Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0354723B2 - - Google Patents
[go: Go Back, main page]

JPH0354723B2 - - Google Patents

Info

Publication number
JPH0354723B2
JPH0354723B2 JP10011285A JP10011285A JPH0354723B2 JP H0354723 B2 JPH0354723 B2 JP H0354723B2 JP 10011285 A JP10011285 A JP 10011285A JP 10011285 A JP10011285 A JP 10011285A JP H0354723 B2 JPH0354723 B2 JP H0354723B2
Authority
JP
Japan
Prior art keywords
hollow chamber
earth
shaped hollow
wedge
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP10011285A
Other languages
Japanese (ja)
Other versions
JPS61261506A (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP10011285A priority Critical patent/JPS61261506A/en
Publication of JPS61261506A publication Critical patent/JPS61261506A/en
Publication of JPH0354723B2 publication Critical patent/JPH0354723B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 産業上の利用分野: 本発明は、埋立工事において、底開き型でない
土運船によつて土砂を土砂載積地から埋立地に運
搬する場合、岩壁のない土砂載積地または荷揚地
において使用する設備に関するものである。
[Detailed description of the invention] Industrial field of application: The present invention is applicable to land reclamation work, in which earth and sand without rock walls are transported from an earth loading site to a landfill by an earth carrier that does not have an open-bottom type. This relates to equipment used at loading or unloading ports.

従来の技術: 海の一部を埋立てて、新たに人工の島を造成
し、あるいは陸地に接して海上に陸つづきの埋立
地を造成する場合、下記の手順によるのが通例で
あつた。
Conventional technology: When reclaiming a part of the sea to create a new artificial island, or creating a land-contact reclaimed land in the sea, the following procedure was usually followed.

(1) 埋立予定地の輪郭、いわゆる額縁をコンクリ
ートケーソン鋼矢板等によつて造る。額縁と
は、岸壁としての役割を果す仮設構造物と考え
てよい。
(1) Build an outline of the planned landfill site, a so-called frame, using concrete caisson steel sheet piles, etc. A picture frame can be thought of as a temporary structure that serves as a quay.

(2) 額縁で輪郭を形成された埋立予定地内に底開
き型の土運船を額縁の未完成部から出入させる
ことによつて土砂を運び、埋立予定地内に土砂
を沈めることにより除々に水深を浅くしてい
く。
(2) An open-bottomed earth carrier is brought in and out of the planned reclamation site outlined by a picture frame through the unfinished part of the frame, and the soil is sunk into the planned reclamation site, gradually increasing the water depth. Make it shallower.

(3) 土砂まじりの水をポンプにより給送するなど
の方法によつて浅くなつた部分の水深をさらに
浅くする。
(3) Make the shallow areas even shallower by pumping water mixed with sediment.

(4) 底開き型でない土運船によつて土砂を運び、
クラムシエル、バツクホーなどによつて額縁外
側から額縁の内側を土砂で埋めて、次第に額縁
ぞいの陸地面積を広げる。
(4) Transporting earth and sand using earth transport vessels that are not open-bottomed,
The land area in front of the frame is gradually expanded by filling the inside of the frame with earth and sand using clamshells, batskukes, etc. from the outside of the frame.

(5) 額縁ぞいにある程度の陸地が形成されると、
額縁内側に敷設したベルトコンベヤやダンプカ
ーによつて、土砂を運搬することにより陸地部
の拡張が進められる。
(5) Once a certain amount of land is formed between the picture frames,
The land area will be expanded by transporting earth and sand using belt conveyors and dump trucks installed inside the frame.

埋立工事は、通例以上の手順で進められるの
で、該岸壁を土運船の荷降ろしのための接岸に使
用することは、埋立工事が進渉するにつれて、ベ
ルトコンベヤやダンプカーによる移動距離、いわ
ゆる横持ち距離の増大をまねき、工事のかさむ原
因となつた。
Since reclamation work is carried out using more steps than usual, the use of the quay for the berthing of earth-carrying vessels for unloading is difficult as the reclamation work progresses due to the distance traveled by belt conveyors and dump trucks, so-called lateral movement. This led to an increase in the carrying distance and increased construction costs.

