Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0259037B2 - - Google Patents
[go: Go Back, main page]

JPH0259037B2 - - Google Patents

Info

Publication number
JPH0259037B2
JPH0259037B2 JP14737184A JP14737184A JPH0259037B2 JP H0259037 B2 JPH0259037 B2 JP H0259037B2 JP 14737184 A JP14737184 A JP 14737184A JP 14737184 A JP14737184 A JP 14737184A JP H0259037 B2 JPH0259037 B2 JP H0259037B2
Authority
JP
Japan
Prior art keywords
nut
welding
scrap
guide pin
upper electrode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14737184A
Other languages
Japanese (ja)
Other versions
JPS6127183A (en
Inventor
Hideaki Hida
Kazuo Naruse
Shigeru Yajima
Shizuo Ogawa
Masakazu Sugiura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Yashima Kogyo KK
Kyoho Machine Works Ltd
Original Assignee
Toyota Motor Corp
Yashima Kogyo KK
Kyoho Machine Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp, Yashima Kogyo KK, Kyoho Machine Works Ltd filed Critical Toyota Motor Corp
Priority to JP14737184A priority Critical patent/JPS6127183A/en
Publication of JPS6127183A publication Critical patent/JPS6127183A/en
Publication of JPH0259037B2 publication Critical patent/JPH0259037B2/ja
Granted legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/14Projection welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Resistance Welding (AREA)

Description

【発明の詳細な説明】 〔発明の利用分野〕 本発明はプロジエクシヨン溶接機に係り、特に
ナツト下孔のないパネルにナツトを溶接するに好
適なプロジエクシヨン溶接機に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Application of the Invention] The present invention relates to a projection welding machine, and more particularly to a projection welding machine suitable for welding a nut to a panel without a nut pilot hole.

〔発明の背景〕[Background of the invention]

従来、パネル上にナツトを溶着するプロジエク
シヨン溶接機として、実開昭56−6580号公報に開
示されているものが知られている。これは上下動
する上部電極に磁気吸着手段を設け、下部電極側
に設置されているパネル上の所望位置にナツト吸
着状態で上部電極を下降させることにより、ナツ
トの位置決めと溶着とを同時に行わせるものであ
る。
Conventionally, as a projection welding machine for welding a nut onto a panel, the one disclosed in Japanese Utility Model Application Publication No. 56-6580 is known. This is done by installing magnetic adsorption means on the upper electrode that moves up and down, and lowering the upper electrode while adsorbing the nut to a desired position on the panel installed on the lower electrode side, thereby simultaneously positioning and welding the nut. It is something.

ところが、上記従来の溶接機では、ナツトと上
部電極の吸着位置に偏位が生じやすく、下部電極
上のパネルに対し正確に位置あわせをすることが
できず、結局溶接位置決め精度が悪い欠点があつ
た。この点、ナツト吸着側の電極にナツト位置決
め用のガイド手段を設けることも考えられるが、
溶接時にガイド手段などを通じて溶接電流が分流
し、溶接品質の低下をきたしてしまう問題が生じ
る。さらには、従来の溶接機はパネルにナツト下
孔を設けたものでなければ正確な位置決めができ
ず、したがつてナツト下孔のないパネルにナツト
を溶接することは極めて困難であつた。
However, with the conventional welding machine described above, deviations tend to occur in the suction position between the nut and the upper electrode, making it impossible to accurately align the position with respect to the panel on the lower electrode, resulting in poor welding positioning accuracy. Ta. In this regard, it may be possible to provide a guide means for nut positioning on the nut suction side electrode, but
A problem arises in that the welding current is diverted through the guide means during welding, resulting in a reduction in welding quality. Furthermore, conventional welding machines cannot accurately position nuts unless the panel has a nut pilot hole, and it is therefore extremely difficult to weld a nut to a panel without a nut pilot hole.

