Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0252722B2 - - Google Patents
[go: Go Back, main page]

JPH0252722B2 - - Google Patents

Info

Publication number
JPH0252722B2
JPH0252722B2 JP19122282A JP19122282A JPH0252722B2 JP H0252722 B2 JPH0252722 B2 JP H0252722B2 JP 19122282 A JP19122282 A JP 19122282A JP 19122282 A JP19122282 A JP 19122282A JP H0252722 B2 JPH0252722 B2 JP H0252722B2
Authority
JP
Japan
Prior art keywords
attached
wire ropes
horizontal
pipes
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP19122282A
Other languages
Japanese (ja)
Other versions
JPS5980810A (en
Inventor
Saburo Muraki
Yoshitami Muraki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KEEBURU ASHIBA KK
Original Assignee
KEEBURU ASHIBA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEEBURU ASHIBA KK filed Critical KEEBURU ASHIBA KK
Priority to JP19122282A priority Critical patent/JPS5980810A/en
Publication of JPS5980810A publication Critical patent/JPS5980810A/en
Publication of JPH0252722B2 publication Critical patent/JPH0252722B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 この発明は、架設及び撤去をきわめて安全にか
つ容易に行なえるようにした、足場装置に関す
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a scaffolding device that can be erected and removed extremely safely and easily.

これまでは、たとえば塗装等のために橋梁等に
足場を架設するには、まず橋梁等から多数のチエ
ーンを吊り下げ、それらチエーンにより縦パイプ
を吊り下げて縦パイプに多数の横パイプを張り渡
し、それら横パイプ上に足場板を掛け渡した後
に、最後に下側全面に防護用のネツトを張り渡し
ていた。チエーン下げやパイプ張り渡し作業はた
いへん複雑であつて、時間のかかる面倒な作業で
あつた。そして、最も重要な欠点は、まだ下にネ
ツトの張られていない間の作業であるためにたい
へん危険なことであつた。さらに、架設した足場
を撤去する際には、まずネツトを取り外した後に
足場板、パイプ、チエーン等を取り外す作業をす
ることになるので、それらの作業はネツトのない
状態でのたいへん危険なものであつた。そして同
じく、横パイプ、縦パイプ、チエーン等を取り外
していく作業はたいへん複雑で、時間のかかる面
倒な作業であつた。
Until now, in order to erect scaffolding on a bridge, etc. for painting purposes, etc., first, many chains were suspended from the bridge, vertical pipes were suspended from the chains, and many horizontal pipes were stretched around the vertical pipes. After scaffolding boards were strung over these horizontal pipes, protective netting was finally strung over the entire bottom surface. Chain lowering and pipe tensioning work were extremely complicated, time consuming and troublesome work. The most important drawback was that the work was extremely dangerous since the work was done while the net was not yet installed. Furthermore, when removing a scaffold that has been erected, the net must first be removed and then the scaffolding boards, pipes, chains, etc. must be removed, which is extremely dangerous work without the net. It was hot. Similarly, the work of removing horizontal pipes, vertical pipes, chains, etc. was extremely complicated, time-consuming, and troublesome work.

この発明は、危険をともなうことがなくしかも
短時間内で簡単に足場の架設や撤去ができるよう
にした、足場装置を提供することを目的とする。
An object of the present invention is to provide a scaffolding device that allows scaffolding to be easily erected and removed within a short period of time without causing any danger.

つぎに、この発明の第1実施態様を第1図及び
第2図により説明する。
Next, a first embodiment of the present invention will be explained with reference to FIGS. 1 and 2.

第1図はこの発明の第1実施態様を示す斜視図
である。まず2本のワイヤロープ1,1を平行に
張り渡している。2本のワイヤロープ1,1には
それぞれ多数の摺動具2,2…を取付けている。
第2図に示すように、摺動具2は、ガイド体3の
上にリベツト4により回動自在にクランプ5を取
り付けた構造をしている。ガイド体3は、ほぼ〓
形をした板材を円筒状に丸めて製作したものであ
り、中央には下方から上方へ向けて隙間6が形成
されている。隙間6の部分からワイヤロープ1に
はめて90度回動させるとワイヤロープ1に取付け
ることができるので、ワイヤロープ1への取付け
の便利なものである。ガイド体3の上面には前後
にそれぞれリング7,7を取付けている。
FIG. 1 is a perspective view showing a first embodiment of the invention. First, two wire ropes 1, 1 are stretched in parallel. A large number of sliding tools 2, 2, . . . are attached to the two wire ropes 1, 1, respectively.
As shown in FIG. 2, the sliding tool 2 has a structure in which a clamp 5 is rotatably attached to a guide body 3 by a rivet 4. As shown in FIG. The guide body 3 is approximately
It is manufactured by rolling a shaped plate material into a cylindrical shape, and a gap 6 is formed in the center from the bottom to the top. It can be attached to the wire rope 1 by inserting it into the wire rope 1 from the gap 6 and turning it 90 degrees, so it is convenient to attach to the wire rope 1. Rings 7, 7 are attached to the upper surface of the guide body 3 at the front and rear, respectively.

