JPH0313804B2 - - Google Patents
Info
- Publication number
- JPH0313804B2 JPH0313804B2 JP8896185A JP8896185A JPH0313804B2 JP H0313804 B2 JPH0313804 B2 JP H0313804B2 JP 8896185 A JP8896185 A JP 8896185A JP 8896185 A JP8896185 A JP 8896185A JP H0313804 B2 JPH0313804 B2 JP H0313804B2
- Authority
- JP
- Japan
- Prior art keywords
- ropes
- rope
- busbar
- horizontal
- protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000001681 protective effect Effects 0.000 claims description 40
- 229910000831 Steel Inorganic materials 0.000 claims description 27
- 239000010959 steel Substances 0.000 claims description 27
- 238000010276 construction Methods 0.000 claims description 19
- 230000005540 biological transmission Effects 0.000 claims description 12
- 239000000725 suspension Substances 0.000 claims description 7
- 238000009434 installation Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 230000002159 abnormal effect Effects 0.000 description 3
- 239000012777 electrically insulating material Substances 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 239000004020 conductor Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 229920000271 Kevlar® Polymers 0.000 description 1
- 241001465754 Metazoa Species 0.000 description 1
- 239000004677 Nylon Substances 0.000 description 1
- 238000010292 electrical insulation Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 239000004761 kevlar Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Description
【発明の詳細な説明】
本発明は架空送電線の架線工事において、隣接
する鉄塔間で構造物の上空を横切つて多条の電線
を架設する場合、架線工事中の不測の事態で電線
の異常な垂下による下方構造物への接触、損壊事
故又は電線の損傷の防止を図る装置である。DETAILED DESCRIPTION OF THE INVENTION In overhead power transmission line work, the present invention provides a method for installing multiple electric wires across the sky between adjacent steel towers, and in case of unforeseen circumstances during the overhead line work. This is a device that prevents contact with lower structures, damage accidents, and damage to electric wires due to abnormal drooping.
従来、架線工事における下方構造物の保護に
は、構造物の付近両側に保護用足場を構築してそ
の間にワイヤーロープをネツト状に架設するなど
の方法が採られている。しかし近年、送電線の設
備規模の大型化、横過構造物の多様化に伴い保護
用足場の規模も大形で高強度化する傾向にあり、
経済性、工事効率、また社会環境面、足場用地の
確保面からもその設置は非常に困難なものになつ
ている。また下方構造物が特別高圧送電線の場合
は、大規模な保護用足場となると共に、保護装置
自体が導電材料であるため、保護装置の設置に長
期の停電を必要とし、保護装置そのものと下方送
電線との接触事故にも十分な対策が必要となる。 Conventionally, methods have been adopted to protect lower structures during overhead line work, such as constructing protective scaffolding on both sides near the structure and erecting wire ropes in a net shape between them. However, in recent years, as the scale of power transmission line facilities has become larger and the number of crossing structures has become more diverse, protective scaffolding has tended to become larger and stronger.
Their installation has become extremely difficult in terms of economy, construction efficiency, social environment, and securing land for scaffolding. In addition, if the lower structure is a special high-voltage power transmission line, it becomes a large-scale protective scaffold, and since the protective device itself is made of conductive material, installation of the protective device requires a long power outage, and the protective device itself and the lower Adequate measures are also required to prevent accidents caused by contact with power transmission lines.
他方、最近保護足場の構築をしない装置とし
て、隣接鉄塔間にメツセンジヤーワイヤーを張
り、架設する電線を金車でこのワイヤーに吊るす
吊り金車工法が行われているが、多導体電線を架
設する場合はその重量に耐えるため上記ワイヤー
が大形となりその取扱の労苦が増大するので工事
の能率が悪くなり、また特別高圧送電線の横過の
場合などはメツセンジヤーワイヤー及び金車装置
の架線工事中のトラブルは直接下方構造物の損傷
につながると共に、架線工事従業者の感電災害事
故を誘発することも予想される。 On the other hand, recently, as a device that does not require the construction of protective scaffolding, the hanging metal wheel method has been used, in which a wire is stretched between adjacent steel towers and the electric wire to be erected is hung from this wire with a metal wheel, but it is not necessary to construct a multi-conductor electric wire. In such cases, the above-mentioned wire becomes large in order to withstand the weight, and the labor involved in handling it increases, which reduces the efficiency of construction work.Also, in the case of crossing special high-voltage power lines, it is difficult to use the wire and the metal wheel device. Trouble during overhead line construction can directly lead to damage to the structures below, and is also expected to cause electric shock accidents for overhead line construction workers.
