- Prior art keywords
- container
- boom
- barge
- mast
- ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Ship Loading And Unloading (AREA)
- Jib Cranes (AREA)
Description
【発明の詳細な説明】
[産業上の利用分野]
本発明はフローテイングコンテナクレーンに係
り、特に沖合におけるコンテナ荷役を実現できる
新規なフローテイングコンテナクレーンに関す
る。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a floating container crane, and more particularly to a novel floating container crane that can realize container cargo handling offshore.
[従来の技術]
近年コンテナによる貨物輸送が一般的となつて
きており、殊にコンテナ専用船等の船舶を利用し
たコンテナ輸送の輸送量は極めて大きなものとな
つてきている。大型なコンテナ専用船等によるコ
ンテナ輸送に際しては、通常大規模な港湾施設に
設備されるコンテナ専用埠頭等が利用され、常設
のコンテナクレーンによつてコンテナの積卸作業
が行なわれている。[Prior Art] Freight transportation using containers has become common in recent years, and in particular, the volume of container transportation using ships such as container ships has become extremely large. When transporting containers by large container ships, etc., container wharves installed in large-scale port facilities are usually used, and containers are loaded and unloaded using permanently installed container cranes.
[発明が解決しようとする問題点]
ところで、コンテナの荷役作業も最も効率良く
行なうことができるコンテナクレーンの設備が大
規模な港湾施設に限られているため、大型なコン
テナ専用船からのコンテナの積卸しが可能な地域
が制限されているという問題があつた。従つて各
地の小港湾で直接コンテナの荷役作業を行なうこ
とができなかつた。[Problems to be Solved by the Invention] By the way, since container crane equipment, which can carry out container loading and unloading work most efficiently, is limited to large-scale port facilities, it is difficult to handle containers from large container ships. There was a problem that the areas where loading and unloading were possible were restricted. Therefore, it was not possible to carry out container loading and unloading work directly at small ports around the country.
また、コンテナの荷役に際してコンテナ専用埠
頭等の利用を余儀なくされ係船料や岸壁管理料等
諸費用が嵩むという問題があつた。 In addition, there was a problem in that vessels were forced to use a dedicated container wharf when handling containers, resulting in increased costs such as mooring fees and quay management fees.
更に、コンテナの積卸し可能な地域が制限され
るため、コンテナ荷役地からトラツクや鉄道、小
型船舶等を利用してコンテナを各地に輸送するよ
うにしているが、この際、コンテナ専用船から荷
揚げしたコンテナを一旦ヤードに集荷し、その後
地域別に選別して発送するようにしており、発送
までの作業が煩雑で非能率的なものであつた。 Furthermore, since there are restrictions on the areas where containers can be loaded and unloaded, containers are transported to various locations using trucks, trains, small ships, etc. The containers are collected at a yard and then sorted by region and shipped, making the process of shipping complicated and inefficient.
ここに従前より沖荷用荷役機械としてフローテ
イング型のジブクレーンやダブルリンク式のクレ
ーンが採用されており、これらはロープで玉掛け
された荷物の取り扱いに便利なものである。そこ
でこれらクレーンを沖合いにおけるコンテナ荷役
に利用することが考えられるが、コンテナのハン
ドリングにはコンテナを吊り上げるスプレツダの
ツイストロツクの穴合せ等精度の高い位置決め機
能等が要求されるため、コンテナ荷役には不適当
であり、採用しても作業能率を著しく低下させる
と考えられる。また近年のコンテナ専用船は大型
化の傾向にあり、且つコンテナも高層に積み重ね
られて積載されているため、これらクレーンの大
型化が余儀なくされると共に、それに伴なつて吊
場用ロープの繰り下げ量が長くなりこのロープの
振れ等のため位置決めが困難化するなど、これら
クレーンの採用は難しいものである。 Floating jib cranes and double link cranes have long been used as off-shore cargo handling equipment, and these are convenient for handling cargo slung with ropes. Therefore, it is conceivable to use these cranes for container cargo handling offshore, but since container handling requires highly accurate positioning functions such as hole alignment of the twist locks of the spreaders that lift containers, they are not suitable for container cargo handling. It is considered appropriate, and even if adopted, it would significantly reduce work efficiency. In addition, in recent years, container ships have tended to become larger, and containers are also stacked in high-rise stacks, so these cranes have been forced to become larger, and along with this, the amount of lowering of ropes for hoisting stations has increased. It is difficult to employ these cranes because the length of the rope makes positioning difficult due to swinging of the rope.
[発明の目的]
本発明は上述したような問題点に鑑みて創案さ
れたものであり、その目的は沖合におけるコンテ
ナ荷役を実現できる新規なフローテイングコンテ
ナクレーンを提供するにある。[Object of the Invention] The present invention was devised in view of the above-mentioned problems, and its purpose is to provide a new floating container crane that can realize container cargo handling offshore.
