- JPH0378444B2 JPH0378444B2 JP21187A JP21187A JPH0378444B2 JP H0378444 B2 JPH0378444 B2 JP H0378444B2 JP 21187 A JP21187 A JP 21187A JP 21187 A JP21187 A JP 21187A JP H0378444 B2 JPH0378444 B2 JP H0378444B2
- Authority
- JP
- Japan
- Prior art keywords
- widening
- substructure
- existing
- vertical
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 claims description 8
- 239000004567 concrete Substances 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000011178 precast concrete Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は橋梁下部工の桁座拡幅工法に係るもの
である。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a girder widening method for bridge substructures.
(従来の技術)
地震時に橋梁が外れて地上または河中、海中に
落下した場合には、その復旧は容易ではない。特
に当該橋が緊急輸送路に当つている場合には、復
旧活動等に多大の支障を招来することになる。(Prior Art) When a bridge comes off during an earthquake and falls onto the ground, into a river, or into the sea, it is not easy to restore it. Especially if the bridge in question is on an emergency transportation route, it will cause a great deal of trouble to recovery efforts.
このような重大な被害を防止するための、落橋
防止対策の一つとして、橋梁下部工の桁座の拡幅
が行われている。 In order to prevent such serious damage, one measure to prevent bridge collapses is to widen the girders of bridge substructures.
第3図は従来の拡幅工法を示し、既存下部工a
の側面を穿孔したのち、モルタルを充填して差し
筋bを挿入して植立し、現場で既存下部工aに鉄
筋コンクリートを継足して拡幅部cを構成する。 Figure 3 shows the conventional widening method.
After drilling a hole in the side of the substructure, fill it with mortar, insert reinforcing bars b and plant them, and add reinforced concrete to the existing substructure a on site to form the widening section c.
第4図は従来の拡幅工法の他の例を示し、既存
下部工aの側面にアンカーホールdを穿設してア
ンカーボルトeを挿入して定着し、同アンカーボ
ルトeを介して鋼製拡幅部fを既存下部工aに固
定している。 Figure 4 shows another example of the conventional width widening method, in which an anchor hole d is drilled on the side of the existing substructure a, an anchor bolt e is inserted and fixed, and the steel width is widened through the anchor bolt e. Part f is fixed to the existing substructure a.
(発明が解決しようとする問題点)
しかしながら前者の方法においては既存のコン
クリートと新設コンクリートとの相互の附着をよ
くするために、既存コンクリートの面荒しを行な
う必要があり、また差し筋やアンカーの定着、拡
幅部の鉄筋コンクリートの施工に時間を要する。(Problem to be solved by the invention) However, in the former method, it is necessary to roughen the surface of the existing concrete in order to improve the mutual adhesion between the existing concrete and the new concrete, and it is also necessary to roughen the surface of the existing concrete and remove the reinforcements and anchors. It will take time to establish and construct reinforced concrete in the widening section.
また後者の方法においては、アンカーボルトと
既存コンクリートとの定着によつてのみ拡幅部が
固定されるものであるが、既存下部工に厚さがな
いときは十分な定着長がとれないことがある。 In addition, in the latter method, the widening section is fixed only by anchor bolts and existing concrete, but if the existing substructure is not thick enough, it may not be possible to secure a sufficient anchor length. .
(問題点を解決するための手段)
本発明はこのような問題点を解決するために提
案されたものであつて、橋梁における既存下部工
の頂面及び外側面に夫々垂直アンカー並に水平ア
ンカーを植設し、次いで拡幅部材の内側面に定着
された倒L型取付部材における前記拡幅部材の頂
部より内側に突出する水平部片及び拡幅部材内側
面に添う垂直部片の同拡幅部材の下端突出部を、
夫々前記垂直アンカー並に水平アンカーを介して
前記既存下部工に固定することによつて、前記の
問題点を解決するものである。(Means for Solving the Problems) The present invention has been proposed to solve these problems, and it provides vertical anchors and horizontal anchors on the top and outside surfaces of existing substructures of bridges, respectively. and then the lower ends of the horizontal part of the inverted L-shaped mounting member fixed to the inner surface of the width-expanding member that protrudes inward from the top of the width-expanding member and the vertical piece along the inner surface of the width-expanding member. The protruding part
The above problem is solved by fixing to the existing substructure via the vertical anchor and the horizontal anchor, respectively.