クランプ5は、横パイプ8を取付けるための構
造をしている。そして、横パイプ8の両端付近を
2本のワイヤロープ1,1にそれぞれ摺動自在に
取付けた摺動具2,2のクランプ5,5に取付け
ている。同じようにして、多数の横パイプ8,8
…を左右の摺動具2,2…に取付けている。そし
て、先頭の摺動具2の後方のリング7にチエーン
9の1端を取付け、そのチエーン9の他端を2番
目の摺動具2の前方のリング7に取付け、同じよ
うにして左右の摺動具2,2…についてそれぞれ
前後方向に隣りどうしの摺動具2,2…をチエー
ン9,9…により連結している。チエーン9,9
…は同じ長さのものとしている。
The clamp 5 has a structure for attaching the horizontal pipe 8. The vicinity of both ends of the horizontal pipe 8 are attached to clamps 5, 5 of sliding tools 2, 2 which are slidably attached to two wire ropes 1, 1, respectively. In the same way, a large number of horizontal pipes 8, 8
... are attached to the left and right sliding tools 2, 2.... Then, one end of the chain 9 is attached to the ring 7 at the rear of the first sliding tool 2, and the other end of the chain 9 is attached to the ring 7 at the front of the second sliding tool 2. Regarding the sliding tools 2, 2..., adjacent sliding tools 2, 2... in the front-rear direction are connected by chains 9, 9..., respectively. chain 9,9
...are of the same length.

横パイプ8,8…の中央にはそれぞれフツク1
0,10…を取付けている。そして、別体の細長
いシート11の中央に吊りひも12,12…を取
付けておいて、それら吊りひも12,12…を横
パイプ8,8…のフツク10,10…に掛けてい
る。シート11の両端付近にそれぞれ孔13,1
3…をあけている。それらの孔13,13…にそ
れぞれロープ14,14を上下方向にジグザグ状
に通しながら、ロープ14,14のシート11よ
り上に出た部分をそれぞれ横パイプ8,8…の両
端付近に掛けている。ロープ14,14の各前端
は先頭の横パイプ8にくくりつけている。また、
先頭の横パイプ8の中央にはリング15を取付け
ている。リング15には、前方に張り渡した前方
ロープ16の後端を取付け、また後方に張り渡し
た後方ロープ17の前端も取付けている。
There is a hook 1 in the center of each horizontal pipe 8, 8...
0, 10... are attached. Hanging strings 12, 12... are attached to the center of the separate elongated sheet 11, and these hanging strings 12, 12... are hung on the hooks 10, 10... of the horizontal pipes 8, 8.... Holes 13 and 1 are provided near both ends of the sheet 11, respectively.
3... is open. While passing the ropes 14, 14 vertically in a zigzag pattern through the holes 13, 13, respectively, the portions of the ropes 14, 14 that protrude above the sheet 11 are hung near both ends of the horizontal pipes 8, 8, respectively. There is. The front ends of the ropes 14, 14 are tied to the leading horizontal pipe 8. Also,
A ring 15 is attached to the center of the horizontal pipe 8 at the top. A rear end of a front rope 16 stretched forward is attached to the ring 15, and a front end of a rear rope 17 stretched backward is also attached.

以上に示したものは、架設前には横パイプ8,
8…が1端側に寄せられていてシート11は折れ
曲がりながらたれ下がつているのであるが、これ
を架設するには前方ロープ16を引けばよい。左
右のガイド体3,3がワイヤロープ1,1に沿つ
てガイドすることにより、まず先頭の横パイプ8
がワイヤロープ1,1と直交する状態を保ちなが
ら前進し、左右のチエーン9,9が伸び切つた後
は2番目の横パイプ8も同様にして前進させ、以
下同様にして横パイプ8,8…を等間隔に展開さ
せながら前進させていく。横パイプ8,8…を展
開させながら横パイプ8,8…の上に足場板1
8,18…を乗せていくと、足場装置やたちまち
にして完成するのである。
What is shown above is the horizontal pipe 8,
8... are brought to one end side, and the sheet 11 is bent and sagging, but in order to erect it, the front rope 16 can be pulled. By guiding the left and right guide bodies 3, 3 along the wire ropes 1, 1, the first horizontal pipe 8
moves forward while maintaining a state perpendicular to the wire ropes 1, 1, and after the left and right chains 9, 9 are fully extended, the second horizontal pipe 8 is also advanced in the same way, and the horizontal pipes 8, 8 are moved forward in the same manner. ...and move forward while deploying them at equal intervals. While expanding the horizontal pipes 8, 8..., place the scaffolding board 1 on top of the horizontal pipes 8, 8...
8, 18, and so on, the scaffolding device is quickly completed.

つぎに、架設したものを撤去するには、足場板
18,18…を取り外しながら後方ロープ17を
後方へ引つ張ればよい。先頭の横パイプ8からだ
んだんに後退していつて元の状態に帰り、最後に
ワイヤロープ1,1を取り外すとすべての撤去作
業が終了する。
Next, in order to remove the constructed object, the rear rope 17 may be pulled rearward while removing the scaffolding boards 18, 18, . . . . The wire ropes 1, 1 are gradually retreated from the leading horizontal pipe 8 and returned to their original state, and finally the wire ropes 1, 1 are removed, and all removal work is completed.

つぎに、この発明の第2実施態様を第3図及び
第4図により説明する。
Next, a second embodiment of the present invention will be explained with reference to FIGS. 3 and 4.

第3図は第2実施態様を示す斜視図である。足
場架設作業に当つては、同じくまず2本のワイヤ
ロープ1,1を平行に張り渡す。ワイヤロープ
1,1にはそれぞれ長方形状をした摺動具2,2
…を吊り下げている。摺動具2の枠は上枠19と
下枠20とで構成しており、上枠19と下枠20
とはリベツト21で回動自在に連結している。上
枠19には滑車22を取付け、下枠20には左右
に2個ずつのピン孔23,23…をあけている。
そして、滑車22,22…を左右のワイヤロープ
1,1に乗せながら、左右のワイヤロープ1,1
に多数の摺動具2,2…を吊り下げているのであ
る。
FIG. 3 is a perspective view showing the second embodiment. In the scaffold construction work, two wire ropes 1, 1 are similarly stretched in parallel. The wire ropes 1, 1 have rectangular sliding tools 2, 2, respectively.
...is hanging. The frame of the sliding tool 2 is composed of an upper frame 19 and a lower frame 20.
and are rotatably connected by rivets 21. A pulley 22 is attached to the upper frame 19, and two pin holes 23, 23, . . . are bored in the lower frame 20 on the left and right sides.
Then, while placing the pulleys 22, 22... on the left and right wire ropes 1, 1,
A large number of sliding tools 2, 2, . . . are suspended from the shaft.

断面角形をした縦パイプ24を多数用意してい
る。縦パイプ24の先端付近と後端付近とには、
それぞれ2個ずつのピン孔25,25…をあけて
いる。そして、縦パイプ24の上面には、横パイ
プ8,8…をクランプするためのクランプ5,5
…を等間隔に取付けている。
A large number of vertical pipes 24 having a square cross section are prepared. Near the tip and rear end of the vertical pipe 24,
Two pin holes 25, 25, . . . are formed in each case. On the upper surface of the vertical pipe 24, clamps 5, 5 for clamping the horizontal pipes 8, 8...
...are installed at equal intervals.

作業者は安全な場所にいて、縦パイプ24の先
端部分を先頭の摺動具2の下枠20にはめ、縦パ
イプ24の先端付近にあけたピン孔25,25と
下枠20のピン孔23,23とを一致させた後
に、ピン孔23,23,25,25にピン26を
通して縦パイプ24の先端を取付ける。同様にし
て縦パイプ24の後端を2番目の摺動具2に取付
け、同じ作業を左右のワイヤロープ1,1につい
てする。
The worker is in a safe place, fits the tip of the vertical pipe 24 into the lower frame 20 of the first sliding tool 2, and inserts the pin holes 25, 25 drilled near the tip of the vertical pipe 24 and the pin holes in the lower frame 20. 23, 23, and then insert the pin 26 into the pin holes 23, 23, 25, 25 and attach the tip of the vertical pipe 24. In the same manner, the rear end of the vertical pipe 24 is attached to the second sliding tool 2, and the same operation is performed on the left and right wire ropes 1, 1.

つぎに、左右の縦パイプ24,24にそれぞれ
取付けたクランプ5,5…により横パイプ8,8
…を取付けていく。横パイプ8,8…の中央には
それぞれフツク10,10…を取付けている。
Next, the horizontal pipes 8,8
... will be installed. Hooks 10, 10... are attached to the centers of the horizontal pipes 8, 8..., respectively.

別体のシート11を用意しているが、シート1
1の中央には等間隔に吊りひも12,12…を取
付けている。シート11の両端寄りにそれぞれ等
間隔に孔27,27…をあけている。そして、縦
パイプ24,24に取付けた横パイプ8,8…の
フツク10,10…にそれぞれ吊りひも12,1
2…を掛けながら、シート11の両端寄りにあけ
た孔27,27…を横パイプ8,8…の両端にそ
れぞれはめていくと、下側に防護用のシート11
が張り渡されていくことになる。
Although a separate sheet 11 is prepared, sheet 1
Suspension strings 12, 12, . . . are attached to the center of 1 at equal intervals. Holes 27, 27, . . . are formed at equal intervals near both ends of the sheet 11, respectively. Then, the hanging strings 12, 1 are attached to the hooks 10, 10... of the horizontal pipes 8, 8... attached to the vertical pipes 24, 24, respectively.
2..., and fit the holes 27, 27... drilled near both ends of the sheet 11 into both ends of the horizontal pipes 8, 8..., respectively, and the protective sheet 11 is placed on the lower side.
will be extended.

最後に、横パイプ8,8…の上に足場板18,
18を乗せる。
Finally, the scaffolding board 18 is placed on top of the horizontal pipes 8, 8...
Put 18 on it.

以上の作業が終つたら、架設した部分を押しな
がらワイヤロープ1,1に沿わせて前進させ、2
番目の摺動具2,2に別の縦パイプ24,24の
前端を取付け、さらにそれら縦パイプ24,24
の後端を3番目の摺動具2,2に取付ける。以下
の作業は繰返し作業であるので説明を省略する
が、とにかく作業者は安全な場所にいて架設作業
をし、架設した部分はワイヤロープ1,1に沿わ
せて押し出しながら次次と作業をつづけて架設を
完了させるのである。
After completing the above work, push the constructed part forward along the wire ropes 1 and 2.
Attach the front ends of other vertical pipes 24, 24 to the second sliding tools 2, 2, and
Attach the rear end to the third sliding tool 2,2. The following work is a repetitive work, so the explanation is omitted, but in any case, the worker should do the erection work in a safe place, and continue the work one after another while pushing out the erected part along the wire ropes 1 and 1. The construction is then completed.

つぎに、撤去をするには架設作業とは逆の順序
で作業をやつていけばよい。作業者は安全な場所
にいて、架設部分を引き戻しながら足場板18,
18…、シート11、横パイプ8,8…、縦パイ
プ24,24…の解体撤去作業をつづけて、最後
にワイヤロープ1,1を取り外すと、撤去作業が
完了する。
Next, to remove the structure, simply carry out the work in the reverse order of the erection work. The worker is in a safe place and is pulling back the construction part while moving the scaffolding board 18,
18..., the sheets 11, the horizontal pipes 8, 8..., and the vertical pipes 24, 24..., and finally, when the wire ropes 1, 1 are removed, the removal work is completed.