[発明の概要]
本発明は、コンテナ船からバージ等へコンテナ
を積卸しするためのコンテナクレーンにおいて、
海上に浮上させてコンテナ船とバージ等との間に
フローテイング台船を配置し、フローテイング台
船と、その台船上の船長方向に走行自在に設けら
れた走行架台と、その走行架台上に起立されて設
けられたブームマストと、そのブームマストを囲
繞すると共にそのマストに沿つて昇降自在に設け
られたガイドフレームと、そのガイドフレームの
頂部に設けられ隣接する上記コンテナ船側に水平
に延出され、その長さが少なくともコンテナ船幅
の長さに形成されたフロントブームを有し、その
フロントブームと反対側のバージ側に水平に延出
されたバツクブームを有する荷役ブームと、その
荷役ブームの長手方向に沿つて移動自在に設けら
れたコンテナ吊揚手段と、上記ガイドフレームに
形成され、上記コンテナ吊揚手段で支持するコン
テナをフロントブームとバツクブーム間で往復移
送させるためのコンテナ案内通路と、上記走行架
台の下面に設けられ、その架台を上記台船上に係
留固定するための係留装置と、上記フローテイン
グ台船に設けられ、コンテナ荷役時に海底に打ち
込んでその台船を支持するためのスパツドと、上
記ブームマストと上記走行架台との間に設けら
れ、荷役終了時上記荷役ブームを船長方向に旋回
させて収納すべく上記マストを旋回自在に支持す
る旋回環とを備えて構成したものである。[Summary of the Invention] The present invention provides a container crane for loading and unloading containers from a container ship to a barge, etc.
A floating barge is floated on the sea and placed between a container ship and a barge. A boom mast provided in an upright manner, a guide frame surrounding the boom mast and provided movably up and down along the mast, and a guide frame provided at the top of the guide frame and extending horizontally to the side of the adjacent container ship. a cargo handling boom having a front boom whose length is at least as long as the width of the container ship, and a back boom extending horizontally on the side of the barge opposite to the front boom; a container lifting means provided movably along the longitudinal direction; a container guide path formed on the guide frame for reciprocating the container supported by the container lifting means between a front boom and a back boom; A mooring device provided on the underside of the traveling pedestal for mooring and fixing the trestle on the barge, and a spud provided on the floating barge for driving into the seabed and supporting the barge during container handling. and a swing ring that is provided between the boom mast and the traveling frame and supports the mast in a freely swingable manner so that the cargo handling boom is rotated in the direction of the ship's ship and stowed at the end of cargo handling. be.
上記構成によれば、コンテナ船とバージ等との
間でコンテナを荷役する際、フローテイング台船
をコンテナ船とバージとの間に位置させると共
に、ガイドフレームを介して荷役ブームを昇降さ
せてフロントブームをコンテナ船の上方に位置さ
せた後、コンテナ吊揚手段でコンテナを吊下げて
フロントブームからバツクブームへまたはこの逆
方向にコンテナを移送することによりコンテナの
荷役を行うことができる。 According to the above configuration, when loading and unloading containers between a container ship and a barge, etc., the floating barge is positioned between the container ship and the barge, and the loading and unloading boom is raised and lowered via the guide frame. After the boom is positioned above the container ship, the container can be loaded and unloaded by suspending the container using a container lifting means and transferring the container from the front boom to the back boom or in the opposite direction.
ガイドフレームにコンテナ案内通路を設けたの
で、荷役ブームに沿つてコンテナを移送する際、
コンテナがブームマストに阻害されることなくフ
ロントブームからバツクブームへまたはその逆方
向に迅速に移送することができる。 A container guide path is provided on the guide frame, so when transferring containers along the cargo handling boom,
Containers can be quickly transferred from the front boom to the back boom or vice versa without being obstructed by the boom mast.
荷役時には、フローテイング台船が海底に打ち
込んだスパツドで支持され、走行架台が係留装置
で台船上に係留固定されるので、安定した状態で
コンテナの荷役を行うことができる。 During cargo handling, the floating barge is supported by spuds driven into the seabed, and the traveling platform is moored and fixed onto the barge using a mooring device, so containers can be handled in a stable manner.
荷役の終了時には、ガイドフレームを下降させ
ると共に、荷役ブームを船長方向に旋回させて収
納するので、フローテイング台船の動揺が抑制さ
れ、安全性が向上する。 At the end of cargo handling, the guide frame is lowered and the cargo handling boom is swung toward the ship's captain and stowed away, which suppresses the movement of the floating barge and improves safety.
[実施例]
次に本発明の好適一実施例を添付図面に従つて
詳述する。[Embodiment] Next, a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.
第1図及び第2図に示すように海上Sには、コ
ンテナ1を積載してきたコンテナ船2と、このコ
ンテナ船2からコンテナ1を積み卸しして移し替
えるための内航行用バージや小型船舶3との間に
配置されるフローテイング台船4が浮上される。
この台船4は相当の船幅を有してコンテナ船の長
手方向に沿つて箱船様に形成される。この台船4
には、これより海底Bに打ち込まれて海底Bから
台船4を支承して船体動揺を規制するためのスパ
ツド5が適宜箇所に複数設けられる。このスパツ
ド5は、台船4に設けられたスパツド巻上装置6
により、海底Bに対して昇降自在に構成される。
また台船4にはこの他、係留装置、操船装置等
(図示せず)が設備される。 As shown in Figures 1 and 2, on the sea S, there is a container ship 2 loaded with containers 1, and a domestic barge or small vessel for unloading and transferring the containers 1 from the container ship 2. A floating barge 4 disposed between the two is floated.
The barge 4 has a considerable width and is shaped like an ark along the longitudinal direction of the container ship. This barge 4
, a plurality of spuds 5 are provided at appropriate locations to support the barge 4 from the seabed B by driving it into the seabed B, thereby regulating the movement of the ship. This spud 5 is connected to a spud hoisting device 6 provided on the barge 4.
