Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0339128B2 - - Google Patents
[go: Go Back, main page]

JPH0339128B2 - - Google Patents

Info

Publication number
JPH0339128B2
JPH0339128B2 JP7375784A JP7375784A JPH0339128B2 JP H0339128 B2 JPH0339128 B2 JP H0339128B2 JP 7375784 A JP7375784 A JP 7375784A JP 7375784 A JP7375784 A JP 7375784A JP H0339128 B2 JPH0339128 B2 JP H0339128B2
Authority
JP
Japan
Prior art keywords
frame
pile
press
machine
chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7375784A
Other languages
Japanese (ja)
Other versions
JPS60215920A (en
Inventor
Morio Kitamura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Giken Seisakusho Co Ltd
Original Assignee
Giken Seisakusho Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Giken Seisakusho Co Ltd filed Critical Giken Seisakusho Co Ltd
Priority to JP7375784A priority Critical patent/JPS60215920A/en
Publication of JPS60215920A publication Critical patent/JPS60215920A/en
Publication of JPH0339128B2 publication Critical patent/JPH0339128B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20Placing by pressure or pulling power

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 発明の技術分野 本発明は杭圧入機、特に地下埋設管、例えば下
水管の敷設に先立ち、その敷設部位に基礎杭を圧
入する杭圧入機に関する。
TECHNICAL FIELD OF THE INVENTION The present invention relates to a pile press-in machine, and particularly to a pile press-in machine for press-fitting a foundation pile into a site where underground pipes, such as sewer pipes, are to be laid prior to laying the pipes.

発明の技術的背景とその問題点 下水管等の地下埋設管の敷設は従来、管の敷設
に先立ち、左右に対向する土留め壁を地盤中に造
成し、それ等土留め壁間の土を必要深さ掘下げ、
その掘削した溝の底に栗石等を敷き並らべ、タン
パー類で搗き固めた後、コンクリートを打設して
基礎とし、その上に管を敷設し、掘削した溝に土
を埋め戻すという工法で行われている。しかしそ
の埋め戻し後、埋め戻し土が締つて地盤として落
着くまでの間に種々の原因で地下埋設管に不同沈
下が生ずることが少なくない。不同沈下を起すと
管の勾配が当初意図するところより大きく狂つた
り、管と管の接続が不良となつたりし、管中を流
れる流体洩れの原因となる。この傾向は既設のマ
ンホールに接続して地下埋設管を新しく敷設した
場合、特に大きく、管継目の勾配に狂いだけでな
く、継目を破壊することすらある。それは既設マ
ンホールの沈下が既に終了しているのに対し新規
敷設管が沈下を起す結果、管の沈下が実質的に大
きくなるからである。そしてこの問題を簡潔に解
決し得る有効な対策が末だ確立されていないのが
実状である。
Technical background of the invention and its problems Traditionally, when laying underground pipes such as sewage pipes, prior to laying the pipe, earth retaining walls facing left and right are constructed in the ground, and the soil between the earth retaining walls is removed. Dig down to the required depth,
A construction method in which chestnut stones, etc. are laid out at the bottom of the excavated trench, pounded and hardened with a tamper, concrete is poured as a foundation, a pipe is laid on top of the foundation, and the excavated trench is backfilled with soil. It is being carried out in However, after backfilling, until the backfill soil compacts and settles into the ground, uneven settlement often occurs in underground pipes for various reasons. If uneven settling occurs, the slope of the pipes may be more deviated than originally intended, or the connections between pipes may become poor, causing fluid flowing through the pipes to leak. This tendency is particularly severe when a new underground pipe is installed by connecting it to an existing manhole, and can not only disrupt the slope of the pipe joint but also destroy the joint. This is because while the existing manhole has already settled, the newly installed pipe will begin to settle, resulting in a substantially larger settlement of the pipe. The reality is that no effective measures have been established to easily solve this problem.

