- JPH0340182B2 JPH0340182B2 JP58108918A JP10891883A JPH0340182B2 JP H0340182 B2 JPH0340182 B2 JP H0340182B2 JP 58108918 A JP58108918 A JP 58108918A JP 10891883 A JP10891883 A JP 10891883A JP H0340182 B2 JPH0340182 B2 JP H0340182B2
- Authority
- JP
- Japan
- Prior art keywords
- vertical
- horizontal
- bar
- lip
- lower horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0275—Retaining or protecting walls characterised by constructional features cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
この発明はコンクリート構造物や鉄筋コンクリ
ート構造物を構成するための型枠工法に関する。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a formwork method for constructing concrete structures and reinforced concrete structures.
(従来技術)
在来の型枠工法は木や金属よりなる堰板を所定
の形状に設置し、これをその外側より多くのばた
材や支柱等の支保工で固定し、型枠内に打設され
たコンクリートが所要強度に硬化したら堰板およ
び支保工を撤去する方法である。しかし、在来の
型枠工法では型枠の組立てに際し多数枚の堰板を
組立後各所にすき間ができないように一枚一枚正
確に設置し、かつこれをずれたりしないように確
実に固定する必要があり、また複雑な形状の構造
物の型枠では堰板をその都度図面に合わせて切断
加工する必要があるため型枠の組立作業がきわめ
て面倒であつた。また、堰板にメタルフオームや
プラスチツクパネルを使用した場合、コンクリー
トの打上り面が平滑過ぎるため左官のモルタル等
がうまく付着せず、後日左官による仕上げ部分が
はく落することがある。(Prior art) The conventional formwork construction method involves setting up a weir board made of wood or metal in a predetermined shape, fixing it from the outside with supports such as battens and pillars, and placing it inside the formwork. This method involves removing the weir plates and shoring once the poured concrete has hardened to the required strength. However, in the conventional formwork construction method, when assembling the formwork, a large number of weir plates are accurately installed one by one so that there are no gaps after assembly, and they are securely fixed so that they do not shift. Furthermore, in the case of formwork for complex-shaped structures, it was necessary to cut the weir plates each time according to the drawings, making assembly of the formwork extremely troublesome. Furthermore, when metal foam or plastic panels are used for the weir board, the concrete surface is too smooth, so mortar from plastering does not adhere well, and the finished parts may peel off later.
(発明の目的)
この発明は前記事情に鑑みて提案されたもので
型枠工事の簡略化、省力化がはかれるとともに複
雑な形状の構造物にも簡単に対処でき、かつ打上
り面を左官仕上げとした場合、仕上げ部分のはく
落を防止することができるコンクリート型枠工法
を提供することを目的とする。(Objective of the Invention) This invention was proposed in view of the above circumstances, and it simplifies and saves labor in formwork work, can easily handle complex-shaped structures, and has a plastered surface finish. The purpose of the present invention is to provide a concrete formwork construction method that can prevent the finished part from peeling off.
(発明の構成)
第1図にはこの発明に係る型枠工法が示されて
いる。(Structure of the Invention) FIG. 1 shows a formwork construction method according to the present invention.
当該型枠工法には、断面略リツプ溝状の型材か
らなり、軸組2を構成する下部横桟3、縦桟4、
および上部横桟5と、下部横桟3または上部横桟
5と縦桟4とを連結する連結金具7と、軸組2の
内部へ剥離可能に張り付けられる金網類16と、
が使用される。 The formwork construction method includes a lower horizontal bar 3, a vertical bar 4, which is made of a shape material having a roughly lip groove-like cross section, and which constitutes the framework 2.
and a connecting fitting 7 that connects the upper horizontal bar 5 and the lower horizontal bar 3 or the upper horizontal bar 5 and the vertical bar 4, and a wire mesh 16 that is removably attached to the inside of the framework 2;
is used.
そして、連結金具7は第6図(または第7図)
に示されるように水平部10と垂直部11とから
略L字状に形成され、水平部10には挟持板13
が軸ピン12で取り付けられ、垂直部11の左右
端部には水平方向へ二股状に突出する挟持片1
5,15が形成されている。 The connecting fittings 7 are shown in Fig. 6 (or Fig. 7).
As shown in FIG.
is attached with a shaft pin 12, and at the left and right ends of the vertical part 11 are clamping pieces 1 that protrude horizontally in a bifurcated manner.
5 and 15 are formed.
第1図に示されるように、下部横桟3のリツプ
部14上には一定間隔をおいて複数の縦桟4が立
設され、縦桟4の上端部にはリツプ部14が当接
するように上部横桟5が配置される。 As shown in FIG. 1, a plurality of vertical bars 4 are erected at regular intervals on the lip part 14 of the lower horizontal bar 3, and the lip part 14 is in contact with the upper end of the vertical bar 4. The upper horizontal beam 5 is arranged at.
下部横桟3または上部横桟4とは連結金具7に
より連結され、その際には第3図のように上下の
横桟3,5のリツプ部14,14が水平部10と
挟持片13とで挟持され、縦桟4のリツプ部1
4,14が水平部11に形成された挟持片15,
15で挟持される。 The lower horizontal bar 3 or the upper horizontal bar 4 are connected by a connecting fitting 7, and in this case, the lip portions 14, 14 of the upper and lower horizontal bars 3, 5 are connected to the horizontal portion 10 and the clamping piece 13, as shown in FIG. The lip portion 1 of the vertical beam 4
4 and 14 are clamping pieces 15 formed on the horizontal portion 11,
15.
このようにして構成された軸組2が第1図のよ
うに対向して設置され、軸組2の内側には型枠と
して金網類16が張り付けられる。 The frameworks 2 constructed in this manner are installed facing each other as shown in FIG. 1, and a wire mesh 16 is attached as a formwork inside the frameworks 2.
そして、軸組2,2間にはコンクリートが打設
される。 Then, concrete is placed between the frames 2 and 2.
コンクリート硬化後、軸組2が撤去され、金網
類16は埋め殺しとされる。 After the concrete hardens, the framework 2 is removed and the wire mesh 16 is buried.
(実施例)
以下、この発明を図示する一実施例によつて説
明する。(Example) The present invention will be described below with reference to an illustrative example.
図面第1図は、この発明の一実施例を示す概要
図である。 FIG. 1 is a schematic diagram showing an embodiment of the present invention.
現場打ちコンクリートによるコンクリート基礎
1の上に軸組2,2を必要間隔で対向させて組立
てる。軸組2は下部横桟3と縦桟4と上部横桟5
とから構成する。下部横桟3はコンクリート基礎
1の上に敷設し、複数個の固定金物6でコンクリ
ート基礎1上に固定する。縦桟4は下部横桟3の
上に下部横桟3の長手方向に一定間隔おきに立設
し、第6図および第7図に示す連結金具7で下部
横桟3に連結する。上部横桟5は縦桟4,4間に
跨設し、連結金具7で縦桟4,4にそれぞれ連結
する。 Frame assemblies 2, 2 are assembled facing each other at required intervals on a concrete foundation 1 made of cast-in-place concrete. The frame assembly 2 includes a lower horizontal beam 3, a vertical beam 4, and an upper horizontal beam 5.
It consists of The lower horizontal beam 3 is laid on the concrete foundation 1 and fixed onto the concrete foundation 1 with a plurality of fixing hardware 6. The vertical bars 4 are erected on the lower horizontal bar 3 at regular intervals in the longitudinal direction of the lower horizontal bar 3, and are connected to the lower horizontal bar 3 by connecting fittings 7 shown in FIGS. 6 and 7. The upper horizontal bar 5 is disposed astride between the vertical bars 4, 4, and is connected to the vertical bars 4, 4 by connecting fittings 7, respectively.
下部横桟3、縦桟4および上部横桟5は断面略
リツプ溝状に形成された金属製型材である。 The lower horizontal bar 3, the vertical bar 4, and the upper horizontal bar 5 are metal shapes having a substantially lip groove shape in cross section.
固定金物6は図の実施例においてアングル材で
形成されており、釘やネジ9によつてコンクリー
ト基礎1に固着され、固定金物6により下部横桟
3が取り外し可能に支持される。 The fixed hardware 6 is formed of an angle material in the illustrated embodiment, and is fixed to the concrete foundation 1 with nails or screws 9, and the lower horizontal beam 3 is removably supported by the fixed hardware 6.
連結金具7は水平部10と垂直部11とから略
L字型に形成され、水平部10の略中央部にはそ
の上側より軸ピン12が貫通され、この軸ピン1
2の貫通部分には挾持板13が回転自在に固着さ
れている。そして、連結金具7は、水平部10と
挾持板13とで上下の横桟3,5のリツプ部1
4,14を挾持させて上下の横桟3,5にそれぞ
れ固着する。また、垂直部11の左右縁端部には
水平方向に二股に突出する挾持片15,15が垂
直部11の上下方向に沿つて形成され、連結金具
7は挾持板15,15で縦桟4のリツプ部14,
14を挾持させて縦桟4に固着する。 The connecting fitting 7 is formed into a substantially L-shape by a horizontal portion 10 and a vertical portion 11, and a shaft pin 12 is passed through the approximately central portion of the horizontal portion 10 from above.
A clamping plate 13 is rotatably fixed to the penetrating portion of 2. The connecting fitting 7 is connected to the lip portion 1 of the upper and lower horizontal bars 3 and 5 by the horizontal portion 10 and the clamping plate 13.
4 and 14 are sandwiched and fixed to the upper and lower horizontal bars 3 and 5, respectively. In addition, clamping pieces 15, 15 that protrude into two in the horizontal direction are formed at the left and right edges of the vertical part 11 along the vertical direction of the vertical part 11, and the connecting fitting 7 is connected to the vertical crosspiece 4 by the clamping plates 15, 15. lip portion 14,
14 is clamped and fixed to the vertical beam 4.
軸組2,2の組立てが完了したら、軸組2,2
の内側に金網類16を係止具8等で剥離可能に取
り付ける。 After completing the assembly of frames 2, 2,
A wire mesh 16 is removably attached to the inside of the housing using a locking tool 8 or the like.
金網類16にはメタルラスやワイヤラスあるい
はリブラス等が使用される。 For the wire mesh 16, metal lath, wire lath, ribbon lath, or the like is used.
図の実施例において係止具8には横桟3,5ま
たは縦桟4の内側に形成した突出片が使用されて
いるが、特に桟材の内側に形成する必要はなく、
フツクやボルト等を用いてもよい。 In the illustrated embodiment, a protruding piece formed on the inside of the horizontal bars 3, 5 or the vertical bar 4 is used as the locking tool 8, but it is not necessary to form it on the inside of the bar.
Hooks, bolts, etc. may also be used.
また、軸組2,2間には必要に応じてスペーサ
ーを取り付ける。 Moreover, a spacer is attached between the frame assemblies 2 and 2 as necessary.
金網類16の張り付けが完了したら金網類1
6,16内に鉄筋17を配筋し、次いでコンクリ
ートを打設する。 When pasting of wire mesh 16 is completed, wire mesh 1
Reinforcing bars 17 are placed inside the walls 6 and 16, and then concrete is poured.
打設されたコンクリートがある程度の強度を発
現したら軸組2,2を撤去する。必要に応じて金
網類16の表面にモルタル等の仕上げ材を塗着す
る。 When the poured concrete has developed a certain level of strength, the frameworks 2 and 2 are removed. If necessary, a finishing material such as mortar is applied to the surface of the wire mesh 16.
なお、図示した実施例のほかに、一面のみをこ
の発明の型枠工法で施工し、残りの面を従来の木
製または金属製の堰板を用いて構築することもで
きる。 In addition to the illustrated embodiment, it is also possible to construct only one side using the formwork construction method of the present invention and construct the remaining sides using conventional wooden or metal weir plates.
(発明の効果)
以上、この施工方法によれば、横桟と縦桟とを
連結金具で連結して軸組を容易に組み立てること
ができ、また軸組の内側には型枠として金網類が
張り付けられるので、型枠工事の簡略化、省力化
が図れ、工期の短縮化が可能となる。(Effects of the Invention) As described above, according to this construction method, the frame can be easily assembled by connecting the horizontal beam and the vertical beam with the connecting metal fittings, and wire mesh can be used as a formwork inside the frame. Since it can be pasted, formwork work can be simplified and labor-saving, and the construction period can be shortened.
また、軸組を構成する上下横桟および縦桟は繰
返し使用が可能であるので、経済性が良好であ
る。 Moreover, since the upper and lower horizontal bars and vertical bars that make up the framework can be used repeatedly, it is economically efficient.
また、金網類を型枠として用いているので、加
工が容易であり、複雑な形状の構造物にも対処が
可能となる。 Furthermore, since wire mesh is used as the formwork, it is easy to process and can be used for structures with complex shapes.
さらに、軸組が撤去されて金網類のみが埋め殺
しとされるので、仕上り面を左官仕上げとした場
合、仕上げ部分の剥落を防止できる。 Furthermore, since the framework is removed and only the wire mesh is buried, if the finished surface is plastered, it is possible to prevent the finished part from peeling off.
第1図は組立てた軸組の一部斜視図、第2図は
その平面図、第3図は下部横桟と縦桟との連結状
態を示す斜視図、第4図、第5図は上下横桟およ
び縦桟の一部斜視図、第6図、第7図は連結金具
の斜視図である。
1……コンクリート基礎、2……軸組、3……
下部横桟、4……縦桟、5……上部横桟、6……
固定金物、7……連結金具、8……係止具、9…
…釘やネジ、10……水平部、11……垂直部、
12……軸ピン、13……挾持板、14……リツ
プ部、15……挾持片、16……金網類、17…
…鉄筋。
Figure 1 is a partial perspective view of the assembled frame, Figure 2 is its plan view, Figure 3 is a perspective view showing the connection between the lower horizontal beam and the vertical beam, and Figures 4 and 5 are the top and bottom. A partial perspective view of the horizontal beam and the vertical beam, and FIGS. 6 and 7 are perspective views of the connecting fittings. 1... Concrete foundation, 2... Frame, 3...
Lower horizontal bar, 4... Vertical bar, 5... Upper horizontal bar, 6...
Fixed hardware, 7... Connecting metal fittings, 8... Locking tools, 9...
...Nails and screws, 10...Horizontal part, 11...Vertical part,
12... Axis pin, 13... Holding plate, 14... Lip portion, 15... Holding piece, 16... Wire mesh, 17...
...reinforced steel.
Claims (1)
構成する下部横桟3、縦桟4、および上部横桟5
と、 水平部10と垂直部11とから略L字状に形成
され、水平部10には挟持板13が軸ピン12で
取り付けられ、垂直部11の左右端部には水平方
向へ二股状に突出する挟持片15,15が形成さ
れ、下部横桟3または上部横桟5と縦桟4とを連
結する連結金具7と、 軸組2の内側へ剥離可能に張り付けられる金網
類16と、 を有し、 下部縦桟3のリツプ部14上に一定間隔をおい
て複数の縦桟4を立設し、 縦桟4の上端部にリツプ部14が当接するよう
に上部横桟5を配置し、 上下の横桟3,5のリツプ部14,14を水平
部10と挟持板13とで挟持し、縦桟4のリツプ
部14,14を垂直部11に形成された挟持片1
5,15で挟持させて、下部横桟3または上部横
桟5と縦桟4とを連結金具7により連結して一対
の軸組2,2を構成し、 軸組2の内側に型枠として金網類16を張り付
け、 軸組2,2間にコンクリートを打設し、 コンクリート硬化後、前記軸組2を撤去するこ
とを特徴とするコンクリート型枠工法。[Scope of Claims] 1. A lower horizontal bar 3, a vertical bar 4, and an upper horizontal bar 5, which are made of a profile member with a substantially lip groove shape in cross section, and constitute the framework 2.
A horizontal part 10 and a vertical part 11 form a substantially L-shape, and a clamping plate 13 is attached to the horizontal part 10 with a shaft pin 12, and a bifurcated horizontal part is provided at the left and right ends of the vertical part 11. A connecting metal fitting 7 in which protruding clamping pieces 15, 15 are formed and connects the lower horizontal beam 3 or the upper horizontal beam 5 and the vertical beam 4, and a wire mesh 16 that is releasably attached to the inside of the framework 2. A plurality of vertical bars 4 are erected at regular intervals on the lip part 14 of the lower vertical bar 3, and the upper horizontal bar 5 is arranged so that the lip part 14 is in contact with the upper end of the vertical bar 4. The lip parts 14, 14 of the upper and lower horizontal bars 3, 5 are held between the horizontal part 10 and the clamping plate 13, and the lip parts 14, 14 of the vertical bar 4 are held by the clamping piece 1 formed on the vertical part 11.
5 and 15, and connect the lower horizontal beam 3 or the upper horizontal beam 5 and the vertical beam 4 with the connecting fittings 7 to form a pair of frameworks 2, 2, and the inside of the framework 2 as a formwork. A concrete formwork construction method characterized by pasting wire mesh 16, pouring concrete between frames 2, 2, and removing said frames 2 after the concrete hardens.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10891883A JPS5921829A (en) | 1983-06-17 | 1983-06-17 | Concrete formwork method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10891883A JPS5921829A (en) | 1983-06-17 | 1983-06-17 | Concrete formwork method |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1468982A Division JPS58131270A (en) | 1982-02-01 | 1982-02-01 | Mold frame method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5921829A JPS5921829A (en) | 1984-02-03 |
| JPH0340182B2 true JPH0340182B2 (en) | 1991-06-18 |
Family
ID=14496947
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP10891883A Granted JPS5921829A (en) | 1983-06-17 | 1983-06-17 | Concrete formwork method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5921829A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104295086B (en) * | 2014-10-29 | 2017-01-18 | 扬州国电通用电力机具制造有限公司 | Metal frame type fabricated formwork structure |
| JP7273409B2 (en) * | 2019-07-01 | 2023-05-15 | 株式会社クギン | Foundation construction method and beam unit |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS54166702U (en) * | 1978-05-16 | 1979-11-22 |
-
1983
- 1983-06-17 JP JP10891883A patent/JPS5921829A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5921829A (en) | 1984-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7191572B2 (en) | Construction method and system | |
| JPH0340182B2 (en) | ||
| CN213174782U (en) | Frame column wall | |
| JPH0252747B2 (en) | ||
| CN113775044A (en) | Assembly type steel shell composite cement board formwork-dismantling-free building system | |
| JP3347206B2 (en) | Precast concrete stairs | |
| JPS58204228A (en) | Construction of concrete retaining wall | |
| JPH0673786A (en) | Junction of precast concrete column | |
| JPS58131270A (en) | Mold frame method | |
| JPH0960294A (en) | Decorative floor slab construction method and makeup form | |
| JPH0380946B2 (en) | ||
| JPH02236325A (en) | Construction method for super-highrise building | |
| JPH06346471A (en) | Construction method of reinforced concrete retaining wall using large precast plate. | |
| JPS6043547A (en) | Mold frame and reinforcement iron integral assembling and constructing method | |
| JP2891113B2 (en) | Installation method of reinforced concrete shear walls | |
| JP3035885U (en) | Cloth foundation solid welded rebar with abandoned formwork | |
| JPH03279533A (en) | Constructing method for rigid-frame type rc super-high building | |
| JPS5923159Y2 (en) | Formwork equipment for manufacturing walls and floor slabs of buildings | |
| KR200373487Y1 (en) | The mold conjunction structure having a join means which formed a notch portion | |
| JPH04315659A (en) | Driving mold construction method using framed sheathing board | |
| JPS5858503B2 (en) | Construction method of reinforced concrete composite wall | |
| JPS63261037A (en) | Construction method of Watsuful slab and lower structure of Watsuful slab | |
| JPS6025577B2 (en) | Construction method of slab in concrete building | |
| JPH0128188B2 (en) | ||
| JPH05202594A (en) | Finished surface construction method for stair concrete structure |