on the top of the sliding formwork 10.
すなわち、固定アーム21,21の係合部21
a,21aが打設コンクリート11の両壁を形成
する滑動型枠10,10の上端部10a,10a
に装着されて、荷重負荷機構20が着脱できる状
態で固定されるものである。 That is, the engaging portion 21 of the fixed arms 21, 21
a, 21a are the upper ends 10a, 10a of the sliding forms 10, 10 forming both walls of the poured concrete 11;
The load application mechanism 20 is fixed in a removable state.
荷重負荷機構20の筐体20aは、上部が閉塞
された円筒状のものであつて、この筐体20aの
内部には、モータ23と貫入棒2とが収納されて
いるものである。 The housing 20a of the load application mechanism 20 has a cylindrical shape with a closed top, and the motor 23 and the penetration rod 2 are housed inside the housing 20a.
ここで、貫入棒2は、モータ23を正回転、逆
回転することにより筐体2aに対して出し入れさ
れる構成を採る。 Here, the penetrating rod 2 is configured to be moved in and out of the housing 2a by rotating the motor 23 in forward and reverse directions.
すなわち、貫入棒2は、先端部2aが閉塞され
たパイプ状をしていて、筐体20aの下側の先端
部に設けられた軸受部25によりスライド可能に
支持されている。モータ23の軸は、ねじがきら
れたスクリユウ軸24に結合していて、スクリユ
ウ軸24が貫入棒2の内部に嵌入していて、貫入
棒2の後端にある螺合部2bに係合している。そ
の結果、モータ23の回転に応じて貫入棒2が進
退することになる。 That is, the penetrating rod 2 has a pipe shape with a closed end 2a, and is slidably supported by a bearing 25 provided at the lower end of the housing 20a. The shaft of the motor 23 is coupled to a screw shaft 24 which is threaded, and the screw shaft 24 is fitted inside the penetrating rod 2 and engages with a threaded portion 2b at the rear end of the penetrating rod 2. ing. As a result, the penetrating rod 2 moves forward and backward in accordance with the rotation of the motor 23.
また、筐体20aの上側の閉塞部20bには、
貫入棒2の移動量を検出する移動量検出器6が設
置されている。この移動量検出器6は、ロータリ
エンコーダが使用されていて、その軸は、モータ
23の軸に結合されている。 In addition, in the upper closing part 20b of the housing 20a,
A movement amount detector 6 for detecting the movement amount of the penetration rod 2 is installed. This movement amount detector 6 uses a rotary encoder, the shaft of which is coupled to the shaft of the motor 23.
ここで、貫入棒2の移動位置の上限と下限とを
検出するために、筐体20aの内側壁面上下にリ
ミツトスイツチ26,27が設けられていて、リ
ミツトスイツチ26,27は螺合部2bの端部で
押下されて作動する。なお、上限のリミツトスイ
ツチ26は、滑動型枠10,10の上限位置10
a,10aと係合する固定アーム21,21の係
合位置21a,21aの位置に貫入棒2の先端部
2aが一致したときに、作動するように位置付け
られ、この位置で“ON”状態となる。 Here, in order to detect the upper and lower limits of the movement position of the penetrating rod 2, limit switches 26 and 27 are provided above and below the inner wall surface of the housing 20a, and the limit switches 26 and 27 are located at the ends of the threaded portion 2b. It is activated when pressed. Note that the upper limit switch 26 is located at the upper limit position 10 of the sliding formworks 10, 10.
When the tip 2a of the penetrating rod 2 matches the engagement positions 21a, 21a of the fixed arms 21, 21 that engage with the fixed arms 21, 10a, the penetrating rod 2 is positioned to operate, and in this position it is in the "ON" state. Become.
そして、これらリミツトスイツチ26,27か
らの信号は、貫入棒2の上限位置、下限位置の信
号として、CPU7にそれぞれ入力される。 Signals from these limit switches 26 and 27 are input to the CPU 7 as signals for the upper limit position and lower limit position of the penetrating rod 2, respectively.
さて、モータ23への駆動電力は、駆動回路5
から供給され、貫入棒2は、打設コンクリート1
1との関係で所定の荷重が発生する。 Now, the drive power to the motor 23 is supplied to the drive circuit 5.
The penetrating rod 2 is supplied from the poured concrete 1
A predetermined load is generated in relation to 1.
次に、打設コンクリート11に対する貫入制御
と滑動型枠10の移動量の制御について説明す
る。 Next, control of penetration into the poured concrete 11 and control of the amount of movement of the sliding formwork 10 will be explained.
まず、第7図に見る、キーボード9における所
定の機能キーを入力て、滑動型枠10の長さKと
して、例えば、120cmと滑動型枠10の下限から
の制御目標値Sn(所定の硬化状態にある打設コン
クリート11のあらかじめ設定した厚さ)とし
て、例えば、40cmを入力する。次に、打設コンク
リート11に対する打ち込み時間及び配合状態に
対応して打設コンクリート11が自重分を支える
のに十分な強度に達した硬度に対応する状態を示
す限界値P1(第4図参照)以上の荷重値を示す数
値Ps〔Kg〕を入力する。そして、貫入棒2がセツ
トされた打設コンクリート11に対する測定点の
情報を入力する。ただし、前記荷重Psは、所定
の状態に硬化した打設コンクリートの層が破壊す
る荷重P2を越えないものとする。なお、これら
の値は、あらかじめ試験により求めたものであ
る。 First, input a predetermined function key on the keyboard 9 shown in FIG. For example, input 40 cm as the preset thickness of the poured concrete 11 at . Next, a limit value P 1 is determined corresponding to the hardness at which the poured concrete 11 has reached sufficient strength to support its own weight, depending on the pouring time and mixing conditions for the poured concrete 11 (see Figure 4). ) Enter the numerical value Ps [Kg] that indicates a load value greater than or equal to ). Then, information on measurement points for the poured concrete 11 in which the penetration rod 2 is set is input. However, the load Ps shall not exceed the load P2 at which the layer of poured concrete that has hardened to a predetermined state will break. Note that these values were determined in advance through tests.
このキーボード9からのこれらの入力情報の
内、滑動型枠10の長さ120cmと目標値40cmとは、
CPU7の設定値記憶手段74に送出されて記憶
される。また、これ以外の入力情報は、CPU7
の荷重制御手段71に入力される。CPU7の荷
重制御手段71がこの入力情報を受けると、測定
点についての情報をメモリの所定領域に記憶する
とともに、この荷重Psから貫入棒挿入装置3の
モータ23が荷重Psを発生する対応の電流値Is
(目標電流値)を算出し、これを同様にメモリに
記憶する。そして、駆動回路5に駆動制御信号
(起動信号+正方向回転信号)を送出する。この
駆動制御信号を受けた駆動回路5は、モータ23
を正方向回転して貫入棒2を打設コンクリート1
1に対して挿入する所定の電力をモータ23に供
給する。 Among the input information from the keyboard 9, the length of the sliding formwork 10 is 120 cm and the target value is 40 cm.
It is sent to the setting value storage means 74 of the CPU 7 and stored therein. In addition, input information other than this is provided by CPU 7.
is input to the load control means 71 of. When the load control means 71 of the CPU 7 receives this input information, it stores information about the measurement point in a predetermined area of the memory, and from this load Ps, the motor 23 of the penetrating rod insertion device 3 generates a corresponding current to generate the load Ps. valueIs
(target current value) and similarly stores it in the memory. Then, a drive control signal (starting signal + forward rotation signal) is sent to the drive circuit 5. The drive circuit 5 receiving this drive control signal controls the motor 23
Rotate in the forward direction and pour the penetration rod 2 into the concrete 1.