〔発明の目的〕[Purpose of the invention]

本発明の目的は、ナツト溶着位置決め精度が高
く、かつ溶接品質も優れたプロジエクシヨン溶接
を行うことができるものであつて、溶接後にナツ
トのねじ孔に対応して穿孔作業を同時に行うこと
のできるプロジエクシヨン溶接機を提供すること
にある。
An object of the present invention is to perform projection welding with high nut welding positioning accuracy and excellent welding quality, and to simultaneously perform drilling work corresponding to the threaded hole of the nut after welding. Our goal is to provide a projection welding machine that can.

〔発明の概要〕[Summary of the invention]

上記目的を達成するために、本発明に係るプロ
ジエクシヨン溶接機は、一方の溶接電極に、所定
位置に供給された溶接対象ナツトのねじ孔内に出
入可能とされるガイドピンを設け、当該ガイドピ
ンを溶接及び孔明け作業時において突出引込の両
動作をさせる制御手段を設け、他方の溶接電極に
ナツトが溶接される板材(パネル)への穿孔用ポ
ンチ手段を設けるとともに、このポンチ手段には
スクラツプ排出路を形成し、前記ガイドピンによ
りスクラツプを前記排出路に押出し可能に構成し
たものである。
In order to achieve the above object, the projection welding machine according to the present invention is provided with a guide pin that can enter and exit the screw hole of the nut to be welded, which is supplied to a predetermined position, on one of the welding electrodes. A control means is provided for causing the guide pin to both protrude and retract during welding and drilling work, and the other welding electrode is provided with a punching means for punching into the plate material (panel) to which the nut is welded, and this punching means A scrap discharge passage is formed, and the scrap can be pushed out into the discharge passage by the guide pin.

上記構成により、パネルにナツト下孔を形成し
ない場合であつても、ナツトと上部電極との位置
決めがガイドピンにより正確に行われ、溶接時の
電流の分流が生ぜず、しかも溶接後にナツトのね
じ孔に対応した位置に穿孔し、同時にスクラツプ
を排出することができるので、精度および品質の
向上とともに、作業効率を高めることができるの
である。
With the above configuration, even if a pilot hole for the nut is not formed in the panel, the positioning of the nut and the upper electrode is performed accurately by the guide pin, there is no current splitting during welding, and the screw of the nut can be adjusted after welding. Since the holes can be drilled at corresponding positions and the scrap can be discharged at the same time, accuracy and quality can be improved, as well as work efficiency.

〔発明の実施例〕[Embodiments of the invention]

以下に本発明に係るプロジエクシヨン溶接機の
実施例を図面を参照して詳細に説明する。
Embodiments of the projection welding machine according to the present invention will be described in detail below with reference to the drawings.

第1図はプロジエクシヨン溶接機の要部縦断面
図である。この図に示されるように、この溶接機
は上部電極1と下部電極2とを有し、両者の突合
せによつて、溶接対象であるナツト3とパネル4
を溶着するようにしている。上部電極1は固定位
置にある下部電極2に対して上下動可能に構成さ
れ、このために上部電極は溶接機本体5に保持さ
れた供給ヘツドロツド6の下端部に取付けられて
いる。供給ヘツドロツド6は溶接機本体5の上部
位置に設置された加圧シリンダ7(第5図参照)
により鉛直下方向に押出し移動可能とされてい
る。上部電極1は供給ヘツドロツド6の下端を挿
入状態にして取付けられるもので、ケーブルター
ミナル8とこれに接続される溶接ケーブル9とに
より溶接電流が供給されるようになつている。上
部電極1の先端は截頭円錐体とされ、先端面に溶
接対象であるナツト3を吸着させ、下部電極2ま
で移送させるようにしている。ナツト3の吸着作
用は供給ヘツドロツド6に取付けた吸着コイル3
8への通電(励磁)により行わせる。
FIG. 1 is a longitudinal cross-sectional view of the main parts of a projection welding machine. As shown in this figure, this welding machine has an upper electrode 1 and a lower electrode 2, and by butting them together, a nut 3 and a panel 4 to be welded are welded.
I try to weld it. The upper electrode 1 is configured to be movable up and down relative to the lower electrode 2 which is in a fixed position, and for this purpose the upper electrode is attached to the lower end of a supply head rod 6 held in the welding machine body 5. The supply head rod 6 is a pressure cylinder 7 installed at the upper part of the welding machine main body 5 (see Fig. 5).
It is possible to push it out vertically downward. The upper electrode 1 is attached by inserting the lower end of the supply head rod 6, and welding current is supplied by a cable terminal 8 and a welding cable 9 connected thereto. The tip of the upper electrode 1 is a truncated cone, and the nut 3 to be welded is attracted to the tip surface and transferred to the lower electrode 2. The suction action of the nut 3 is based on the suction coil 3 attached to the supply head rod 6.
This is done by energizing (excitation) 8.