It is configured to be able to move up and down with respect to the seabed B.
In addition, the barge 4 is also equipped with a mooring device, a ship maneuvering device, etc. (not shown).
このように構成されたフローテイング台船4上
には起立させてブームマスト7が設けられる。ブ
ームマスト7は数本のマストが連結されて構成さ
れたトラス構造で成り、軽量化や風圧等に対する
抵抗の軽減が図られている。またこのマスト7
は、台船上にその船長方向に沿つて走行自在に構
成される。具体的には走行機構8は、台船4上に
その船長方向に沿つて敷設された一対の走行レー
ル9と、マスト7の基部に設けられた走行レール
9間に掛け渡された走行架台10と、この走行架
台10の四隅に夫々1セツトずつ設けられ走行レ
ール9上に走行される走行車輪群11とから構成
される。また走行架台10には、走行駆動装置及
び架台10を一定位置に固定するための係留装置
等12が設備される。更に走行架台10とマスト
7の基部との間には、走行架台10に対してマス
ト7等の上部構造を旋回自在とするための旋回環
13が設けられ、マスト7等は旋回駆動装置(図
示せず)によつて旋回されるようになつている。 A boom mast 7 is installed upright on the floating barge 4 configured in this way. The boom mast 7 has a truss structure in which several masts are connected, and is designed to be lightweight and reduce resistance to wind pressure and the like. Also this mast 7
is constructed on a barge so that it can move freely along the length of the barge. Specifically, the traveling mechanism 8 includes a pair of traveling rails 9 laid on the barge 4 along its longitudinal direction, and a traveling mount 10 spanned between the traveling rails 9 provided at the base of the mast 7. and a set of running wheels 11, which are provided at each of the four corners of the running frame 10 and run on the running rails 9. Further, the traveling pedestal 10 is equipped with a traveling drive device and a mooring device 12 for fixing the pedestal 10 at a fixed position. Further, a swing ring 13 is provided between the traveling frame 10 and the base of the mast 7 to allow the upper structure such as the mast 7 to freely rotate relative to the traveling frame 10. (not shown).
このように起立されたブームマスト7には、鉛
直方向に沿つて昇降自在にガイドフレーム14が
設けられる。このガイドフレーム14は中央部に
コンテナ案内通路15を区画形成するトラス構造
で成り、上部に頂部鉄構16が設けられると共
に、下部がマスト7に支持される。このガイドフ
レーム14の昇降機構17は、第3図に示すよう
に主に、マスト7をその周方向外方から囲繞する
ように配設されたガイドフレーム14の底部枠体
18と、枠体18の直下に並設されマスト7を囲
繞する昇降用フレーム19と、これら昇降用フレ
ーム19と底部枠体18との間に鉛直方向に沿つ
て設けられ伸縮駆動される昇降用シリンダ20
と、これら昇降用フレーム19及び底部枠体18
夫々に水平方向へ移動自在に設けられマスト側へ
出没されてマスト7の桁材21に係脱自在に係合
する係合部材22と、これら係合部材22と昇降
用フレーム19又は底部枠体18に設けられた反
力支持ブラケツト23との間に夫々設けられ係合
部材22を出没させるべく伸縮駆動される係脱用
シリンダ24とから構成される。そして昇降機構
17によるガイドフレーム14等の上部構造のマ
スト7に対する上昇は、先ず昇降用フレーム19
の係合部材22を係脱用シリンダ24の伸長によ
り桁材21に係合させてガイドフレーム14をマ
スト7に支持させた状態において、ガイドフレー
ム14の底部枠体18の係合部材22を係脱用シ
リンダ24の収納により桁材21から離脱させ
る。次いで昇降用シリンダ20を伸長させて昇降
用フレーム19に対して底部枠体18を上昇さ
せ、ガイドフレーム14全体をマスト7に対して
上昇させる。次いで底部枠体18の係合部材22
を係脱用シリンダ24の伸長により桁材21に係
合させる。最後に、昇降用フレーム19の係合部
材22を係脱用シリンダ24により桁材21から
離脱させ、昇降用シリンダ20を収納させて底部
枠体18側へ昇降用フレーム19を引き上げ、再
び係脱用シリンダ24により昇降用フレーム19
の係合部材22を桁材21に係合させる。このよ
うな作業でガイドフレーム14をマスト7の桁材
21の1ピツチ分上昇させることができ、同様な
作業の反復により順次マスト7に対してガイドフ
レーム14を上昇させてゆくことができる。下降
の場合には、逆の手順で作業を行なえば良い。こ
のようにすればガイドフレーム14はマスト7上
の更に高い位置に支持され、コンテナ案内通路1
5はマスト7に遮られることなく連通される(第
2図に実線で示す)。また上記構成により、ガイ
ドフレーム14等の重量や外力、モーメントはマ
スト7に伝達され支持される。 The boom mast 7 thus erected is provided with a guide frame 14 that can be raised and lowered along the vertical direction. The guide frame 14 has a truss structure that defines a container guide passage 15 in the center, has a top steel structure 16 at its upper part, and is supported by a mast 7 at its lower part. As shown in FIG. 3, the elevating mechanism 17 of the guide frame 14 mainly includes a bottom frame 18 of the guide frame 14, which is arranged to surround the mast 7 from the outside in the circumferential direction, and a frame 18. Lifting frames 19 are arranged in parallel directly below the mast 7 and surround the mast 7, and a lifting cylinder 20 is provided along the vertical direction between the lifting frames 19 and the bottom frame 18 and is driven to expand and contract.
and these lifting frames 19 and bottom frame 18
Engagement members 22 that are provided to be movable in the horizontal direction and retract and protrude toward the mast side to removably engage with the beam members 21 of the mast 7, and these engagement members 22 and the lifting frame 19 or the bottom frame. The engaging/disengaging cylinders 24 are provided between the engagement member 18 and the reaction force support bracket 23 provided at the engagement member 18, and are driven to expand and contract in order to cause the engagement member 22 to come out and go in and out. When the upper structure such as the guide frame 14 is lifted relative to the mast 7 by the lifting mechanism 17, first the lifting frame 19
When the engagement member 22 of the bottom frame 18 of the guide frame 14 is engaged with the beam member 21 by extension of the engagement/disengagement cylinder 24 and the guide frame 14 is supported by the mast 7, the engagement member 22 of the bottom frame 18 of the guide frame 14 is engaged. By storing the removal cylinder 24, it is removed from the girder material 21. Next, the lifting cylinder 20 is extended to raise the bottom frame 18 with respect to the lifting frame 19, and the entire guide frame 14 is raised with respect to the mast 7. Next, the engagement member 22 of the bottom frame 18
is engaged with the beam member 21 by extension of the engagement/disengagement cylinder 24. Finally, the engaging member 22 of the lifting frame 19 is detached from the girder 21 by the engaging/disengaging cylinder 24, the lifting cylinder 20 is retracted, the lifting frame 19 is pulled up toward the bottom frame 18, and the engaging/disengaging cylinder 24 is disengaged again. The frame 19 for lifting and lowering by the cylinder 24 for
The engaging member 22 is engaged with the beam member 21. Through such operations, the guide frame 14 can be raised by one pitch of the beam member 21 of the mast 7, and by repeating similar operations, the guide frame 14 can be successively raised relative to the mast 7. When descending, the procedure can be reversed. In this way, the guide frame 14 is supported at a higher position on the mast 7, and the container guide path 1
5 is in unobstructed communication with the mast 7 (indicated by a solid line in FIG. 2). Furthermore, with the above configuration, the weight, external force, and moment of the guide frame 14 and the like are transmitted to and supported by the mast 7.
他方第1図及び第2図に示すように、ブームマ
スト7に対して昇降されるマスト7の頂部を形成
するガイドフレーム14には、隣接するコンテナ
船2側からバージ3側へ亘つて船幅方向に一連に
水平に延出される荷役ブーム25が設けられる。
この荷役ブーム25はガイドフレーム14からコ
ンテナ船側へ延出され、その長さが少なくともコ
ンテナ船2の船幅と同じ長さに形成されたフロン
トブーム26とバージ側へ延出されたバツクブー
ム27とから構成され、夫々頂部鉄構16に一端
がピン連結された複数のステ28で水平に支持さ
れる。 On the other hand, as shown in FIGS. 1 and 2, a guide frame 14 that forms the top of the mast 7 that is raised and lowered relative to the boom mast 7 has a width that extends from the adjacent container ship 2 side to the barge 3 side. A cargo handling boom 25 is provided which extends horizontally in series in the direction.
This cargo handling boom 25 extends from the guide frame 14 toward the container ship side, and includes a front boom 26 whose length is at least the same as the width of the container ship 2, and a back boom 27 that extends toward the barge side. It is horizontally supported by a plurality of stays 28 each having one end connected to the top steel structure 16 with a pin.
更にこのように構成された荷役ブーム25に
は、その長手方向に沿つて移動自在にコンテナ吊
揚手段29が設けられる。このコンテナ吊揚手段
29は主に、荷役ブーム25の下桁材に車輪30
が係合されて走行自在に設けられた横行トロリ3
1と、横行トロリ31下に吊り下げられたシーブ
ブロツク32を介して支持されたコンテナ荷役用
のスプレツダ33と、横行トロリ31を走行させ
るための横行機構34と、コンテナ1を吊り上
げ、吊り下げるための巻上機構35とから構成さ
れる。横行トロリ31には運転室36が設けられ
る。スプレツダ33はシーブブロツク32に対し
て着脱自在に取り付けられ、また一般的な構成で
成るコンテナ用のツイストロツク装置(図示せ
ず)を有している。横行機構34は第4図に示す
ように主に、1基の横行用ウインチ37と、この
ウインチ37から張り出された一対の横行用ロー
プ38とから構成される。これら横行用ロープ3
8は夫々一端がウインチ37に逆方向に巻回され
ると共に、他端が夫々シーブ39を介してフロン
トブーム26の先端シーブ40、バツクブーム2
7の先端シーブ41に掛けられ、更にこれらシー
ブ40,41を介して横行トロリ31に連結され
る。そしてウインチ37を正逆転することによ
り、横行トロリ31を前後進させるようになつて
いる。他方、巻上機構35は第5図に示すよう
に、主に一対の巻上用ウインチ42と、これら巻
上用ウインチ42から夫々張り出されシーブブロ
ツク32を吊り下げる一組の巻上用ロープ43と
から構成される。これら巻上用ロープ43は夫々
両端がウインチ42に同方向に巻回されると共
に、両端間が順次後部ロープシーブ44、横行ト
ロリ上方の支持ロープシーブ45を介してシーブ
ブロツク32を吊り下げ、更にフロントブーム先
端へ延設されて前部ロープシーブ46に掛け渡さ
れており、ロープ43相互はクレーンの中心に対
して対称に張られている。そしてこれらウインチ
42を同方向に正逆転させることによりシーブブ
ロツク32が上下されてコンテナ1を吊り上げ、
吊り下げできるようになつている。これら横行用
ウインチ37、巻上用ウインチ42はバツクブー
ム27に設置された機械室47内に設けられる。 Further, the cargo handling boom 25 configured in this manner is provided with a container hoisting means 29 movably along its longitudinal direction. This container lifting means 29 mainly consists of wheels 30 mounted on the lower girder of the cargo handling boom 25.