また、埋立の際に海底の地層を乱すと、埋立完
了後に地盤の部分沈下等を起す原因となるので、
何層かに分けてなるべく海底の平坦性を保ちなが
ら埋立てるのが好ましいとされている。しかしな
がら、従来の工法では上記最終段階では、額縁の
外側から定置式の揚土機を使うために、水際線近
くに土砂を盛上げざるを得ず、部分沈下の原因と
もなつていた。
Additionally, if the strata of the ocean floor are disturbed during reclamation, it may cause partial subsidence of the ground after the reclamation is completed.
It is said that it is preferable to reclaim land in several layers while maintaining the flatness of the ocean floor as much as possible. However, in the conventional construction method, a stationary earth lifting machine was used from outside the frame in the final stage, which forced the earth and sand to be piled up near the waterline, causing partial subsidence.

額縁の内側から埋立工事を進めることも行なわ
れてはいたが、額縁の内側では埋立ずみの陸地か
ら海底に向けて土砂がくずれ、さらに潮の干満や
波の影響を受けて通常1:7程度の勾配(渚勾配
という)が自然に形成されるために遠浅の海岸線
が自然に形成され、大型土運船の使用は困難にな
る。したがつて、小型の土運船を使用した能率の
悪い埋立工事を行わざるを得なかつた。
Land reclamation work was also carried out from inside the picture frame, but inside the picture frame, the earth and sand that had been reclaimed fell down towards the seabed, and was further affected by the tides and waves, so the ratio was usually around 1:7. Because of the natural slope (called beach slope), a shallow coastline is formed naturally, making it difficult to use large soil transport vessels. As a result, inefficient land reclamation work using small earth-carrying vessels had to be carried out.

そこで本発明者は、大型土運船による高能率の
埋立工事を可能ならしめ、かつ上述した従来技術
の欠点を除くための新規な埋立工法を発明し、先
に特許出願(特開昭58−168734号公報参照)し
た。
Therefore, the present inventor invented a new method for reclamation work that enables highly efficient reclamation work using large earth carriers and eliminates the drawbacks of the conventional technology described above. (Refer to Publication No. 168734).

以下、第3図および第4図について、上記特開
昭58−168734号公報記載の発明を略説する。
Hereinafter, the invention described in the above-mentioned Japanese Patent Application Laid-open No. 168734/1988 will be briefly explained with reference to FIGS. 3 and 4.

第3図は、該従来技術の実施に当つて使用する
に適する土運船の一例を示す側面図、第4図は該
土運船の平面図、図示の土運船10は、船長約
100m、船幅約25m、船高約6mであり、土砂載
積部1の周囲に、又は甲板上にダンプカーの走行
を可能ならしめるような広い車輌走行面2が設け
られている。
FIG. 3 is a side view showing an example of an earth transport ship suitable for use in implementing the prior art, FIG. 4 is a plan view of the earth transport ship, and the illustrated earth transport ship 10 has a ship length of approximately
The vessel is 100 meters long, approximately 25 meters wide, and approximately 6 meters high, and is provided with a wide vehicle running surface 2 around the earth and sand loading section 1 or on the deck to allow dump trucks to run on it.

岸壁20は、たとえば鋼矢板21を打込むこと
によつて構成された垂直壁21、あるいは埋立ず
みの土砂22上に載置されたフラツプ23よりな
る。鋼矢板は、コンゲートセルなどに代えること
も可能であり、又、安息角度の大なる土砂の場合
は適当に土盛するだけでもよい。
The quay wall 20 is composed of a vertical wall 21 constructed by driving steel sheet piles 21, for example, or a flap 23 placed on reclaimed earth and sand 22. The steel sheet piles can be replaced with concrete cells or the like, and in the case of earth and sand with a large angle of repose, it is sufficient to simply use an appropriate earth embankment.

台船30は、台船本体31、ランプウエイ3
2、ランプウエイ垂下支柱33よりなり、ランプ
ウエイ32の一端はフラツプ23の係合部と、他
端は土運船の係合部とそれぞれ係合している。
The barge 30 includes a barge body 31 and a rampway 3.
2. The rampway is composed of hanging supports 33, and one end of the rampway 32 is engaged with the engagement portion of the flap 23, and the other end is engaged with the engagement portion of the earth carrier.

発明の目的: 特開昭58−168734号公報記載の発明は、額縁内
の渚勾配の水際での大型土運船による土砂荷揚の
困難を除去するために、額縁外側からの荷揚、す
なわち仮設岸壁からの荷揚を効率良く行うことを
目的としてなされたものである。
Purpose of the invention: The invention described in JP-A No. 58-168734 aims to remove the difficulty of unloading earth and sand by large earth carriers at the edge of the beach slope within the frame, by unloading from the outside of the frame, that is, by constructing a temporary quay. This was done with the aim of efficiently unloading cargo from.

しかしながら、著しく大型の埋立工事が一般化
した今日では、額縁内側の埋立と額縁外側と本格
的岸壁設営工事並びに額縁近辺の埋立完了地域で
の整地、建造物の建設などが並行して行なわれる
ことが多く、額縁内側の渚勾配の水際における大
型土運船による効率の良い荷揚げに対する要求が
高まるに至つた。
However, in today's world where extremely large-scale land reclamation work has become commonplace, land reclamation inside the picture frame, full-scale wharf construction work outside the picture frame, land leveling in the area near the picture frame where the reclamation has been completed, construction of buildings, etc. are being carried out in parallel. As a result, there was a growing demand for efficient cargo unloading by large cargo vessels at the waterfront on the slope of the beach inside the frame.

本発明の目的は、これを可能ならしめるために
使用する補助設備を提供することである。
The aim of the invention is to provide auxiliary equipment used to make this possible.

発明の構成: 上述した目的を達成するために、本発明におい
ては下記の構成を有する半浮上桟橋を使用する。
Configuration of the invention: In order to achieve the above-mentioned object, the present invention uses a semi-floating pier having the following configuration.

すなわち、本発明の半浮上桟橋は、隔壁によつ
て、直方体形状中空室と楔形状中空室とに分割さ
れた本体と、該楔形状中空室に注排水を行うポン
プと注排水管とからなり、前記本体上側面には一
連の平坦な車輌走行面を形成し、楔形状中空室下
面は渚勾配(約1:7)に近い傾斜を有する。
That is, the semi-floating pier of the present invention consists of a main body divided into a rectangular parallelepiped-shaped hollow chamber and a wedge-shaped hollow chamber by a partition wall, and a pump and a drain pipe for pouring water into the wedge-shaped hollow chamber. A series of flat vehicle running surfaces are formed on the upper side of the main body, and the lower surface of the wedge-shaped hollow chamber has an inclination close to a beach slope (approximately 1:7).

実施例 以下第1図および第2図に示す本発明の実施例
について、その構成、作用及び効果を更に詳細に
説明する。
Embodiment The structure, operation, and effect of the embodiment of the present invention shown in FIGS. 1 and 2 will be explained in more detail below.

図示の実施例においては、本発明にかかる半浮
上桟橋100は全長35m、幅26.25m、深さ2.5m
であり、上甲板101上は土砂満載時総重量70t
にも達する大型ダンプトラツクの走行にも耐え得
るだけの十分な強度を持たせるため、厚い鋼板が
張られ、船殻本体はまたこの重量に耐える必要か
ら縦肋骨構造とすることが望ましい。本体内には
隔壁102が設けられ、これによつて船首部を構
成する楔形状中空室103と直方体形状中空室1
04とに分割されている。図示は省略したが、楔
形状中空室103に水を注入し、また排出するた
めのポンプと注排水管を具備している。
In the illustrated embodiment, the semi-floating pier 100 according to the present invention has a total length of 35 m, a width of 26.25 m, and a depth of 2.5 m.
The total weight of the upper deck 101 when fully loaded with earth and sand is 70 tons.
In order to have sufficient strength to withstand the travel of large dump trucks, which can reach up to 100 kg, thick steel plates are clad, and the hull body must also have a vertical rib structure to withstand this weight. A partition wall 102 is provided inside the main body, which allows a wedge-shaped hollow chamber 103 and a rectangular parallelepiped-shaped hollow chamber 1 to form the bow part.
It is divided into 04. Although not shown in the drawings, it is equipped with a pump and an inlet/drain pipe for injecting and discharging water into the wedge-shaped hollow chamber 103.

本発明にかかる半浮上桟橋100を使用するに
際しては、第1図及び第2図に示すように、岸壁
あるいは護岸(仮設岸壁)を設けてない渚に動力
によりその船首部(楔形状中空室部分)を引き上
げた後、ポンプ(図示せず)により該楔形状中空
室に水を注入し、船首部を沈下させる。船首部の
下底面は渚勾配とほぼ同程度の勾配を与えられて
いるので、半浮上桟橋100の上甲板101はほ
ぼ水平を保つて船尾部はなお水上に浮上してい
る。
When using the semi-floating pier 100 according to the present invention, as shown in FIGS. 1 and 2, the bow portion (wedge-shaped hollow chamber portion) is ) is raised, water is injected into the wedge-shaped hollow chamber by a pump (not shown), and the bow section is submerged. Since the bottom surface of the bow section is given a slope approximately equal to the beach slope, the upper deck 101 of the semi-floating pier 100 remains approximately horizontal, and the stern section is still floating above the water.

この状態の時、半浮上桟橋100の四隅に設け
られている耳状の棒ぐい支承具105,105,
106,106の孔に、それぞれ棒ぐい107,
107,108,108を挿通し、海底に打込ん
で位置決めする。潮の干満の影響を受けて、船尾
部が上下することはあつても、船首部を軸として
左右に揺動することは、これによつて防止するこ
とができる。
In this state, the ear-shaped bar supports 105, 105, provided at the four corners of the semi-floating pier 100,
In the holes 106 and 106, there are rods 107 and 106, respectively.
107, 108, and 108, and position them by driving them into the seabed. Although the stern section may move up and down under the influence of the tide, this prevents it from rocking left and right about the bow section.

半浮上桟橋の位置決めが完了すると、土砂22
上にフラツプ23を載置し、また台船30を介し
て土運船と連結し、大型ダンプカーによつて土砂
の荷揚げを行う。
When the positioning of the semi-floated pier is completed, the earth and sand 22
A flap 23 is placed on top and connected to an earth transport vessel via a barge 30, and earth and sand is unloaded by a large dump truck.

台船30は、台船本体31、ランプウエイ3
2、ランプウエイ垂下支柱33よりなり、ランプ
ウエイ32の一端はフラツプ23の係合部と、他
端は土運船10の係合部とそれぞれ係合してい
る。なお、第3図、第4図における41はそれぞ
れ防舷材を示しており、第1図及び第2図に示す
本発明の実施例においてもこれらの防舷材を使用
することは望ましいが、必須ではない。
The barge 30 includes a barge body 31 and a rampway 3.
2. The rampway is composed of hanging supports 33, and one end of the rampway 32 is engaged with the engagement portion of the flap 23, and the other end is engaged with the engagement portion of the earth carrier 10, respectively. Note that 41 in FIGS. 3 and 4 respectively indicate fenders, and it is desirable to use these fenders also in the embodiment of the present invention shown in FIGS. 1 and 2, but Not required.

本発明の半浮上桟橋を使用するときは、楔形状
中空室下面は渚勾配に近い傾斜を有する故に、大
規模な埋立工事に際して、本格的岸壁設営工事、
埋立完了地域での整地工事、建造物の建設工事等
に支障を来すことのないように額縁内側の渚勾配
の水際における大型土運船による効率の良い荷揚
げを行うことができるし、また半浮上桟橋の移動
が比較的容易であるため、地盤の部分沈下の原因
となる地層の乱れを起こさないように設置位置を
かなり頻繁に変更しつつ土砂の荷揚げを行い得る
などの作用効果が得られる。
When using the semi-floating pier of the present invention, since the lower surface of the wedge-shaped hollow chamber has an inclination close to that of a beach, it is difficult to carry out full-scale quay construction work during large-scale land reclamation work.
In order to avoid hindrance to land leveling work and building construction work in the area where the reclamation has been completed, it is possible to efficiently unload cargo by large earth carriers at the waterfront of the slope of the beach inside the frame, and to Since the floating pier is relatively easy to move, it has the advantage of being able to unload earth and sand while changing its installation location fairly frequently to avoid disturbing the strata, which can cause partial subsidence of the ground. .

本発明の半浮上桟橋の本体は、隔壁によつて直
方体形状中空室と楔形状中空室に分割され、ポン
プと注排水管により楔形状中空室に注排水が行わ
れることにより、排水された楔形状中空室部分を
渚に引き上げた後、楔形状中空室に注水し、楔形
状中空室の付近の高さをフラツプ23上のトラツ
クの走行が容易な高さにできる。隔壁により本体
全体に注水せず楔形状中空室に選択的に注水でき
る故に、少ない注水動力、注水時間により楔形状
中空室の高さを変更できる。また注水時に本体の
重心が楔形状中空室の近くに移り、船首部の揺動
が減少され、船首部と埋立ずみ土砂との係合が容
易である。
The main body of the semi-floating pier of the present invention is divided into a rectangular parallelepiped-shaped hollow chamber and a wedge-shaped hollow chamber by a partition wall, and water is poured into the wedge-shaped hollow chamber by a pump and a drain pipe, so that the wedge-shaped hollow chamber is drained. After the shaped hollow chamber portion is pulled up to the shore, water is poured into the wedge shaped hollow chamber, and the height of the vicinity of the wedge shaped hollow chamber can be made to a height at which the truck can easily run on the flap 23. Since water can be selectively injected into the wedge-shaped hollow chamber by the partition wall without injecting water into the entire body, the height of the wedge-shaped hollow chamber can be changed with less water injection power and water injection time. Furthermore, when water is injected, the center of gravity of the main body moves closer to the wedge-shaped hollow chamber, reducing the swinging of the bow and making it easier for the bow to engage with reclaimed earth and sand.

【図面の簡単な説明】[Brief explanation of drawings]

第1図及び第2図は、それぞれ本発明の一実施
例の側面図及び平面図、第3図及び第4図はそれ
ぞれ本発明の半浮上桟橋を使用せず、従来技術に
よつて、岸壁から土砂の荷揚げを行う場合の一例
を示す側面図と平面図である。 100:半浮上桟橋、102:隔壁、103:
楔形状中空室(船首部)、104:直方形状中空
室(船尾部)。
1 and 2 are a side view and a plan view, respectively, of an embodiment of the present invention, and FIGS. 3 and 4 are respectively views of a quay wall constructed by the prior art without using the semi-floating pier of the present invention. FIG. 2 is a side view and a plan view showing an example of unloading earth and sand. 100: Semi-floating pier, 102: Bulkhead, 103:
Wedge-shaped hollow chamber (bow section), 104: Rectangular hollow chamber (stern section).

Claims (1)

【特許請求の範囲】 1 隔壁によつて、直方体形状中空室と楔形状中
空室とに分割された本体;および 前記楔形状中空室に注排水を行うポンプと注排
水管;からなり 前記本体の上側面は一連の平坦な車輌走行面を
形成し、楔形状中空室下面は渚勾配に近い傾斜を
有することを特徴とする半浮上桟橋。 2 前記本体の四隅において側方に突出した耳状
の棒ぐい支承具を有することを特徴とする特許請
求の範囲第1項記載の半浮上桟橋。
[Scope of Claims] 1. A main body divided by a partition into a rectangular parallelepiped-shaped hollow chamber and a wedge-shaped hollow chamber; and a pump and a drain pipe that supply water to the wedge-shaped hollow chamber; A semi-floating pier characterized in that an upper surface forms a series of flat vehicle running surfaces, and a lower surface of the wedge-shaped hollow chamber has an inclination close to that of a beach. 2. The semi-floating pier according to claim 1, further comprising ear-shaped bar supports projecting laterally at the four corners of the main body.
JP10011285A 1985-05-11 1985-05-11 Semi-float pier Granted JPS61261506A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10011285A JPS61261506A (en) 1985-05-11 1985-05-11 Semi-float pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10011285A JPS61261506A (en) 1985-05-11 1985-05-11 Semi-float pier

Publications (2)

Publication Number Publication Date
JPS61261506A JPS61261506A (en) 1986-11-19
JPH0354723B2 true JPH0354723B2 (en) 1991-08-21

Family

ID=14265283

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10011285A Granted JPS61261506A (en) 1985-05-11 1985-05-11 Semi-float pier

Country Status (1)

Country Link
JP (1) JPS61261506A (en)

Also Published As

Publication number Publication date
JPS61261506A (en) 1986-11-19

Similar Documents

Publication Publication Date Title
US6082931A (en) Modular maritime dock design
US3640075A (en) Method of installing breakwater caissons
CN103806407A (en) Pile-bucket integrated wharf structure and construction method thereof
WO2024032815A1 (en) Construction method for water body replacement type storage yard, and storage yard
US5853264A (en) Bridge, dock and pier shoring-up bulk-delivery floating conveyor unit
CN201649036U (en) Pipe pile platform for pier construction
CN1143138A (en) Launching method for laud region prefabricated sinking caisson
CN218813475U (en) Deep water gravity pier trestle type breakwater
US2966778A (en) Caissons for wharf construction and method of installing same
JPH0354723B2 (en)
JP3276617B2 (en) Marine landfill method using sea sand
US11787514B2 (en) Marine construction and a method for constructing the same
JPS58168734A (en) Reclamation work
JP7489301B2 (en) Floating structure transport method and sinking platform
KR102383736B1 (en) Crane rail foundation integrated caisson and construction method
RU2096555C1 (en) Coastal terminal for loading/unloading of ships and method for its erection
JP3926027B2 (en) Caisson construction method
SU359347A1 (en) BOTTOM IMPORTANT
JPS5973389A (en) Process of launching concrete structure
JPH05311667A (en) Launching method for large caisson
JP2535905Y2 (en) Artificial ground
CN121087994A (en) Construction method for building dike and throwing stone at sea
CN206126372U (en) A reject platform for boats and ships cargo transfer
JPS6130486A (en) Floating dog made from a modified ship
JPH036306B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees