JPH0376361B2 - - Google Patents
Info
- Publication number
- JPH0376361B2 JPH0376361B2 JP19465985A JP19465985A JPH0376361B2 JP H0376361 B2 JPH0376361 B2 JP H0376361B2 JP 19465985 A JP19465985 A JP 19465985A JP 19465985 A JP19465985 A JP 19465985A JP H0376361 B2 JPH0376361 B2 JP H0376361B2
- Authority
- JP
- Japan
- Prior art keywords
- slag
- roadbed
- layer
- wire mesh
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000002893 slag Substances 0.000 claims description 100
- 239000004575 stone Substances 0.000 claims description 26
- 239000002245 particle Substances 0.000 claims description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 15
- 238000005056 compaction Methods 0.000 claims description 11
- 239000002689 soil Substances 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 9
- 239000010410 layer Substances 0.000 description 51
- 238000012423 maintenance Methods 0.000 description 9
- 238000006703 hydration reaction Methods 0.000 description 7
- 238000007664 blowing Methods 0.000 description 4
- 230000008439 repair process Effects 0.000 description 4
- 230000015271 coagulation Effects 0.000 description 3
- 238000005345 coagulation Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000005096 rolling process Methods 0.000 description 3
- 239000002344 surface layer Substances 0.000 description 3
- 241001669679 Eleotris Species 0.000 description 2
- 239000010426 asphalt Substances 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000839 emulsion Substances 0.000 description 2
- 230000008020 evaporation Effects 0.000 description 2
- 238000001704 evaporation Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
- Railway Tracks (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Description
(産業上の利用分野)
本発明は、軌道用路盤の改良方法に係り、営業
使用中の鉄道軌道の軟弱路盤部を夜間等の短かい
運転休止中に改良する場合に使用するものであ
る。
(従来の技術)
一般に鉄道用軌道では、車輌による振動荷重が
連続的に加わるため、路床土や道床砕石の微粉が
雨水と混り、泥状化して枕木上へ噴き上つたり、
或いは道床砕石が路盤内へ減込んだりすることが
屡々発生する。前記噴泥現象等が生ずると、軌道
は順次弱体化して適度な弾性が喪失されると共
に、線路に高低差や曲がりが生じ、所謂道床更換
等の補修が必要になつてくる。
而して、営業使用中の鉄道等に於いては、前記
道床更換や軌道路盤の補修工事を全て夜間の短時
間内に遂行しなければならないため、必然的に従
前の線路工夫による手作業に替えて、機械化保線
が必要となつてくる。現実には、保線用のロボツ
トに相当するマルチプルタイタンパーの如き保線
用機械を使用することにより、作業能率の向上や
人手不足に対する対応が図られている。
ところで、保線用ロボツトによる機械化保線
は、作業能率等の点では優れているが、作業の実
施内容が予かじめ定められたプログラム通りに実
施されるため、所謂現場の特異性に適応したきめ
細かい保線作業が出来ないという難点がある。例
えば、前記軌道に於ける噴泥現象等は、軌道の踏
切部や築堤軌道の一部に於いて局所的に発生する
が、前記機械化保線に於いては、路盤の軟弱箇所
だけ特別に保線工事の頻度を高めたり、或いは路
盤の軟弱箇所のみ別に所謂“追加搗き固め”を行
なう様なことは不可能であり、全保線区間に亘つ
て一様な路盤の“搗き固め”が行なわれることに
なる。その結果、折角保線工事が完了しても、前
述の如く路盤の軟弱箇所に対するきめの細かい搗
き固めが行なわれていないため、再度同じ箇所か
ら噴泥を生ずることになる。
一方、前述の如き軌道用路盤の軟弱箇所を強化
するには、路床土の入替えや道床砕石の下方にコ
ンクリート層を形成する方法が採用されていた。
しかし、路床土の入替には長い作業時間を必要
とすると共に、路盤強化費が高くつく。又、コン
クリート層を形成する方法はコンクリート板の割
れ目から泥吹きが発生して、補修に困難を来たし
たという実積がある。
これに対して、近年新規に鉄道を建設する場合
に、粒度調整をした鉱滓を使用して軌道用路盤を
強化する方法が開発され、使用に供されている。
即ち、第2図に示す如く、路床土1の上にしや
断層(路床が粘性土の場合)2を形成し、更にそ
の上に粒度調整砕石3と粒度調整鉱滓4を敷設し
た後、該鉱滓層4の外表面にアスフアルト乳剤層
5を敷設する。前記アスフアルト乳剤層5によつ
て鉱滓層4内の水分蒸発を防止しつつ、該鉱滓層
4を10%前後の水分含有状態で締め固めることに
より、所謂鉱滓の水硬性によつてこれが凝結硬化
し、数ケ月後には圧縮強度が30〜60Kg/cm2に達す
ると共に、その後も長期に亘つて硬化が促進さ
れ、最終的には100〜120Kg/cm2の圧縮強度が達成
される。
又、凝結硬化した鉱滓層4は、路床土からの噴
泥を防止すると共に道床砕石の減込みの防止、荷
重の均等分散による路床変位の軽減、雨水浸透の
減少による路盤状態の良好化等の作用を行ない、
軌道に多くの好影響を与える。
しかし乍ら、前記粒度調整鉱滓層4が完全に凝
結固化するまでには相当の期間を必要とするう
え、適当な水分含有状態で鉱滓を十分に締め固め
る必要があり、例えばタイヤローラ8t〜20t
による転圧10回、及びマカダムローラ10t〜1
2tによる転圧3〜5回を必要とする。従つて新
