JPH0376368B2 - - Google Patents

Info

Publication number
JPH0376368B2
JPH0376368B2 JP16598685A JP16598685A JPH0376368B2 JP H0376368 B2 JPH0376368 B2 JP H0376368B2 JP 16598685 A JP16598685 A JP 16598685A JP 16598685 A JP16598685 A JP 16598685A JP H0376368 B2 JPH0376368 B2 JP H0376368B2
Authority
JP
Japan
Prior art keywords
asphalt
pine
mast
present
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP16598685A
Other languages
Japanese (ja)
Other versions
JPS6227141A (en
Inventor
Katsuo Matsuzaki
Juzo Konoe
Mamoru Sato
Shigeto Fujimori
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Sea Works Co Ltd
Original Assignee
Japan Sea Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Sea Works Co Ltd filed Critical Japan Sea Works Co Ltd
Priority to JP16598685A priority Critical patent/JPS6227141A/en
Publication of JPS6227141A publication Critical patent/JPS6227141A/en
Publication of JPH0376368B2 publication Critical patent/JPH0376368B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)
  • Synthetic Leather, Interior Materials Or Flexible Sheet Materials (AREA)
  • Laminated Bodies (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、海中構造物等の基礎部分を洗掘から
保護するために用いられるアスフアルトマツトに
関し、特に、そのマツトの周辺部に透水性を有す
る重い部材を一体に取付け、水流や、波によりそ
の端部が煽られることを防止出来るようにしたア
スフアルトマツトに関する。
Detailed Description of the Invention (Field of Industrial Application) The present invention relates to asphalt pine used to protect the foundations of underwater structures etc. from scouring, and particularly relates to asphalt pine that has water permeability in the peripheral area of the pine. The present invention relates to an asphalt mat in which a heavy member is integrally attached, and its ends are prevented from being stirred up by water currents or waves.

(従来の技術) 従来より、防波堤や、海上作業台等のような海
中構造物の構築を行う際には、海底地盤の上に基
礎捨石層を形成し、その上を平らに均してから、
構造物本体の構築を行うようにしている。
(Conventional technology) Conventionally, when constructing underwater structures such as breakwaters and offshore work platforms, a foundation rubble layer is formed on the seabed ground, and the top layer is leveled and then leveled. ,
I am trying to construct the structure itself.

そして、その海底地盤が砂地、または、比較的
小さな砂利層である場合には、その海底地盤を平
坦に均してから帆布、塩化ビニール製の板、また
は、所定の厚さに形成したアスフアルトマツトを
敷き込み、その上に基礎捨石等の敷設を行つて基
礎を形成し、その基礎の上に構造物本体を構築す
るようにしていることが多い。
If the seabed is sandy or has a relatively small gravel layer, the seabed is leveled and then covered with canvas, vinyl chloride boards, or asphalt pine formed to a specified thickness. In most cases, the foundation is laid by laying foundation rubble, etc. on top of it, and then the structure itself is built on top of that foundation.

上記したもののうちで、特にアスフアルトマツ
トは、比較的波の荒い海域、または、海流の速い
場所での海中構造物等の基礎部分に用いられてい
ることが多いものであり、捨石基礎の洗掘防止、
地盤の砂等の吸出し防止等の目的で用いられてい
る。
Among the above-mentioned materials, asphalt pine in particular is often used for the foundations of underwater structures in sea areas with relatively rough waves or in places with fast ocean currents. prevention,
It is used for purposes such as preventing sand, etc. from being sucked out from the ground.

そして、上記したようなアスフアルトマツトと
しては、本出願人が先に公開している特公昭47−
45284号公報、特公昭50−17623号公報等に記載さ
れているように、アスフアルトマスチツクの間に
ガラス繊維のネツトのような補強部材と、吊り上
げ用のワイヤーロープ等をサンドイツチ状に挟み
込んだ状態で、一体に形成しているものである。
As for the above-mentioned asphalt pine, the present applicant has previously disclosed the
As described in Publication No. 45284, Japanese Patent Publication No. 50-17623, etc., a reinforcing member such as a glass fiber net and a wire rope for lifting are sandwiched between asphalt mastic in a sandwich-like manner. It is formed in one piece.

ところが、上記したようなアスフアルトマツト
を用いて海中構造物の工事を行うと、その構造物
の影響を受けて、その周囲に渦流を発生させるこ
とがある。そして、特にその構造物の施工場所の
海底地盤が、砂地や比較的小さな砂利層の場合に
は、そのアスフアルトマツトの先端部分の地盤が
上記した渦流や波等によつて洗掘され、それによ
つてアスフアルトマツトの先端部がめくれ上がつ
たり、渦流や波によつて煽られたりして、その基
礎部分の支持を確実に行い得ないという状態が発
生することがある。
However, when asphalt pine as described above is used to construct an underwater structure, it may be affected by the structure and generate eddy currents around it. In particular, if the seabed ground where the structure is constructed is sandy or a relatively small gravel layer, the ground at the tip of the asphalt pine will be scoured by the above-mentioned eddies and waves, etc. As a result, the tip of the asphalt pine may curl up or become agitated by eddies or waves, resulting in a situation where the base cannot be reliably supported.

したがつて、そのような状態で海中構造物の基
礎部分の洗掘が進行すると、基礎の支持力が低下
し、構造物が次第に傾いたり、台風等による大き
い波の影響を受けた場合には、海中構造物が不安
定になり、ひどいときには、転倒したりする事故
が発生する。
Therefore, if the foundation of an underwater structure continues to be scoured under such conditions, the supporting capacity of the foundation will decrease, and the structure will gradually tilt, or if it is affected by large waves from a typhoon, etc. Undersea structures become unstable, and in severe cases, accidents such as overturning occur.

そこで、上記したような基礎部分の洗掘を防止
するために、本出願人は、先にアスフアルトマツ
トの端部に所定の範囲で孔を多数形成し、その孔
から地盤の砂を吸い出しさせて、自然な状態でア
スフアルトマツトの先端部を地盤に砂等の中に曲
り込みを行わせ、その後の波等によるアスフアル
トマツトへの影響を少なくすることを提案してい
る。(特願昭59−189621号)(特開昭61−68914号) しかしながら、上記した先願のアスフアルトマ
ツトは、比較的波の荒い場所での海中構造物の基
礎の支持に用いられるものの、その前提として、
工事期間中、および、工事終了後の所定の期間に
は、比較的波が穏やかな時期があることを条件に
しているもので、その波の穏やかな時期に、緩か
な洗掘を行わせ、アスフアルトマツトの先端部
を、自然な状態で曲がり込みさせるようにしてい
るものであり、その曲がり込みによつて、その後
の波の荒い時期に洗掘を発生させないようにする
ことを目的としている。
Therefore, in order to prevent the above-mentioned scouring of the foundation, the applicant first formed a number of holes in a predetermined area at the end of the asphalt pine and sucked out the sand from the ground through the holes. proposed that the tip of the asphalt pine be bent into the sand or the like in the ground in a natural state to reduce the influence of subsequent waves on the asphalt pine. (Japanese Patent Application No. 59-189621) (Japanese Unexamined Patent Publication No. 61-68914) However, although the asphalt pine of the above-mentioned earlier application is used to support the foundations of underwater structures in areas with relatively rough waves, As a premise,
The condition is that there will be periods of relatively calm waves during the construction period and for a specified period after the completion of construction, and gentle scouring will be carried out during those periods of calm waves. The tip of the asphalt pine is bent in a natural manner, and the purpose of this bending is to prevent scouring during subsequent periods of rough waves.

ところが、工事の施工期間が限定され、波の荒
い時期に工事を行うことが要求されるときや、水
流の速い場所での海中構造物の施工を行う等の、
施工条件の良くない場所での工事に際しては、ア
スフアルトマツトの敷設を行つた直後に、その周
囲の部分が洗掘を受けることになり、上記したよ
うな先端孔明きマツトでは、海流による洗掘に対
処することが不可能になるという場合が発生して
いる。
However, when the construction period is limited and construction is required to be carried out during periods of rough waves, or when constructing an underwater structure in a place with fast water currents, etc.
When construction is carried out in areas with poor construction conditions, the surrounding area will be subject to scouring immediately after the asphalt pine is laid, and the above-mentioned pine with perforated ends will be susceptible to scouring by ocean currents. There are cases where it becomes impossible to deal with the situation.

(発明が解決しようとする問題点) 本発明は、上記したような従来例の欠点を解消
するもので、アスフアルトマツトの周囲にチエー
ン等のような比重が大きく、透水性のある部材を
一体に取付けすることにより、その周囲が洗掘さ
れたときに、海底地盤にしたがつて直ちに曲り込
みが容易に行われ、それによつて、海流等による
洗掘に対処することが出来るようにしたアスフア
ルトマツトの提供を目的としている。
(Problems to be Solved by the Invention) The present invention solves the above-mentioned drawbacks of the conventional example. By installing asphalt pine, when the surrounding area is scoured, the asphalt pine immediately bends easily according to the seabed ground, thereby making it possible to cope with scour caused by ocean currents, etc. The purpose is to provide

(問題点を解決するための手段および作用) 本発明のアスフアルトマツトは、アスフアルト
マスチツクの層の間にガラス繊維のネツト等によ
る補強部材を挿入し、さらに、補強部材に沿つ
て、所定の間隔でワイヤーロープ等の吊部材を埋
設している。
(Means and effects for solving the problems) The asphalt mast of the present invention has a reinforcing member such as a glass fiber net inserted between the layers of asphalt mastic, and furthermore, a reinforcing member made of a glass fiber net or the like is inserted at a predetermined interval along the reinforcing member. Suspension members such as wire ropes are buried in the area.

さらに、本発明のアスフアルトマツトは、その
周囲に、チエーン等で形成された重錘部材を設け
ていて、チエーンの端部をアスフアルトマスチツ
クの中に埋設し、外部に出た部分のチエーンを多
数本組合せて、アスフアルトマツト本体の厚さと
ほぼ同じ厚さで、重錘部材を形成している。
Furthermore, the asphalt mast of the present invention is provided with a weight member formed of a chain or the like around the asphalt mast. This combination forms a weight member having approximately the same thickness as the asphalt mat main body.

この重錘部材の長さは、そのアスフアルトマツ
トを敷設する場所での海流の速さに従つて決定さ
れるもので、海流が非常に速い場合には、その突
出長さを大きく取るようにする。
The length of this weight member is determined according to the speed of the ocean current at the location where the asphalt pine is laid. If the ocean current is very fast, the protrusion length should be increased. .

したがつて、本発明のアスフアルトマツトは、
それを敷設した直後に荒い波等による洗掘の影響
を受けたとしても、水および砂等の透過性の非常
に大きな重錘部材が最初に海底地盤中に埋没さ
れ、アンカーとして作用するために、アスフアル
トマツトの周囲の部分が、海流や波等の影響を受
けて煽られたり、強い洗掘を受けることを確実に
防止出来るようになる。
Therefore, the asphalt pine of the present invention is
Even if it is affected by scouring by rough waves, etc. immediately after it is laid, the weight member, which is highly permeable to water and sand, is first buried in the seabed ground and acts as an anchor. , it becomes possible to reliably prevent the surrounding area of asphalt pine from being stirred up under the influence of ocean currents, waves, etc., or from being subjected to strong scouring.

(実施例) 図示された実施例にしたがつて本発明のアスフ
アルトマツトの構成を説明すると、第1〜2図に
示すように、本発明のアスフアルトマツト1は、
その本体が従来より用いられているアスフアルト
マツトと同様に、所定の厚さに敷設されたアスフ
アルトマスチツク2の層の上に、ガラス繊維のネ
ツト等により形成された補強部材3を形成し、さ
らに、ワイヤーロープ5を所定の間隔で配置し、
そのワイヤーロープ5の両端部に吊り上げ用のア
イ6を形成するとともに、その途中の部分に滑り
止め金具7を設けている。
(Example) The structure of the asphalt mat of the present invention will be explained according to the illustrated embodiment. As shown in FIGS. 1 and 2, the asphalt mat 1 of the present invention includes:
Its main body is similar to that of conventionally used asphalt masts, in which a reinforcing member 3 made of glass fiber net or the like is formed on a layer of asphalt mast 2 laid to a predetermined thickness. , wire ropes 5 are arranged at predetermined intervals,
Lifting eyes 6 are formed at both ends of the wire rope 5, and an anti-slip fitting 7 is provided in the middle of the eye.

また、前記ワイヤーロープ5に対して、直角な
方向に、多数本の帯鉄8を配設し、アスフアルト
マツト1の長さ方向の強度を付加するとともに、
アスフアルトマツトの上に重いものが乗つたとき
に、その支持を確実に行い得るようにしているも
ので、さらに、本発明のアスフアルトマツトの下
の面には、その敷設場所に応じて、補強部材を形
成することもある。
In addition, a large number of iron bands 8 are arranged in a direction perpendicular to the wire rope 5 to add strength to the asphalt mat 1 in the longitudinal direction,
When a heavy object is placed on the asphalt pine, it can be supported reliably.Furthermore, the lower surface of the asphalt pine of the present invention is provided with reinforcing members depending on the installation location. may also form.

本発明のアスフアルトマツト1には、第3図に
示すように、その周囲に多数本のチエーン11に
より形成された重錘部材の層10を形成してい
る。この重錘部材の層10は、チエーン11の端
部をアスフアルトマスチツクの層の間に埋設し、
そのチエーンのリンクを用いて複数本の所定の長
さのチエーンを連接して形成しているもので、そ
の厚さをアスフアルトマツト本体の厚さとほぼ同
じになるようにして形成し、その長さを通常は
0.5〜1mに形成するが、本発明のアスフアルトマ
ツトの場合には敷設を行う場所での波の荒さや、
海流の速さが、特に、その重錘部材の層10の幅
を決定する条件としては、大きなフアクターとな
るものである。
As shown in FIG. 3, the asphalt mat 1 of the present invention has a layer 10 of weight members formed by a large number of chains 11 around it. This layer of weight member 10 embeds the end of the chain 11 between layers of asphalt mastic,
It is formed by connecting multiple chains of a predetermined length using the links of the chain, and the thickness is approximately the same as the thickness of the asphalt pine body, and the length Usually
However, in the case of the asphalt pine according to the present invention, it is necessary to install the asphalt pine at the location where it is laid, depending on the roughness of the waves,
The speed of the ocean current is a major factor, especially in determining the width of the layer 10 of the weight member.

つぎに、第4図に示される例に従つて、本発明
のアスフアルトマツトを施工した場合の洗掘の進
行状態を説明すると、イに示すように、本発明の
アスフアルトマツト1を海底地盤12上に施工
し、構造物を施工した直後には、海底地盤12が
平坦になつているために、アスフアルトマツト1
もその地盤12に一致して水平に施工される。し
かし、その構造物の施工による渦流の発生や、水
流の影響を受けて、アスフアルトマツト1の端部
の地盤に洗掘の現象が発生し、ロに示すように、
洗掘された地盤12に凹部13が形成される。
Next, according to the example shown in FIG. 4, the progress of scouring when the asphalt pine of the present invention is constructed will be explained. Immediately after constructing the structure, the asphalt pine 1
The construction is also carried out horizontally in line with the ground 12. However, due to the generation of eddy currents caused by the construction of the structure and the influence of water currents, a scour phenomenon occurs in the ground at the end of the asphalt pine 1, as shown in B.
A recess 13 is formed in the scoured ground 12.

ところが、本発明のアスフアルトマツト1にお
いては、その周囲に重錘部材10が形成されてお
り、その重錘部材10の重量が非常に大きなもの
であるために、洗掘によつて形成された凹部13
に重錘部材10の先端が曲り込んでその洗掘され
た地盤の形状と一致するようになる。
However, in the asphalt pine 1 of the present invention, the weight member 10 is formed around it, and since the weight of the weight member 10 is very large, the recess formed by scour 13
The tip of the weight member 10 is bent to match the shape of the scoured ground.

そして、そのアスフアルトマツト1の端部に形
成した重錘部材10の曲り込みに続いて、ハに示
すように、アスフアルトマツト1の側部が洗掘の
進行に従つて曲り込む現象が発生する。
Then, following the bending of the weight member 10 formed at the end of the asphalt mat 1, a phenomenon occurs in which the side part of the asphalt mat 1 bends as the scour progresses, as shown in FIG.

ところが、通常の海における潮の流れは、河川
の場合とは異なり、時間によつてその流れの方向
が異なるものであり、一方的に洗掘の現象が発生
するものではない。従つて、矢印V方向の海流に
よつて洗掘が行なわれた後では、逆方向の海流に
よつて埋め戻しが行なわれることになる。
However, unlike in the case of rivers, the direction of the current in the sea differs depending on the time, and the phenomenon of scouring does not occur unilaterally. Therefore, after scour is performed by the ocean current in the direction of arrow V, backfilling is performed by the ocean current in the opposite direction.

そして、本発明のアスフアルトマツト1を施工
した後で、所定の期間が経過すると、ハに示され
るように、アスフアルトマツト1の端部は、重錘
部材10をアンカーとして、海底地盤12の中に
埋設され、その上に埋め戻しの部分13aが形成
されることになり、アスフアルトマツト1の周囲
の部分を安定した状態で保持出来ることになる。
本発明のアスフアルトマツト1は、上記したよう
な状態で、海底地盤12の上に基礎の支持部材と
して施工されるために、そのアスフアルトマツト
1の上に施工された構造物等を、荒い波や海流に
対しても安全に支持し、その重量を支えることが
出来ることになる。
Then, after a predetermined period of time has passed after the asphalt pine 1 of the present invention is constructed, the end of the asphalt pine 1 is inserted into the seabed ground 12 using the weight member 10 as an anchor, as shown in C. The asphalt mat 1 is buried, and a backfilling portion 13a is formed thereon, making it possible to maintain the surrounding area of the asphalt mat 1 in a stable state.
Since the asphalt pine 1 of the present invention is constructed as a support member for a foundation on the submarine ground 12 in the above-described state, the structure etc. constructed on the asphalt pine 1 is protected against rough waves and It will be able to safely support ocean currents and support its weight.

本発明のアスフアルトマツト1は、上記したよ
うな構成を有するものであるから、例えば、アス
フアルトマツト本体の幅と長さおよび厚さを構造
物の大きさやその重量等の条件の他に、アスフア
ルトマツトの取り扱い性等の条件にしたがつて所
定の形状のものとして分割して形成する。そし
て、その製作に際しては、マツトの中間部にガラ
ス繊維のネツトにより構成された補強部材3を挿
入するとともに、補強部材3に沿つて、ワイヤー
ロープを一定の間隔で配置しており、さらに、本
発明のアスフアルトマツトの周囲の部分には所定
の長さのチエーン11の基端部を埋設し、所定の
幅で重錘の層10を形成している。
Since the asphalt mat 1 of the present invention has the above-described configuration, for example, the width, length, and thickness of the asphalt mat main body are determined in addition to conditions such as the size of the structure and its weight. It is divided and formed into predetermined shapes according to conditions such as ease of handling. When manufacturing the mat, a reinforcing member 3 made of glass fiber net is inserted into the middle of the mat, and wire ropes are arranged at regular intervals along the reinforcing member 3. The base end of a chain 11 of a predetermined length is buried in the surrounding area of the asphalt pine according to the invention, thereby forming a layer 10 of weights with a predetermined width.

また、前記ワイヤーロープ5の所定の部分に
は、滑り止め金具7としてアルミ管等を嵌め込
み、それを潰してワイヤーロープ5と一体に取付
けするとともに、その両側にワツシヤーを取付
け、これらの突出部材により、ワイヤーロープ5
がアスフアルトマツト1の中で滑ることのないよ
うにしている。
In addition, an aluminum pipe or the like is fitted as a non-slip fitting 7 into a predetermined part of the wire rope 5, and it is crushed and attached to the wire rope 5 integrally, and washers are attached to both sides of the fitting. , wire rope 5
prevents it from slipping inside the asphalt mat 1.

アスフアルトマツト1の周囲には、上記したよ
うに所定の幅の重錘部材の層10を形成するが、
この重錘部材の層10のチエーン11の端部は、
第3図に示すように、アスフアルトマツト1のア
スフアルトマスチツク内に埋設し、そのアスフア
ルトマツト1の側部に突出している部分から、チ
エーン11のリンクを接続してアスフアルトマツ
ト本体の厚さと同じ厚さ、例えば10cm厚さのもの
に形成することが出来るものである。
The layer 10 of the weight member having a predetermined width is formed around the asphalt pine 1 as described above.
The end of the chain 11 of the layer 10 of the weight member is
As shown in Fig. 3, the asphalt mast 1 is buried in the asphalt mast 1, and the links of the chain 11 are connected from the part protruding to the side of the asphalt mast 1 to a thickness equal to the thickness of the asphalt mast body. For example, it can be formed to a thickness of 10 cm.

本発明のアスフアルトマツト1においては、ア
スフアルトマスチツクの比重が約2.2であるのに
対して、チエーン11の比重は約7.8であるため
に、重錘部材としてチエーン11を密接して取付
けた場合には、アスフアルトマスチツク単体に比
較して2〜3倍の重さを有することになり、さら
に、本発明の重錘部材10が透水性を有するもの
であるために、水流によつて煽られたりすること
がなく、アンカーとしての役目を果すことにな
る。
In the asphalt mast 1 of the present invention, the specific gravity of the asphalt mast is approximately 2.2, while the specific gravity of the chain 11 is approximately 7.8. is two to three times as heavy as the asphalt mastic alone, and furthermore, since the weight member 10 of the present invention has water permeability, it will not be stirred by water flow. There is nothing to do, and it will serve as an anchor.

また、本発明のアスフアルトマツト1を施工す
る場所としては、波の比較的荒い場所を対象とし
ているもので、例えば、条件の良い時を選んで施
工を行つたとしても、その直後またはアスフアル
トマツトが安定する前に、荒い波の影響を受ける
ような、非常に条件の良くない場所で、海中構造
物の基礎を支えるために本発明のアスフアルトマ
ツト1を用いることが可能である。このような条
件の非常に悪い場所での工事においては、従来よ
り用いられているアスフアルトマツトを単独で使
用すると、水理実験の結果では、30〜50cmの厚さ
のアスフアルトマツトを用いる必要があるという
ことになる。
In addition, the asphalt pine 1 of the present invention is intended to be installed in a place where the waves are relatively rough. It is possible to use the asphalt mat 1 of the present invention to support the foundations of underwater structures in locations with very poor conditions, such as those that are affected by rough waves before stabilizing. For construction work in places with extremely poor conditions like this, if the conventionally used asphalt pine is used alone, the results of hydraulic experiments indicate that it is necessary to use asphalt pine with a thickness of 30 to 50 cm. It turns out that.

しかし、上記したような厚いアスフアルトマツ
トは、理論的には製作が可能なものであるとして
も、非常に重いものになり、搬送や、敷設が困難
で、構造物の施工コストが非常に大きな問題とな
るが、本発明の端部に重錘部材を付設しているア
スフアルトマツトにおいては、アスフアルトマツ
トの厚さを、従来より用いられているアスフアル
トマツトと同じ様に比較的薄いものとして形成
し、その周囲の部分を重くすることにより、その
地盤に対しての構造物の重量の支持を確実に行い
得ることになる。
However, even if thick asphalt pine as described above could be produced theoretically, it would be very heavy, difficult to transport and install, and the construction cost of the structure would be a huge problem. However, in the asphalt mat with a weight member attached to the end of the present invention, the thickness of the asphalt mat is made relatively thin like the asphalt mat used conventionally, By making the surrounding area heavier, the weight of the structure can be reliably supported by the ground.

なお、本発明の上記した実施例において、アス
フアルトマツト1の端部に取付けするチエーン1
1は、チエーンに類似する重量と柔軟性等の構成
と、透水性等の作用を有するものであれば、他の
部材を用いることも可能であり、さらに、アスフ
アルトマツトへの固定方法も、任意の方法を採用
出来ることも当然のことである。
In addition, in the above-described embodiment of the present invention, the chain 1 attached to the end of the asphalt mat 1
As for 1, other members can be used as long as they have a similar weight and flexibility structure as a chain, and water permeability, etc. Furthermore, the method of fixing to the asphalt mat can be arbitrary. Of course, it is also possible to adopt this method.

本発明のアスフアルトマツトは、上記したよう
にその端部に重錘部材を付設するのみでなく、第
2図にも示されるように、その本体の側部に多数
の孔15を形成した有孔部分を設け、その端部に
重錘部材10を一体に設けて、先端孔明きアスフ
アルトマツトとして形成することも可能である。
The asphalt mat of the present invention not only has a weight member attached to its end as described above, but also has a perforated material having a large number of holes 15 formed on the side of its main body, as shown in FIG. It is also possible to form a perforated asphalt mat by providing a section and integrally providing the weight member 10 at the end thereof.

そして、この場合には、重錘部材と、有孔部分
との両方の部分での水や砂等の流通により、アス
フアルトマツトの安定と、海底地盤への曲り込み
等が非常に安定した状態で行なわれることにな
り、アスフアルトマツトの施工直後に非常に速い
渦流や、潮流の影響を受けたとしても、アスフア
ルトマツトの端部が煽られたり、捲れ上がつたり
することがなく、海底地盤と、アスフアルトマツ
トの一体化が早期に進行することになり、構造物
の支持を確実に行うことを可能にするものであ
る。
In this case, the distribution of water, sand, etc. in both the weight member and the perforated part ensures the stability of the asphalt pine and its bending into the seabed ground in a very stable state. Even if the asphalt pine is affected by very fast eddy currents or tidal currents immediately after construction, the edges of the asphalt pine will not be stirred up or rolled up, and it will remain in contact with the seabed ground. This allows the asphalt mats to be integrated at an early stage, making it possible to securely support the structure.

また、本発明のアスフアルトマツトは、従来よ
り用いられているアスフアルトマツトと同じ様
に、通常の防波堤や、海中構造物の基礎の支持部
材として用いることが可能なものであり、その端
部を特に重くすることにより、洗掘等に対して基
礎を保護することが非常に容易に出来るととも
に、海中での工事の時期が波の静かな夏場等に限
定されることがなく、その施工も非常に容易に出
来ることになるのである。
In addition, the asphalt pine of the present invention can be used as a support member for the foundations of ordinary breakwaters and underwater structures, in the same way as conventionally used asphalt pine. By making it heavier, it is very easy to protect the foundation from scouring, etc., and the period of underwater construction is not limited to summer when the waves are calm, making it very easy to carry out construction. This can be done easily.

(発明の効果) 本発明のアスフアルトマツトは、上記したよう
な構成を有するものであるから、非常に荒い波の
影響を受ける場所等での工事に際しての基礎の構
築が容易に出来、その工期を短縮することが可能
になる。
(Effects of the Invention) Since the asphalt pine of the present invention has the above-described configuration, it is possible to easily construct a foundation for construction in places affected by extremely rough waves, and the construction period can be shortened. It becomes possible to shorten the length.

また、本発明のアスフアルトマツトは、潮流の
みでなく、構造物の設置によつて新たに発生する
渦流によつて、その端部の曲り込みが非常に速く
行なわれることになり、海底地盤を形成する砂
や、砂利層を確実にカバーすることになるため
に、アスフアルトマツトの上に構築された基礎
や、構造物等を安定した状態で設置することが出
来るものである。
In addition, the asphalt pine of the present invention bends its edges very quickly not only due to tidal currents but also due to the eddy currents newly generated by the installation of structures, forming a submarine base. Since it reliably covers the sand and gravel layer, foundations and structures built on asphalt pine can be installed in a stable state.

さらに、本発明においては、アスフアルトマツ
トの厚さや、その内部に挿入される補強部材等を
任意に形成することが出来るために、工事現場の
条件に対応して、アスフアルトマツトを形成する
ことが可能であり、その施工期間とコストも、ア
スフアルトマツトを用いない場合に比較して、大
幅に引き下げることを可能にする。
Furthermore, in the present invention, since the thickness of the asphalt pine and the reinforcing members inserted therein can be arbitrarily formed, it is possible to form the asphalt pine according to the conditions of the construction site. This makes it possible to significantly reduce the construction period and cost compared to when asphalt pine is not used.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は、本発明のアスフアルトマツトの構成
を示す一部切り欠き平面図、第2図は、その断面
図、第3図は、アスフアルトマツトの端部の構成
を示す説明図であり、第4図イないしハは、それ
ぞれアスフアルトマツトの端部の曲り込み状態を
示す説明図である。 図中の符号 1……アスフアルトマツト、2…
…アスフアルトマスチツク、3……補強部材、5
……ワイヤーロープ、6……アイ、7……滑り止
め金具、8……帯鉄、10……重錘部材、11…
…チエーン、12……海底地盤、13……凹部、
15……孔。
FIG. 1 is a partially cutaway plan view showing the structure of an asphalt pine according to the present invention, FIG. 2 is a sectional view thereof, and FIG. Figures 4A to 4C are explanatory diagrams showing the bent state of the end of the asphalt mat, respectively. Codes in the diagram 1... Asphalt pine, 2...
... Asphalt mastic, 3 ... Reinforcement member, 5
... wire rope, 6 ... eye, 7 ... anti-slip fitting, 8 ... band iron, 10 ... weight member, 11 ...
...Chain, 12...Seafloor ground, 13...Concavity,
15...hole.

Claims (1)

【特許請求の範囲】 1 アスフアルトマスチツクの層の間に補強部材
を挿入し、所定の厚さに形成したアスフアルトマ
ツトにおいて、その周囲に所定の幅のマツトの厚
さとほぼ同じ厚さで、透水性を有するチエーン等
の重い部材を一体に取付けした重錘部材の層を設
けたことを特徴とするアスフアルトマツト。 2 アスフアルトマスチツクの間に補強部材を挿
入し、所定の厚さに形成したアスフアルトマツト
において、そのアスフアルトマツトの周囲の部分
に、所定の範囲にわたつてアスフアルトマツトを
上下に貫通する多数の孔を形成した孔あき部分を
形成するとともに、そのマツトの周囲の部分にチ
エーン等の重い部材を取付けして形成した重錘部
材の層を設けたことを特徴とする特許請求の範囲
第1項記載のアスフアルトマツト。
[Scope of Claims] 1. In an asphalt mast formed to a predetermined thickness by inserting a reinforcing member between the layers of asphalt mastic, a water-permeable material is provided around the asphalt mast with a thickness substantially equal to the thickness of the mast having a predetermined width. 1. An asphalt mat characterized by having a layer of a weight member to which a heavy member such as a chain having properties is integrally attached. 2 A reinforcing member is inserted between the asphalt masts, and in the asphalt mast formed to a predetermined thickness, a large number of holes are formed in the surrounding area of the asphalt mast, extending vertically through the asphalt mast over a predetermined range. In addition to forming the perforated portion, a layer of a weight member formed by attaching a heavy member such as a chain to the surrounding portion of the pine is provided. Asphalt Matsut.
JP16598685A 1985-07-29 1985-07-29 Asphalt mat Granted JPS6227141A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16598685A JPS6227141A (en) 1985-07-29 1985-07-29 Asphalt mat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16598685A JPS6227141A (en) 1985-07-29 1985-07-29 Asphalt mat

Publications (2)

Publication Number Publication Date
JPS6227141A JPS6227141A (en) 1987-02-05
JPH0376368B2 true JPH0376368B2 (en) 1991-12-05

Family

ID=15822751

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16598685A Granted JPS6227141A (en) 1985-07-29 1985-07-29 Asphalt mat

Country Status (1)

Country Link
JP (1) JPS6227141A (en)

Also Published As

Publication number Publication date
JPS6227141A (en) 1987-02-05

Similar Documents

Publication Publication Date Title
KR20230114233A (en) Protection device for sea water cable
JPH10140536A (en) Underwater mat installation base and underwater mat installation method
EP0152232A2 (en) Stabilisation mat
JPH0376368B2 (en)
KR102008877B1 (en) Concrete mattress for protecting submarine cable
US4629360A (en) Retaining wall system
JP4282115B2 (en) Offshore structure construction method
JPS6314909A (en) Scour-proof construction for underwater structure
JPS6053124B2 (en) Sheet for stabilizing the base of underwater structures
JPH10266161A (en) Mat member and execution method thereof
JP2732135B2 (en) Super-quiet floating surface
JP3017797U (en) Dangerous and safe equipment at the water
JP3738101B2 (en) Water bottom laying sheet
JP3547699B2 (en) Seawall structure
KR100188519B1 (en) Anchor for oil fence and method for installation oil fence using its anchor
JP2001049648A (en) Pollution diffusion preventive device by artificial sea weed
JPH0860635A (en) Wave-dissipating structure in harbors
JPH0765303B2 (en) Scouring protection method for bottomed offshore structures
JP2721444B2 (en) Underwater formwork construction method
JP3168446B2 (en) Seabed laying sheet
KR20250165410A (en) System and installation method for forming anchor points for offshore wind turbine floats
AU2003235014A1 (en) Device for stabilising the position of a pipeline installed on a seabed or riverbed
JPH07127035A (en) Sheet for laying underwater
JPH01304210A (en) Execution of submerged breakwater with flexible construction
JPS6346507Y2 (en)