A traversing trolley 3 is engaged with and is provided to freely run.
1, a spreader 33 for container cargo handling supported via a sheave block 32 suspended below the traversing trolley 31, a traversing mechanism 34 for running the traversing trolley 31, and a traversing mechanism 34 for lifting and suspending the container 1. The winding mechanism 35 is composed of a winding mechanism 35 and a winding mechanism 35. A driver's cab 36 is provided in the traversing trolley 31. The spreader 33 is detachably attached to the sheave block 32 and has a twist lock device (not shown) for containers of a conventional construction. As shown in FIG. 4, the traversing mechanism 34 mainly includes one traversing winch 37 and a pair of traversing ropes 38 extending from the winch 37. These ropes for traveling 3
8 is wound around the winch 37 in the opposite direction at one end, and the other end is connected to the tip sheave 40 of the front boom 26 and the back boom 2 through the sheave 39, respectively.
7, and further connected to the traversing trolley 31 via these sheaves 40 and 41. By rotating the winch 37 in the forward and reverse directions, the traversing trolley 31 is moved forward and backward. On the other hand, the hoisting mechanism 35, as shown in FIG. It consists of 43. Both ends of these hoisting ropes 43 are wound around the winch 42 in the same direction, and the sheave block 32 is suspended between both ends sequentially via the rear rope sheave 44 and the support rope sheave 45 above the traversing trolley, and then the sheave block 32 is suspended from the front boom. The ropes 43 are extended to the tip and wrapped around the front rope sheave 46, and the ropes 43 are stretched symmetrically with respect to the center of the crane. By rotating these winches 42 forward and backward in the same direction, the sheave block 32 is raised and lowered to lift the container 1.
It is designed to be hung. The traverse winch 37 and the hoisting winch 42 are provided in a machine room 47 installed in the back boom 27.
尚、48は運転室36やスプレツダ33へ給電
するための給電用ケーブルであり、収納時はバツ
クブーム27の端部に束ねた状態となるように構
成される。 Note that 48 is a power supply cable for supplying power to the driver's cab 36 and the spreader 33, and is configured to be bundled at the end of the back boom 27 when stored.
次に本実施例の作用について述べる。 Next, the operation of this embodiment will be described.
沖合いにおいてコンテナの荷役作業を行なうに
際しては第1図及び第2図に示すように、沖合い
に係留されたコンテナ船2の舷側にフローテイン
グ台船4を接舷し係留すると共に、スパツド5を
海底Bに打ち込んで台船4を固定する。従つて相
当の波や潮流に対しても台船4の動揺等を規制す
ることができ、陸上設備並に荷役作業を行なうこ
とができる。 When carrying out container cargo handling work offshore, as shown in Figures 1 and 2, a floating barge 4 is moored alongside the side of a container ship 2 moored offshore, and a spud 5 is moored on the seabed. Drive into B to fix barge 4. Therefore, it is possible to restrict the movement of the barge 4 even in the face of considerable waves and currents, and it is possible to carry out cargo handling operations as well as land-based facilities.
その後バージ3を台船4のコンテナ船側と反対
側の舷側に接舷し係留してコンテナ船2との間に
台船4を位置させる。 Thereafter, the barge 3 is brought alongside and moored to the side of the barge 4 opposite to the container ship side, and the barge 4 is positioned between it and the container ship 2.
次に走行機構8により台船4上にブームマスト
7を走行架台させ、荷役目的位置まで移動させて
走行架台10を台船4上に係留装置12で係留し
固定する。 Next, the boom mast 7 is made to travel on the barge 4 by the traveling mechanism 8, moved to the cargo handling target position, and the traveling gantry 10 is moored and fixed on the barge 4 by the mooring device 12.
次いで昇降機構17によりガイドフレーム1
4、荷役ブーム25等の上部構造をマスト7に対
して上昇させ、フロントブーム26がコンテナ船
2の上方を横切る高さ位置で固定する。このよう
に荷役ブーム25等の荷役設備を昇降自在に構成
したことにより、コンテナ船2における積荷状
況、即ち船体の浮上高さや積荷の積層高さに対応
させて荷役ブーム25の高さを調節することがで
きる。従つて吊揚手段29の吊り高さ位置とコン
テナ1の積層高さ位置との相対高さをできる限り
小さくでき、吊り作業中の揺れを抑制できると共
に、またコンテナ1とスプレツダ33との結合作
業を行ない易くできる。また相対高さが小さいの
で巻上機構35による巻上量も削減でき、作業能
率を向上できる。尚、荷役ブーム25の上昇位置
によつてはガイドフレーム14のコンテナ案内通
路15にマスト7の上部が突出してこれを遮る虞
れがあるが、その部分のマスト7を、横行トロリ
31とコンテナ吊揚手段29を使用して解体する
ことによりコンテナの移送を確保できる。 Next, the guide frame 1 is moved by the lifting mechanism 17.