本発明は上記後者の装置と同じく保護足場を構
築しない装置に属し、即ち当該構造物を挾んで隣
接する両鉄塔を利用し、その間に上下2組の母線
ロープを張り、そのうち下部の複数母線ロープ相
互間を横に連絡するように線長方向に沿つて複数
の水平保護ロープを設置し、更に上部と下部の各
外側にある母線ロープ相互間を縦に連絡するよう
に線長方向に沿つて複数の垂直保護ロープを設置
することにより、架線工事を行う多条の全電線の
周りを囲う吊り橋状の保護装置を形成して下方構
造物の保護を行うものである。それにより保護足
場が不用となり、その構築のための手間及び用地
確保が省略される。また多条の全電線を包囲保護
するので、その架線工事はメツセンジヤーワイヤ
ーの張架を必要とすることなく通常の架線工法で
実施可能であり、従つて架線工事の能率低下を生
じない。なお、本保護装置はその構造上から電線
の風による横方向の振れには電線に追従し、縦方
向のトラブルによる異常な電線垂下の場合にはこ
れを受止めるので、通常の架線工事幅と空間を確
保すればよい。 The present invention belongs to a device that does not construct a protective scaffold like the latter device, that is, it uses two adjacent steel towers that sandwich the structure, and between them two sets of upper and lower busbar ropes are stretched, and the lower multiple busbar ropes are used. A plurality of horizontal protection ropes are installed along the line length direction so as to connect each other horizontally, and further along the line length direction so as to connect vertically between the busbar ropes on the outside of each of the upper and lower parts. By installing a plurality of vertical protection ropes, a suspension bridge-like protection device is formed that surrounds all the multi-stranded electric wires during overhead line work, thereby protecting the structures below. This eliminates the need for protective scaffolding, and saves time and effort for constructing it and securing land. Furthermore, since all of the multi-strand electric wires are surrounded and protected, the overhead line work can be carried out using normal overhead line construction methods without the need for tensioning messenger wire, and therefore there is no reduction in the efficiency of the overhead line work. Furthermore, due to its structure, this protection device follows the horizontal deflection of the wire due to the wind, and detects abnormal drooping of the wire due to problems in the vertical direction. Just make sure you have space.
また本発明は従来のような鋼製ワイヤーロープ
の使用を廃止して、母線ロープ及び水平保護ロー
プ、垂直保護ロープ等をすべて電気絶縁材料で構
成するものである。それにより、これらのロープ
が万一断線落下したとき、下方構造物が電気設備
の場合でもこれに電気的トラブルを与えない。特
にそれが特高送電線の場合、その停電事故に加え
て人畜の感電事故を生ずることがないという利点
がある。更に、電気絶縁材料は一般に鋼材より遥
かに軽量であるので、保護装置の架設及び撤去の
作業を軽快にすると共に、上記のような断線落下
事故のとき、下方構造物に与える機械的衝撃が小
さく、損傷を生じない利点がある。 Furthermore, the present invention eliminates the use of conventional steel wire ropes, and instead constructs the bus rope, horizontal protection ropes, vertical protection ropes, etc., all of electrically insulating materials. As a result, if these ropes should break and fall, even if the underlying structure is electrical equipment, no electrical trouble will occur to it. Particularly in the case of extra-high power transmission lines, there is an advantage that in addition to power outage accidents, electric shock accidents to humans and animals will not occur. Furthermore, since electrical insulating materials are generally much lighter than steel materials, they make it easier to erect and remove protective equipment, and they also reduce the mechanical shock given to the structures below in the event of a disconnection/fall accident like the one mentioned above. , which has the advantage of not causing damage.
本発明は更に進んで、上記吊り橋状保護装置の
架設作業を容易にするため、また架設後に強風時
この保護装置の機械的安全性を確保するために、
下部水平及び上下間垂直各保護ロープを上下の各
母線ロープに各々ローラーを介して線長方向に移
動可能の関係に係合し、この移動の操作をするた
めに各母線ロープに沿つて電気絶縁性の補助ロー
プを付設し、これと上記ローラーの支持枠とを固
定関係に結合して水平、垂直各保護ロープの母線
ロープ上への展開及び鉄塔側への収納を容易にす
るものである。 The present invention furthermore provides the following steps in order to facilitate the construction work of the above-mentioned suspension bridge-like protection device and to ensure the mechanical safety of this protection device during strong winds after erection.
The lower horizontal and upper and lower vertical protective ropes are respectively engaged with the upper and lower bus ropes in a movable relationship in the line length direction through rollers, and electrically insulated along each bus rope to operate this movement. By attaching an auxiliary rope and connecting it to the supporting frame of the roller in a fixed relationship, it is possible to easily deploy the horizontal and vertical protective ropes onto the busbar rope and store them on the tower side.
本発明の1実施例を図面について説明するに、
第1図において、A,Bは隣接する2個の鉄塔で
あり、その間に唯今から架設しようとする送電線
4が1部既に架設済みの状態で示される。送電線
4の下方に両電柱9,11間に張架された電線1
0が既設の下方構造物として存在し、この電線1
0は送電線4と直交又は斜交している。本発明に
よる保護装置は送電線4のうち最上段にある地線
と下方の既設電線10との間に送電線4に沿つて
架設される。 To explain one embodiment of the present invention with reference to the drawings,
In FIG. 1, A and B are two adjacent steel towers, and a portion of the power transmission line 4 that is about to be installed between them is already shown. Electric wire 1 strung between both utility poles 9 and 11 below power transmission line 4
0 exists as an existing lower structure, and this electric wire 1
0 is perpendicular or oblique to the power transmission line 4. The protection device according to the present invention is installed along the power transmission line 4 between the ground wire at the top of the power transmission line 4 and the existing electric wire 10 below.
鉄塔A,Bの3相3線式2回線送電線を支持す
る各上下3段の水平アームのうち最下段アーム
5,6の下方にそれより稍長い保護用水平アーム
12,13が夫々鉄塔A,Bに固定設置される。
両水平アーム12,13は互に向き合う方向に設
置され、その間に4本の下段母線ロープ14が互
に適当な間隔を保つて平行に張架される。これら
の母線ロープを横に連絡する水平保護ロープ16
が各母線ロープ14の線長方向に沿つて複数個互
に適当な間隔を保つて設置され、これら複数の母
線ロープ14と複数の水平保護ロープ16との各
交点位置にローラー具20が設けられる。各ロー
ラー具20に内蔵されたローラーは各母線ロープ
14に対してそれと接触して転動する関係にあ
り、このローラーを支持する枠体は保護ロープ1
6の対応位置部分と係止関係に結合される。更に
各母線ロープ14に沿つてそれと線長方向に移動
可能なようにして下段補助ロープ18が設けら
れ、このロープもまた上記のローラー支持枠体に
対応位置において係止関係に結合される。なお図
面には省略してあるが、補助ロープ18は鉄塔A
とB間の距離の2倍強の長さを有し、その何れか
一方の半部が図面に示されたものであり、この半
部の両端部は架設操作完了直前に図示のように両
側の水平アーム12,13に固定される。 Of the horizontal arms 5 and 6 in the three upper and lower stages that support the three-phase, three-wire, two-circuit power transmission lines on the towers A and B, protective horizontal arms 12 and 13, which are slightly longer than the lowermost arms 5 and 6, are installed on the towers A and B, respectively. ,B are fixedly installed.
Both horizontal arms 12 and 13 are installed in directions facing each other, and four lower busbar ropes 14 are stretched in parallel between them with appropriate spacing between them. A horizontal protection rope 16 connects these busbar ropes laterally.
are installed at appropriate intervals along the length direction of each bus rope 14, and a roller tool 20 is provided at each intersection of the plurality of bus ropes 14 and the plurality of horizontal protection ropes 16. . The rollers built into each roller tool 20 are in a relationship of rolling in contact with each bus rope 14, and the frame supporting this roller is the protective rope 1.
6 in a locking relationship. Further, a lower auxiliary rope 18 is provided along each generatrix rope 14 so as to be movable in the longitudinal direction thereof, and this rope is also coupled in a locking relationship to the roller support frame at a corresponding position. Although omitted in the drawing, the auxiliary rope 18 is attached to the steel tower A.
and B, one half of which is shown in the drawings, and both ends of this half are connected to each other as shown in the drawings immediately before the completion of the erection operation. is fixed to the horizontal arms 12, 13 of.
鉄塔A,Bに互に対向するようにして設置され
た最上段水平アーム7,8の両端を各結着点とし
て鉄塔A,B間に2個の上段母線ロープ15が架
設される。なおこれら水平アーム7,8と前記の
水平アーム12,13とは略同長に設定される。
上段母線ロープ15に沿つて上段補助ロープ19
が設けられ、この補助ロープ19の長さ及び状態
は前記した下段補助ロープ18の場合と同じであ
る。両上段母線ロープ15にも前記と同様に各複
数のローラー具20が設けられ、これらは下段外
側2個の母線ロープ14に設けられた各複数のロ
ーラー具20と上下相対応する位置に配置され、
その間に上下の各ローラー具20を連絡する垂直
保護ロープ17が設けられる。これらローラー具
の各支持枠体は補助ロープ18の対応位置に係止
され、また垂直保護ロープ17の上端及び下端は
夫々上段及び下段のローラー具20の各支持枠体
に係止される。なお下段の水平保護ロープ16の
数は垂直保護ロープ17より多くして、両端に垂
直保護ロープの付いた水平保護ロープの相互間に
垂直保護ロープの付いてない水平保護ロープが1
個又はいくつか設けられ、下方保護の密度を高め
ると共に側方については簡略化のため密度を低く
してある。 Two upper busbar ropes 15 are installed between the steel towers A and B, with both ends of the uppermost horizontal arms 7 and 8 installed on the steel towers A and B facing each other as connection points. Note that these horizontal arms 7, 8 and the horizontal arms 12, 13 are set to have approximately the same length.
Upper auxiliary rope 19 along upper busbar rope 15
The length and condition of this auxiliary rope 19 are the same as those of the lower auxiliary rope 18 described above. Both upper bus ropes 15 are also provided with a plurality of roller tools 20 in the same manner as described above, and these are arranged at positions corresponding to the upper and lower positions of the roller tools 20 provided on the two outer bus ropes 14 of the lower row. ,
A vertical protective rope 17 connecting the upper and lower roller tools 20 is provided between them. The support frames of these roller tools are locked to corresponding positions on the auxiliary rope 18, and the upper and lower ends of the vertical protection rope 17 are locked to the support frames of the upper and lower roller tools 20, respectively. The number of lower horizontal protection ropes 16 is greater than the number of vertical protection ropes 17, and there is one horizontal protection rope without a vertical protection rope between the horizontal protection ropes with vertical protection ropes attached to both ends.
One or more are provided, and the density of the lower protection is increased, and the density of the side protection is lowered for simplicity.