A predetermined power to be inserted into the motor 23 is supplied to the motor 23.
その結果、モータ23が正回転駆動され、スク
リユウ軸24が正回転されて、貫入棒2が打設コ
ンクリート11の表面に向かつて前進する。この
モータ23の回転に応じて、ロータリーエンコー
ダで構成される移動量検出器6からCPU7には
モータ23の回転量に応じた信号が送出される。 As a result, the motor 23 is driven to rotate in the forward direction, the screw shaft 24 is rotated in the forward direction, and the penetrating rod 2 moves forward toward the surface of the poured concrete 11. In accordance with the rotation of the motor 23, a signal corresponding to the rotation amount of the motor 23 is sent from a movement amount detector 6 composed of a rotary encoder to the CPU 7.
貫入棒2が前進して、基準位置10cに一致し
た時点で、リミツトスイツチ26が“ON”状態
となり、この信号がCPU7に入力されると、こ
のリミツトスイツチ26から“ON”状態信号を
貫入深さ算出手段72が受け、この時点で、貫入
深さ算出手段72が移動量検出器6からの信号を
カンウトして基準位置10cからの貫入深さを算
出する。そして、貫入深さ算出手段72は、キー
ボード9から入力された測定位置に対応する情報
を荷重制御手段71から受けて、これとこの算出
結果とをデイスプレイ装置8に送出する。 When the penetration rod 2 moves forward and matches the reference position 10c, the limit switch 26 becomes "ON", and when this signal is input to the CPU 7, the "ON" state signal from the limit switch 26 is used to calculate the penetration depth. At this point, the penetration depth calculation means 72 counts the signal from the movement amount detector 6 and calculates the penetration depth from the reference position 10c. Then, the penetration depth calculation means 72 receives information corresponding to the measurement position input from the keyboard 9 from the load control means 71, and sends this and the calculation result to the display device 8.
デイスプレイ装置8は、測定位置に対応する情
報からこれに対応する棒グラフに、算出結果に応
じた貫入棒2の滑動型枠10の上限の基準位置1
0cからの深さを表示して行く。なお、この場
合、貫入深さ算出手段72は、打設コンクリート
11の表面からの深さに換算して算出し、デイス
プレイ装置8は、打設コンクリート11の表面か
らの深さを表示するようにしてもよい。このよう
にする場合には、あらかじめ、滑動型枠10の基
準位置10cから打設コンクリート11の表面ま
での位置を測定して、これをCPU7に入力して
おくことになる。 The display device 8 displays the reference position 1 of the upper limit of the sliding formwork 10 of the penetration rod 2 according to the calculation result on the bar graph corresponding to the information corresponding to the measurement position.
The depth from 0c is displayed. In this case, the penetration depth calculating means 72 calculates the depth by converting it into the depth from the surface of the poured concrete 11, and the display device 8 is configured to display the depth from the surface of the poured concrete 11. It's okay. In this case, the position from the reference position 10c of the sliding formwork 10 to the surface of the poured concrete 11 is measured in advance and inputted into the CPU 7.
一方、荷重制御手段71は、モータ23の始動
後、一定時間後(定常運転状態に入つた後)、荷
重状態検出器4からの信号を受付て、駆動回路5
の電流値Iを、前記メモリに記憶した目標電流値
Isと比較して、この判定の結果、I<Isであれば
駆動制御を継続し、I≧Isになつたとき、駆動停
止信号を駆動回路5に送出して、貫入棒2の挿入
動作を停止する。 On the other hand, the load control means 71 receives a signal from the load state detector 4 after a certain period of time after starting the motor 23 (after entering the steady operation state), and the drive circuit 5
The current value I of is the target current value stored in the memory.
As a result of this determination, if I<Is, drive control is continued, and when I≧Is, a drive stop signal is sent to the drive circuit 5 to stop the insertion operation of the penetrating rod 2. Stop.
このようにして貫入棒2は、打設コンクリート
11に挿入されて行くことになり、このとき貫入
棒2には打設コンクリート11の硬化状態に応じ
てモータ23により負荷がかけられ、その負荷に
応じてモータ23が回転する。そして、駆動回路
5から送出された駆動電流値が設定値Isになつた
時点で、その負荷が荷重Psとなり、CPU7の荷
重制御手段71から駆動停止信号が送出されて、
駆動回路の出力が停止して、モータ23の回転が
停止する。このとき同時に、貫入深さ算出手段7
2に動作停止信号が供給されて、その算出処理が
停止することになる。 In this way, the penetration rod 2 is inserted into the poured concrete 11, and at this time, a load is applied to the penetration rod 2 by the motor 23 according to the hardening state of the poured concrete 11, and the load is The motor 23 rotates accordingly. Then, when the drive current value sent out from the drive circuit 5 reaches the set value Is, the load becomes the load Ps, and a drive stop signal is sent out from the load control means 71 of the CPU 7.
The output of the drive circuit is stopped, and the rotation of the motor 23 is stopped. At this time, at the same time, the penetration depth calculation means 7
2 is supplied with an operation stop signal, and the calculation process is stopped.
その結果、設定した荷重Psに対応する強度を
持つた状態にある打設コンクリート11の層のと
ころの深さがデイスプレイ装置8により表示さ
れ、測定されることになる。 As a result, the display device 8 displays and measures the depth of the layer of poured concrete 11 that has a strength corresponding to the set load Ps.
ここで、貫入深さ算出手段72が動作停止信号
を受けた時点で、貫入深さ算出手段72は、ずれ
量算出手段73に貫入深さについての算出結果の
情報(貫入深さS)を送出する。ずれ量算出手段
73は、設定数値記憶手段74に記憶されている
滑動型枠10の長さK(=120cm)と目標値Sn(=
40cm)を読出して、算出された貫入深さSとか
ら、まず、滑動型枠10の下限位置からの長さ
Skを、
Sk=K−S
として算出(Sk=80cm)し、次に、目標値Snか
らの差値Qを、
Q=Sn−Sk
として算出する(算出結果には、正負の符号を含
む)。 Here, when the penetration depth calculation means 72 receives the operation stop signal, the penetration depth calculation means 72 sends information on the calculation result regarding the penetration depth (penetration depth S) to the deviation amount calculation means 73. do. The deviation amount calculation means 73 calculates the length K (=120 cm) of the sliding formwork 10 stored in the set numerical value storage means 74 and the target value Sn (=
40cm), and from the calculated penetration depth S, first calculate the length from the lower limit position of the sliding formwork 10.
Calculate Sk as Sk=K-S (Sk=80cm), then calculate the difference Q from the target value Sn as Q=Sn-Sk (calculation results include positive and negative signs) .
そして、この算出値を制御手段75へ滑動型枠
10のずれ量として送出する。制御手段75は、
このずれ量の情報Qを受けて、このずれ量Qがな
くなる方向に滑動型枠10を移動する制御信号を
滑動型枠移動機構12に送出する。その結果、こ
のずれ量に応じて、滑動型枠10の下限から見て
所定の硬化状態にある打設コンクリートの厚さが
目標値Snに維持されるようにこの滑動型枠10
が滑動型枠移動機構12により所定の速度に変更
されるか又は所定の位置に移動されることにな
る。 Then, this calculated value is sent to the control means 75 as the amount of deviation of the sliding formwork 10. The control means 75 is
Upon receiving the information Q on the amount of deviation, a control signal is sent to the sliding form moving mechanism 12 to move the sliding form 10 in a direction in which this amount of deviation Q disappears. As a result, the sliding formwork 10 is adjusted according to the amount of deviation so that the thickness of the poured concrete in a predetermined hardened state when viewed from the lower limit of the sliding formwork 10 is maintained at the target value Sn.
is changed to a predetermined speed or moved to a predetermined position by the sliding formwork moving mechanism 12.
具体的には、滑動型枠10に対して設定した目
標値より上まで打設コンクリートの硬化状態が進
行しているときには、滑動型枠10は所定の基準
速度より速くされて、それが目標値より下となつ
ているときには、滑動型枠10は所定の基準速度
より遅くされる。この場合の滑動型枠10の速度
の増減量は、前記差値Q(ずれ量)の関数として、
この値に対応して増減される。 Specifically, when the hardening state of the poured concrete has progressed to a level higher than the target value set for the sliding formwork 10, the sliding formwork 10 is made faster than a predetermined reference speed, and the speed reaches the target value. When it is lower, the sliding formwork 10 is made slower than the predetermined reference speed. In this case, the increase/decrease in the speed of the sliding formwork 10 is as a function of the difference value Q (shift amount).
It is increased or decreased according to this value.
また、位置で管理する場合には、硬化状態の厚
さが目標値になるような位置に滑動型枠10の下
限が位置する位置まで、滑動型枠10が上又は下
に移動される。 Moreover, when managing by position, the sliding formwork 10 is moved upward or downward to a position where the lower limit of the sliding formwork 10 is located at a position where the thickness of the cured state becomes the target value.
なお、この場合の滑動型枠10の移動は、測定
点1つの差値Qによることなく、複数の測定点を
採つて、これらの平均値を採つて、この平均値を
ずれ量として採用して、この平均値に応じて滑動
型枠10の移動を制御してもよい。そして、この
ようなシステムによる滑動型枠10の制御は、速
度や位置に応じて、所定の期間をおいて定期的に
制御される。 In addition, the movement of the sliding formwork 10 in this case is not based on the difference value Q of one measurement point, but by taking a plurality of measurement points, taking the average value of these, and using this average value as the amount of deviation. , the movement of the sliding formwork 10 may be controlled according to this average value. The sliding formwork 10 is controlled by such a system periodically at predetermined intervals depending on the speed and position.
ところで、貫入棒2が所定の硬化状態のところ
まで挿入されて、その挿入の停止処理をした後に
は、荷重制御手段71は、この停止処理から一定
時間後に、駆動回路5に対し貫入棒2の引抜き駆
動制御信号(起動信号+逆方向回転信号)を送出
して、貫入棒2を打設コンクリート11から抜き
取る。この制御は、リミツトスイツチ26が
“ON”状態になるまで行われ、荷重制御手段7
1がリミツトスイツチ26の“ON”状態信号を
受けた時点(又はその後一定の時間の後)に、駆
動停止信号を送出してその動作を停止する。ここ
で、貫入深さ算出手段72の算出値、設定値Ps
等は、リセツトされて初期状態となるが、デイス
プレイ装置8の表示は、キーボード9からリセツ
ト信号が入力されるまで、表示状態が保持され
る。 By the way, after the penetration rod 2 has been inserted to a predetermined hardened state and the insertion is stopped, the load control means 71 causes the drive circuit 5 to control the penetration rod 2 after a certain period of time after the insertion is stopped. A pullout drive control signal (starting signal + reverse rotation signal) is sent out to pull out the penetrating rod 2 from the poured concrete 11. This control is performed until the limit switch 26 is in the "ON" state, and the load control means 7
1 receives the "ON" state signal from the limit switch 26 (or after a certain period of time), it sends out a drive stop signal and stops its operation. Here, the calculated value of the penetration depth calculating means 72, the set value Ps
etc. are reset to the initial state, but the display on the display device 8 remains in its display state until a reset signal is input from the keyboard 9.
なお、貫入棒2の挿入量が下限値に至つたとき
には、リミツトスイツチ27からCPU7に信号
が送出されて、荷重制御手段71及び貫入深さ算
出手段72がこの信号を受け、同様に、駆動停止
信号が駆動回路5に送出され、動作停止信号が貫
入深さ算出手段72に出されて、その後、引抜き
駆動制御信号が送出されて、貫入棒2が上限に至
つたときに停止する。また、貫入棒2を引抜き駆
動する処理を行つている間は、貫入深さ算出手段
72は動作しない。 Note that when the insertion amount of the penetration rod 2 reaches the lower limit value, a signal is sent from the limit switch 27 to the CPU 7, and the load control means 71 and the penetration depth calculation means 72 receive this signal and similarly issue a drive stop signal. is sent to the drive circuit 5, an operation stop signal is sent to the penetration depth calculation means 72, and then a pull-out drive control signal is sent to stop the penetration rod 2 when it reaches the upper limit. Moreover, while the process of pulling out and driving the penetration rod 2 is being performed, the penetration depth calculation means 72 does not operate.
このようにして設定荷重Psに応じた打設コン
クリートの深さが測定され、滑動型枠10が制御
される。ここで、設定荷重Psは貫入棒2にかけ
る最大値を意味するものであり、これは打設コン
クリート11の貫入抵抗に対応して設定されるも
のである。しかも、この貫入抵抗は打設コンクリ
ート11の強度に対応している。そこで、CPU
7のメモリに強度から電流値Isを求める変換テー
ブル又は変換式を記憶して置けば、荷重Psを設
定することなく同様な処理ができるものである。 In this way, the depth of poured concrete according to the set load Ps is measured, and the sliding formwork 10 is controlled. Here, the set load Ps means the maximum value to be applied to the penetration rod 2, and this is set in accordance with the penetration resistance of the poured concrete 11. Moreover, this penetration resistance corresponds to the strength of the poured concrete 11. Therefore, the CPU
If a conversion table or conversion formula for determining the current value Is from the intensity is stored in the memory of 7, similar processing can be performed without setting the load Ps.
なお、設定荷重Psから対応する電流値Isを求め
る場合には、変換式によつてもよく、また、対応
する変換データを記憶した記憶テーブルを参照し
て行つてもよい。 Note that when calculating the corresponding current value Is from the set load Ps, a conversion formula may be used or a storage table storing corresponding conversion data may be referred to.
次に打設コンクリート11に対して測定場所を
換えて、1個所乃至複数個所に対して同様な測定
がなされ、各測定結果が表示される。そして、そ
れに対応する滑動型枠が同様に制御されてその測
定点に応じた滑動型枠が移動されることになる。 Next, the measurement location for the poured concrete 11 is changed, and similar measurements are made at one or more locations, and each measurement result is displayed. Then, the corresponding sliding formwork is controlled in the same way, and the sliding formwork corresponding to that measurement point is moved.
このようにして、各測定点に応じて打設コンク
リートの強度状態に応じて滑動型枠を制御して行
くものである。 In this way, the sliding formwork is controlled according to the strength state of the poured concrete at each measurement point.
第8図A,Bは、第7図の実施例において、貫
入抵抗を自重を支えるのに十分な強度を持つよう
な荷重値に設定して、打設コンクリート13にお
ける測定点A,B,C,Dの4個所を測定した場
合の測定状態の説明図と、デイスプレイ装置8の
表示状態を打設コンクリート11の貫入深さMと
の関係としてグラフで示したものである。 Figures 8A and 8B show measurement points A, B, and C in the poured concrete 13 in the embodiment shown in Figure 7, with the penetration resistance set to a load value that has sufficient strength to support its own weight. , D, and a graph showing the display state of the display device 8 in relation to the penetration depth M of the poured concrete 11.
なお、図中、14は、滑動型枠の制御システム
におけるCPU7とデイスプレイ装置8と駆動回
路5等からなる本体部分を示すものである。 In the figure, reference numeral 14 indicates a main body portion including a CPU 7, a display device 8, a drive circuit 5, etc. in the sliding formwork control system.
第8図A,Bに示すように、任意の個所の打設
コンクリートの強度状態を知ることができ、その
結果に応じて、対応して滑動型枠10を制御し
て、順次作業を進めることができる。 As shown in FIGS. 8A and 8B, the strength state of poured concrete at any location can be known, and the sliding formwork 10 can be controlled in accordance with the results to proceed with the work in sequence. Can be done.
ところで、この実施例では、目標値を一定値に
設定しているが、例えば、40cm±10cmというよう
にこれを一定の範囲として設定してもよい。ま
た、実施例では、貫入棒2にかかる荷重を検出
し、設定荷重状態か否かを検出しているが、第4
図に見るごとく、自重を支えるのに必要な強度を
発現する硬化状態にある打設コンクリートにあつ
ては、荷重がP1以上で、かつ、打設コンクリー
トの硬化状態を破壊しない範囲(荷重P2以下)
では、その貫入深さは、ほぼ一定になる。そこ
で、貫入棒2に前記の範囲の設定荷重がかかる程
度に、あらかじめ貫入棒挿入装置3のモータ23
に所定の駆動電力を供給しておけば、前記荷重状
態検出器4は、不必要なものとなり、貫入棒2
は、自動的に自重を支えるのに必要な所定の強度
を持つ貫入深さの位置で留まることになる。 By the way, in this embodiment, the target value is set to a constant value, but it may be set as a constant range, for example, 40 cm±10 cm. In addition, in the embodiment, the load applied to the penetration rod 2 is detected and whether or not the set load state is detected.
As shown in the figure, for poured concrete in a hardened state that exhibits the strength necessary to support its own weight, the load must be P 1 or more and within the range that does not destroy the hardened state of the poured concrete (load P 2 or less)
Then, the penetration depth becomes almost constant. Therefore, the motor 23 of the penetrating rod insertion device 3 is adjusted in advance to the extent that the set load in the above range is applied to the penetrating rod 2.
If a predetermined driving power is supplied to the penetrating rod 2, the load state detector 4 becomes unnecessary.
will automatically remain at a penetration depth that has the required strength to support its own weight.
次に、この滑動型枠制御システムの他の実施例
について説明する。 Next, another embodiment of this sliding formwork control system will be described.
この実施例は、荷重をもつて、貫入抵抗を測定
する手段を前記実施例における貫入棒2に付加す
るものである。したがつて、駆動電流の電流値Is
により、停止信号を発生することなく、直接、貫
入棒2の荷重を測定して、貫入棒2の挿入を停止
するようにする。 In this embodiment, means for applying a load and measuring penetration resistance is added to the penetration rod 2 in the previous embodiment. Therefore, the current value Is of the drive current
Accordingly, the load on the penetrating rod 2 is directly measured without generating a stop signal, and the insertion of the penetrating rod 2 is stopped.
すなわち、その具体的な構成は、貫入棒2の螺
合部2bの下部、表面付近にひずみゲージ(又は
ロードセル)を接着してその部分のひずみを電気
量に変換してこれを貫入棒2の荷重対応値として
検出する。そして、この電気量をA/D変換器を
介してCPU7に入力する。CPU7の荷重制御手
段71は、ひずみゲージからの信号を検出荷重P
に変換して、設定荷重Psと比較する。この比較
の結果、検出荷重P〔Kg〕<設定荷重Ps〔Kg〕のと
きには、モータ23は駆動され続けて貫入棒2へ
の荷重が続けられる。そして、検出荷重P≧設定
荷重Psになつたとき、CPU7の荷重制御手段7
1がこの信号を受け、駆動回路5に駆動停止信号
が出されて、貫入深さ算出手段72により算出さ
れた、貫入棒2の深さがデイスプレイ装置8上に
表示される。そして、このとき算出された結果に
応じて、ずれ量算出手段73により、ずれ量が算
出されて、制御手段75が動作し、滑動型枠10
が滑動型枠移動機構12により制御される。一
方、貫入棒挿入装置3には、その後、引抜き駆動
制御信号が送出されて、貫入棒2が上限に至つた
ときに停止する。 That is, the specific configuration is that a strain gauge (or load cell) is attached to the lower part of the threaded part 2b of the penetrating rod 2, near the surface, and the strain in that part is converted into an electric quantity, which is then transferred to the penetrating rod 2. Detected as a load corresponding value. This amount of electricity is then input to the CPU 7 via the A/D converter. The load control means 71 of the CPU 7 detects the load P by the signal from the strain gauge.
and compare it with the set load Ps. As a result of this comparison, when the detected load P [Kg]<the set load Ps [Kg], the motor 23 continues to be driven and the load on the penetration rod 2 continues. Then, when the detected load P≧set load Ps, the load control means 7 of the CPU 7
1 receives this signal, a drive stop signal is issued to the drive circuit 5, and the depth of the penetration rod 2 calculated by the penetration depth calculation means 72 is displayed on the display device 8. Then, in accordance with the result calculated at this time, the deviation amount calculation means 73 calculates the deviation amount, and the control means 75 operates, so that the sliding formwork 10
is controlled by the sliding formwork moving mechanism 12. On the other hand, a pull-out drive control signal is then sent to the penetrating rod insertion device 3, and the penetrating rod 2 stops when it reaches the upper limit.
このようにして、ひずみゲージを貫入棒2に設
置して、直接求める荷重Psで貫入棒2の挿入を
停止することができる。 In this way, by installing a strain gauge on the penetrating rod 2, it is possible to stop the insertion of the penetrating rod 2 at the directly determined load Ps.
次に、貫入棒2に荷重を懸けるとともに振動を
与える他の実施例について説明する。 Next, another embodiment in which a load is applied to the penetration rod 2 and vibration is applied will be described.
第9図は、この発明を適用した滑動型枠の制御
システムの他の一実施例の構成図であり、第7図
との相違は、振動を与える機構を付加し、貫入棒
2に加速度計を設けて、加速度を検出することを
もつて貫入抵抗を測定して、打設コンクリート1
1の強度状態を検出することと滑動型枠10が手
動で制御されることである。なお、第7図と同一
のものは同一の符号で示す。 FIG. 9 is a block diagram of another embodiment of the sliding formwork control system to which the present invention is applied. is installed, the penetration resistance is measured by detecting the acceleration, and the poured concrete 1
1 strength state and the sliding formwork 10 is manually controlled. Components that are the same as those in FIG. 7 are designated by the same reference numerals.
ここで、CPU70は、第7図におけるCPU7
に対応するものであるが、手動制御の関係で、ず
れ量算出手段73と設定値記憶手段74とがな
く、滑動型枠10のずれ量は、オペレータがデイ
スプレイ8上の表示状態を参照して把握する。そ
して、このずれ量をキーボード9から入力して滑
動型枠10を移動するものである。そこで、制御
手段75は、キーボード9からの信号で直接制御
される。そして、デイスプレイ8には、目標とな
る滑動型枠10に対する深さがあらかじめ目標深
さの値8aとして表示されている。 Here, the CPU 70 is the CPU 7 in FIG.
However, due to manual control, there is no deviation amount calculation means 73 and set value storage means 74, and the deviation amount of the sliding formwork 10 is determined by the operator by referring to the display state on the display 8. grasp. Then, the sliding formwork 10 is moved by inputting this shift amount from the keyboard 9. Therefore, the control means 75 is directly controlled by signals from the keyboard 9. The target depth for the sliding formwork 10 is displayed in advance on the display 8 as a target depth value 8a.
なお、この目標深さの値8aの表示は、貫入深
さ算出手段72がキーボード9からの入力信号を
受けてなされるもので、目標深さの値8aは、滑
動型枠10の長さK(その下限)から目標値Snを
引いた値(その上限側からの値)として換算され
たものである。 Note that the target depth value 8a is displayed by the penetration depth calculating means 72 in response to an input signal from the keyboard 9, and the target depth value 8a is determined by the length K of the sliding formwork 10. (the lower limit) minus the target value Sn (the value from the upper limit).
ここで、30は、加振機構であつて、貫入棒2
に振動を加えるものである。この加振機構30
は、貫入棒2の螺合部2bと貫入棒2の外周固定
部材31とをばね32を介して接合し、外周固定
部材31のさらに外側に振動発生装置33を設置
する構成を採り、このことにより、貫入棒2を加
振しながら挿入するというものである。 Here, 30 is a vibration mechanism, and the penetrating rod 2
It adds vibration to the This vibration mechanism 30
adopts a configuration in which the threaded portion 2b of the penetrating rod 2 and the outer peripheral fixing member 31 of the penetrating rod 2 are joined via a spring 32, and a vibration generator 33 is installed further outside the outer peripheral fixing member 31. Accordingly, the penetration rod 2 is inserted while being vibrated.
一方、34は、加速度計であつて、第10図に
見るごとく、先端に重り35を有するアーム36
にひずみゲージ37が設けられていて、アーム3
6がブラケツト38を介して貫入棒2に固定され
ている。そして、このひずみゲージ37によりア
ーム36の上下振動によるひずみを加速度として
検出する。したがつて、加速度が大きにときに
は、振幅の大きな正弦波信号が発生し、加速度が
小さいときには、振幅の小さな正弦波信号が発生
する。この検出信号は、A/D変換器12を介し
てCPU7の荷重制御手段71に入力される。 On the other hand, 34 is an accelerometer, and as shown in FIG. 10, an arm 36 has a weight 35 at its tip.
A strain gauge 37 is provided on the arm 3.
6 is fixed to the penetrating rod 2 via a bracket 38. The strain gauge 37 detects the strain caused by the vertical vibration of the arm 36 as acceleration. Therefore, when the acceleration is large, a sine wave signal with a large amplitude is generated, and when the acceleration is small, a sine wave signal with a small amplitude is generated. This detection signal is input to the load control means 71 of the CPU 7 via the A/D converter 12.
ところで、この実施例では、設定荷重Psに代
えて、設定加速度αと測定点の情報とをキーボー
ド9から入力することになる。 By the way, in this embodiment, instead of the set load Ps, the set acceleration α and information on the measurement point are input from the keyboard 9.
そして、これらの入力情報は、荷重制御手段7
1に受付られて、設定加速度αは、対応する設定
振幅電圧値Vαに変換され、それぞれメモリに記
憶される。次に、荷重制御手段71から駆動回路
5に駆動信号が出力され、貫入棒2に荷重が加え
られるとともに、振動発生装置32に駆動信号が
送出されて貫入棒2が加振される。 These input information are then transmitted to the load control means 7.
1, the set acceleration α is converted into a corresponding set amplitude voltage value Vα, and each is stored in the memory. Next, a drive signal is outputted from the load control means 71 to the drive circuit 5 to apply a load to the penetrating rod 2, and a driving signal is sent to the vibration generator 32 to vibrate the penetrating rod 2.
このとき、加速度計34からの信号をA/D変
換器12によりA/D変換して荷重制御手段71
が受けて、その振幅値を判定して、得た検出電圧
の振幅値Vと設定加速度αに対応する設定電圧の
振幅値Vαとを比較する。 At this time, the signal from the accelerometer 34 is A/D converted by the A/D converter 12 and the load control means 71
is received, its amplitude value is determined, and the obtained amplitude value V of the detected voltage is compared with the amplitude value Vα of the set voltage corresponding to the set acceleration α.
この比較の結果、検出電圧振幅値V>設定電圧
振幅値Vαのときには、モータ23は駆動され続
けて貫入棒2への荷重が続けられ、かつ、加振が
続けられる。そして、検出電圧振幅値V≦設定電
圧振幅値Vαになつたとき、CPU7の荷重制御手
段71が、駆動回路5及び振動発生装置33に駆
動停止信号が出されて、貫入深さ算出手段72に
より算出された、貫入棒2の深さがデイスプレイ
装置8上に表示される。そして、その後、引抜き
駆動制御信号が送出されて、貫入棒2が上限に至
つたときに停止する。 As a result of this comparison, when the detected voltage amplitude value V>the set voltage amplitude value Vα, the motor 23 continues to be driven, the load on the penetration rod 2 continues, and the vibration continues. Then, when the detected voltage amplitude value V≦the set voltage amplitude value Vα, the load control means 71 of the CPU 7 issues a drive stop signal to the drive circuit 5 and the vibration generator 33, and the penetration depth calculation means 72 The calculated depth of the penetration rod 2 is displayed on the display device 8. Thereafter, a withdrawal drive control signal is sent out, and the penetrating rod 2 is stopped when it reaches the upper limit.
さて、デイスプレイ8には、あらかじめ目標深
さ8aが表示されているので、表示された貫入棒
2の深さとの差値をオペレータは、読み取ること
ができる。そこで、オペレータは、キーボード9
上の滑動型枠10を制御する機能キーを入力した
後、この読み取つた差値をその符号とともにキー
ボード9から入力する。 Now, since the target depth 8a is displayed in advance on the display 8, the operator can read the difference value from the displayed depth of the penetration rod 2. Therefore, the operator uses the keyboard 9
After inputting the function key for controlling the upper sliding formwork 10, the read difference value and its sign are inputted from the keyboard 9.
この入力信号は、制御手段75に入力されて、
前述の第7図の場合と同様に、制御手段75がこ
れを滑動型枠10のずれ量として受け付け、貫入
棒2の貫入深さが滑動型枠10の上限から見て目
標深さに一致するように滑動型枠10の速度(又
は位置)をこの入力されたずれ量が生じない方向
に制御信号を滑動型枠移動機構12に送出する。
その結果、先の実施例と同様に、このずれ量に応
じて、滑動型枠10の下限から見て所定の硬化状
態にある打設コンクリートの厚さが目標値Snに
なるようにこの滑動型枠10が滑動型枠移動機構
12により所定の速度移動されるか又は所定の位
置に移動されることになる。 This input signal is input to the control means 75, and
As in the case of FIG. 7 described above, the control means 75 accepts this as the amount of deviation of the sliding formwork 10, and the penetration depth of the penetration rod 2 matches the target depth when viewed from the upper limit of the sliding formwork 10. A control signal is sent to the sliding form moving mechanism 12 so that the speed (or position) of the sliding form 10 is controlled in a direction in which the input deviation amount does not occur.