4. Raise the upper structure such as the cargo handling boom 25 with respect to the mast 7 and fix it at a height position where the front boom 26 crosses above the container ship 2. By configuring the cargo handling equipment such as the cargo handling boom 25 so that it can be raised and lowered, the height of the cargo handling boom 25 can be adjusted in accordance with the loading situation on the container ship 2, that is, the floating height of the ship and the stacking height of the cargo. be able to. Therefore, the relative height between the lifting height position of the lifting means 29 and the stacking height position of the containers 1 can be made as small as possible, and shaking during the lifting operation can be suppressed, and the joining operation between the container 1 and the spreader 33 can be made as small as possible. can be done easily. Furthermore, since the relative height is small, the amount of hoisting by the hoisting mechanism 35 can also be reduced, and work efficiency can be improved. Depending on the raised position of the cargo handling boom 25, there is a risk that the upper part of the mast 7 may protrude into the container guide passage 15 of the guide frame 14 and obstruct it. Transport of the container can be ensured by dismantling it using the lifting means 29.
次いで台船4の船長方向に沿つて支持されてい
る荷役ブーム25を旋回環13を介して旋回さ
せ、隣接するコンテナ船側からバージ側へ亘つて
一連に水平に延出させる。このように荷役ブーム
25を旋回可能に構成したことにより、船幅方向
外方へ張り出したままの荷役ブーム25が邪魔と
なり、コンテナ船2への接舷や離脱の際、またバ
ージ3の台船4に対する接舷や離脱の際に船舶の
上部構造物に干渉したりするのを防止でき、安全
に作業できる。 Next, the cargo handling boom 25 supported along the longitudinal direction of the barge 4 is rotated via the rotation ring 13 to extend horizontally from the adjacent container ship side to the barge side. By configuring the cargo handling boom 25 to be able to rotate in this way, the cargo handling boom 25 that remains protruding outward in the width direction of the ship becomes an obstacle, and when coming alongside or leaving the container ship 2, or the barge of the barge 3. It is possible to prevent interference with the superstructure of the ship when coming alongside or leaving the ship, and work can be done safely.
以上のようにして準備作業が完了したならばコ
ンテナ吊揚手段29によりコンテナ船2からコン
テナ1を吊り上げフロントブーム26側からガイ
ドフレーム14のコンテナ案内通路15を介して
バツクブーム27側へ移送し、バージ3へコンテ
ナ1を搭載してゆくことになる。この作業は陸上
のコンテナクレーン設備による場合と略同様に行
なうことができる。 When the preparation work is completed as described above, the container 1 is lifted from the container ship 2 by the container lifting means 29 and transferred from the front boom 26 side to the back boom 27 side via the container guide passage 15 of the guide frame 14, and then transferred to the barge. Container 1 will be loaded onto 3. This work can be performed in substantially the same way as when using land-based container crane equipment.
尚、シーブブロツク32の部分に旋回装置を設
備したり、横行トロリ31に旋回装置を装着する
ことにより、バージ3上でコンテナ1を旋回させ
てバージ3の積荷スペースに対応させて移載する
ことができ、搭載の効率化を図ることができる。 Furthermore, by installing a turning device on the sheave block 32 or attaching a turning device to the traversing trolley 31, the container 1 can be turned on the barge 3 and transferred in a way that corresponds to the cargo space of the barge 3. This allows for more efficient loading.
以上のようにしてコンテナ1の荷役作業が終了
したならば、準備作業と反対の手順で作業を行な
うことにより全体作業を完了することができる。 Once the cargo handling work for the container 1 has been completed as described above, the entire work can be completed by performing the work in the reverse order of the preparatory work.
また、本フローテイングコンテナクレーンの沖
合い係留状態での長期的休止や荒天時に対する安
全対策として、次のような手段を講じることがで
きる。即ち、荷役ブーム25をマスト7に対して
最下方位置まで降下させ(第2図中、二点鎖線で
示す)、旋回環13により荷役ブーム25を台船
の船長方向に沿つて配置し格納する。更にブーム
25を台船4に固縛したり係留台(図示せず)に
支持させる。このようにすれば台船4の動揺を抑
制して安全性を向上できる。またブームマスト7
やガイドフレーム14等をトラス構造としたこと
により、クレーン装置がトツプヘビーとなるのを
防止でき、また風圧に対して抵抗ととなるのを抑
えて、外乱を排除できる。更にスパツド5を海底
Bに打ち込んでおいても良い。 In addition, the following measures can be taken as safety measures against long-term suspension of this floating container crane while it is moored offshore or during stormy weather. That is, the cargo handling boom 25 is lowered to the lowest position relative to the mast 7 (indicated by the two-dot chain line in FIG. 2), and the cargo handling boom 25 is arranged and stored along the longitudinal direction of the barge using the swing ring 13. . Furthermore, the boom 25 is lashed to the barge 4 or supported on a mooring platform (not shown). In this way, the oscillation of the barge 4 can be suppressed and safety can be improved. Also boom mast 7
By making the crane, guide frame 14, etc. into a truss structure, it is possible to prevent the crane device from becoming top-heavy, suppress resistance to wind pressure, and eliminate disturbances. Furthermore, the spud 5 may be driven into the seabed B.
他方、外乱の軽減やトラス構造等の採用による
重量軽減により、台船4の小型化も図り得る。 On the other hand, the barge 4 can be made smaller by reducing disturbances and reducing weight by adopting a truss structure or the like.