(作用)
本発明においてはプレキヤストコンクリート
製、プレキヤスト鉄筋コンクリート製、または鋼
製拡幅部材の内側面に倒L型取付部材の垂直部片
を同部片の下端が拡幅部材の下端より下方に突出
するように定着し、既存下部工の頂面及び外側面
に夫々垂直アンカー並に水平アンカーを植設した
のち、前記拡幅部材に定着された倒L型取付部材
における拡幅部材の頂部より内側に突出する水平
部片、及び前記垂直部片における拡幅部材の下端
突出部を、夫々前記垂直アンカー並に水平アンカ
ーを介して前記既存下部工に固着し、かくして前
記拡幅部材を既存下部工の外側面に固定するもの
である。(Function) In the present invention, the vertical part of the inverted L-shaped mounting member is attached to the inner surface of the widening member made of precast concrete, precast reinforced concrete, or steel, so that the lower end of the vertical part of the member protrudes downward from the lower end of the widening member. After installing vertical anchors and horizontal anchors on the top and outer surfaces of the existing substructure, the inverted L-shaped mounting member fixed to the width expansion member will protrude inward from the top of the width expansion member. The lower end protrusions of the widening members in the horizontal piece and the vertical piece are fixed to the existing substructure via the vertical anchor and the horizontal anchor, respectively, and thus the widening member is fixed to the outer surface of the existing substructure. It is something to do.
従つて同拡幅部材は既存下部工に対して外側面
のみならず、頂面においても固定されるので、高
い固定強度が得られる。 Therefore, the widening member is fixed to the existing substructure not only on the outer surface but also on the top surface, so that high fixing strength can be obtained.
(発明の効果)
このように本発明によれば、拡幅部材は同部材
に定着された倒L型取付部材と、既存下部工の頂
面及び外側面に植設された垂直アンカー並に水平
アンカーを介して既存下部工に外側面と頂面との
2箇所において固定されるので、高い固定強度が
得られ、既存下部工の厚さがなく、十分にアンカ
ーと既存コンクリートとの定着長をとれない場合
でも、拡幅部材を既存下部工に確実に取付けるこ
とができる。(Effects of the Invention) According to the present invention, the width expanding member has an inverted L-shaped mounting member fixed to the member, and vertical anchors and horizontal anchors installed on the top and outer surfaces of the existing substructure. Since it is fixed to the existing substructure at two points, the outside surface and the top surface, through the anchor, high fixing strength is obtained, and there is no thickness of the existing substructure, allowing for sufficient anchorage length between the anchor and the existing concrete. Even if there is no existing substructure, the widening member can be reliably attached to the existing substructure.
また本発明によれば前記したように拡幅部材の
取付けに際して、現場における配筋、コンクリー
ト打設作業が不要となるので施工が簡略化され、
工期を短縮しうるものである。 Further, according to the present invention, as described above, when installing the widening member, on-site reinforcement work and concrete pouring work are not required, so the construction is simplified.
This can shorten the construction period.
(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.
1は既存下部工、2はプレキヤストコンクリー
ト、プレキヤスト鉄筋コンクリート、または鋼製
の拡幅部材で、その内側面に鋼板より構成された
倒L型取付部材3の垂直部片3aが、同部片3a
の下端部が前記拡幅部材2の下端部より下方に突
出するように定着されている。 1 is an existing substructure, 2 is a widening member made of precast concrete, precast reinforced concrete, or steel, and the vertical part 3a of the inverted L-shaped mounting member 3, which is made of a steel plate on the inside surface, is the same part 3a.
It is fixed so that its lower end protrudes below the lower end of the width widening member 2.
而して前記既存下部工1における、同下部工1
上に架設される相隣る主桁4間の頂部及び外側部
に夫々垂直アンカーホール5及び水平アンカーホ
ール6を穿設するとともに、同各アンカーホール
5,6に夫々垂直アンカー7並に水平アンカー8
を挿入して定着し、前記倒L型取付部材3におけ
る拡幅部材2の頂部より内側に突出する水平部片
3b、及び同部材2の下端より突出する垂直部片
3aを夫々前記垂直アンカー7並に水平アンカー
8を介して既存下部工1の頂部及び外側部に固定
し、かくして前記拡幅部材2を既存下部工1に固
定するものである。 Therefore, in the existing substructure 1, the same substructure 1
Vertical anchor holes 5 and horizontal anchor holes 6 are drilled at the top and outside of the adjacent main girders 4 that are constructed above, and vertical anchors 7 and horizontal anchors are installed in each of the anchor holes 5 and 6, respectively. 8
The horizontal part 3b of the inverted L-shaped mounting member 3 protrudes inward from the top of the widening member 2, and the vertical part 3a protrudes from the lower end of the member 2, respectively. The widening member 2 is fixed to the top and outer side of the existing substructure 1 via horizontal anchors 8, and thus the widening member 2 is fixed to the existing substructure 1.
このように前記実施例によれば、前記拡幅部材
2が同部材2に定着された倒L型取付部材3と、
既存下部工1の頂面及び外側面に植立された垂直
アンカー7並に水平アンカー8を介して、既存下
部工1に頂部と外側部との2個所において固定さ
れるので、前記拡幅部材2は既存下部工1に確固
と固定され、既存下部工1の厚さがなくて同下部
工1のコンクリートとアンカーとの定着長が十分
にとれない場合でも、拡幅部材2の既存下部工1
に対する取付が可能となる。 In this way, according to the embodiment, the inverted L-shaped mounting member 3 to which the width expanding member 2 is fixed;
The widening member 2 is fixed to the existing substructure 1 at two locations, at the top and outside, via vertical anchors 7 and horizontal anchors 8 installed on the top and outer surfaces of the existing substructure 1. is firmly fixed to the existing substructure 1, and even if the existing substructure 1 is not thick enough to allow sufficient anchoring length between the concrete of the same substructure 1 and the anchor, the existing substructure 1 of the widening member 2
It becomes possible to attach to.
また前記実施例によれば、拡幅部材2の取付に
際して、現場での配筋、コンクリート打設作業が
なくなるので施工が簡略化され、工期が縮減され
る。 Further, according to the above embodiment, when installing the width widening member 2, there is no need for on-site reinforcing and concrete pouring work, so the construction is simplified and the construction period is shortened.
第1図は本発明に係る橋梁下部工の桁座拡幅工
法の一実施例の実施状況を示す縦断面図で、第2
図の矢視−図、第2図はその平面図、第3図
及び第4図は夫々従来の橋梁下部工の桁座拡幅工
法の実施状況を示す縦断面図である。
1……既存下部工、2……拡幅部材、3……倒
L型取付部材、3a……垂直部片、3b……水平
部片、5……垂直アンカーホール、6……水平ア
ンカーホール、7……垂直アンカーボルト、8…
…水平アンカーボルト。
FIG. 1 is a longitudinal sectional view showing the implementation status of one embodiment of the bridge substructure widening method of bridge substructure according to the present invention.
2 is a plan view thereof, and FIGS. 3 and 4 are vertical cross-sectional views showing the state of implementation of the conventional bridge substructure widening method. 1... Existing substructure, 2... Widening member, 3... Inverted L-shaped mounting member, 3a... Vertical piece, 3b... Horizontal piece, 5... Vertical anchor hole, 6... Horizontal anchor hole, 7... Vertical anchor bolt, 8...
…Horizontal anchor bolt.