As a result, as in the previous embodiment, the sliding mold is adjusted so that the thickness of the poured concrete in a predetermined hardened state as viewed from the lower limit of the sliding formwork 10 becomes the target value Sn, according to the amount of deviation. The frame 10 is moved at a predetermined speed or to a predetermined position by the sliding formwork moving mechanism 12.
このようにして、貫入棒2の挿入時の加速度を
検出して、もつて、貫入抵抗を測定して、打設コ
ンクリート11の硬化状態が自重を支えるのに十
分な強度を持つ硬化状態にある深さを測定でき、
この測定した貫入棒2の深さに応じて、滑動型枠
10を目標の深さになる移動方向に制御し、もつ
て、滑動型枠10の下限から見て所定の硬化状態
にある打設コンクリートの厚さが目標値Snにな
るよう滑動型枠10を移動することができる。 In this way, the acceleration at the time of insertion of the penetration rod 2 is detected, and the penetration resistance is then measured, and it is determined that the hardened state of the poured concrete 11 has sufficient strength to support its own weight. Depth can be measured,
In accordance with the measured depth of the penetration rod 2, the sliding formwork 10 is controlled in the moving direction to reach the target depth, and as a result, the concrete is placed in a predetermined hardened state when viewed from the lower limit of the sliding formwork 10. The sliding formwork 10 can be moved so that the concrete thickness reaches the target value Sn.
なお、貫入棒2の滑動型枠10に対する貫入深
さの測定は、第5図に見るごとく、貫入棒2の貫
入量は、加振時間〔min〕により管理できるの
で、打設コンクリート11の状態に応じた特性グ
ラフから所定の加振時間を選択して、CPU7の
メモリにこの加振時間を設定加振時間として記憶
し、貫入棒2に対する加振時間をカウントして、
加振時間が設定加振時間となつた時点の貫入棒2
の深さを測定して滑動型枠10を制御するように
してもよい。 In addition, when measuring the penetration depth of the penetration rod 2 into the sliding formwork 10, as shown in FIG. 5, the penetration depth of the penetration rod 2 can be controlled by the vibration time [min], so Select a predetermined excitation time from the characteristic graph corresponding to , store this excitation time in the memory of the CPU 7 as the set excitation time, count the excitation time for the penetration rod 2,
Penetration rod 2 when the excitation time reaches the set excitation time
The sliding formwork 10 may also be controlled by measuring the depth.
同様に、第4図に見るごとく、貫入棒2の貫入
量は、打撃回数により管理できるので、打設コン
クリート11の状態に応じた特性グラフから所定
の打撃回数を選択して、貫入棒挿入装置3のモー
タ23に換えて、貫入棒2の上部に打撃機構を配
置して、貫入棒2を設定荷重Pk〔Kg〕にて打撃す
ることにより、貫入棒2を打設コンクリート11
に挿入し、貫入棒2に対する打撃回数をカウント
して、打撃回数が設定打撃回数となつた時点の貫
入棒2の深さを測定して、滑動型枠10を制御し
てもよい。 Similarly, as shown in FIG. 4, the penetration amount of the penetration rod 2 can be controlled by the number of blows, so a predetermined number of blows is selected from the characteristic graph corresponding to the condition of the poured concrete 11, and the penetration rod insertion device In place of the motor 23 of No. 3, a striking mechanism is placed on the top of the penetration rod 2, and the penetration rod 2 is struck by a set load Pk [Kg], thereby causing the penetration rod 2 to move into the poured concrete 11.
The sliding formwork 10 may be controlled by inserting the penetrating rod 2 into the penetrating rod 2, counting the number of strikes against the penetrating bar 2, and measuring the depth of the penetrating bar 2 when the number of strikes reaches a set number of strikes.
また、各実施例のCPU7における荷重制御手
段71は、設定荷重Psが貫入棒2に負荷されて
いるか、加速度が設定加速度に対応する振幅値
Vαになつたか否か、加振時間Tが設定時間とな
つたか否か、打撃回数が設定回数となつたか否
か、等をそれぞれ判定する判定手段の機能を果た
していて、これらは、等価的に貫入抵抗が所定値
であるか否かを判定することにほかならない。 In addition, the load control means 71 in the CPU 7 of each embodiment determines whether the set load Ps is applied to the penetration rod 2 or whether the acceleration has an amplitude value corresponding to the set acceleration.
It functions as a determination means for determining whether Vα has been reached, whether the excitation time T has reached the set time, whether the number of strikes has reached the set number, etc., and these functions are equivalently This is nothing more than determining whether the penetration resistance is at a predetermined value.
以上説明してきたが、この発明における荷重手
段は、実施例では、貫入棒挿入装置3と駆動回路
5とCPU7とにより構成されていて、貫入量測
定手段は、移動量検出器6とCPU7とデイスプ
レイ装置8とにより構成されているが、このよう
な構成に限定されないことはもちろんである。 As explained above, the loading means in this invention is composed of the penetration rod insertion device 3, the drive circuit 5, and the CPU 7 in the embodiment, and the penetration amount measuring means is composed of the movement amount detector 6, the CPU 7, and the display. Although the device 8 is configured by the device 8, it goes without saying that the configuration is not limited to this.
例えば、貫入棒挿入装置は、油圧による負荷機
構を採用して貫入棒に荷重をかけることもでき、
駆動回路は、電磁弁等を用いて油圧制御をしても
よい。また、CPU7の荷重制御手段71が主と
して判定手段の役割を果たす場合には、これは、
コンパレータの論理回路を用いて実現でき、貫入
深さ算出手段は、カウンタ等と論理回路により実
現できるものである。 For example, the penetrating rod insertion device may employ a hydraulic loading mechanism to apply a load to the penetrating rod.
The drive circuit may be hydraulically controlled using a solenoid valve or the like. In addition, if the load control means 71 of the CPU 7 mainly plays the role of determination means, this
This can be realized using a comparator logic circuit, and the penetration depth calculation means can be realized using a counter or the like and a logic circuit.
また、実施例では、自重を支える強度を備える
貫入抵抗に対応して、荷重等を設定しているが、
この貫入抵抗は、所定の強度を持つ対応貫入抵抗
に対するものとして、荷重等を設定することがで
きることはもちろんである。 In addition, in the example, the load etc. are set in accordance with the penetration resistance that has the strength to support its own weight.
It goes without saying that a load or the like can be set for this penetration resistance in relation to a corresponding penetration resistance having a predetermined strength.
さらに、実施例では、滑動型枠の上部先端を基
準としているが、貫入深さの測定基準点はどこに
採つてもよいものである。また、打設コンクリー
トの硬化状態の厚さを決める基準は、結果的に、
滑動型枠10の下側のある位置を基準にしてこの
下側から見て所定の硬化状態にある打設コンクリ
ートの厚さが目標値になるように滑動型枠が移動
されればよく、滑動型枠の目標位置の設定の仕方
等は任意に選択できるものである。 Further, in the embodiment, the upper tip of the sliding formwork is used as a reference point, but the reference point for measuring the penetration depth may be taken anywhere. Additionally, the criteria for determining the thickness of poured concrete in its hardened state are as follows:
It is only necessary that the sliding formwork is moved so that the thickness of the poured concrete in a predetermined hardened state becomes the target value when viewed from the lower side of the sliding formwork 10 with reference to a certain position on the lower side of the sliding formwork 10. The method of setting the target position of the formwork can be arbitrarily selected.