第2図及び第3図は夫々上段及び下段の各ロー
ラー具20とそれに関連する各ロープとの相互関
係を示す。第2図において、ローラー具20はそ
の中央の孔を貫通する上段母線ロープ15と接触
して転動する各々いくつかの水平ローラー21と
垂直ローラー22を内蔵し、これらのローラーは
その全体の四周を囲む枠体23により支持され
る。枠体23の詳細構造は図面に省略されるが、
その左右両側面の何れか一方において垂直ローラ
ー22がその上端部を軸にして回転して中央孔の
囲いを開放できるように構成される。従つて母線
ロープ15はローラー枠体23の中央孔にその囲
いの一側の開閉により挿脱できる。枠体23の上
面から突出して上部吊具24が、また下面から突
出して下部吊具25が夫々固設される。下部吊具
25の1つの孔に上段補助ロープ19の対応部分
が、また他の孔に垂直保護ロープ17の上端が何
れもリングを介して係止される。 2 and 3 show the mutual relationship between the upper and lower roller tools 20 and their associated ropes, respectively. In FIG. 2, the roller device 20 incorporates several horizontal rollers 21 and vertical rollers 22 each rolling in contact with the upper busbar rope 15 passing through its central hole, these rollers covering all four circumferences of its entire circumference. It is supported by a frame body 23 surrounding it. Although the detailed structure of the frame body 23 is omitted in the drawing,
A vertical roller 22 on either the left or right side is configured to rotate around its upper end to open the enclosure of the central hole. Therefore, the bus rope 15 can be inserted into and removed from the central hole of the roller frame 23 by opening and closing one side of the enclosure. An upper hanger 24 and a lower hanger 25 are fixedly protruded from the upper surface of the frame 23 and from the lower surface, respectively. A corresponding portion of the upper auxiliary rope 19 is secured to one hole of the lower suspender 25, and the upper end of the vertical protective rope 17 is secured to the other hole through a ring.
第3図において、ローラー具20は第2図にお
けるローラー具20と全く同じ構造のものであ
り、その中央孔に下段母線ロープ14が挿通され
る。上部吊具24に垂直保護ロープ17の下端が
リングを介して係止され、下部吊具25の1つの
孔に下段補助ロープ18の対応部分が、また他の
孔に水平保護ロープ16の1端が何れもリングを
介して係止される。第3図は第1図において外側
の下段母線ロープ14に関連するローラー具20
及び関連ロープを示すが、内側の下段母線ロープ
14について言えば第3図において上部吊具24
に係止された垂直保護ロープ17がなく、その代
り下部吊具25の残りの1つの孔に他の水平保護
ロープ区分16の1端がリングを介して係止され
た関係にある。 In FIG. 3, a roller tool 20 has exactly the same structure as the roller tool 20 in FIG. 2, and the lower busbar rope 14 is inserted through its central hole. The lower end of the vertical protective rope 17 is locked to the upper hanging tool 24 via a ring, the corresponding part of the lower auxiliary rope 18 is secured to one hole of the lower hanging tool 25, and one end of the horizontal protective rope 16 is secured to the other hole. Both are locked through rings. FIG. 3 shows a roller tool 20 associated with the outer lower busbar rope 14 in FIG.
and related ropes, but regarding the inner lower busbar rope 14, the upper hanging tool 24 is shown in FIG.
There is no vertical protective rope 17 latched to the vertical protective rope 17; instead, one end of another horizontal protective rope section 16 is in a latched relationship via a ring to the remaining one hole of the lower sling 25.
母線ロープ等すべてのロープ14〜19は電気
絶縁性の材料で作られ、従つて一般的にその重量
は従来の鋼材に比べて軽量である。またこれらの
ロープは本発明の使用態様から見てなるべく機械
的強度、耐久性、耐候性等の高いものであること
が望ましい。これらの諸条件に良く適合する材料
を使用したロープの1例として特殊の高強力有機
繊維を使用した所謂ケブラーロープがある。この
ものは電気的絶縁性を有することのほかに、略同
径の従来のワイヤーロープと比較して機械的破断
強度が略同等であり、しかも重量は1/3以下であ
る。 All ropes 14-19, such as busbar ropes, are made of electrically insulating material and are therefore generally light in weight compared to conventional steel. Further, it is desirable that these ropes have as high mechanical strength, durability, weather resistance, etc. as possible in view of the usage mode of the present invention. An example of a rope that uses a material that satisfies these conditions is a so-called Kevlar rope that uses special high-strength organic fibers. In addition to having electrical insulation properties, this wire rope has approximately the same mechanical breaking strength as conventional wire ropes of approximately the same diameter, and is less than 1/3 the weight.
第1図に示す本発明による保護装置の設置工事
の順序について説明するに、先ず隣接鉄塔A,B
に水平アーム12,13を取付けて後、これら水
平アームの間に4条の下段補助ロープ18を延線
する。そのためにはヘリコプターから延線用ナイ
ロンロープを水平アーム12,13間に延線し、
予め鉄塔A側に用意した4条の補助ロープ18の
各先端を延線用ロープに結着した後、鉄塔B側で
この延線用ロープを巻取ることにより水平アーム
12と13間に4条の補助ロープ18を延線架設
する。各補助ロープ18は前記のように鉄塔A,
B間の距離の2倍強の長さを有するので、補助ロ
ープ18の先端が水平アーム13に達したとき補
助ロープ18の前半部の終りが水平アーム12に
あり、後半部はそれに続く。そこで鉄塔A側にお
いてこの後半部の各始点付近に4条の母線ロープ
14の各始点を夫々結着して引続き鉄塔B側で各
補助ロープ18を引つ張りリールに巻取ることに
より各母線ロープ14及び補助ロープ後半部の始
端は水平アーム13に到達し、終端は水平アーム
12に達する。そこで各母線ロープ14を緊線し
てその始端と終端を夫々水平アーム13と12に
固定するとこれらのロープは第1図に示す状態に
なり、各補助ロープ18はその前半部が鉄塔B側
でリールに巻取られ後半部が各母線ロープ14に
概ね沿う状態で水平アーム12,13間に延線さ
れる。 To explain the order of installation work of the protection device according to the present invention shown in FIG. 1, first, the adjacent steel towers A and B
After installing the horizontal arms 12 and 13, four lower auxiliary ropes 18 are extended between these horizontal arms. To do this, a nylon rope for wire extension is extended from the helicopter between the horizontal arms 12 and 13,
After tying each tip of the four auxiliary ropes 18 prepared in advance on the steel tower A side to the wire extension rope, the four wire ropes are wound up on the steel tower B side to form four ropes between the horizontal arms 12 and 13. The auxiliary rope 18 is extended and installed. Each auxiliary rope 18 is connected to the steel tower A, as described above.
Since the length is a little more than twice the distance between B and B, when the tip of the auxiliary rope 18 reaches the horizontal arm 13, the end of the first half of the auxiliary rope 18 is on the horizontal arm 12, and the second half follows. Therefore, the starting points of the four bus ropes 14 are tied to each of the starting points of the latter half on the tower A side, and each of the auxiliary ropes 18 is then wound on a tension reel on the tower B side. 14 and the starting end of the second half of the auxiliary rope reach the horizontal arm 13, and the terminal end reaches the horizontal arm 12. Therefore, by tightening each bus rope 14 and fixing its starting and ending ends to the horizontal arms 13 and 12, respectively, these ropes will be in the state shown in Figure 1, and each auxiliary rope 18 will have its front half on the tower B side. The wire is wound onto a reel and extended between the horizontal arms 12 and 13 with the latter half generally following each busbar rope 14.
鉄塔A,Bの最上段水平アーム7と8間に上段
母線ロープ15及び上段補助ロープ19を架設す
る工事も上記下段の場合と同じようにして行われ
る。但し下段では母線ロープ14及び補助ロープ
16が各々4本であつたが、上段では各々2本だ
けである。 Construction work for constructing the upper busbar rope 15 and the upper auxiliary rope 19 between the uppermost horizontal arms 7 and 8 of the steel towers A and B is carried out in the same manner as in the case of the lower stage. However, in the lower stage, there were four bus ropes 14 and four auxiliary ropes 16 each, but in the upper stage, there were only two each.
次に下段の水平保護ロープ16及び上下段間の
垂直保護ロープ17の取付作業に入る。そのため
先ず鉄塔B側において上下段すべての母線ロープ
14,15に第2図又は第3図に示すようなロー
ラー具20をその1側を開閉することにより係合
し、上段においてローラー具20の下部吊具25
に垂直保護ロープ17の上端を係止し、下段にお
いてローラー具20の上部吊具24に垂直保護ロ
ープ17の下端を係止すると共に、下部吊具25
に水平保護ロープ16の各区分の両端を係止す
る。また上下段共に下部吊具25に補助ロープ1
8,19の各対応部分を係止する。次にすべての
補助ロープ18,19を鉄塔A側で巻取り鉄塔B
側で送出すと、最初の垂直保護ロープ17(a−
1)及び水平保護ロープ16(b−1)は上下の
母線ロープ15,14に沿つて鉄塔Bから鉄塔A
の方へ移動する。この移動の距離が予定の長さに
なつたとき、移動を停止して次の保護ロープ17
(a−2),16(b−2)について上記と同様の
操作をする。即ち第2の各ローラー具20を母線
ロープ15,14に係合しその吊具24,25に
各保護ロープ17,16及び各補助ロープ19,
18を係止して後、すべての補助ロープを同時に
鉄塔Aの方へ予定の長さだけ移動させる。以下同
様の操作を繰返し、最後に所要組数n番目の保護
ロープ17(a−n),16(b−n)を鉄塔B
側の水平アーム8,13から送り出した所で一連
の操作を終了する。この終了した時点での各保護
ロープ17(a−1),(a−2),(a−n)及び
16(b−1),(b−2),(b−n)は第1図に
夫々a−1,a−2,a−n,b−1,b−2,
b−nとして表示される。その後各補助ロープ1
9,18を鉄塔AとB間で緊線してその両端を水
平アーム7,8,12,13に固定すると、図示
のような吊り橋状の保護装置が完成する。 Next, work begins on attaching the horizontal protection rope 16 on the lower tier and the vertical protection rope 17 between the upper and lower tiers. To do this, first, on the side of the steel tower B, a roller tool 20 as shown in FIG. Hanging tool 25
The upper end of the vertical protective rope 17 is locked to the upper hanging tool 24 of the roller tool 20 at the lower stage, and the lower end of the vertical protective rope 17 is locked to the lower hanging tool 25.
Both ends of each section of horizontal protection rope 16 are secured to. In addition, the auxiliary rope 1 is attached to the lower suspension tool 25 for both the upper and lower tiers.
8 and 19 are locked. Next, wind up all the auxiliary ropes 18 and 19 on the steel tower A side and
When sent out on the side, the first vertical protection rope 17 (a-
1) and the horizontal protection rope 16 (b-1) are connected from tower B to tower A along the upper and lower busbar ropes 15 and 14.
move towards. When the distance of this movement reaches the planned length, the movement is stopped and the next protective rope 17 is moved.
The same operation as above is performed for (a-2) and 16 (b-2). That is, each of the second roller tools 20 is engaged with the busbar ropes 15, 14, and each of the protective ropes 17, 16 and each of the auxiliary ropes 19,
After locking 18, all the auxiliary ropes are simultaneously moved toward the tower A by a predetermined length. The same operation is repeated, and finally the required number of sets of protection ropes 17 (a-n) and 16 (b-n) are attached to the steel tower B.
The series of operations ends when it is sent out from the side horizontal arms 8 and 13. The protective ropes 17 (a-1), (a-2), (a-n) and 16 (b-1), (b-2), (b-n) at the time of completion are shown in Figure 1. respectively a-1, a-2, a-n, b-1, b-2,
Displayed as bn. Then each auxiliary rope 1
9 and 18 are strung between the steel towers A and B and their ends are fixed to the horizontal arms 7, 8, 12, and 13, a suspension bridge-like protection device as shown is completed.
強風時などの対策として各保護ロープ17,1
6を回収する操作の手順について述べると、先ず
各補助ロープ18,19の水平アーム12,1
3,7,8への固定を解除して後、鉄塔A側に巻
取られていたこれら補助ロープの各半部を繰出
し、鉄塔B側で巻取ることにより保護ロープ1
6,17を鉄塔B側へ移動させる。そこで先ず保
護ロープ17(a−n),16(b−n)が水平
アーム8,13に夫々到達したとき、それに関連
するローラー具20を母線ロープ15,14から
外ずし、吊具25から補助ロープ19,18を解
放してこれらのローラー具20及びそれに付いて
いた保護ロープ17(a−n),16(b−n)
を回収する。次に補助ロープ19,18を更に所
定の長さだけ水平アーム8,13の方へ引いて次
の保護ロープ17,16が水平アーム8,13に
到達したとき上記と同様の操作をしてこれらの保
護ロープ及び関連のローラー具を取外ずし回収す
る。以下同様の操作を繰返して最後の保護ロープ
17(a−1),16(b−1)及び関連のロー
ラー具20の回収を終る。なお上記において、再
度の展開を考慮して垂直及び水平保護ロープだけ
を回収してローラー具は残しておいてもよいし、
また垂直及び水平保護ロープはすべて束ねてアー
ム8−13間及びアーム13に夫々緊縛しておい
てもよい。上記の回収操作中最後の保護ロープ1
7(a−1),16(b−1)が鉄塔Bの方へ可
成り進行すると、これらロープと水平アーム7,
12との間の補助ロープ19,18が大きくたる
んで不都合を生ずる恐れがある場合はそれを防止
するために、この間の補助ロープについて適当な
間隔毎に母線ロープ15,14にローラー具20
を挿入してこれに補助ロープの対応部分を係止す
れば補助ロープの垂下を制限することができる。 As a measure against strong winds, each protective rope 17,1
6. First, the horizontal arms 12, 1 of each auxiliary rope 18, 19 are recovered.
After releasing the fixation to the auxiliary ropes 3, 7, and 8, each half of these auxiliary ropes that had been wound up on the tower A side is let out, and the protection rope 1 is wound up on the tower B side.
6 and 17 to the tower B side. Therefore, first, when the protective ropes 17 (a-n) and 16 (b-n) reach the horizontal arms 8 and 13, respectively, the roller tools 20 associated therewith are removed from the busbar ropes 15 and 14, and the hanging tools 25 are removed. By releasing the auxiliary ropes 19 and 18, these roller tools 20 and the protective ropes 17 (a-n) and 16 (b-n) attached to them are removed.
Collect. Next, the auxiliary ropes 19, 18 are further pulled toward the horizontal arms 8, 13 by a predetermined length, and when the next protective ropes 17, 16 reach the horizontal arms 8, 13, the same operation as above is performed to remove them. Remove and recover the protective rope and related roller equipment. Thereafter, similar operations are repeated to complete the collection of the last protective ropes 17 (a-1), 16 (b-1) and related roller tools 20. In addition, in the above, it is also possible to collect only the vertical and horizontal protective ropes and leave the roller equipment in consideration of re-deployment.
Further, all the vertical and horizontal protection ropes may be bundled and tied tightly between the arms 8-13 and to the arm 13, respectively. The last protective rope 1 during the above recovery operation
When 7(a-1) and 16(b-1) advance considerably towards the steel tower B, these ropes and the horizontal arm 7,
In order to prevent the auxiliary ropes 19, 18 between the auxiliary ropes 19 and 12 from becoming inconvenient due to large slack, roller tools 20 are attached to the busbar ropes 15 and 14 at appropriate intervals for the auxiliary ropes between them.
By inserting the auxiliary rope and locking the corresponding part of the auxiliary rope therein, the drooping of the auxiliary rope can be restricted.
鉄塔A,B間での全電線の架線工事が完了して
後上記保護装置を撤収する手順について述べる
と、先ず上記した強風時対策の手順に従つてすべ
ての保護ロープ16,17及び関連のローラー具
20を回収して後、鉄塔AとB間で各補助ロープ
18,19を鉄塔B側に巻取り回収する。次に各
母線ロープ14,15を回収するには、その鉄塔
A,Bでの固定を解除し、鉄塔B側でこの解除さ
れた母線ロープ2条毎に1条の延線用ロープを接
続して各母線ロープを鉄塔B側から繰出し、鉄塔
A側で巻取り回収する。最後に延線用ロープを地
上で回収する(地上に落ちない場合はヘリコプタ
ーなどで回収する)と共に、鉄塔A,Bの水平ア
ーム12,13を撤去して撤収作業を完了する。 Describing the procedure for removing the above-mentioned protection devices after the overhead wiring work for all the electric lines between towers A and B is completed, first, all the protection ropes 16, 17 and related rollers should be removed in accordance with the above-mentioned procedure for measures against strong winds. After collecting the tool 20, each of the auxiliary ropes 18 and 19 is wound up between the steel towers A and B to the steel tower B side and collected. Next, to recover each bus rope 14, 15, release the fixation from the steel towers A and B, and connect one wire extension rope to each two of the released bus rope ropes on the steel tower B side. Each bus rope is let out from the tower B side, and wound and collected on the tower A side. Finally, the line extension rope is recovered on the ground (if it does not fall to the ground, it is recovered by a helicopter, etc.), and the horizontal arms 12 and 13 of the steel towers A and B are removed to complete the removal work.
本発明によれば、隣接する鉄塔間での多条の電
線架線工事において、既に完成した両鉄塔間に直
接保護ロープ網を架設するので、途中に保護足場
を構築する方法と比較してその構築に要する足場
用地の確保の必要がなく、工事の日数と費用を節
約でき、しかも両鉄塔間に水平保護ロープのほか
に垂直保護ロープをも設けて吊り橋状保護装置と
することにより架線工事中の電線は保護装置に包
括された状態となり、電線の横振れなどにも追従
し、工事中の電線異常垂下時には垂下量を抑制
し、下方構造物又は電線自身の損傷を確実に防止
でき、且つ従来用いられていた吊金車工法などの
ように架線工法を変更することなく、一般的な架
線工法がそのまま使用できる。また吊り橋状保護
網のすべてのロープを電気絶縁材料で構成するこ
とにより、下方構造物が架空送電線などのような
電気的構造物であつても、本保護装置の設置及び
撤去のための停電の必要は皆無で、設置、撤去中
など万一保護装置の一部が下方構造物に接触して
も感電、損傷など電気的又は機械的損害を与える
ことがなく、且つその材料の軽量性の故に保護装
置の設置及び撤去の工事が容易である。更に母線
ロープに関連してその線長方向に移動可能の補助
ロープ及びローラー具を設けることにより保護装
置の組立工事を簡易にすることができ、且つ強風
時などに保護装置の破損を回避するため水平及び
垂直保護ロープを随時回収しまたその後再展開す
る作業が容易にできるなどの効果がある。 According to the present invention, a protective rope network is directly erected between the two already completed towers in the construction of multi-wire overhead lines between adjacent steel towers, so the construction is more efficient than the method of constructing protective scaffolding in the middle. There is no need to secure the scaffolding site required for construction, which saves construction time and costs.In addition, by installing vertical protection ropes in addition to horizontal protection ropes between both towers, creating a suspension bridge-like protection device, it is possible to reduce construction costs during overhead line construction. The wire is wrapped in a protective device that follows the wire's lateral deflection, suppresses the amount of drooping in the event of abnormal wire drooping during construction, and reliably prevents damage to the structure below or the wire itself. General overhead wire construction methods can be used as they are without changing the overhead wire construction method, such as the hanging wheel construction method that was previously used. In addition, by constructing all the ropes of the suspension bridge-like protection net with electrically insulating material, even if the structure below is an electrical structure such as an overhead power line, it is possible to prevent power outages during the installation and removal of this protection device. Even if a part of the protective device comes into contact with the underlying structure during installation or removal, there will be no electrical or mechanical damage such as electric shock or damage. Therefore, installation and removal of the protective device is easy. Furthermore, by providing an auxiliary rope and a roller device that are movable in the line length direction in relation to the busbar rope, it is possible to simplify the assembly work of the protection device, and to avoid damage to the protection device during strong winds, etc. This has the advantage that horizontal and vertical protection ropes can be easily retrieved at any time and then redeployed.
第1図は本発明による保護装置の概要斜視図、
第2図及び第3図は第1図において2個所に使用
された部分的要素の各斜視図である。
4:多条電線、7,8:最上段水平アーム、1
0:下方構造物、12,13:水平アーム、1
4:下段母線ロープ、15:上段母線ロープ、1
6:水平保護ロープ、17:垂直保護ロープ、1
8:下段補助ロープ、19:上段補助ロープ、2
0:ローラー具、21,22:ローラー、23:
ローラー枠。
FIG. 1 is a schematic perspective view of a protection device according to the present invention;
2 and 3 are perspective views of two partial elements in FIG. 1; FIG. 4: Multi-strand electric wire, 7, 8: Top horizontal arm, 1
0: Lower structure, 12, 13: Horizontal arm, 1
4: Lower bus rope, 15: Upper bus rope, 1
6: Horizontal protection rope, 17: Vertical protection rope, 1
8: Lower auxiliary rope, 19: Upper auxiliary rope, 2
0: Roller tool, 21, 22: Roller, 23:
roller frame.
Claims (1)
つて多条の電線を架線する場合、鉄塔A,Bに
各々設置された最下段アームの下に各水平アーム
を互に対向するようにして設置し、これら各水平
アームの両端及びその間のいくつかの中間点を各
結着点として鉄塔A,B間に複数の電気絶縁性下
段母線ロープを架設し、鉄塔A,Bに互に対向す
るようにして設置された最上段水平アームの両端
を各結着点として鉄塔A,B間に2個の電気絶縁
性上段母線ロープを架設し、上記の下段及び上段
各母線ロープに沿つてそれと線長方向に移動可能
にして鉄塔A,B間の距離の2倍強の長さを有す
る電気絶縁性補助ロープを設け、上記の下段及び
上段各母線ロープにそれと接触して転動するロー
ラーを内蔵するローラー具を各母線ロープの線長
方向に沿つて複数個設け、これら複数のローラー
具を互に適当な間隔を保つような位置に置いてそ
の各ローラー枠を対応する補助ロープの何れか一
方の半部の対応位置部分に係止し、下段複数の母
線ロープにはこれらを横に連絡する線長方向に沿
つて適当間隔で複数の電気絶縁性水平保護ロープ
を設けてこれらを各母線ロープとの交叉点におい
て各対応する上記ローラー枠に係止し、上段の両
母線ロープと下段の外側2個の母線ロープとを
夫々縦に連絡するそれらの線長方向に沿つて複数
の電気絶縁性垂直保護ロープを設けてこれらの上
端及び下端を各対応する上記ローラー枠に係止
し、かくして各補助ロープの上記半部の両端を対
応する各水平アームに固定することにより上段及
び下段各複数の母線ロープと下段複数の水平保護
ロープと上下段間複数の垂直保護ロープとにより
構成される吊り橋状保護装置により上方の多条電
線と下方の構造物との接触を阻止する送電線架線
工事における下方構造物保護装置。1. When installing multiple electric wires across the sky above the structure between adjacent steel towers A and B, each horizontal arm should be placed under the lowest arm installed on each tower A and B so that they are facing each other. A plurality of electrically insulating lower busbar ropes are installed between towers A and B, using both ends of each horizontal arm and several intermediate points between them as connection points, and the ropes are connected to towers A and B. Two electrically insulating upper busbar ropes are installed between towers A and B with both ends of the uppermost horizontal arms installed facing each other as connection points, and the ropes are installed along the lower and upper busbar ropes. In addition, an electrically insulating auxiliary rope that is movable in the line length direction and has a length more than twice the distance between towers A and B is provided, and rollers that roll in contact with the lower and upper busbar ropes are provided. A plurality of roller tools with built-in cables are provided along the length direction of each bus rope, and these roller tools are placed at a position that maintains an appropriate distance from each other, and each roller frame is connected to one of the corresponding auxiliary ropes. A plurality of electrically insulating horizontal protective ropes are provided at appropriate intervals along the length of the line that connects the lower busbar ropes horizontally. A plurality of electric wires are connected to each of the corresponding roller frames at the intersection points with the bus ropes, and vertically connect both bus ropes on the upper stage and the two outside bus ropes on the lower stage, respectively, along the length direction of the wires. By providing insulating vertical protection ropes and locking their upper and lower ends to each respective said roller frame, and thus securing both ends of said half of each auxiliary rope to each corresponding horizontal arm, each of the upper and lower tiers is secured. Transmission line overhead line construction work that prevents contact between the multiple electric wires above and structures below using a suspension bridge-like protection device consisting of multiple busbar ropes, multiple horizontal protection ropes on the lower tier, and multiple vertical protection ropes between the upper and lower tiers. Lower structure protection device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60088961A JPS61251405A (en) | 1985-04-26 | 1985-04-26 | Protection of downward construction for power transmission line stringing work |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60088961A JPS61251405A (en) | 1985-04-26 | 1985-04-26 | Protection of downward construction for power transmission line stringing work |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS61251405A JPS61251405A (en) | 1986-11-08 |
| JPH0313804B2 true JPH0313804B2 (en) | 1991-02-25 |
Family
ID=13957426
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP60088961A Granted JPS61251405A (en) | 1985-04-26 | 1985-04-26 | Protection of downward construction for power transmission line stringing work |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS61251405A (en) |
-
1985
- 1985-04-26 JP JP60088961A patent/JPS61251405A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS61251405A (en) | 1986-11-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4478312A (en) | System and portable cage for servicing power transmission lines | |
| CN101277002B (en) | Method for construction of charged assembling 10kV bi-gyrus distribution line concrete lever | |
| CN209913456U (en) | Anti-drop device based on overhead line | |
| JP2006230443A (en) | Attaching the protective net to the steel tower | |
| JPH0226442B2 (en) | ||
| JP3401751B2 (en) | How to transfer electric wires from wire-drawing wheel to suspension clamp at the time of work on tight line | |
| JPH0313804B2 (en) | ||
| JPH02211012A (en) | Method of setting up net for transmission line stringing work and net used therefor | |
| JPS6268010A (en) | Protecting method for lower structure in transmission line installing work | |
| RU184101U1 (en) | Item complete transitional supporting cable-air (PKPO-KV) | |
| CN212478731U (en) | Three-loop cable terminal iron tower with high-altitude area maintenance platform | |
| CN203787851U (en) | Maintenance device used for power supply and power transmission lines | |
| CN114725835B (en) | Erection and dismantling method of high-voltage line net sealing device | |
| JP3254407B2 (en) | How to rebuild the tower | |
| CN208508475U (en) | Double circuits on same tower line conductor support frame | |
| CN201318119Y (en) | L-shaped insulating ladder for live-wire operation of strong electric field | |
| CN220319240U (en) | 500kV transmission corner tower | |
| CN222735667U (en) | Auxiliary device for preventing tipping over | |
| KR100392351B1 (en) | The method of conductors string on 765kv transmission line | |
| JPH0614441A (en) | Prevention method of ground fault by cutting overhead ground wire | |
| JPH0214098Y2 (en) | ||
| JP3742376B2 (en) | Auxiliary transfer device and transmission method for transmission lines | |
| CN219535583U (en) | 110kV single-circuit flat-bed-free type cable terminal tower | |
| CN217545402U (en) | Auxiliary operation platform for overhauling in-out lead of 110kV strain double-string composite insulator | |
| CN212604654U (en) | Anti-dancing device for additional conductors of electrified railway catenary |