JPH0338369B2 - - Google Patents
Info
- Publication number
- JPH0338369B2 JPH0338369B2 JP22132183A JP22132183A JPH0338369B2 JP H0338369 B2 JPH0338369 B2 JP H0338369B2 JP 22132183 A JP22132183 A JP 22132183A JP 22132183 A JP22132183 A JP 22132183A JP H0338369 B2 JPH0338369 B2 JP H0338369B2
- Authority
- JP
- Japan
- Prior art keywords
- sheet pile
- vertical hole
- auger screw
- blind casing
- auger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【発明の詳細な説明】
本発明は、シートパイルの設置方法の改良に関
するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an improved method of installing sheet piles.
建屋構築時の根切りに際して、周辺地盤の崩壊
やそれに伴う近隣建屋の沈下を防止すべく、シー
トパイルによる連続地中壁が形成される。 When the roots are cut during building construction, a continuous underground wall is formed using sheet piles to prevent the surrounding ground from collapsing and the surrounding buildings from subsidence.
このシートパイルを地中に設置するに、従来
は、第1図イに示すように、オーガスクリユー1
1によつて排土掘削しながら縦穴A′を形成し、
かつ同時に、シートパイル12を前記縦穴A′近
くに沿わせて地中に埋入させ、該シートパイル1
2の下端が所定深さに達した後に、前記オーガス
クリユー11を逆回転させながら該オーガスクリ
ユー11を引き抜く設置工法をとつている。 In order to install this sheet pile underground, conventionally, as shown in Figure 1A, an auger screw 1
Form a vertical hole A′ while excavating the soil according to 1.
At the same time, the sheet pile 12 is buried in the ground along the vertical hole A', and the sheet pile 1
An installation method is used in which the auger screw 11 is pulled out while rotating the auger screw 11 in the opposite direction after the lower end of the auger screw 2 reaches a predetermined depth.
しかし、縦穴A′の形成に際して多くの土砂が
排土されることと、オーガスクリユー11の引き
抜きによる体積減少とが相俟つて、縦穴A′内の
地盤は極めて軟弱なものとなつており、このため
に、第1図ロに示すように、建屋構築側の地盤に
根切りを行なうと、根切り側の縦穴A′に対応す
るシートパイル12が根切り側に倒れだし、これ
による周辺地盤Cとの間隙形成によつて該周辺地
盤Cの崩壊を生じ、そしてまた、シートパイルC
を挾んで根切り側とは反対側の縦穴A′に対応す
る箇所の周辺地盤Cの崩壊もみられ、これらが周
辺地盤Cのゆるみを招来し、近隣建屋の沈下を生
じさせることが多々あつた。 However, the ground inside the vertical hole A' is extremely soft due to the fact that a lot of earth and sand is removed when forming the vertical hole A', and the volume is reduced due to the pulling out of the auger screw 11. For this reason, as shown in Figure 1B, when a root cut is made in the ground on the building construction side, the sheet pile 12 corresponding to the vertical hole A' on the root cut side begins to fall down to the root cut side, and the surrounding ground is caused by this. The formation of a gap with C causes the collapse of the surrounding ground C, and also the sheet pile C
Collapses of the surrounding ground C were also observed at locations corresponding to the vertical hole A' on the opposite side of the root cutting side, and these often led to loosening of the surrounding ground C and caused the subsidence of neighboring buildings. .
本発明は、簡単な改良によつて縦穴内の地盤強
度を強化させ、近隣建屋の沈下を防止することを
目的とする。 The purpose of the present invention is to strengthen the ground strength within a vertical hole through simple improvements and to prevent the subsidence of neighboring buildings.
以下、本発明方法の実施例を第2図以降の図面
に基いて説明すると、先ず第2図に示すように、
建設機械1に装備された駆動昇降体2に、連続螺
旋のオーガスクリユー3と、該オーガスクリユー
3を同芯状に内装する内面にテフロン加工等の摩
擦低減加工を施してある筒体から成る盲ケーシン
グ4、及び、埋設すべきシートパイル5を吊下げ
状にセツトし、そして第3図に示すように、前記
オーガスクリユー3を掘削方向に正回転させると
共に、該オーガスクリユー3とは逆方向に盲ケー
シング4を回転させながら、前記昇降体2を強制
的に押圧降下させ、前記オーガスクリユー3によ
る掘削土を盲ケーシング4内にストツクさせなが
ら、地中に縦穴Aを掘削形成する。 Hereinafter, embodiments of the method of the present invention will be explained based on the drawings from FIG. 2 onwards. First, as shown in FIG. 2,
A driving elevating body 2 equipped on a construction machine 1 is provided with a continuous spiral auger screw 3 and a cylindrical body whose inner surface is coated with friction reducing material such as Teflon, and the inner surface of the auger screw 3 is concentrically arranged inside the auger screw 3. The blind casing 4 and the sheet pile 5 to be buried are set in a hanging manner, and as shown in FIG. 3, the auger screw 3 is rotated forward in the excavation direction and While rotating the blind casing 4 in the opposite direction, the elevating body 2 is forcibly pushed down, and while the soil excavated by the auger screw 3 is stored in the blind casing 4, a vertical hole A is excavated in the ground. do.
これと同時的に、前記シートパイル5を縦穴A
近くに沿わせて地中に埋入させるのである。 At the same time, the sheet pile 5 is moved to the vertical hole A.
It is buried underground along the side.
第4図に示すように、前記シートパイル5の下
端が所定深さに達した時点で、該シートパイル5
の昇降体2に対する連結を解除し、然る後に、前
記オーガスクリユー3並びに盲ケーシング4を
夫々逆回転させながら昇降体4を強制上昇させ、
前記盲ケーシング4内にストツクさせた掘削土を
縦穴A内に埋め戻しながら、オーガスクリユー3
並びに盲ケーシング4を縦穴Aから引き抜くので
ある。 As shown in FIG. 4, when the lower end of the sheet pile 5 reaches a predetermined depth, the sheet pile 5
is disconnected from the elevating body 2, and then the auger screw 3 and the blind casing 4 are respectively rotated in the opposite direction while the elevating body 4 is forcibly raised;
While backfilling the vertical hole A with the excavated soil stored in the blind casing 4, the auger screw 3
At the same time, the blind casing 4 is pulled out from the vertical hole A.
以上をもつて、1本のシートパイル5の設置を
完了するのであり、以後は、シートパイル5,5
どうしを連結させながら順次シートパイル5の設
置を行なうことによつて、第1図ロに示すような
連続地中壁Bを形成するのである。 With the above, the installation of one sheet pile 5 is completed, and from now on, the installation of one sheet pile 5, 5
By sequentially installing the sheet piles 5 while connecting them, a continuous underground wall B as shown in FIG. 1B is formed.
尚、掘削土が例えば粘土質のような場合には、
該掘削土がオーガスクリユー3の螺旋翼から分離
しにくくて、縦穴A内への埋戻しが困難になるこ
とが想定されるが、この場合は、水やベントナイ
ト等の流動物を供給してやれば良く、その一手段
としては、オーガスクリユー軸を筒軸構造にして
それの筒壁に適当な孔を形成し、そして筒軸の上
端に流動物の供給管を接続して、必要に応じて流
動物を吐出させれば良い。 In addition, if the excavated soil is clayey, for example,
It is assumed that the excavated soil will be difficult to separate from the spiral blades of the auger screw 3, making it difficult to backfill into the vertical hole A. In this case, it is recommended to supply fluids such as water or bentonite. One way to do this is to make the auger screw shaft into a cylindrical structure, form an appropriate hole in the cylindrical wall, connect a fluid supply pipe to the upper end of the cylindrical shaft, and adjust the flow as necessary. All you have to do is discharge the fluid.
以上説明したように本発明によるシートパイル
の設置方法は、連続螺旋のオーガスクリユーと該
オーガスクリユーを内装する内面に摩擦低減加工
してある盲ケーシングとによつて、掘削土を前記
盲ケーシング内にストツクさせながら地中に縦穴
を掘削形成し、かつ同時に、シートパイルを前記
縦穴近くに沿わせて地中に埋入させ、該シートパ
イルの下端が所定深さに達した後に、前記オーガ
スクリユーを逆回転させながら該オーガスクリユ
ーと盲ケーシングを引き抜き、前記盲ケーシング
内にストツクした掘削土を前記縦穴内に埋戻す点
に特徴がある。 As explained above, the method for installing a sheet pile according to the present invention uses a continuous spiral auger crew and a blind casing whose inner surface is friction-reduced and which houses the auger crew. A vertical hole is excavated in the ground while the sheet pile is stocked in the ground, and at the same time, a sheet pile is buried in the ground along the vicinity of the vertical hole, and after the lower end of the sheet pile reaches a predetermined depth, the auger The system is characterized in that the auger screw and the blind casing are pulled out while rotating the screw in the opposite direction, and the excavated soil stored in the blind casing is backfilled into the vertical hole.
即ち、従来は、掘削土を排土していたのである
が、本発明では、過度の抵抗とならぬよう内面を
低摩擦にした盲ケーシング内に掘削土をストツク
させておいて、オーガスクリユー並びに盲ケーシ
ングの引き抜きに際して、このストツクした掘削
土を元の縦穴内に強制的に埋戻すものであり、こ
れによつて、縦穴内の地盤強度を元の状態に近い
状態に復元させ得るのであり、而して、シートパ
イルの傾きやこれに伴う周辺地盤の崩壊、あるい
は、縦穴自体への周辺地盤の崩壊を、極めて効果
的に防止できるようになり、延いては近隣建屋の
沈下トラブルを解消できるに至つた。 That is, in the past, the excavated soil was discharged, but in the present invention, the excavated soil is stored in a blind casing with a low friction inner surface to prevent excessive resistance, and the excavated soil is removed from the auger screw. In addition, when the blind casing is pulled out, this accumulated excavated soil is forcibly backfilled into the original vertical hole, thereby restoring the ground strength within the vertical hole to a state close to its original state. As a result, it becomes possible to extremely effectively prevent the inclination of the sheet pile and the associated collapse of the surrounding ground, or the collapse of the surrounding ground into the vertical hole itself, which in turn eliminates the problem of subsidence in neighboring buildings. I was able to do it.
第1図イは従来のシートパイル設置方法の説明
図、第1図ロは従来方法による連続地中壁の部分
斜視図である。第2図以降が本発明の実施例に係
り、第2図乃至第4図はシートパイル設置の手順
を示す説明図である。
3……オーガスクリユー、4……盲ケーシン
グ、5……シートパイル、A……縦穴。
FIG. 1A is an explanatory diagram of a conventional sheet pile installation method, and FIG. 1B is a partial perspective view of a continuous underground wall according to the conventional method. FIG. 2 and subsequent figures relate to embodiments of the present invention, and FIGS. 2 to 4 are explanatory diagrams showing the procedure for installing sheet piles. 3...Auguscrew, 4...Blind casing, 5...Sheet pile, A...Vertical hole.
Claims (1)
リユーを内装する内面に摩擦低減加工してある盲
ケーシングとによつて、掘削土を前記盲ケーシン
グ内にストツクさせながら地中に縦穴を掘削形成
し、かつ同時に、シートパイルを前記縦穴近くに
沿わせて地中に埋入させ、該シートパイルの下端
が所定深さに達した後に、前記オーガスクリユー
を逆回転させながら該オーガスクリユーと盲ケー
シングを引き抜き、前記盲ケーシング内にストツ
クした掘削土を前記縦穴内に埋戻すことを特徴と
するシートパイルの設置方法。1. Excavating a vertical hole in the ground while storing excavated soil in the blind casing using a continuous spiral auger crew and a blind casing that houses the auger crew and has an inner surface treated to reduce friction; At the same time, a sheet pile is buried in the ground along the vicinity of the vertical hole, and after the lower end of the sheet pile reaches a predetermined depth, the auger screw and the blind casing are removed while rotating the auger screw in the opposite direction. A method for installing a sheet pile, comprising pulling out the sheet pile, and backfilling the vertical hole with the excavated soil stored in the blind casing.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22132183A JPS60112922A (en) | 1983-11-22 | 1983-11-22 | Method of installing sheet pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22132183A JPS60112922A (en) | 1983-11-22 | 1983-11-22 | Method of installing sheet pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60112922A JPS60112922A (en) | 1985-06-19 |
| JPH0338369B2 true JPH0338369B2 (en) | 1991-06-10 |
Family
ID=16764966
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22132183A Granted JPS60112922A (en) | 1983-11-22 | 1983-11-22 | Method of installing sheet pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60112922A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04124574U (en) * | 1991-04-30 | 1992-11-13 | トキコ株式会社 | master cylinder |
-
1983
- 1983-11-22 JP JP22132183A patent/JPS60112922A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60112922A (en) | 1985-06-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2842855B2 (en) | Long-distance propulsion method and equipment in semi-shield method | |
| US4595059A (en) | Method of providing a conductor pipe to an opening portion of a well | |
| JP2001115458A (en) | Deep well construction method using earth retaining wall | |
| JP2009046891A (en) | Spiral auger and construction method of fitting branch pipe to underground buried main pipe using the spiral auger | |
| JPH0338369B2 (en) | ||
| JP7248545B2 (en) | Construction method of drilling rig and monopile foundation | |
| JPS6019827A (en) | Drawing work of follower pile | |
| JPH07247551A (en) | Excavation method for high-water ground with impermeable layer | |
| JPH0421013B2 (en) | ||
| JP2733561B2 (en) | Underground wall construction method with curvature | |
| JPS60126423A (en) | Pile driving method | |
| JP3488887B2 (en) | Well drilling method | |
| JP3015842B2 (en) | Excavation method | |
| CN214460448U (en) | Foundation pit enclosure structure applying high-pressure jet grouting water stopping pile | |
| JPH1171983A (en) | Deep well drilling method | |
| JPS5845529B2 (en) | Steel pipe installation equipment | |
| JPH0384115A (en) | Excavated casing | |
| JPS6156734B2 (en) | ||
| JP2808288B2 (en) | Ground drilling equipment | |
| JPH0689558B2 (en) | Water collecting well and lateral well construction method for water collecting well | |
| JPH02136438A (en) | Laying work of casing tube in bottom-expansion excavation | |
| JPH02311617A (en) | Construction of foundation pile | |
| JPH06307178A (en) | Excavation of ground | |
| JPH05311643A (en) | Sheet pile for underground continuous wall and underground continuous wall construction method | |
| JPS60208515A (en) | Piling work |