また、供給ヘツドロツド6と上部電極1とは一
体となつて供給ヘツド本体を構成しているが、こ
のヘツド本体内には上部電極1の先端面より出入
可能なガイドピン10が配置されている。このガ
イドピン10はピストン部11とこれより小径断
面のピンロツド部12とから構成され、供給ヘツ
ドロツド6内に形成したシリンダ室13に前記ピ
ストン部11を装着し、ピンロツド部12を上部
電極1の先端部に貫通させて、その端面から突出
させ得るようにしている。このため、シリンダ室
13内でピストン部11を往復移動させるが、こ
れはエアーシリンダ機構として構成され、ピスト
ン部11を挾んだ両端のシリンダ室を空圧室とし
ており、上下空圧室に通じるように供給ヘツドロ
ツド6と上部電極1とに空気給排ポート14A,
14Bを形成している。ここで、前記ガイドピン
10のピンロツド部12はその突出作動時に供給
されるナツト3のねじ孔3Aに嵌入され、位置決
めを行うとともに、溶接後にねじ孔3Aに対応す
るパネル4の部分に穿孔作業を行つた結果生じる
スクラツプを排出させる作用も行う。
Further, the supply head rod 6 and the upper electrode 1 are integrated to constitute a supply head body, and a guide pin 10 that can be moved in and out from the tip end face of the upper electrode 1 is arranged in the head body. This guide pin 10 is composed of a piston part 11 and a pin rod part 12 having a smaller diameter cross section. It is made to penetrate through the section and protrude from the end surface thereof. For this purpose, the piston part 11 is reciprocated within the cylinder chamber 13, but this is configured as an air cylinder mechanism, and the cylinder chambers at both ends that sandwich the piston part 11 are pneumatic chambers, which communicate with the upper and lower pneumatic chambers. An air supply/discharge port 14A is connected to the supply head rod 6 and the upper electrode 1 as shown in FIG.
14B is formed. Here, the pin rod portion 12 of the guide pin 10 is fitted into the screw hole 3A of the nut 3 supplied during the protruding operation, and is positioned, and after welding, the portion of the panel 4 corresponding to the screw hole 3A is drilled. It also has the effect of discharging the scraps that result from this process.

次に、上記上部電極1の先端部には溶接対象の
ナツト3を、第5図に示す如く、ナツト供給装置
15により連続送給するが、供給ナツト3を上部
電極1の下部に案内するナツトキヤツチヤ機構1
6を溶接機本体5に設けている。この具体的機構
を第2図および第3図に示す。すなわちナツトキ
ヤツチヤ機構16は、上部電極1の両側位置で支
軸17に取付けられたキヤツチヤアーム18を有
し、アーム18の先端にて傾斜したナツト送給ガ
イド19およびナツト受部20を形成するように
している。したがつて各アーム18の先端にはガ
イド19および受部20半割体が一体に設けら
れ、両アーム18をスプリング21の作用による
アーム閉脚動作時にナツト3を上部電極1の先端
面位置に走行案内するようにし、アーム開脚動作
によつて上部電極1の下方移動の障害にならない
ようにしている。開脚動作を行わせるために、特
に供給ロツドヘツド6にはカム板22が取付けら
れ、下降移動によりスプリング21に抗して両ア
ーム18を開脚方向に回転させるものとしてい
る。なおナツト送給ガイド19にはナツト送給装
置15のシユートが連接し、ナツト通路としてい
る。
Next, a nut 3 to be welded is continuously fed to the tip of the upper electrode 1 by a nut feeding device 15, as shown in FIG. Mechanism 1
6 is provided on the welding machine main body 5. This specific mechanism is shown in FIGS. 2 and 3. That is, the nut catcher mechanism 16 has a catch arm 18 attached to a support shaft 17 at both sides of the upper electrode 1, and a nut feeding guide 19 and a nut receiving part 20 are formed at the tip of the arm 18. I have to. Therefore, a guide 19 and a half-piece receiving part 20 are integrally provided at the tip of each arm 18, and when both arms 18 are closed by the action of a spring 21, the nut 3 is moved to the tip surface position of the upper electrode 1. The upper electrode 1 is guided so as not to become an obstacle to the downward movement of the upper electrode 1 due to the arm opening operation. In order to carry out the opening operation, a cam plate 22 is particularly attached to the supply rod head 6, and its downward movement rotates both arms 18 in the opening direction against the force of the spring 21. The nut feeding guide 19 is connected to the chute of the nut feeding device 15, forming a nut passage.

次に、下部電極2の周辺構成を第1図に基づい
て説明する。下部電極2は溶接機本体5に立設さ
れた電極支持ケーシング23の頂部に取付けられ
ており、本体5の定位置に固定設置される。前記
ケーシング23の内部には円筒空間が形成されて
おり、この内部にはポンチ取付けロツド24が挿
通されている。このロツド24の上端部には前記
パネル4に対する穿孔作業を行うためのポンチ2
5が取付けられている。ポンチ25は下部電極2
の中心部を貫通するように取付けられ、先端の穿
孔部を下部電極2の上面より突出可能としてい
る。このポンチ25は通常は下部電極2より引込
まれており、この動作のために前記ポンチ取付け
ロツド24は溶接機本体5に取付けられている油
圧シリンダ26にて上下往復動可能とされてい
る。ここで、前記ポンチ25とこれを取付けるロ
ツド24とは同一軸心上に配置されて連結されて
いるが、これらを貫通するようにスクラツプ通路
27が内部に形成されている。このスクラツプ通
路27はポンチ25の上端面に開口し、ロツド2
4のシリンダ26への取付け基端部分に形成した
スクラツプ出口管28に開口させている。また、
スクラツプ通路27は途中からスクラツプ寸法よ
り大きい断面通路とされ、スクラツプ寸法に対応
する小径通路27Aはポンチ25の上端からの小
範囲にのみ形成しているものである。したがつ
て、ポンチ25による穿孔作業の後、形成された
スクラツプは小径通路27Aを経過すると、容易
にスクラツプ通路27を通して排出可能となつて
いる。このスクラツプ25の排出状態を第4図に
示す。すなわち、ナツト3とパネル4とを溶着し
た後、ポンチ25を上昇移動させ、パネル4に穿
孔作業を施すが、これにより形成されたスクラツ
プ29は、はじめ小径通路27Aに存在するた
め、これを前述したガイドピン10をさらに下降
移動させることによつて押出し、大きい断面のス
クラツプ通路27まで押込み排出させるのであ
る。
Next, the peripheral structure of the lower electrode 2 will be explained based on FIG. 1. The lower electrode 2 is attached to the top of an electrode support casing 23 erected on the welding machine main body 5, and is fixedly installed at a fixed position on the main body 5. A cylindrical space is formed inside the casing 23, into which a punch attachment rod 24 is inserted. A punch 2 is attached to the upper end of this rod 24 for punching holes in the panel 4.
5 is installed. The punch 25 is the lower electrode 2
It is attached so as to penetrate through the center of the lower electrode 2, and the perforated portion at the tip can protrude from the upper surface of the lower electrode 2. This punch 25 is normally retracted from the lower electrode 2, and for this purpose the punch attachment rod 24 is capable of vertical and reciprocating movement by a hydraulic cylinder 26 attached to the welding machine main body 5. Here, the punch 25 and the rod 24 to which it is attached are disposed on the same axis and connected, and a scrap passage 27 is formed inside so as to pass through them. This scrap passage 27 opens at the upper end surface of the punch 25, and
It opens into a scrap outlet pipe 28 formed at the proximal end of the cylinder 26. Also,
The scrap passage 27 has a cross section larger than the scrap size from the middle, and a small diameter passage 27A corresponding to the scrap size is formed only in a small range from the upper end of the punch 25. Therefore, after the punch 25 performs the drilling operation, the formed scrap passes through the small diameter passage 27A and can be easily discharged through the scrap passage 27. FIG. 4 shows how the scrap 25 is discharged. That is, after welding the nut 3 and the panel 4, the punch 25 is moved upward to perform a drilling operation on the panel 4, but since the scrap 29 formed by this is initially present in the small diameter passage 27A, this was not described above. By further moving the guide pin 10 downward, it is pushed out to the scrap passage 27 having a large cross section and is discharged.

次に、上記装置の駆動機構を第6図に示す。駆
動機構はガイドピン10を出入させ、また上部電
極1の加圧(前進)・開放(後退)をなすエアー
回路30と、穿孔作業をなす油圧シリンダ26を
駆動するとともに、穿孔時に上部電極1を固定状
態に保持する電極ロツクシリンダ31を駆動する
ための油圧回路32とを有している。前記エアー
回路30は電磁切換弁33,34を切換動作させ
ることによりガイドピン10の出入動作および上
部電極1の上下移動を行わせることができるので
ある。また油圧回路32は各油圧シリンダ26,
31の油圧通路に配置した電磁切換弁35,36
を切換動作させることにより穿孔作業を行わせる
ことができるようになつている。そして各駆動機
器を作動させるタイムチヤートは第7図のように
構成し、これを実施するシーケンス制御回路を第
8図に示すように構成する。特に、この制御手段
では上部電極1からガイドピン10を出入させる
操作を溶接電流の通電時に行うものとし、溶接時
にガイドピン10が引込み動作させるように制御
され、溶接電流通電終了後に突出させるようにし
ている。そして、この溶接後に電極ロツクシリン
ダ31と穿孔用シリンダ26とを作動させること
によりパネル4にパンチングを施し、形成された
スクラツプ29をガイドピン10の突出作用を利
用してスクラツプ通路27内に押出し、これを排
出するようにしているのである。具体的には、パ
ネル4は下部電極2に搬入されたことを検知して
起動指令を与え、ナツト送給をなすとともに、吸
着コイル通電回路のa接点CR5を作動させて上
部電極1にナツトを吸着させる。このナツト吸着
時にはガイドピン10が突出状態にあるため、両
者の嵌合により位置決めが正確に行われる。そし
て同時に上部電極1を下降させる駆動回路のa接
点CR5も作動させるので、電磁切換弁34が加
圧側に切換わり、上部電極1がナツト吸着状態で
下部電極2にセツトされているパネル4に向つて
下降される。下降端に達すると、該位置に設定さ
れているリミツトスイツチLS−2がオンされ、
これにより吸着コイルへの通電を切り、ガイドピ
ン10の駆動用電磁切換弁33を作動させる回路
のb接点を起動し、ピンを引込動作させるのであ
る。また同時にタイマTR1を起動し、溶接電流
の通電回路中のタイマスイツチTR1を作動さ
せ、設定時間だけ通電し溶接を行わせる。そし
て、この溶接電流の通電終了と同時にガイドピン
10をもとの状態すなわち電磁切換弁33を復帰
させてピン突出状態として次の穿孔作業に入るの
である。穿孔作業は、まず電極ロツクシリンダ3
1に対応する電磁切換弁36に起動信号を与え、
該シリンダ31を下降させて上部電極1を溶接位
置に固定保持する。そしてこの動作終了を検知し
て穿孔用の油圧シリンダ26に対応する電磁切換
弁35に起動信号を与え、油圧シリンダ26を介
してポンチ25を上昇移動し、パネル4にパンチ
ングを施すのである。そして形成されたスクラツ
プ29は、予めガイドピン10が圧接されている
ので、パンチングと同時にスクラツプ29はスク
ラツプ通路27に押込まれ、小径通路27Aはず
れるまで押込み動作を続ける。そして、小径通路
27Aを経過したスクラツプ29は自然落下によ
りスクラツプ通路27を経て外部に排出され、作
業が終了するのである。
Next, the drive mechanism of the above device is shown in FIG. The drive mechanism moves the guide pin 10 in and out, drives the air circuit 30 that pressurizes (advances) and releases (retreats) the upper electrode 1, and the hydraulic cylinder 26 that performs the drilling operation, and also drives the upper electrode 1 during drilling. It has a hydraulic circuit 32 for driving an electrode lock cylinder 31 that is held in a fixed state. The air circuit 30 can move the guide pin 10 in and out and move the upper electrode 1 up and down by switching the electromagnetic switching valves 33 and 34. Further, the hydraulic circuit 32 includes each hydraulic cylinder 26,
Electromagnetic switching valves 35 and 36 arranged in the hydraulic passage of 31
Drilling work can be performed by switching between the two. A time chart for operating each driving device is constructed as shown in FIG. 7, and a sequence control circuit for implementing this is constructed as shown in FIG. 8. In particular, in this control means, the operation of moving the guide pin 10 in and out of the upper electrode 1 is performed when the welding current is applied, and the guide pin 10 is controlled to be retracted during welding, and made to protrude after the welding current has ended. ing. After this welding, the panel 4 is punched by operating the electrode lock cylinder 31 and the punching cylinder 26, and the formed scrap 29 is pushed out into the scrap passage 27 using the protruding action of the guide pin 10. This is what we are trying to do to get rid of it. Specifically, the panel 4 detects that the nut has been carried into the lower electrode 2, issues a start command, feeds the nut, and activates the a contact CR5 of the adsorption coil energization circuit to place the nut in the upper electrode 1. Let it absorb. Since the guide pin 10 is in a protruding state when the nut is attracted, accurate positioning is achieved by fitting the two together. At the same time, the a contact CR5 of the drive circuit that lowers the upper electrode 1 is activated, so the electromagnetic switching valve 34 is switched to the pressurizing side, and the upper electrode 1 is directed toward the panel 4 set on the lower electrode 2 with the nut attracted. Then it is lowered. When the lowering end is reached, limit switch LS-2 set at that position is turned on.
This turns off the power to the attraction coil, activates the b contact of the circuit that operates the driving electromagnetic switching valve 33 of the guide pin 10, and causes the pin to retract. At the same time, the timer TR1 is activated, and the timer switch TR1 in the welding current energization circuit is activated to energize for a set time to perform welding. Then, at the same time as the application of the welding current is finished, the guide pin 10 is returned to its original state, that is, the electromagnetic switching valve 33 is returned to its original state, and the pin is placed in the protruding state to begin the next drilling operation. The drilling work begins with the electrode lock cylinder 3.
Give a start signal to the electromagnetic switching valve 36 corresponding to 1,
The cylinder 31 is lowered to fix and hold the upper electrode 1 at the welding position. When the completion of this operation is detected, a start signal is given to the electromagnetic switching valve 35 corresponding to the hydraulic cylinder 26 for punching, and the punch 25 is moved upward via the hydraulic cylinder 26 to punch the panel 4. Since the formed scrap 29 is pressed against the guide pin 10 in advance, the scrap 29 is pushed into the scrap passage 27 at the same time as punching, and the pushing operation continues until the small diameter passage 27A is removed. Then, the scrap 29 that has passed through the small diameter passage 27A is discharged to the outside through the scrap passage 27 by gravity, and the work is completed.

上述のような構成に係るプロジエクシヨン溶接
機によれば、上部電極1に溶接対象であるナツト
3を吸着させる際、ガイドピン10にて両者の位
置決めを確実に行うことができ、このガイドピン
10は溶接作業時には上部電極1に引込まれてい
るので、ナツト3とパネル4間の位置決めが高い
精度で行われるとともに、ガイドピン10を通じ
た分流も生じないので、溶接品質が著しく向上す
ることとなる。また、この装置では、溶接終了後
に正確に位置決めされた個所にポンチ25の動作
によつて穿孔作業が施されるので、パネル4に予
めナツト下孔を形成しない場合であつても、高い
精度でねじ孔3Aに対応する穿孔が可能となる。
しかも、穿孔作業に伴つて発生するスクラツプ2
9は下部電極2の中心部を介して下方向に排出さ
れるので、スクラツプ29の発生に伴う不都合も
生じない。
According to the projection welding machine having the above-described configuration, when the nut 3 to be welded is attracted to the upper electrode 1, the positioning of both can be performed reliably using the guide pin 10. 10 is drawn into the upper electrode 1 during welding work, so the positioning between the nut 3 and the panel 4 is performed with high precision, and no shunt flow occurs through the guide pin 10, so welding quality is significantly improved. Become. In addition, with this device, the punch 25 performs the drilling operation at precisely positioned locations after welding is completed, so even if the nut pilot hole is not formed in the panel 4 in advance, it can be performed with high precision. It becomes possible to drill a hole corresponding to the screw hole 3A.
In addition, scrap 2 generated during drilling work
Since the scrap 9 is discharged downward through the center of the lower electrode 2, there is no problem associated with the generation of the scrap 29.

なお、上記実施例では、上部電極1にガイドピ
ン10を取付けた構成としたが、これを固定側の
下部電極2に形成し、上部電極位置側にスクラツ
プ29の排出通路を形成するようにしてもよい。
またシーケンス回路による制御回路をマイクロコ
ンピユータ処理によつて行わせるようにすること
も可能である。
In the above embodiment, the guide pin 10 is attached to the upper electrode 1, but this is formed on the lower electrode 2 on the fixed side, and a discharge passage for the scrap 29 is formed on the side where the upper electrode is located. Good too.
Furthermore, it is also possible to have the control circuit using the sequence circuit perform processing by a microcomputer.

〔発明の効果〕〔Effect of the invention〕

以上の如く、本発明に係るプロジエクシヨン溶
接機によれば、溶接位置決め精度の向上と溶接品
質の向上を図ることができるとともにパネルに予
めナツト下孔を形成しない場合であつても、十分
に正確な穿孔作業が可能となり、形成されるスク
ラツプの排出処理も簡便に行うことができるとい
う効果を奏する。
As described above, according to the projection welding machine according to the present invention, it is possible to improve welding positioning accuracy and welding quality, and even when a nut pilot hole is not formed in advance in a panel, it is possible to improve welding positioning accuracy and welding quality. Accurate drilling work is possible, and the scrap formed can be easily discharged.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は実施例に係るプロジエクシヨン溶接機
の要部断面図、第2図は上部電極部の正面図、第
3図は第2図の側面図、第4図は穿孔作業時の状
態を示す断面図、第5図はナツト供給装置を含む
プロジエクシヨン溶接機の斜視図、第6図はエア
ー回路および油圧回路の構成図、第7図は溶接作
業のタイムチヤート図、第8図はシーケンス回路
図である。 1……上部電極、2……下部電極、3……ナツ
ト、4……パネル、5……溶接機本体、10……
ガイドピン、15……ナツト供給装置、16……
ナツトキヤツチヤ機構、24……ポンチ取付けロ
ツド、25……ポンチ、27……スクラツプ通
路、29……スクラツプ、30……エアー回路、
32……油圧回路、38……吸着コイル。
Fig. 1 is a sectional view of the main parts of the projection welding machine according to the embodiment, Fig. 2 is a front view of the upper electrode section, Fig. 3 is a side view of Fig. 2, and Fig. 4 is the state during drilling work. 5 is a perspective view of a projection welding machine including a nut supply device, FIG. 6 is a configuration diagram of an air circuit and a hydraulic circuit, FIG. 7 is a time chart of welding work, and FIG. 8 is a sequence circuit diagram. 1... Upper electrode, 2... Lower electrode, 3... Nut, 4... Panel, 5... Welding machine main body, 10...
Guide pin, 15... Nut supply device, 16...
Nut catcher mechanism, 24... Punch attachment rod, 25... Punch, 27... Scrap passage, 29... Scrap, 30... Air circuit,
32...Hydraulic circuit, 38...Adsorption coil.

Claims (1)

【特許請求の範囲】[Claims] 1 一方の溶接電極に、所定位置に供給された溶
接対象ナツトのねじ孔内に出入可能とされるガイ
ドピンを設け、当該ガイドピンを溶接作業時に引
込動作させる制御手段を設け、他方の溶接電極に
ナツトが溶接される板材への穿孔用ポンチ手段を
設けるとともに、このポンチ手段にはスクラツプ
排出路を形成し、前記ガイドピンによりスクラツ
プを前記排出路に押出し可能としたことを特徴と
するプロジエクシヨン溶接機。
1 One welding electrode is provided with a guide pin that can be moved in and out of the screw hole of the nut to be welded that is supplied to a predetermined position, and a control means is provided that retracts the guide pin during welding work, and the other welding electrode is The projector is characterized in that a punch means for punching a hole into a plate material to which a nut is welded is provided, and a scrap discharge passage is formed in the punch means, and the scrap can be pushed out into the discharge passage by the guide pin. Yon welding machine.
JP14737184A 1984-07-16 1984-07-16 Projection welder Granted JPS6127183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14737184A JPS6127183A (en) 1984-07-16 1984-07-16 Projection welder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14737184A JPS6127183A (en) 1984-07-16 1984-07-16 Projection welder

Publications (2)

Publication Number Publication Date
JPS6127183A JPS6127183A (en) 1986-02-06
JPH0259037B2 true JPH0259037B2 (en) 1990-12-11

Family

ID=15428714

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14737184A Granted JPS6127183A (en) 1984-07-16 1984-07-16 Projection welder

Country Status (1)

Country Link
JP (1) JPS6127183A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07103255B2 (en) * 1988-12-02 1995-11-08 東芝シリコーン株式会社 Surface protection method for plastic molded products

Also Published As

Publication number Publication date
JPS6127183A (en) 1986-02-06

Similar Documents

Publication Publication Date Title
US4789768A (en) Projection welder
US4908928A (en) Slug riveting method and apparatus
JP2694073B2 (en) Device for joining two ends of a printer ribbon
JPH0422675B2 (en)
US5015814A (en) Core removing device for wirecut electrical discharge machining apparatus
JP2001087865A (en) Nut feeding device for nut resistance welding
CA2420929C (en) Method and device for welding projection bolt
CN112440054A (en) Welding system for steel cylinder and welding method thereof
JPH0259037B2 (en)
US5183987A (en) Cut-out piece removing method in electric discharge machining and an apparatus therefor
JPS6117380A (en) Projection welding machine
JP2004082193A (en) Welding bolt supply method and equipment
CN112440043A (en) Collecting device and collecting method for steel cylinder welding spatter
JPS595516Y2 (en) Bolt feeding device in projection welding machine
US5184498A (en) Turret punch press
JPS6219328A (en) Initial holing device for wire-cut electric discharge machine
JPH02182383A (en) Projection welding method for perforated part
CN215091253U (en) Double-stroke lifting mechanism for fixed welding machine
JP3326490B2 (en) Projection nut welding equipment and welding method
JP3104862B2 (en) Air blow method and apparatus for lower electrode for bolt welding
JPH106014A (en) Tig welding torch
CN106002057A (en) Valve core suspension welding and positioning device for EGR valve
JPH0349826Y2 (en)
CN107470761B (en) Spot welding machine and control device and control method thereof
KR200142358Y1 (en) Front panel welding apparatus for microwave oven