以上この発明の実施態様を2つ示したが、この
発明の実施態様としては以上に示したものに限ら
れるわけではない。たとえば、ワイヤロープ1を
2本緊張させたものを示したが、ワイヤロープ1
は3本以上緊張させてもよい。摺動具2の構造は
任意であり、ワイヤロープ1に摺動自在に取付け
ることができるようになつていればよい。横パイ
プ8そのものの一部を加工してワイヤロープ1に
摺動自在に取付けることができるようにしてもよ
い。また、ワイヤロープ1に摺動自在に取付ける
ことができるようにした摺動具2を、横パイプ8
に一体的に取付けるようにしてもよい。さらに、
第1図において各横パイプ8をチエーン9で連結
して、先頭の横パイプ8を前進させるとき各横パ
イプ8の間に間隔をあけながら展開していくよう
にしたものを示したが、チエーン9の代りに任意
のひも状体、網状体等を使用してもよい。あるい
は、各横パイプ8をシート11にくくりつける等
して、シート11に各横パイプ8を連結する連結
部材の役目を兼ねさせてもよい。シート11の代
りにネツトを使用する場合はそのネツトに、また
ネツトとシート11とを併用する場合はネツトと
シート11とに連結部材の役目を兼ねさせてもよ
い。
Although two embodiments of this invention have been shown above, the embodiments of this invention are not limited to those shown above. For example, although two wire ropes 1 are shown under tension, wire rope 1
You may tense three or more lines. The structure of the sliding tool 2 is arbitrary, as long as it can be attached to the wire rope 1 in a slidable manner. A part of the horizontal pipe 8 itself may be processed so that it can be slidably attached to the wire rope 1. In addition, a sliding tool 2 that can be slidably attached to the wire rope 1 is attached to the horizontal pipe 8.
It may be installed integrally with the moreover,
In Fig. 1, the horizontal pipes 8 are connected by a chain 9, and when the first horizontal pipe 8 is moved forward, the horizontal pipes 8 are unfolded with a space between them. Any string-like body, net-like body, etc. may be used in place of 9. Alternatively, each horizontal pipe 8 may be attached to the sheet 11, so that the sheet 11 also serves as a connecting member for connecting each horizontal pipe 8. When a net is used instead of the sheet 11, the net may serve as a connecting member, or when the net and the sheet 11 are used together, the net and the sheet 11 may serve as a connecting member.

この発明の構成は以上の通りであるが、この発
明は以下のようなすぐれた効果を奏するものであ
る。
The structure of the present invention is as described above, and the present invention has the following excellent effects.

この発明に係る足場装置においては、平行に緊
張させた2本以上のワイヤロープ1のそれぞれに
多数の摺動具2を摺動自在に取付け、さらに多数
の横パイプ8を、それら摺動具2を介してそれら
ワイヤロープ1間に掛け渡した状態でかつ互いの
間隔をあけた状態で配置している。したがつて、
架設時にはまず2本以上のワイヤロープ1を緊張
させた後に、作業者は安全な場所にいて各ワイヤ
ロープ1に摺動自在に取付けた摺動具2を介して
各ワイヤロープ1に対して各横パイプ8を摺動さ
せていく作業をすれば、各横パイプ8は各ワイヤ
ロープ1間に掛け渡した状態でかつ互いに間隔を
あけた状態で配置することができるので、作業は
きわめて安全なものである。しかも、作業は短時
間内で簡単にすますことができる。
In the scaffolding device according to the present invention, a large number of sliding tools 2 are slidably attached to each of two or more wire ropes 1 tensioned in parallel, and a large number of horizontal pipes 8 are attached to each of the sliding tools 2. The wire ropes 1 are placed in a state where they are stretched between the wire ropes 1 via the wire ropes 1 and spaced apart from each other. Therefore,
At the time of erection, after first tensioning two or more wire ropes 1, an operator in a safe place applies tension to each wire rope 1 through a sliding tool 2 that is slidably attached to each wire rope 1. By sliding the horizontal pipes 8, each horizontal pipe 8 can be placed between each wire rope 1 and spaced apart from each other, making the work extremely safe. It is something. Moreover, the work can be easily completed within a short time.

また、架設した足場を撤去するには、架設時と
同様に作業者は安全な場所にいて、各ワイヤロー
プ1に対して各横パイプ8を摺動させ、一方側へ
片寄せながら撤去作業をするだけでよいので、撤
去作業も安全でかつ短時間の簡単な作業となる。
In addition, in order to remove the scaffold that has been erected, the worker should be in a safe place and slide each horizontal pipe 8 against each wire rope 1, and perform the removal work while moving it to one side. Since all you have to do is to do this, the removal work is safe, short and easy.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の第1実施態様を示す斜視
図、第2図は第1実施態様の要部の斜視図、第3
図は第2実施態様を示す斜視図、第4図は第3図
の−断面図である。 1……ワイヤロープ、2……摺動具、8……横
パイプ、18……足場板。
FIG. 1 is a perspective view showing a first embodiment of the present invention, FIG. 2 is a perspective view of main parts of the first embodiment, and FIG.
The figure is a perspective view showing the second embodiment, and FIG. 4 is a cross-sectional view taken from FIG. 3. 1...Wire rope, 2...Sliding tool, 8...Horizontal pipe, 18...Scaffolding board.

Claims (1)

【特許請求の範囲】[Claims] 1 平行に緊張させた2本以上のワイヤロープ
と、これらワイヤロープのそれぞれに摺動自在に
取付けた多数の摺動具と、これらの摺動具によつ
てそれぞれのワイヤロープと直交する方向でそれ
ぞれのワイヤロープに互いに間隔を開けて掛け渡
した多数の横パイプと、これら多数の横パイプの
上方に載置された足場板と、からなることを特徴
とする足場装置。
1. Two or more wire ropes tensioned in parallel, a number of sliding tools attached to each of these wire ropes so that they can slide freely, and a movement in a direction perpendicular to each wire rope by means of these sliding tools. A scaffolding device comprising a number of horizontal pipes that are stretched over respective wire ropes at intervals, and a scaffold board that is placed above the number of horizontal pipes.
JP19122282A 1982-10-30 1982-10-30 Scaffold apparatus Granted JPS5980810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19122282A JPS5980810A (en) 1982-10-30 1982-10-30 Scaffold apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19122282A JPS5980810A (en) 1982-10-30 1982-10-30 Scaffold apparatus

Publications (2)

Publication Number Publication Date
JPS5980810A JPS5980810A (en) 1984-05-10
JPH0252722B2 true JPH0252722B2 (en) 1990-11-14

Family

ID=16270922

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19122282A Granted JPS5980810A (en) 1982-10-30 1982-10-30 Scaffold apparatus

Country Status (1)

Country Link
JP (1) JPS5980810A (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05295712A (en) * 1992-04-15 1993-11-09 Mitsui Eng & Shipbuild Co Ltd Bridge mobile protection
JP4717705B2 (en) * 2006-04-26 2011-07-06 三菱重工鉄構エンジニアリング株式会社 Viaduct makeup structure and makeup structure construction method
JP7309565B2 (en) * 2019-10-18 2023-07-18 株式会社Ihiインフラシステム Suspended scaffolding and its installation method
JP7387485B2 (en) * 2020-02-20 2023-11-28 日鉄テックスエンジ株式会社 Net installation method
JP7364264B2 (en) * 2022-02-14 2023-10-18 株式会社クリス・コーポレーション hanging scaffolding
JP7523811B2 (en) * 2022-02-14 2024-07-29 株式会社クリス・コーポレーション Suspended scaffolding

Also Published As

Publication number Publication date
JPS5980810A (en) 1984-05-10

Similar Documents

Publication Publication Date Title
JPH0252722B2 (en)
US6035967A (en) Safety apparatus using parallel line catchers for elevated work site operations
JP2016023425A (en) Main rope support
JP3761800B2 (en) Scaffolding bracket, scaffolding frame and scaffold construction method
KR20220035885A (en) Scaffolding safety net fittings
KR200408267Y1 (en) Folding support for safety net installation of scaffold
US2761743A (en) Adjustable scaffold leg unit
KR101221846B1 (en) A rotatory traction apparatus
JP2664642B2 (en) Cover for covering the connecting space of hanging scaffold and connecting space covering structure using it
KR200495121Y1 (en) apparatus
EP3447212A1 (en) Platform apparatus and collection means therefor
KR100812130B1 (en) Lifeline Safety Net
JP3102710B2 (en) Structure that supports the forming tool of a machine that forms metal sheets by stretching
JP2003212451A (en) Template device for mounting elevator
JP2008231875A (en) Manhole fall curing frame
DE35005C (en) Collapsible frame for tensioning and drying curtains
JPS5836518A (en) Curtain apparatus
JPH0211708B2 (en)
JPH0713410B2 (en) Hanging method and hanging device for mountain-shaped plate
JPH0835335A (en) Seat tension structure
JPH07229259A (en) Suspension nipping tool for roof folded plate and conveying laying device therefor
JP3335464B2 (en) Sheet package for tent at building site, tubular cover, and tent construction method
JPH0738565Y2 (en) Curing sheet tensioning device
JPH0654822U (en) Fall prevention tool from the roof
GB2023691A (en) Shoring systems