Claims (1)
夫々垂直アンカー並に水平アンカーを植設し、次
いで拡幅部材の内側面に定着された倒L型取付部
材における前記拡幅部材の頂部より内側に突出す
る水平部片及び拡幅部材内側面に添う垂直部片の
同拡幅部材の下端突出部を、夫々前記垂直アンカ
ー並に水平アンカーを介して前記既存下部工に固
定することを特徴とする橋梁下部工の桁座拡幅工
法。1. Vertical anchors and horizontal anchors are installed on the top and outside surfaces of the existing substructure of the bridge, respectively, and then an inverted L-shaped mounting member fixed to the inside surface of the widening member protrudes inward from the top of the widening member. The lower end protrusion of the horizontal part and the vertical part along the inner surface of the widening member are fixed to the existing substructure via the vertical anchor and the horizontal anchor, respectively. girder widening method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21187A JPS63171905A (en) | 1987-01-06 | 1987-01-06 | Bridge substructure girder widening method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21187A JPS63171905A (en) | 1987-01-06 | 1987-01-06 | Bridge substructure girder widening method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63171905A JPS63171905A (en) | 1988-07-15 |
| JPH0378444B2 true JPH0378444B2 (en) | 1991-12-13 |
Family
ID=11467628
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP21187A Granted JPS63171905A (en) | 1987-01-06 | 1987-01-06 | Bridge substructure girder widening method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63171905A (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20020094652A (en) * | 2001-06-12 | 2002-12-18 | 주식회사 하이콘엔지니어링 | A Method Repairing the Bridge for Preventing Fall thereof |
| JP6297462B2 (en) * | 2014-10-09 | 2018-03-20 | 公益財団法人鉄道総合技術研究所 | A method to prevent the falling of existing bridge girders that are affected by earthquakes and tsunamis |
| JP6241003B2 (en) * | 2014-10-10 | 2017-12-06 | 公益財団法人鉄道総合技術研究所 | Vehicle travel path support device |
| JP6473426B2 (en) * | 2016-03-17 | 2019-02-20 | 公益財団法人鉄道総合技術研究所 | Fall bridge prevention structure |
-
1987
- 1987-01-06 JP JP21187A patent/JPS63171905A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63171905A (en) | 1988-07-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4972537A (en) | Orthogonally composite prefabricated structural slabs | |
| JP2001516408A (en) | Prefabricated concrete members for civil engineering construction with arched walls | |
| RU2375523C1 (en) | Formwork for constructing reinforcing covering of construction made from corrugated steel plates | |
| KR102597084B1 (en) | Steel Ccomposite Rahmen Bridge Structure and its Construction Method | |
| KR100812132B1 (en) | Concrete slab assembly | |
| JPH0424306A (en) | Method of laying floor plate for prefabricated house | |
| KR102615137B1 (en) | Construction of Rahmen Bridge using Centrifugal Casting Square Beam and Construction method | |
| KR100535157B1 (en) | Structures and Methods for Connection between Precast Decks and Prestressed Concrete Girders | |
| KR100343369B1 (en) | Precast concrete beam and connecting method with the other building elements | |
| JPH0378444B2 (en) | ||
| JP2750556B2 (en) | Manufacturing method of prestressed concrete girder | |
| JP2000064222A (en) | Elevated bridge | |
| KR200406615Y1 (en) | Tee type precast concrete panel | |
| KR100334257B1 (en) | Formwork method using no prop for the floor concrete of the bridge | |
| KR102398605B1 (en) | Construction method of seismic retrofit system using pc panel | |
| JP7482587B2 (en) | Joint structure of precast concrete slab members and method for constructing concrete slab structure | |
| JP4364367B2 (en) | Half precast beam | |
| KR19990073084A (en) | Formwork method using no prop for the floor concrete of the bridge | |
| JP4006689B2 (en) | Core material for underground pit and soil cement column wall using soil cement column wall | |
| JPH1113018A (en) | Drop preventing method for bridge and bridge girder supporting width enlarging member | |
| JPH0128162B2 (en) | ||
| KR102895966B1 (en) | Method for constructing a frame bridge using a composite plate-type steel composite girder and a frame bridge constructed thereby | |
| EP4352309B1 (en) | A foundation structure for constructions | |
| JP2001159195A (en) | Joining structure between steel pipe member and concrete member | |
| JP7519945B2 (en) | Reinforcement method for concrete structures and reinforced structures |