管不同沈下の問題は管敷設溝の底に基礎を形成
するのに前示の手段だけでなく、杭を打込んで基
礎を補強すれば、解消されるであろう。しかしな
がら斯様な着想を従来公知の杭打ち機で具現する
には問題がある。地下埋設管の基礎として打込む
杭は該管の継目部相当部位に施すのが最も効果的
であり、その部位は通常、約2.4m間隔というよ
うに比較的間遠であるし、各継目部相当部位で必
要とする杭の分布は管径、管の敷設列数によつて
異なり、これに即応する杭打ち機としては、杭打
ち荷重負荷手段を有する杭打ちヘツドが前後左右
の四方へ比較的広範囲に亘つて自由に移動し得る
機能のものでなければならない。この条件を満足
する杭打ち機として従来公知のものは、作業器と
してのフロントアタチメントが杭打ち荷重負荷手
段付き杭打ちヘツドである点を除き、パワーシヨ
ベル等の土工機械と同様な構造、即ち杭打ちヘツ
ドを所要の個所へ移動するのに、パワーシヨベル
等土工機械のフロントアタチメントにおけると同
様な構造の運動機構に依存しており、前後左右へ
の移動が機台の上部旋回体の水平旋回、及び履帯
等走行装置の前後動の複合によるため、必ずしも
迅速容易でない。特に管敷設の基礎杭は要求され
る載架力が小さく、林業で副産される間伐材で充
分であり、このような杭材には従来公知の杭打ち
機は規模、機動力共に大き過ぎる。加えて、左右
の対向する土留め壁間に掘下げた溝中で機台を履
帯等による走行で移動させることは、ストラツト
が邪魔になつて不可能であり、杭打ち施工を足許
的作業の下に的確に行い得ない。斯くて、従来公
知の杭打ち機では管不同沈下の問題を簡潔に解消
し得ない。
The problem of uneven settlement of pipes may be solved by not only forming the foundation at the bottom of the pipe trench by using the above-mentioned measures, but also by driving piles and reinforcing the foundation. However, there are problems in implementing such an idea with conventionally known pile driving machines. It is most effective to drive piles for the foundation of underground pipes at the joints of the pipes, and these places are usually relatively far apart, approximately 2.4 m apart, and the piles are placed at the joints of the pipes. The distribution of piles required at the corresponding location varies depending on the pipe diameter and the number of rows of pipes laid, and a pile driving machine that can respond to this immediately uses a pile driving head with a pile driving load loading means that can be used in all four directions, front, rear, left and right. It must be able to move freely over a wide range of areas. Conventionally known pile drivers that satisfy this condition have the same structure as earthmoving machines such as power shovels, except that the front attachment as a working device is a pile driving head with a means for applying pile driving loads. To move the head to the required location, it relies on a movement mechanism with a structure similar to that of the front attachment of earth-moving machines such as power shovels. It is not always quick and easy because it involves a combination of back and forth movement of the traveling device. In particular, foundation piles for pipe laying require only a small loading force, and thinning materials produced by forestry are sufficient, and conventionally known pile drivers are too large in size and maneuverability for such pile materials. . In addition, it is impossible to move the machine platform by running on tracks etc. in the trench dug between the left and right opposing earth retaining walls because the struts will get in the way, and pile driving is not possible due to manual work. cannot be done accurately. Therefore, conventionally known pile drivers cannot simply solve the problem of uneven settling of pipes.

発明の目的 そこで本発明は地下埋設管の不同沈下の問題を
簡潔に解消することを保証する杭圧入機を提供し
ようというものである。
OBJECT OF THE INVENTION Therefore, the present invention aims to provide a pile press-in machine that guarantees a simple solution to the problem of uneven settlement of underground pipes.

発明の構成 本発明の杭圧入機は地下埋設管の敷設に先立ち
その敷設部位に基礎杭を圧入する杭圧入機であつ
て、地盤に施した左右に対向する土留め壁と土留
め壁の間に掘下げられた溝の中に於て、これ等土
留め壁の対向する内面間に亘つて突張り状に解放
可能に圧締される圧締手段を有する第1のフレー
ムに、該フレーム上を左右に移動し得る第2のフ
レーム、及び第1のフレームに対し上下動し得る
架台を設け、上記第2のフレームに該フレーム上
を前後動し得る第3のフレームを、上記架台にこ
れとの間に相対的に前後駆動が可能な接地シユー
を、上記第3のフレームに被圧入杭を掴む上下駆
動が可能なチヤツクをそれぞれ備えたことを特徴
としている。
Structure of the Invention The pile press-in machine of the present invention is a pile press-in machine that press-fits foundation piles into the installation site of underground pipes prior to laying underground pipes, and is a pile press-in machine that presses foundation piles into the installation site between underground retaining walls and earth retaining walls placed in the ground. In the trench dug into the earth retaining wall, a first frame having a clamping means releasably clamped in a tension manner between the opposing inner surfaces of the earth retaining wall is placed on the first frame. A second frame that can move left and right, and a pedestal that can move up and down with respect to the first frame are provided, and a third frame that can move back and forth on the second frame is provided, and a third frame that can be moved back and forth on the frame is attached to the pedestal. It is characterized in that the third frame is provided with a grounding shoe that can be relatively driven back and forth between the two, and a chuck that can be driven up and down that grips the press-fitted pile on the third frame.

発明の作用 本発明においては地盤に施した左右に対向する
土留め壁と土留め壁の間に掘下げた溝の中で、こ
れ等土留め壁の対向する内面間に亘つて圧締手段
を突張り状に圧締させると、第1のフレームが該
土留め壁に対し一体的に拘束化される。従つてこ
の状態下で被圧入杭をチヤツクで掴み、これを押
下げ、その押下げに次いでチヤツクを開いて上昇
させ、杭を再び掴んで押下げるという操作を繰返
すことにより杭を地下埋設管の敷設に先立ち、上
記掘下げ溝における地盤に圧入することができ
る。
Effects of the Invention In the present invention, the clamping means is inserted between the opposing inner surfaces of the earth retaining walls in a groove dug between the left and right earth retaining walls that are formed in the ground. When the first frame is tightened and tightened, the first frame is integrally restrained with respect to the earth retaining wall. Therefore, under this condition, the pile can be used to lay an underground pipe by grasping the press-fitted pile with a chuck, pushing it down, then pushing it down, opening the chuck, raising it, grasping the pile again, and pushing it down. Prior to this, it can be press-fitted into the ground in the trench.

上記チヤツクは第2のフレーム上を前後に移動
可能な第3のフレームに備えられ、該第2のフレ
ームが第1のフレーム上で左右に移動し得るので
管径、管の敷設列数に対応する杭分布とするため
に必要とするチヤツクの前後動は第3のフレーム
の前後動で行い、左右動は第2のフレームの左右
動で行い得る。即ち、本発明に従えばチヤツクに
必要な縦送り、横送りは上記第2,3のフレーム
の直進動で直截的に行うことができるのである。
The chuck is provided on a third frame that can move back and forth on the second frame, and the second frame can move left and right on the first frame, so it corresponds to the pipe diameter and the number of rows of pipes laid. The back-and-forth movement of the chuck required to obtain the desired pile distribution can be performed by the back-and-forth movement of the third frame, and the left-right movement of the chuck can be performed by the left-right movement of the second frame. That is, according to the present invention, the vertical and horizontal feeds necessary for the chuck can be directly performed by the linear movement of the second and third frames.

本発明においては第1フレームに該フレームに
対し上下動し得る架台を設け、該架台にこれとの
間に相対的に前後駆動が可能な接地シユーを備え
たので、本発明杭圧入機を地下埋設管の継目部相
当部位に即応する個所に移動させるには、上記架
台と接地シユーとの間の相対的な前後可動スパン
を予め設計的に然るべく定めておくことにより、
左右に対向する土留め壁と土留め壁の間に亘つて
既に述べたようにして一体的に拘束化した第1の
フレームを支持体として架台及び接地シユーを持
上げ、架台に対し接地シユーを前方或いは後方へ
移動させ、その移動させた位置で接地シユー及び
架台を第1のフレームに対し押下げて、接地シユ
ーを接地させた後、第1のフレームの拘束を圧締
手段の圧締解放で触き、接地シユーが移動した側
への架台の駆動により第1,2及び3のフレーム
の組合体を当該側へ変位させるという要領で達成
し得る。この場合、架台及び接地シユーの持上げ
可能高さを設計的に予め然るべく定めておけば、
土留め壁のストラツトに邪魔されることなく、こ
れの上を超えて架台及び接地シユーを移動させ、
本発明杭圧入機を左右対向土留め壁間の掘下げ溝
内で支障なく該溝沿いに前進或いは後進させるこ
とができる。
In the present invention, the first frame is provided with a pedestal that can move up and down with respect to the frame, and the pedestal is equipped with a grounding shoe that can be moved back and forth relative to the first frame, so that the pile press-in machine of the present invention can be installed underground. In order to move it to a location that corresponds to the joint of the buried pipe, the relative longitudinal movable span between the above-mentioned pedestal and the grounding shoe should be determined in advance in the design.
Lift the pedestal and ground shoe using the first frame, which has been integrally restrained as described above, as a support between the left and right opposing earth retaining walls, and move the ground shoe forward with respect to the mount. Alternatively, after moving the grounding shoe backwards and pushing down the grounding shoe and the pedestal against the first frame at the moved position to bring the grounding shoe into contact with the ground, the restraint of the first frame is released by pressing and releasing the clamping means. This can be achieved in such a way that the assembly of the first, second and third frames is displaced to the side by touching and driving the trestle to the side to which the grounding shoe has moved. In this case, if the lifting height of the pedestal and grounding shoe is determined in advance,
Move the frame and grounding shoe over the retaining wall struts without being obstructed by them;
The pile press-in machine of the present invention can be moved forward or backward within the dug-out trench between the left and right opposing earth retaining walls along the trench without any trouble.

発明の効果 このように本発明によれば、杭圧入機を地下埋
設管の継目部相当部位に即応する個所に移動させ
るのに、左右対向土留め壁間の掘り下げ溝内でこ
れを行い得ると共に、管径、管の敷設列数に対応
する分布となるよう杭を圧入するのに必要とする
チヤツクの前後動、左右動をそれぞれ直進動を以
て直截的になし得るので、所要個所に対するチヤ
ツクの移動を規模、機動力において必要最小の適
当な駆動手段、例えば油圧シリンダー・プランジ
ヤー装置で迅速容易に行うことができ、しかも杭
圧入機は上記掘下げ溝内で前後動が可能な結果、
杭圧入施工を足許的作業の下に的確に行い得る。
Effects of the Invention As described above, according to the present invention, in order to move the pile press-in machine to a location immediately corresponding to the joint of underground pipes, it is possible to move the pile press-in machine to a location immediately corresponding to the joint of underground pipes, and to move the pile press-in machine to a location immediately corresponding to the joint portion of underground pipes. The back and forth movement and left and right movement of the chuck required for press-fitting piles in a distribution that corresponds to the pipe diameter and the number of rows of pipes to be laid can be performed directly by straight movement, so the chuck can be moved to the required location. This can be done quickly and easily using the minimum necessary drive means in terms of scale and mobility, such as a hydraulic cylinder plunger device, and as a result of the pile press-in machine being able to move back and forth within the trench,
Pile press-in construction can be performed accurately with preliminary work.

斯くて、本発明によれば地下埋設管の不同沈下
の問題を簡潔に解消することを保証し得るのであ
る。
Thus, according to the present invention, it is possible to ensure that the problem of uneven settlement of underground pipes is simply solved.

本発明において左右に対向する土留め壁の対向
内面間に突張り状に圧締手段を圧締させて第1の
フレームを該土留め壁に対し一体的に拘束化する
のは、この種土留め壁がグランドライン以下に施
さるので、これに応じて本発明杭圧入機を該土留
め壁にしつかりと安定して定着させることを可能
にする。
In the present invention, the first frame is integrally restrained with respect to the earth retaining walls by clamping the clamping means in a tension-like manner between the opposing inner surfaces of the earth retaining walls facing left and right. Since the retaining wall is installed below the ground line, the pile press-in machine of the present invention can be firmly and stably fixed to the retaining wall accordingly.

発明の実施例 以下、本発明の実施例を図面について説明す
る。図で1が第1のフレーム、2が第2のフレー
ム、3が第3のフレームで、第1のフレーム1に
は地盤に施した左右に対向する土留め壁A,Bの
対向する内面間に亘つて突張り状に圧締される圧
締手段、例えば油圧シリンダー・プランジヤー装
置(図示せず)により駆動される押圧体4をフレ
ーム1の前後端それぞれの左右端部に装備し、第
2のフレーム2は第1のフレーム1上に左右(第
1図で上下)へ移動自在に搭載し、第3のフレー
ム3は第2のフレーム2上に前後(第1図におい
て左右)へ移動し得るよう搭載する。第2のフレ
ーム2及び第3のフレーム3の所要方向への移動
はそれぞれ適当な手段、例えば油圧シリンダー・
プランジヤー装置(図示せず)により行えばよ
い。第3のフレーム3には被圧入杭aを掴むチヤ
ツク5を装備する。該チヤツク5は一端側を第3
のフレーム3に対し結合し、他端側をチヤツク5
の本体に対し枢着結合した油圧シリンダー・プラ
ンジヤー装置6により上下に駆動される。7,7
はチヤツク5の上下動を案内するガイドレール
で、該ガイドレール7,7に対しチヤツク5はそ
の本体を摺動案内溝とこれに嵌合する摺動体によ
る滑り対偶結合とすればよい。更に第1のフレー
ム1にはその前後端部に、油圧シリンダー・プラ
ンジヤー装置8,8、8,8により第1のフレー
ム1に対し上下駆動される前後方向に延びる架台
9,9を設け、該架台9,9に油圧シリンダー・
プランジヤー装置10により架台9との間に相対
的に前後駆動される前後方向へ長い接地シユー1
1,11を装備する。上記油圧シリンダー・プラ
ンジヤー装置8,8、8,8は一端側が第1のフ
レーム1に固定され、他端側が架台9,9に枢着
結合され、油圧シリンダー・プランジヤー装置1
0は一端側が架台9に固定され、他端側が接地シ
ユー11に枢着結合される。架台9に対する接地
シユー11の装備は嵌合による滑り対偶の結合と
することができる。
Embodiments of the Invention Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the figure, 1 is the first frame, 2 is the second frame, and 3 is the third frame. A pressing member 4 driven by a hydraulic cylinder/plunger device (not shown), which is pressed in a stretched manner over a period of time, is installed at each of the left and right ends of the front and rear ends of the frame 1. The frame 2 is mounted on the first frame 1 so as to be movable left and right (up and down in Figure 1), and the third frame 3 is mounted on the second frame 2 so as to be movable back and forth (left and right in Figure 1). Load it to get it. The movements of the second frame 2 and the third frame 3 in the required directions are carried out by appropriate means, such as hydraulic cylinders, etc.
This may be done using a plunger device (not shown). The third frame 3 is equipped with a chuck 5 for gripping the press-fitted pile a. The chuck 5 has one end connected to the third
Connect to the frame 3 of the frame 3, and connect the other end to the chuck 5
It is driven up and down by a hydraulic cylinder/plunger device 6 which is pivotally connected to the main body. 7,7
is a guide rail that guides the vertical movement of the chuck 5, and the chuck 5 may be connected to the guide rails 7, 7 by sliding the main body of the chuck 5 with a sliding guide groove and a sliding body fitted therein. Further, the first frame 1 is provided at its front and rear ends with frames 9, 9 extending in the front-rear direction and driven up and down with respect to the first frame 1 by hydraulic cylinder plunger devices 8, 8, 8, 8. Hydraulic cylinders and mounts 9,9
A grounding shoe 1 that is long in the front and back direction and is driven back and forth relative to the frame 9 by the plunger device 10
Equip 1 and 11. The hydraulic cylinder/plunger devices 8, 8, 8, 8 are fixed at one end to the first frame 1, and pivotally connected to the frames 9, 9 at the other end.
0 is fixed to the frame 9 at one end, and pivotally connected to the grounding shoe 11 at the other end. The grounding shoe 11 can be attached to the pedestal 9 by a pair of sliding fittings.

上例構成の本発明杭圧入機による杭aの圧入施
工は次のようにして行われる。
Press-fitting of pile a by the pile press-fitting machine of the present invention having the above-mentioned configuration is carried out as follows.

左右に対向する土留め壁A,Bの間に掘下げら
れた溝Cの中に杭圧入機を置き、油圧シリンダ
ー・プランジヤー装置8,8、8,8による操作
で第1のフレーム1の高さ、換言すればチヤツク
5の高さを適当な度合いに定め、また要すればチ
ヤツク5の向きを所要の垂直度にし、押圧体4,
4、4,4を土留め壁A,Bに圧締させる。こゝ
に杭圧入機は土留め壁A,Bの間に亘つて押圧体
4,4、4,4の突張り状圧締の下に一体的に拘
束化される。即ち土留め壁A,Bが杭a圧入のた
めの反力アンカーとして役立つ。
A pile press-in machine is placed in the groove C dug between the left and right retaining walls A and B, and the height of the first frame 1 is adjusted by operating the hydraulic cylinder plunger devices 8, 8, 8, 8. In other words, the height of the chuck 5 is set to an appropriate degree, and if necessary, the direction of the chuck 5 is set to a required vertical degree, and the pressing body 4,
4, 4, 4 are pressed against the retaining walls A and B. Here, the pile press-in machine is integrally restrained between the earth retaining walls A and B under the tension-like pressing of the pressing bodies 4, 4, 4, 4. That is, the earth retaining walls A and B serve as reaction force anchors for press-fitting the pile a.

この拘束状態下で第2のフレーム2の左右動及
び/または第3のフレーム3の前後動によりチヤ
ツク5を必要部位に位置調整し、その調整した位
置で杭aを掴み、油圧シリンダー・プランジヤー
装置6によるチヤツク5の押下げで杭aを地盤に
圧入する。杭aの圧入は、チヤツク5の開放下の
上昇、上昇した位置での杭aの掴持、再押下げの
回分操作の繰返しで累進的に行われる。
Under this restrained state, the chuck 5 is adjusted to the required position by the left and right movement of the second frame 2 and/or the back and forth movement of the third frame 3, and the peg a is grasped at the adjusted position, and the hydraulic cylinder plunger device Pile a is press-fitted into the ground by pushing down chuck 5 with step 6. The press-fitting of the pile a is carried out progressively by repeating the following operations: lifting the chuck 5 open, holding the pile a in the raised position, and pushing it down again.

或る必要部位に対する杭aの圧入施工が終る
と、次の杭圧入施工部位へ杭圧入機を移動させ
る。この移動は下記の要領で行えばよい。
When the press-fitting of the pile a into a certain required area is completed, the pile press-in machine is moved to the next pile press-fitting area. This movement may be performed in the following manner.

先ず、押圧体4,4、4,4の圧締による杭圧
入機の拘束状態下で、油圧シリンダー・プランジ
ヤー装置8,8、8,8の操作により架台9,
9、及び接地シユー11,11を持上げ、次いで
油圧シリンダー・プランジヤー装置10で架台
9,9に対し接地シユー11,11を前方或いは
後方へ押しやり、その押しやつた位置で油圧シリ
ンダー・プランジヤー装置8,8、8,8により
接地シユー11及び架台9の組合体を接地シユー
11が着地するまで押下げ、然る後、押圧体4,
4、4,4の圧締を解放して第1のフレーム1を
自由とし、接地シユー11,11を先の押しやつ
た側へ油圧シリンダー・プランジヤー装置10に
より架台9,9を駆動させる。この架台9,9の
駆動につれ第1,2及び3のフレーム1,2,3
の組合体が同側へ移動される。
First, under the condition that the pile press-in machine is restrained by the pressing of the pressing bodies 4, 4, 4, 4, the pedestal 9,
9, and the grounding shoes 11, 11 are lifted up, and then the hydraulic cylinder/plunger device 10 is used to push the grounding shoes 11, 11 forward or backward relative to the mounts 9, 9, and in the pushed position, the hydraulic cylinder/plunger device 8 , 8, 8, 8 push down the combination of the grounding shoe 11 and the frame 9 until the grounding shoe 11 lands on the ground, and then the pressing body 4,
4, 4, 4 are released to free the first frame 1, and the hydraulic cylinder/plunger device 10 drives the frames 9, 9 toward the pushing side of the ground shoes 11, 11. As the frames 9, 9 are driven, the first, second and third frames 1, 2, 3
The combination body is moved to the ipsilateral side.

接地シユー11,11を予め然るべき長さにし
ておけば、上記移動の1ステツプを以て、次杭圧
入施工部位への杭圧入機の移動が完了する。接地
シユー11,11の長さが短かい場合は前示移動
の繰返しで所要の転位を行えばよい。
If the grounding shoes 11, 11 are set to appropriate lengths in advance, the movement of the pile press-in machine to the next pile press-in construction site is completed with one step of the movement described above. If the lengths of the grounding shoes 11, 11 are short, the required dislocation may be performed by repeating the predetermined movement.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例を示す平面図、第2
図は第1図の側面図、第3図はチヤツク及びそれ
を上下動させる油圧シリンダー・プランジヤー装
置の側面図、第4図は同実施例における架台及び
接地シユー組合体の縦断面図、第5図は第4図の
−線断面図である。 1は第1のフレーム、2は第2のフレーム、3
は第3のフレーム、4は押圧体、5はチヤツク、
6,8,10は油圧シリンダー・プランジヤー装
置、9は架台、11は接地シユー。
FIG. 1 is a plan view showing one embodiment of the present invention, and FIG.
3 is a side view of the chuck and the hydraulic cylinder/plunger device that moves it up and down; FIG. 4 is a vertical sectional view of the pedestal and ground shoe assembly in the same embodiment; The figure is a sectional view taken along the - line in FIG. 4. 1 is the first frame, 2 is the second frame, 3
is the third frame, 4 is the pressing body, 5 is the chuck,
6, 8, and 10 are hydraulic cylinder/plunger devices, 9 is a pedestal, and 11 is a grounding shoe.

Claims (1)

【特許請求の範囲】[Claims] 1 地下埋設管の敷設に先立ち、その敷設部位に
基礎杭を圧入する杭圧入機であつて、地盤に施し
た左右に対向する土留め壁と土留め壁の間に掘下
げられた溝の中に於て、これ等土留め壁の対向す
る内面間に亘つて突張り状に解放可能に圧締され
る圧縮手段を有する第1のフレームに、該フレー
ム上を左右に移動し得る第2のフレーム、及び第
1のフレームに対し上下動し得る架台を設け、上
記第2のフレームに該フレーム上を前後動し得る
第3のフレームを、上記架台にこれとの間に相対
的に前後駆動が可能な接地シユーを、上記第3の
フレームに被圧入杭を掴む上下駆動が可能なチヤ
ツクをそれぞれ備えたことを特徴とする杭圧入
機。
1. A pile press-in machine that presses foundation piles into the installation site prior to laying underground pipes, into a trench dug between the left and right earth retaining walls placed in the ground. A second frame movable from side to side on the first frame is attached to the first frame having compression means releasably compressed in a stretched manner between the opposing inner surfaces of the earth retaining wall. and a mount that can move up and down with respect to the first frame, a third frame that can move back and forth on the second frame, and a third frame that can move back and forth relative to the second frame. A pile press-in machine, characterized in that the third frame is provided with a chuck that can be driven up and down to grasp a pile to be press-fitted.
JP7375784A 1984-04-11 1984-04-11 Pile penetrator Granted JPS60215920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7375784A JPS60215920A (en) 1984-04-11 1984-04-11 Pile penetrator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7375784A JPS60215920A (en) 1984-04-11 1984-04-11 Pile penetrator

Publications (2)

Publication Number Publication Date
JPS60215920A JPS60215920A (en) 1985-10-29
JPH0339128B2 true JPH0339128B2 (en) 1991-06-12

Family

ID=13527425

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7375784A Granted JPS60215920A (en) 1984-04-11 1984-04-11 Pile penetrator

Country Status (1)

Country Link
JP (1) JPS60215920A (en)

Also Published As

Publication number Publication date
JPS60215920A (en) 1985-10-29

Similar Documents

Publication Publication Date Title
JPH03100223A (en) Method for building seamless, continuous, and linear or circular structural wall and machine for realizing said method
EP0465667A1 (en) Method of and apparatus for laying pipes
US4146347A (en) Method and apparatus for lateral excavation
CN112609705A (en) Steel sheet pile supporting system and method suitable for shallow soft soil foundation pit
JPS6120118Y2 (en)
US3638438A (en) Trench-forming, pipelaying and trench wall supporting machine
JPH0339128B2 (en)
JPH06193063A (en) Press-in pile driving machine and press-in piling method
JPH1046580A (en) Temporary frame type for earth retaining and buried piping method using it
US4925159A (en) Vertical power pulling device
JP3339616B2 (en) Piping connection unit, jig for assembling piping connection unit, and piping connection device
JPH0519380Y2 (en)
JPH0510596U (en) Concrete box for underground structure
KR200283509Y1 (en) Directional curve excavator for pipework
JPH07259169A (en) Construction method of concrete block
CN115030069B (en) Diversion box culvert construction method for penetrating through existing rail lower base body
JP2925125B2 (en) Joint groove burying method and device
CN216922119U (en) Guide structure of underground-excavated jacking pipe in soft soil layer under existing railway line
JPH0431319Y2 (en)
KR102087978B1 (en) A method of pressurizing steel pipe and a method of constructing an underground structure in a lower toe pipe section
JPH11323887A (en) Pipeline burial method and its equipment
JPS6331623B2 (en)
JPH0455084Y2 (en)
JP3145627B2 (en) Excavator for all casing method
JPH0548820B2 (en)

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term