規に軌道用路盤を構築する場合には問題は無い
が、営業中の鉄道の軌道用路盤の改良に粒度調整
鉱滓を用いるためには、鉱滓の締め固め方法に改
良を加え、凝結固化に必要とする締め固め時間の
短縮を図らねばならない。即ち、従前の様に、タ
イヤローラやマカダムローラで何回も粒度調整鉱
滓を転圧する締め固め工法では、作業時間が絶対
的に不足し、経済的な路盤強化が図れないからで
ある。
(解決すべき問題点)
本発明は営業運転中の鉄道の軌道路盤を粒度調
整鉱滓を使用して改良する場合に於ける上述の如
き問題、即ち、敷設した鉱滓層の搗き固めに時間
がかかり過ぎ、短時間内に施工する必要のある路
盤改良工事には適用し難いという問題を解決せん
とするものである。
即ち、本願発明は、路床土上へ敷設する鉱滓に
予かじめ充分な水分を与え、ランマー等の衝撃力
により鉱滓を転圧する際に鉱滓内部より含有水分
を放出せしめ、該内部放出水分によつて短時間内
に急速な凝結作用を達成させると共に、走行する
車輌重量を利用して転圧した鉱滓を長期に亘つて
硬化させることによつて路盤改良作業の大幅な時
間短縮を図り、これにより鉱滓の使用を可能とし
た営業中の軌道用路盤の改良方法を提供するもの
である。
(問題点を解決するための手段)
前記目的を達成するため、本願発明者は粒度調
整鉱滓の水和反応による硬化機構に関する検討と
硬化試験を繰り返し、その結果から下記の事象を
知得した。
従前の鉱滓を敷設した後、加水をしながら時
間をかけてタイヤローラ等で転圧する方法にあ
つては、水和反応による凝結硬化が鉱滓粒子の
外表部より内方へ向つて徐々に進行し、硬化に
比較的長時間を必要とすること。
これに対して、敷設する前の鉱滓に予かじめ
水分を十分に含ませ、敷設した後これをランマ
ー等の衝撃性の力によつて転圧すると、衝撃に
よつて鉱滓粒子内部から含有水分が放出され、
所謂水和反応による凝結作用が鉱滓粒子層の内
部より進行して極めて短時間内に凝結し、最終
硬化時に於ける圧縮強度の70%程度の圧縮強度
が転圧後数時間で得られること。
ランマー等の衝撃力によつて転圧し、且つ短
時間内に凝結せしめた鉱滓層に対して、継続的
に水並びに一定の圧縮・振動加重を加えること
により、粒度調整鉱滓の水硬性が十分に発揮さ
れ、3〜4ケ月後には、ローラ等により敷設時
に鉱滓全層を均等に締め固めした場合と同等の
圧縮強度が得られること。
尚、前記事象は、鉱滓を最初に道路舗装等に使
用した当時、十分な初期転圧が機械力の不足によ
り行なえなかつた場合でも、通行車輌の重量によ
り徐々に鉱滓が締め固められ、2〜3ケ月後には
強固な鉱滓舗装が得られていたことと軌を一にす
るものである。
本発明は、営業中の鉄道の軌道用路盤に於いて
該路盤の軟弱部の路床土を一定の深さに亘つて取
り除き、その後に予かじめ充分に加水した粒度調
整鉱滓を敷設してランマー等の衝撃力により転圧
し、転圧により鉱滓中より水分を押し出して粒度
調整鉱滓を短時間内に凝結させると共に、前記転
圧した粒度調整鉱滓の上方に金網を布設してその
上に金網の網目より大なる粒径を有する道床砕石
を敷設し、走行する車輌重量を利用して前記金網
により分離した道床砕石層を介して粒度調整鉱滓
を加圧圧縮することにより、短時間内に凝結せし
めた前記鉱滓層を凝結硬化させることを発明の基
本構成とするものである。
(作用)
予かじめ飽和状態にまで加水された粒度調整鉱
滓は、ランマー等により衝撃性の圧縮力を加えら
れることにより内部の含有水分が押し出され、所
謂水和反応が急激に進行してその水硬性が現出す
る。その結果、敷設された鉱滓は短時間内に凝結
され、最終圧縮強度の約70%程度の圧縮強度が得
られる。
一方、車輌が通ることにより、車輌重量が金網
で包まれた状態の道床砕石層を介設して鉱滓層へ
伝えられ、長期に亘つて鉱滓層の圧縮が行なわれ
る。即ち、金網で包まれた状態の道床砕石層は、
金網の介存により鉱滓層と完全に縁切りされ、両
者は夫々別体となつて上・下方向に振動移動す
る。その結果、鉱滓層は極めて効率よく均等に車
輛重量によつて圧縮され、これによつて凝結硬化
が促進され、最終的には強固な鉱滓路盤が形成さ
れる。
(実施例)
第1図は本発明を実施した鉄道用軌道の縦断面
図であり、図に於いて6は路盤、7は粒度調整鉱
滓、8は道床砕石、9は金網、10はPC枕木、
11はレールである。
第1図を参照して、本発明により鉄道用軌道の
軟弱路盤部分(例えば踏切部分等)を改良する場
合には、先ず軟弱路盤部分の道床砕石8の上層部
を取除き、その間の枕木10を弛めて一側へ押し
寄せるか、又は一時的に撤去する。次に、枕木1
0下方の道床砕石8及びその直下の路盤を約200
〜250mmの深さに亘つて鋤取り除外する。
路盤の鋤取りが完了すれば、該路盤の鋤取部へ
予かじめ水漬け状態にして十分に含水せしめた粒
度調整鉱滓7を20〜25cmの厚さに敷設し、ランマ
ー等によりその表層部を3〜5回搗き固める。
尚、ランマーとしては、オイル自動潤滑型の重量
80〜100Kg、振動数550〜600回/分位いのものが
最適である。
又、前記粒度調整鉱滓7としては、下表の如き
粒度分布を有する鉱滓の使用が望ましい。
(Industrial Application Field) The present invention relates to a method for improving a track bed, and is used to improve a soft road bed part of a railway track in commercial use during a short suspension of operation, such as at night. (Prior art) Generally, on railway tracks, vibration loads from vehicles are continuously applied, so fine powder from subgrade soil and crushed stone mixes with rainwater, turns into mud, and blows up onto sleepers.
Alternatively, it often occurs that crushed stone from the roadbed sinks into the roadbed. When the mud-spraying phenomenon occurs, the track gradually weakens and loses its appropriate elasticity, and the track also develops height differences and bends, necessitating repairs such as so-called trackbed replacement. Therefore, on railways that are in commercial use, all of the track bed replacement and track base repair work must be completed within a short period of time at night, which inevitably requires manual work using conventional track engineering. Instead, mechanized track maintenance will become necessary. In reality, track maintenance machines such as multiple tampers, which are equivalent to track maintenance robots, are used to improve work efficiency and cope with manpower shortages. By the way, mechanized track maintenance using track maintenance robots is superior in terms of work efficiency, etc., but since the work is carried out according to a predetermined program, it is difficult to perform detailed track maintenance that adapts to the uniqueness of the so-called site. The problem is that it cannot work. For example, the above-mentioned mud blowing phenomenon on the track occurs locally at railroad crossings and part of the embanked track, but in the above-mentioned mechanized track maintenance, special track maintenance work is carried out only on weak parts of the roadbed. It is impossible to increase the frequency of the roadbed, or to perform so-called "additional pounding and compaction" for only weak sections of the roadbed, and it is impossible to do so. Become. As a result, even if track maintenance work is completed, as described above, the soft areas of the roadbed are not thoroughly pounded and hardened, so mud will continue to erupt from the same areas. On the other hand, in order to strengthen the weak spots in the track base as described above, methods have been adopted such as replacing the subgrade soil or forming a concrete layer below the crushed stone of the roadbed. However, replacing the subgrade soil requires a long work time, and the cost of reinforcing the subgrade is high. Furthermore, the method of forming a concrete layer has been proven to cause mud to blow from the cracks in the concrete plate, making repair difficult. On the other hand, in recent years, when constructing a new railway, a method has been developed and put into use for reinforcing the track base using granulated slag. That is, as shown in FIG. 2, after forming a Nishiya fault (if the subgrade is clayey soil) 2 on the subgrade soil 1, and further laying particle size-adjusted crushed stone 3 and particle size-adjusted slag 4 on top of it, An asphalt emulsion layer 5 is laid on the outer surface of the slag layer 4. The asphalt emulsion layer 5 prevents water evaporation in the slag layer 4, and by compacting the slag layer 4 with a moisture content of around 10%, the so-called hydraulic property of the slag causes it to coagulate and harden. After several months, the compressive strength reaches 30 to 60 Kg/cm 2 , and the curing continues for a long time, and finally a compressive strength of 100 to 120 Kg/cm 2 is achieved. In addition, the coagulated and hardened slag layer 4 prevents mud from blowing up from the subgrade soil, prevents subsidence of crushed stones from the subgrade, reduces subgrade displacement by evenly distributing the load, and improves the subgrade condition by reducing rainwater infiltration. etc.,
It has many positive effects on the trajectory. However, it takes a considerable period of time for the particle size-adjusting slag layer 4 to completely coagulate and solidify, and it is also necessary to sufficiently compact the slag in an appropriate moisture content state.
10 times of compaction and macadam roller 10t~1
Requires 3 to 5 rolling presses of 2t. Therefore, there is no problem when constructing a new track base, but in order to use particle size-adjusted slag to improve the track base of railways in operation, improvements must be made to the compaction method of the slag, and solidification is required. It is necessary to reduce the compaction time required. In other words, the conventional compaction method of compacting granule-adjusted slag many times with tire rollers or macadam rollers is absolutely insufficient in working time, and economical reinforcement of the roadbed cannot be achieved. (Problems to be Solved) The present invention solves the above-mentioned problems when improving the track base of railways in commercial operation using grain-adjusted slag, namely, it takes time to pound and harden the laid slag layer. This is an attempt to solve the problem that it is difficult to apply to roadbed improvement work that needs to be completed within a short period of time. That is, the present invention provides sufficient moisture in advance to the slag to be laid on the subgrade soil, and when the slag is compacted by the impact force of a rammer or the like, the moisture contained in the slag is released from the inside of the slag, and the internally released moisture is Therefore, by achieving rapid coagulation within a short period of time and by hardening the compacted slag over a long period of time using the weight of moving vehicles, the time required for roadbed improvement work can be significantly shortened. The present invention provides a method for improving trackbeds in service that makes it possible to use slag. (Means for Solving the Problems) In order to achieve the above object, the inventors of the present invention repeatedly conducted studies and hardening tests on the hardening mechanism of particle size-adjusted slag due to hydration reaction, and learned the following phenomenon from the results. In the conventional method of laying slag particles and rolling them with tire rollers over time while adding water, condensation and hardening due to hydration reaction gradually progresses inward from the outer surface of the slag particles. , requiring a relatively long time for curing. On the other hand, if the slag is sufficiently moistened with water before being laid, and then it is compacted using an impact force such as a rammer, the impact will cause the moisture contained inside the slag particles to be absorbed. is released,
The coagulation effect due to the so-called hydration reaction proceeds from inside the slag particle layer and condenses within a very short time, and a compressive strength of approximately 70% of the final hardening compressive strength is obtained within a few hours after compaction. By continuously applying water and a certain compression/vibration load to the slag layer that has been compacted by the impact force of a rammer and condensed within a short time, the hydraulic properties of the particle size-adjusted slag are sufficiently improved. After 3 to 4 months, a compressive strength equivalent to that obtained when the entire layer of slag is evenly compacted using rollers or the like should be obtained. The above-mentioned phenomenon was caused by the fact that when slag was first used for road paving, etc., even if sufficient initial compaction could not be achieved due to lack of mechanical power, the weight of passing vehicles would gradually compact the slag. This is consistent with the fact that a strong slag pavement was obtained after ~3 months. The present invention involves removing the subgrade soil from the soft parts of the track base of a railway in operation to a certain depth, and then laying granule-adjusted slag that has been sufficiently watered in advance. The slag is compacted by the impact force of a rammer, etc., and the water is pushed out from the slag by the compaction to condense the granule-adjusted slag within a short period of time.A wire mesh is laid above the compacted slag, and a wire mesh is placed on top of the slag. By laying crushed stone on the roadbed with a particle size larger than the mesh of the mesh, and using the weight of the traveling vehicle to pressurize and compress the particle size-adjusted slag through the crushed stone layer on the roadbed separated by the wire mesh, the slag is solidified within a short time. The basic structure of the invention is to coagulate and harden the slag layer. (Function) The grain size-adjusted slag, which has been hydrated in advance to a saturated state, is subjected to an impact compression force using a rammer, etc., so that the moisture content inside is pushed out, and the so-called hydration reaction rapidly progresses. Hydraulic properties appear. As a result, the laid slag is solidified within a short time, and a compressive strength of about 70% of the final compressive strength is obtained. On the other hand, when a vehicle passes through the road, the weight of the vehicle is transferred to the slag layer through the road bed crushed stone layer wrapped in a wire mesh, and the slag layer is compressed over a long period of time. In other words, the roadbed crushed stone layer wrapped in wire mesh is
The wire mesh completely separates it from the slag layer, and the two vibrate upward and downward as separate bodies. As a result, the slag layer is compressed very efficiently and evenly by the weight of the vehicle, thereby promoting hardening and ultimately forming a strong slag roadbed. (Example) Fig. 1 is a longitudinal cross-sectional view of a railway track in which the present invention was implemented, and in the figure, 6 is a roadbed, 7 is a particle size-adjusted slag, 8 is crushed rock, 9 is a wire mesh, and 10 is a PC sleeper. ,
11 is a rail. Referring to FIG. 1, when improving a soft roadbed part (for example, a railroad crossing part, etc.) of a railway track according to the present invention, first, the upper layer of crushed stones 8 of the soft roadbed part is removed, and the sleepers 10 between them are removed. Loosen it and push it to one side, or temporarily remove it. Next, sleeper 1
Approximately 200 pieces of crushed stone 8 and the roadbed directly below it.
Exclude plowing to a depth of ~250mm. When the plowing of the roadbed is completed, 20 to 25 cm thick granulated slag 7, which has been soaked in water in advance and sufficiently hydrated, is laid on the plowed part of the roadbed, and the surface layer is pounded with a rammer etc. Pulse 3 to 5 times to harden.
In addition, as a rammer, the weight of the oil automatic lubrication type is
The best one is one that weighs 80 to 100 kg and has a vibration frequency of 550 to 600 times/minute. Further, as the particle size adjusting slag 7, it is desirable to use slag having a particle size distribution as shown in the table below.
【表】
更に、粒度調整鉱滓は多孔質であり、ランマー
による搗き固めにより圧密されるため、鋤取つた
路盤体積の約1.1〜1.3倍程度の鉱滓量を敷均す。
例えば、作業開始の数時間前に鉱滓を水漬けに
して十分に加水し、該鉱滓を敷設(鉱滓層7の敷
設厚さ20cm)して、前記ランマーによつて4回ほ
ど搗き固めした場合、鉱滓層の厚さは略14cm程度
にまで搗き固められ、且つ敷設から2時間経過後
には、20〜30Kg/cm2の圧縮強度を発揮する程度に
まで凝結する。
鉱滓7の敷均し及び鉱滓表層部のランマー等に
よる搗き固めが完了すれば、鉱滓層7の上方に道
床砕石8の粒径よりも小さな網目を有する金網9
(本実施例では道床砕石8の粒径が25〜40mmであ
るため、網目25mm以下の金網)を布設し、その上
に道床砕石8を厚さ250mm程度敷設して、これを
前記金網9で包囲した状態とする。
敷設した道床砕石8の敷均しが終れば、最後に
前記枕木10を所定位置へ引戻し、これをレール
11へ締付固定したあと、道床砕石8の増し敷き
及び道床の搗き固めを行なう。
前述の如き工程を長さ7〜8m区間を一単位と
して順次繰り返すことにより、所定長さの軌道路
盤の改修が行なわれる。
尚、本発明工法により路盤改良を行なう場合に
は、本願発明者が先きに開発した道床更換機用運
搬車(実願昭59−17271号)を使用してパワーシ
ヨベル等を軟弱路盤部分へ搬入するか、又は自走
型道床交換機(特願昭55−125415号)を利用する
のが最も理想的である。
前記路盤の改良用に敷設された粒度調整鉱滓
は、敷設直後に於いては未だ所謂水和反応による
凝結硬化を十分且つ完全に起していないが、車輛
が通ることにより、金網9により包まれた状態に
ある道床砕石8を介して、下方の鉱滓層7が長期
に亘つて平均的に圧縮転圧され、該圧縮力を受け
つつ順次凝結硬化されることになる。
即ち、レール11上を車輛が走行することによ
り該車輛の重量が金網9で包まれた状態の道床砕
石層8を介して鉱滓層7に伝えられ、道床砕石層
8と鉱滓層7とは金網9によつて完全に縁切りさ
れているため、一体としてではなくて夫々別体と
なつて上下動し、道床砕石層8の上・下振動によ
り鉱滓層7が圧縮転圧されることになる。
一方、鉱滓層7内には、鉱滓の敷設時に予かじ
め水和反応に必要な量の水が加えられており、且
つ鉱滓層7の表層部は鉱滓の敷設時に搗き固めら
れているので水分の蒸発が防止されている。又、
雨水や必要な場合には給水によつて適宜鉱滓層7
内へ加水されるため、時間の経過と共に前記車輛
重量による圧縮転圧を受けつつ、鉱滓層7は内方
部から硬化が進行し、2〜3ケ月後には60〜80
Kg/cm2程度の圧縮強度を有する極めて強固な鉱滓
路盤が形成されることになる。
尚、前記鉱滓層7の凝結硬化に伴なつて鉱滓層
7が2〜3mm程度圧縮され、僅かな線路の沈下を
生ずる場合がある。
しかし、線路の沈下は通常1〜2mm程度であ
り、道床砕石の追加並びに搗き固めにより、線路
の沈下分を補修する必要は全く無い。
(発明の効果)
本発明に於いては、予かじめ鉱滓を水漬けにし
て十分に水分を含有せしめると共に、敷設した鉱
滓層7の全層を一度に転圧するのではなしに、敷
設時にはランマー等の衝撃力によつて搗き固める
ことにより早期に凝結させその後、車輛重量を利
用して長期に亘つて鉱滓層の圧縮硬化を行なう構
成としている。従つて、鉱滓層7の転圧に必要な
作業時間が従前に比較して著しく短かくなると共
に、ランマーの衝撃力による転圧により内部含有
水が押出され、鉱滓の凝結反応が著しく促進され
て所望の圧縮強度が得られるため、営業線であつ
ても鉱滓による軌道路盤の改良工事を実施するこ
とができる。
また、本発明に於いては、金網9を用いて道床
砕石8を包み込んだ状態としているため、当該金
網9がセパレータの作用をし、鉱滓層7と道床砕
石層8とが一体として上下動せずに夫々別体とな
つて上下振動する。その結果、金網で包まれた砕
石層8が転圧子と同様の機能を果し、鉱滓層7が
能率よくしかも均等に長期に亘つて圧縮され、よ
り強固な鉱滓スラブが形成されることになる。
更に、凝結硬化した鉱滓層7は、適当な可撓性
を有するために車輛振動等によつてクラツクが発
生することはなく、また万一クラツクが発生して
も、水が供給されることによつて水和反応が再開
され、クラツクが修復されるため、泥吹き現象が
絶対に再発しない利点がある。
そのうえ、鉱滓スラブは、水分は透過するが泥
を透過させないという特性がある。従つて路盤粘
度が泥となつて軌道上へ噴出することが皆無とな
ると共に、道床砕石が微粉化されてもこれが泥化
することは無くなり、所謂道床上への噴泥現象が
皆無となる。
本発明は上述の通り、営業中の鉄道の軌道路盤
を深夜の運転休止中等の短時間内に改良するうえ
で、極めて高い実用的効用を有するものである。[Table] Furthermore, since the granulated slag is porous and consolidated by pounding and hardening with a rammer, the amount of slag should be approximately 1.1 to 1.3 times the volume of the plowed roadbed. For example, if the slag is soaked in water several hours before the start of work, water is added sufficiently, the slag is laid (the thickness of the slag layer 7 is 20 cm), and the slag is rammed about 4 times with the rammer, The slag layer is pounded and solidified to a thickness of about 14 cm, and after 2 hours from being laid, it solidifies to the extent that it exhibits a compressive strength of 20 to 30 kg/cm 2 . When the leveling of the slag 7 and the pounding and hardening of the surface layer of the slag with a rammer or the like are completed, a wire mesh 9 having a mesh smaller than the grain size of the roadbed crushed stones 8 is placed above the slag layer 7.
(In this example, since the grain size of the road bed crushed stones 8 is 25 to 40 mm, a wire mesh with a mesh size of 25 mm or less) is laid, and on top of that, the road bed crushed stones 8 are laid with a thickness of about 250 mm, and this is covered with the wire mesh 9. Be in a state of encirclement. When the leveling of the laid road bed crushed stones 8 is completed, the sleepers 10 are finally pulled back to a predetermined position and are tightened and fixed to the rails 11, and then additional road bed crushed stones 8 are laid and the road bed is pounded and compacted. By sequentially repeating the above-mentioned steps in units of 7 to 8 m long sections, a predetermined length of the track base is repaired. In addition, when improving the roadbed using the method of the present invention, a power shovel, etc., should be carried to the soft roadbed using a truck for roadbed changing equipment (Utility Application No. 17271, 1983) developed earlier by the inventor of the present application. It is most ideal to use a self-propelled track bed exchanger (Japanese Patent Application No. 125415/1982). Immediately after the slag has been laid for the purpose of improving the roadbed, it has not sufficiently and completely solidified and hardened due to the so-called hydration reaction, but as vehicles pass through it, it becomes wrapped in the wire mesh 9. The lower slag layer 7 is compressed and rolled evenly over a long period of time through the crushed stone 8 in the roadbed, and is sequentially solidified and hardened while being subjected to the compressive force. That is, as a vehicle runs on the rails 11, the weight of the vehicle is transferred to the slag layer 7 via the road bed crushed stone layer 8 wrapped in the wire mesh 9, and the road bed crushed stone layer 8 and the slag layer 7 are separated by the wire mesh. 9, they move up and down not as one body but as separate bodies, and the slag layer 7 is compressed and compacted by the up and down vibration of the crushed rock layer 8. On the other hand, the amount of water necessary for the hydration reaction is added in advance to the slag layer 7 when the slag is laid, and the surface layer of the slag layer 7 is pounded and hardened when the slag is laid, so no moisture is absorbed. evaporation is prevented. or,
The slag layer 7 can be constructed as needed by rainwater or water supply if necessary.
As water is added inside, the slag layer 7 hardens from the inside while being subjected to compaction pressure due to the weight of the vehicle over time, and after 2 to 3 months, the slag layer 7 hardens to 60 to 80%.
An extremely strong slag roadbed with a compressive strength of about Kg/cm 2 is formed. As the slag layer 7 solidifies and hardens, the slag layer 7 may be compressed by about 2 to 3 mm, causing slight subsidence of the track. However, the subsidence of the track is usually about 1 to 2 mm, and there is no need to repair the subsidence of the track by adding crushed stone to the track bed and compacting it. (Effects of the Invention) In the present invention, the slag is soaked in water in advance so that it contains sufficient moisture, and the entire layer of the slag layer 7 that has been laid is not compacted at once, but when the slag is laid, a rammer etc. The structure is such that the slag layer is compacted and hardened by the impact force of 100 ml to cause early solidification, and then the weight of the vehicle is used to compress and harden the slag layer over a long period of time. Therefore, the working time required to compact the slag layer 7 is significantly shorter than before, and the internal water is pushed out by the compaction due to the impact force of the rammer, and the coagulation reaction of the slag is significantly accelerated. Since the desired compressive strength can be obtained, track base improvement work using slag can be carried out even on commercial lines. Further, in the present invention, since the wire mesh 9 is used to enclose the roadbed crushed stone 8, the wire mesh 9 acts as a separator, and the slag layer 7 and the roadbed crushed stone layer 8 cannot move up and down as one. They each become separate bodies and vibrate up and down. As a result, the crushed stone layer 8 wrapped in a wire mesh performs the same function as a rolling indenter, and the slag layer 7 is efficiently and evenly compressed over a long period of time, forming a stronger slag slab. . Furthermore, since the coagulated and hardened slag layer 7 has appropriate flexibility, cracks will not occur due to vehicle vibrations, and even if a crack occurs, water will be supplied. As a result, the hydration reaction is restarted and the crack is repaired, so there is an advantage that the mud blowing phenomenon will never occur again. Additionally, slag slabs have the property of being permeable to moisture but not mud. Therefore, the viscosity of the roadbed becomes mud and there is no possibility of it being ejected onto the track, and even if the crushed rock of the roadbed is pulverized, it will not turn into mud, and there will be no phenomenon of so-called mud blowing onto the roadbed. As described above, the present invention has extremely high practical utility in improving the track base of railways in operation within a short period of time, such as during a late-night suspension of operation.
第1図は本発明を実施した鉄道用軌道の断面図
である。第2図は従前の鉱滓を利用した新設軌道
の断面図である。
6…路盤、7…粒度調整鉱滓層、8…道床砕石
層、9…金網、10…枕木、11…レール。
FIG. 1 is a sectional view of a railway track in which the present invention is implemented. Figure 2 is a cross-sectional view of a new track that uses conventional mine slag. 6...Roadbed, 7...Grain size adjustment slag layer, 8...Road bed crushed stone layer, 9...Wire mesh, 10...Sleepers, 11...Rail.
Claims (1)
の軟弱部の路床土を一定の深さに亘つて取り除
き、その後予かじめ充分に加水した粒度調整鉱滓
を敷設してランマー等の衝撃力により転圧し、転
圧により鉱滓中より水分を押し出して粒度調整鉱
滓を短時間内に凝結させると共に、前記転圧した
粒度調整鉱滓の上方に金網を布設してその上に金
網の網目より大なる粒径を有する道床砕石を敷設
し、走行する車輌重量を利用して前記金網により
分離した道床砕石層を介して粒度調整鉱滓を加圧
圧縮することにより、短時間で凝結せしめた前記
鉱滓層を長期に亘つて凝結硬化させることを特徴
とする軌道用路盤の改良方法。1. In railway roadbeds in operation, the subgrade soil in the soft parts of the roadbed is removed to a certain depth, and then granulated slag that has been sufficiently watered in advance is laid down and the soil is removed using a rammer, etc. The slag is compacted by impact force, and the water is pushed out from the slag by the compaction to condense the granule-adjusted slag within a short period of time.A wire mesh is laid above the compacted slag, and the mesh of the wire mesh is placed on top of the slag. The slag is coagulated in a short time by laying road bed crushed stones having a large particle size and pressurizing and compressing the particle size-adjusted slag through the road bed crushed stone layer separated by the wire mesh using the weight of a running vehicle. A method for improving a track base course, characterized by solidifying and hardening the layer over a long period of time.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19465985A JPS6255301A (en) | 1985-09-02 | 1985-09-02 | Improvement of road foundation for track |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19465985A JPS6255301A (en) | 1985-09-02 | 1985-09-02 | Improvement of road foundation for track |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6255301A JPS6255301A (en) | 1987-03-11 |
| JPH0376361B2 true JPH0376361B2 (en) | 1991-12-05 |
Family
ID=16328183
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP19465985A Granted JPS6255301A (en) | 1985-09-02 | 1985-09-02 | Improvement of road foundation for track |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6255301A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7844073B1 (en) * | 2026-01-05 | 2026-04-13 | 株式会社シクソン | Method for reinforcing concrete slabs on which ballast tracks are laid. |
-
1985
- 1985-09-02 JP JP19465985A patent/JPS6255301A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6255301A (en) | 1987-03-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110820466A (en) | Quick repairing method for cement concrete pavement | |
| CN117026700A (en) | A construction method for reconstruction of CRTSⅠ double-block ballastless track sleepers on existing lines | |
| JP3432302B2 (en) | Construction method and repair method of track | |
| DE4401260C1 (en) | Permanent waxy construction for railway tracks, esp. for high speed | |
| JPH0376361B2 (en) | ||
| RU2448212C2 (en) | Method to reinforce railway track | |
| WO2009036990A1 (en) | Railway superstructure devices | |
| JPH09268501A (en) | Labor-saving track and construction method therefor | |
| JPH0423922B2 (en) | ||
| JP7497323B2 (en) | Construction method of filled ballast track and filled ballast track | |
| JP2959891B2 (en) | Improvement method of track base | |
| CN104947565A (en) | Construction technology for forming railway crossing by pouring of concrete | |
| US2085420A (en) | Method of making or repairing roads | |
| JPH04247104A (en) | Water permeable subgrade and method of constructing the same | |
| JP6839616B2 (en) | Ballast track repair method | |
| JP2865413B2 (en) | How to improve the track base for business lines | |
| JPH05239459A (en) | Roadbed materials and reinforced roadbed methods | |
| CN115075068A (en) | Lifting repair method for ballastless track roadbed settlement spring air cushion | |
| DE102007038461B4 (en) | Method for rehabilitating a rail track and associated rail track | |
| WO1979000031A1 (en) | Rail support with provision for ballast | |
| JP7664199B2 (en) | Ballast track repair method and repair materials, and ballast track | |
| CN111455766B (en) | Road Recycled Asphalt Concrete Structure and Its Construction Technology | |
| AT500876A1 (en) | METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY | |
| JPH10279340A (en) | Track material and track by foam door asphalt, method of manufacturing and construction method | |
| DE10218309B4 (en) | Track for railway vehicles with a ballast bed for tracks, process for its manufacture and a binder mixture for use in the process |