コンクリートが順次打設される滑動型枠と、貫
入棒に荷重をかけて表面部が硬化前の打設コンク
リートにこの貫入棒を挿入する貫入棒挿入手段
と、前記滑動型枠を所定方向に移動する滑動型枠
移動機構と、制御装置とを備え、該制御装置は、
前記滑動型枠における前記打設コンクリートに対
して前記貫入棒の挿入抵抗が所定値にある貫入深
さを測定する貫入量測定手段と、この貫入量から
所定の硬化状態にある打設コンクリートの前記滑
動枠内での打設方向における厚さを算出する算出
手段と、同じ硬化状態にある打設コンクリートの
前記滑動枠内での打設方向における適切な厚さを
定めた設定値と前記算出値とを比較して、両者間
のずれ量を決定する手段と、このずれ量に応じ
て、このずれ量が生じない方向に前記滑動型枠が
移動するように前記滑動型枠移動機構を制御する
ようにしているので、貫入抵抗をもつて測定する
ことにより、所定の硬化状態にある打設コンクリ
ートの位置が貫入棒の貫入量という形で得られ、
滑動型枠の長さからこの貫入量を減算すると、所
定の硬化状態にある打設コンクリートの滑動型枠
内での打設方向厚さ(実測値)を演算することが
できる。そして、予め設定してある適切な滑動型
枠の位置〔同じ硬化状態にある打設コンクリート
の前記滑動枠内での打設方向における適切な厚さ
(目標値)に相当〕と前記実測値とを演算又は表
示等によつて比較することによりこれらの間のず
れ量を得て、このずれ量がなくなるように滑動型
枠を適切な速度で上方に移動するか又は適切な位
置に移動させる制御ができる。
A sliding formwork into which concrete is sequentially placed; a penetration rod insertion means for applying a load to a penetration rod and inserting the penetration rod into the poured concrete whose surface portion has not yet hardened; and moving the sliding formwork in a predetermined direction. a sliding formwork moving mechanism, and a control device, the control device comprising:
penetration amount measuring means for measuring the penetration depth at which the insertion resistance of the penetration rod is at a predetermined value with respect to the poured concrete in the sliding formwork; Calculation means for calculating the thickness in the pouring direction within the sliding frame, a set value that determines an appropriate thickness of poured concrete in the same hardening state in the pouring direction within the sliding frame, and the calculated value. means for determining the amount of deviation between the two by comparing them; and controlling the sliding formwork moving mechanism in accordance with this amount of deviation so that the sliding formwork moves in a direction in which this amount of deviation does not occur. Therefore, by measuring the penetration resistance, the position of the poured concrete in a predetermined hardening state can be obtained in the form of the penetration amount of the penetration rod.
By subtracting this amount of penetration from the length of the sliding formwork, it is possible to calculate the thickness (actual measurement value) of the poured concrete in the sliding formwork in the pouring direction in a predetermined hardened state. Then, the preset position of the appropriate sliding form [corresponding to the appropriate thickness (target value) of poured concrete in the same hardening state in the pouring direction within the sliding frame] and the actual measured value are calculated. The amount of deviation between these is obtained by comparing them by calculation or display, etc., and the sliding formwork is moved upward at an appropriate speed or to an appropriate position so as to eliminate this amount of deviation. Can be done.
その結果、外気温等の不確定要因を全く無視し
て確実に実際の強度状態を捉えて、滑動型枠を適
切な位置に制御することができ、効率よくコンク
リートの打設作業を進めることができるものであ
る。 As a result, it is possible to completely ignore uncertain factors such as outside temperature, accurately grasp the actual strength state, and control the sliding formwork to the appropriate position, allowing efficient concrete placement work. It is possible.
第1図は、打ち込まれた打設コンクリートの強
度の発現と時間の経過の特性を示したグラフ図、
第2図は、滑動型枠内に打ち込まれた打設コンク
リートの強度分布を示すグラフ図、第3図は、滑
動型枠内に打ち込まれた打設コンクリートに上か
ら貫入棒を挿入する挿入状態の説明する説明図、
第4図は、打設コンクリート表面からの貫入深さ
と貫入荷重との関係を示すグラフ図、第5図は、
打設コンクリート表面からの貫入深さと荷重及び
加振を貫入棒に加えた場合の加振時間との関係を
示すグラフ図、第6図は、打設コンクリート表面
からの貫入深さと打撃荷重を貫入棒に加えた場合
の打撃回数との関係を示すグラフ図、第7図は、
この発明を適用した滑動型枠の制御システムの一
実施例の構成図、第8図Aは、貫入抵抗を自重を
支えるのに十分な強度を持つような荷重値に設定
して、打設コンクリートを4個所測定した場合の
測定状態の説明図、第8図Bは、そのデイスプレ
イ装置の表示状態をグラフとして示した説明図、
第9図は、この発明を適用した滑動型枠の制御シ
ステムの他の一実施例の構成図、第10図は、第
9図の実施例における加速度計の具体的説明図で
ある。
1……打設コンクリートの強度状態測定装置、
2……貫入棒、3……貫入棒挿入装置、4……荷
重状態検出器、5……駆動回路、6……ずれ量検
出器、7,70……処理装置(CPU)、8……デ
イスプレイ装置、9……キーボード、10……滑
動型枠、11……打設コンクリート、20……荷
重負荷機構、21……固定アーム、71……荷重
制御手段、72……貫入深さ算出手段、73……
ずれ量算出手段、74……設定値記憶手段、75
……制御手段。
Figure 1 is a graph showing the development of strength of poured concrete and the characteristics over time.
Figure 2 is a graph showing the strength distribution of poured concrete poured into the sliding formwork, and Figure 3 is a graph showing the insertion state in which a penetrating rod is inserted from above into the poured concrete poured into the sliding formwork. An explanatory diagram explaining
Figure 4 is a graph showing the relationship between penetration depth from the surface of poured concrete and penetration load, and Figure 5 is a graph showing the relationship between penetration depth from the surface of poured concrete and penetration load.
Figure 6 is a graph showing the relationship between the penetration depth from the surface of poured concrete and the vibration time when a load and vibration are applied to the penetration rod. Figure 7 is a graph showing the relationship between the number of hits and the number of hits applied to the bar.
FIG. 8A, which is a block diagram of an embodiment of a control system for sliding formwork to which this invention is applied, shows how concrete is poured by setting the penetration resistance to a load value that has sufficient strength to support its own weight. FIG. 8B is an explanatory diagram showing the display state of the display device as a graph;
FIG. 9 is a block diagram of another embodiment of a sliding formwork control system to which the present invention is applied, and FIG. 10 is a concrete explanatory diagram of an accelerometer in the embodiment of FIG. 9. 1... Device for measuring the strength state of poured concrete,
2... Penetration rod, 3... Penetration rod insertion device, 4... Load state detector, 5... Drive circuit, 6... Displacement amount detector, 7, 70... Processing device (CPU), 8... Display device, 9...Keyboard, 10...Sliding formwork, 11...Pouring concrete, 20...Load loading mechanism, 21...Fixed arm, 71...Load control means, 72...Penetration depth calculation means , 73...
Displacement amount calculation means, 74...Setting value storage means, 75
...control means.
Claims (1)
貫入棒に荷重をかけて表面部が硬化前の打設コン
クリートにこの貫入棒を挿入する貫入棒挿入手段
と、前記滑動型枠を所定方向に移動する滑動型枠
移動機構と、制御装置とを備え、該制御装置は、
前記滑動型枠における前記打設コンクリートに対
して前記貫入棒の挿入抵抗が所定値にある貫入深
さを測定する貫入量測定手段と、この貫入量から
所定の硬化状態にある打設コンクリートの前記滑
動枠内での打設方向における厚さを算出する算出
手段と、同じ硬化状態にある打設コンクリートの
前記滑動枠内での打設方向における適切な厚さを
定めた設定値と前記算出値とを比較して、両者間
のずれ量を決定する手段と、このずれ量に応じ
て、このずれ量が生じない方向に前記滑動型枠が
移動するように前記滑動型枠移動機構を制御する
制御手段を有することを特徴とする滑動型枠の制
御方式。 2 貫入棒挿入手段によりかけられる所定の荷重
は、打設コンクリートが自重分を支えるのに十分
な強度を備える硬化状態にあるときに貫入棒が挿
入されなくなる値以上で、かつ、その硬化状態が
破壊されない範囲のものであり、所定値は、一定
の範囲として与えられることを特徴とする特許請
求の範囲第1項記載の滑動型枠の制御方式。 3 貫入量測定手段は、貫入棒の貫入抵抗を検出
する貫入抵抗検出手段と、前記貫入棒の貫入抵抗
が所定値にあるか否かを判定する判定手段と、前
記貫入棒の貫入量を検出する貫入量検出手段とを
有し、前記貫入棒の挿入抵抗が所定値になつたと
きの前記貫入棒の貫入量を測定することを特徴と
する特許請求の範囲第1項記載の滑動型枠の制御
方式。 4 貫入棒挿入手段によりかけられる所定の荷重
は、打設コンクリートが自重分を支えるのに十分
な強度を備える硬化状態にあるときに貫入棒が挿
入されなくなる値以上で、かつ、その硬化状態が
破壊されない範囲のものであり、貫入抵抗検出手
段は、荷重を検出することをもつて貫入抵抗を検
出するものであり、判定手段は、前記貫入棒の荷
重が前記所定の設定荷重であるか否かを判定する
ものであることを特徴とする特許請求の範囲第3
項記載の滑動型枠の制御方式。[Claims] 1. A sliding formwork into which concrete is sequentially poured;
A penetration rod insertion means for applying a load to the penetration rod and inserting the penetration rod into poured concrete whose surface portion has not yet hardened, a sliding formwork moving mechanism for moving the sliding formwork in a predetermined direction, and a control device. The control device includes:
penetration amount measuring means for measuring the penetration depth at which the insertion resistance of the penetration rod is at a predetermined value with respect to the poured concrete in the sliding formwork; Calculation means for calculating the thickness in the pouring direction within the sliding frame, a set value that determines an appropriate thickness of poured concrete in the same hardening state in the pouring direction within the sliding frame, and the calculated value. means for determining the amount of deviation between the two by comparing them; and controlling the sliding formwork moving mechanism in accordance with this amount of deviation so that the sliding formwork moves in a direction in which this amount of deviation does not occur. A control method for a sliding formwork characterized by having a control means. 2. The predetermined load applied by the penetration rod insertion means is greater than or equal to the value at which the penetration rod will not be inserted when the poured concrete is in a hardened state with sufficient strength to support its own weight, and the hardened state is 2. The control method for sliding formwork according to claim 1, wherein the predetermined value is within a range that will not be destroyed, and the predetermined value is given as a fixed range. 3 The penetration amount measuring means includes penetration resistance detection means for detecting the penetration resistance of the penetration rod, determination means for determining whether the penetration resistance of the penetration rod is at a predetermined value, and detection means for detecting the penetration amount of the penetration rod. The sliding formwork according to claim 1, further comprising a penetration amount detection means for measuring the penetration amount of the penetration rod when the insertion resistance of the penetration rod reaches a predetermined value. control method. 4. The predetermined load applied by the penetration rod insertion means is greater than or equal to the value at which the penetration rod will not be inserted when the poured concrete is in a hardened state with sufficient strength to support its own weight, and the hardened state is The penetration resistance detection means detects penetration resistance by detecting the load, and the determination means determines whether the load of the penetration rod is the predetermined set load. Claim 3 is characterized in that it determines whether
Control method for sliding formwork as described in Section.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5559484A JPS60199164A (en) | 1984-03-23 | 1984-03-23 | Control method of sliding formwork |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5559484A JPS60199164A (en) | 1984-03-23 | 1984-03-23 | Control method of sliding formwork |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60199164A JPS60199164A (en) | 1985-10-08 |
| JPH0241624B2 true JPH0241624B2 (en) | 1990-09-18 |
Family
ID=13003085
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5559484A Granted JPS60199164A (en) | 1984-03-23 | 1984-03-23 | Control method of sliding formwork |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60199164A (en) |
-
1984
- 1984-03-23 JP JP5559484A patent/JPS60199164A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60199164A (en) | 1985-10-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN213121509U (en) | Concrete slump testing arrangement is used in hydraulic engineering construction | |
| CN211426500U (en) | High slump retaining nature recycled concrete slump test equipment | |
| JPH0374786B2 (en) | ||
| JPH0241624B2 (en) | ||
| CN209356500U (en) | Slump cylinder | |
| JP5458254B2 (en) | Mortar consistency evaluation method and consistency evaluation apparatus | |
| JP7257797B2 (en) | Concrete setting time determination device, determination method and concrete construction method | |
| JP3233179B2 (en) | Concrete top leveling tool | |
| JP2001336143A (en) | Executed condition control method for ground improvement and executed condition control system | |
| JPH05340938A (en) | Method and device for judging leveling timing of concrete | |
| JP2002001721A (en) | Method and apparatus for evaluating consistency of fresh concrete | |
| CN217112023U (en) | A device for detecting the bonding force of concrete steel bars | |
| CN218239721U (en) | Concrete penetration resistance tester | |
| CN107192793A (en) | Distress in concrete grouting material concrete castability test method | |
| CN118603814A (en) | A device and method for testing viscosity of expansive polymer slurry | |
| CN111023980A (en) | Multifunctional displacement meter and displacement measurement method used in model test | |
| CN118225275A (en) | Temperature measuring device and temperature measuring method for large-volume concrete construction | |
| CN221326542U (en) | Concrete slump detection device | |
| CN111765856B (en) | Nondestructive detection device and method for effective anchoring depth of anchor rod | |
| JPH05179646A (en) | Inspection for pile placing work quality | |
| CN113153272A (en) | CFG pile drilling construction depth detection and construction control system and method | |
| CN118980809B (en) | Concrete setting time detection device and application method thereof | |
| CN220932976U (en) | Auxiliary tool for measuring slump by single person | |
| JPS6371621A (en) | Measuring instrument for top end depth of strike arranged concrete | |
| CN220419339U (en) | Portable concrete slump detection device |