第6図及び第7図には変形実施例が示されてい
る。本実施例は、シーブブロツク32の下部に旋
回装置49を装着し、これにスプレツダ33を懸
架させるようにしたものである。そしてコンテナ
船2からコンテナ1を吊り下げた後、旋回装置4
9によつてスプレツダ33を旋回させることによ
り、コンテナ1の向きを変更できるようにしたも
のである。このように構成すればバージ3が小型
であつたり、コンテナ船上の積付方向に対して異
なる方向にコンテナ1をバージ3に搭載する必要
がある場合等に、自由にコンテナ1を移載するこ
とができる。またこのように構成すればコンテナ
案内通路15を小さくでき、ガイドフレーム14
の小型化を可能として構造強度上、更に軽量化を
達成できる。 A modified embodiment is shown in FIGS. 6 and 7. In this embodiment, a swing device 49 is attached to the lower part of the sheave block 32, and the spreader 33 is suspended from this. After suspending the container 1 from the container ship 2, the turning device 4
The direction of the container 1 can be changed by rotating the spreader 33 using the handle 9. With this configuration, the container 1 can be freely transferred when the barge 3 is small or when the container 1 needs to be loaded onto the barge 3 in a direction different from the loading direction on the container ship. I can do it. Further, with this configuration, the container guide passage 15 can be made smaller, and the guide frame 14 can be made smaller.
This makes it possible to reduce the size of the structure, thereby achieving further weight reduction in terms of structural strength.
[発明の効果]
以上要するに本発明によれば、次のような優れ
た効果を発揮する。[Effects of the Invention] In summary, according to the present invention, the following excellent effects are achieved.
(1) 沖合い等の海上に浮上されコンテナ船とバー
ジ等との間に配置されるフローテイング台船上
に、コンテナクレーンを構成するブームマス
ト、荷役ブーム及びコンテナ吊揚手段を配備し
たことにより、沖合いで陸上のコンテナクレー
ンと同様にコンテナの積卸し作業を実現でき
る。(1) By installing the boom mast, cargo handling boom, and container lifting means that constitute a container crane on a floating barge that floats offshore and is placed between a container ship and a barge, etc., offshore This enables loading and unloading of containers in the same way as a land-based container crane.
(2) 従つてコンテナクレーン設備が設けられる大
規模な港湾施設においてのみならず、コンテナ
専用岸壁のない小港湾でもコンテナ荷役を行な
うことができる。(2) Therefore, container cargo handling can be carried out not only in large-scale port facilities equipped with container crane equipment, but also in small ports without dedicated container quays.
(3) またコンテナ船の岸壁への接岸を不要とでき
るので、岸壁管理料等諸費用が不要となり、コ
ンテナ輸送に際しての経費の節減を達成でき
る。(3) Furthermore, since it is not necessary for the container ship to berth at the quay, miscellaneous expenses such as quay management fees are eliminated, and costs can be reduced when transporting containers.
(4) コンテナ船から荷役ブームを介して直接バー
ジに積載でき、またその際バージの行き先に応
じて選別しつつコンテナを移載できるので、一
旦湾岸のヤード等に集荷してから選別する作業
を省略でき、発送までの効率向上を図り得、コ
ンテナの流通事情を改善できる。(4) It is possible to directly load containers from a container ship onto a barge via a cargo handling boom, and at that time, the containers can be transferred while being sorted according to the destination of the barge, so there is no need to first collect the cargo at a yard on the bay and then sort it. This can be omitted, improving efficiency up to shipping, and improving container distribution conditions.
(5) ブームマストに沿つて昇降するガイドフレー
ムにコンテナを通すコンテナ案内通路を形成し
たので、コンテナ吊揚手段で吊下げたコンテナ
をブームマストに阻害されることなくフロント
ブームとバツクブームとの間を往復移動させる
ことができ、また、荷役時においてはフローテ
イング台船がスパツドで支持され、走行架台が
係留装置で台船上に係留固定されるので安定し
た状態で荷役ができ、荷役終了時におては、ガ
イドフレームを下降させると共に荷役ブームを
台船の船長方向に旋回させて収納するので、フ
ローテイング台船の動揺を抑制することがで
き、その安全性を向上させ得る。(5) A container guide path is formed in the guide frame that moves up and down along the boom mast, allowing the container suspended by the container lifting means to be moved between the front boom and the back boom without being obstructed by the boom mast. In addition, during cargo handling, the floating barge is supported by spuds, and the traveling platform is moored and fixed on the barge using a mooring device, allowing cargo handling to be carried out in a stable condition. Since the guide frame is lowered and the cargo handling boom is rotated toward the captain of the barge and stored, it is possible to suppress the movement of the floating barge and improve its safety.
第1図は本発明の好適一実施例を示す正面図、
第2図はその側面図、第3図は昇降機構を示す概
略側面図、第4図は横行機構を示す概略斜視図、
第5図は巻上機構を示す概略斜視図、第6図は変
形実施例を示す正面図、第7図はその側面図であ
る。
図中、1はコンテナ、2はコンテナ船、3はバ
ージ、4はフローテイング台船、7はブームマス
ト、25は荷役ブーム、29はコンテナ吊揚手段
である。
FIG. 1 is a front view showing a preferred embodiment of the present invention;
FIG. 2 is a side view thereof, FIG. 3 is a schematic side view showing the elevating mechanism, and FIG. 4 is a schematic perspective view showing the traversing mechanism.
FIG. 5 is a schematic perspective view showing the winding mechanism, FIG. 6 is a front view showing a modified embodiment, and FIG. 7 is a side view thereof. In the figure, 1 is a container, 2 is a container ship, 3 is a barge, 4 is a floating barge, 7 is a boom mast, 25 is a cargo handling boom, and 29 is a container lifting means.
Claims (1)
するためのコンテナクレーンにおいて、海上に浮
上され、上記コンテナ船と上記バージ等の間に配
置されたフローテイング台船と、該台船上の船長
方向に走行自在に設けられた走行架台と、該走行
架台上に起立されて設けられたブームマストと、
該ブームマストを囲繞すると共にそのマストに沿
つて昇降自在に設けられたガイドフレームと、該
ガイドフレームの頂部に設けられ隣接する上記コ
ンテナ船側に水平に延出され、その長さが少なく
ともコンテナ船幅の長さに形成されたフロントブ
ームを有し、該フロントブームと反対側のバージ
側に水平に延出されたバツクブームを有する荷役
ブームと、該荷役ブームの長手方向に沿つて移動
自在に設けられたコンテナ吊揚手段と、上記ガイ
ドフレームに形成され、上記コンテナ吊揚手段で
支持するコンテナをフロントブームとバツクブー
ム間で往復移送させるためのコンテナ案内通路
と、上記走行架台の下面に設けられ、その架台を
上記台船上に係留固定するための係留装置と、上
記フローテイング台船に設けられ、コンテナ荷役
時に海底に打ち込んでその台船を支持するための
スパツドと、上記ブームマストと上記走行架台と
の間に設けられ、荷役終了時上記荷役ブームを船
長方向に旋回させて収納すべく上記マストを旋回
自在に支持する旋回環とを備えたことを特徴とす
るフローテイングコンテナクレーン。1. In a container crane for loading and unloading containers from a container ship to a barge, etc., a floating barge that is floated on the sea and placed between the container ship and the barge, etc. and travels in the direction of the captain on the barge. a freely provided traveling platform; a boom mast provided upright on the traveling platform;
a guide frame that surrounds the boom mast and is movable up and down along the mast; and a guide frame that is installed at the top of the guide frame and extends horizontally toward the adjacent container ship, the length of which is at least the width of the container ship. a cargo handling boom having a front boom formed in length, and a back boom extending horizontally on the side of the barge opposite to the front boom; a container lifting means formed on the guide frame and for reciprocating the container supported by the container lifting means between the front boom and the back boom; a mooring device for mooring and fixing the pedestal on the barge; a spud installed on the floating barge and driven into the seabed to support the barge during container cargo handling; the boom mast; and the traveling pedestal; 1. A floating container crane, comprising: a swing ring that is provided between the cranes and supports the mast in a freely swingable manner so as to swing the cargo handling boom toward the ship's ship and stow it at the end of cargo handling.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24290485A JPS62105893A (en) | 1985-10-31 | 1985-10-31 | floating container crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24290485A JPS62105893A (en) | 1985-10-31 | 1985-10-31 | floating container crane |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62105893A JPS62105893A (en) | 1987-05-16 |
| JPH0333637B2 true JPH0333637B2 (en) | 1991-05-17 |
Family
ID=17095944
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP24290485A Granted JPS62105893A (en) | 1985-10-31 | 1985-10-31 | floating container crane |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS62105893A (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5644784Y2 (en) * | 1978-05-31 | 1981-10-20 | ||
| JPS6032779B2 (en) * | 1979-09-28 | 1985-07-30 | 株式会社東芝 | liquid heating device |
-
1985
- 1985-10-31 JP JP24290485A patent/JPS62105893A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62105893A (en) | 1987-05-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5538382A (en) | Variable level lifting platform for a cargo container handling crane | |
| WO2018171284A1 (en) | Wind power steel pipe pile lifting transportation process | |
| US3467263A (en) | Shipboard gantry crane and hoist mechanism therefor | |
| JPS58185389A (en) | Device and method of loading and unloading barge to and from ship | |
| US3640413A (en) | Boat crane | |
| US2613001A (en) | Cargo handling apparatus for ships | |
| US3102642A (en) | List compensating device | |
| CN101346272B (en) | Floating equipment for shipping and transshipment containers | |
| EP0406394A1 (en) | Container crane | |
| US3658187A (en) | Marine cargo handling crane | |
| CN109626236B (en) | Control method for suspension arm and lifting appliance of folding arm type lifting equipment | |
| JP2001226073A (en) | Method of installing portal crane | |
| KR101166718B1 (en) | Stabilized Container Crane With Improved Legs | |
| JPH09175781A (en) | Container crane | |
| JPH0333637B2 (en) | ||
| US6648571B1 (en) | Mobile handling apparatus for loading and unloading ships in docks | |
| US4762240A (en) | Articulating crane | |
| JPS59207392A (en) | Transporter and use thereof | |
| JPS62126040A (en) | floating container crane | |
| KR101166717B1 (en) | Mobile Harbor With Container Crane | |
| EP0551665A1 (en) | Crane relocation and erection | |
| JPH09315758A (en) | Container crane | |
| JP3234536B2 (en) | Multipurpose crane | |
| US3532227A (en) | Crane for loading and unloading container ships | |
| CN216613827U (en) | Ship hoisting equipment for cargo handling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |