JPH0411683B2 JP20704683A JP20704683A JPH0411683B2 JP H0411683 B2 JPH0411683 B2 JP H0411683B2 JP 20704683 A JP20704683 A JP 20704683A JP 20704683 A JP20704683 A JP 20704683A JP H0411683 B2 JPH0411683 B2 JP H0411683B2
Authority
JP
Japan
Prior art keywords
sheath
anchor head
construction
fixed
steel wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP20704683A
Other languages
Japanese (ja)
Other versions
JPS59109604A (en
Inventor
Kunimitsu Yamada
Tetsuo Toyokawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Seiko Co Ltd
Original Assignee
Tokyo Seiko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Seiko Co Ltd filed Critical Tokyo Seiko Co Ltd
Priority to JP20704683A priority Critical patent/JPS59109604A/en
Publication of JPS59109604A publication Critical patent/JPS59109604A/en
Publication of JPH0411683B2 publication Critical patent/JPH0411683B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は斜張橋、無線鉄塔等においてシース
内部に複数本の鋼線等を緊張して斜材類の緊張材
を架設する緊張材の架設工法に関するものであ
る。
[Detailed Description of the Invention] [Field of Industrial Application] This invention relates to a tension member for constructing a cable-stayed bridge, a radio tower, etc. by tensioning a plurality of steel wires, etc. inside a sheath. This relates to construction methods.

〔従来技術〕 従来第1図に示すように地上に構築したタワー
TとデツキD間に緊張材である斜材Lを複数本架
設してデツキDを吊下した斜張橋が開発されてい
る。前記緊張材としては合成樹脂等の保護シース
内に鋼線若しくは鋼より線を複数本挿通したもの
が採用されており、あらかじめシース内に前記鋼
線類を挿通して一体化された緊張材を現場に組ん
だ足場上に持ち上げて、直接両端をタワーTとデ
ツキDに各々連結する工法によつて架設されてい
た。その他無線鉄塔等における緊張材の架設には
略同様の工法が採用されていた。
[Prior art] As shown in Fig. 1, a cable-stayed bridge has been developed in which a plurality of diagonal members L, which are tension members, are installed between a tower T and a deck D built on the ground to suspend the deck D. . The tension material is made by inserting a plurality of steel wires or stranded steel wires through a protective sheath such as synthetic resin, and the steel wires are inserted into the sheath in advance to form the integrated tension material. It was erected using a construction method that involved lifting it onto scaffolding erected on site and directly connecting both ends to Tower T and Deck D, respectively. Almost the same method was used to erect tendons for other radio towers, etc.

このような従来の緊張材架設工法には以下のよ
うな問題が存在していた。
Such conventional tendon construction methods have the following problems.

○イ シース内に多数本に鋼線類を挿通した緊張材
の重量は極めて大きくなり、これを架設する作
業は極めて困難である。
○A. The weight of the tension material, which consists of many steel wires inserted into the sheath, is extremely large, and the work to erect it is extremely difficult.

○ロ 長大な斜張橋等においては作業足場は巨大な
ものとなつていた。
○B For long cable-stayed bridges, the work scaffolding was huge.

○ハ 肉厚の厚い合成樹脂等のシース内に鋼線類を
挿通した緊張材は、リール等に巻いた場合荷姿
が大きくなつて運搬作業が極めて困難である。
○C Tensile material made by inserting steel wires into a thick sheath of synthetic resin, etc., becomes bulky when wound on a reel, etc., making it extremely difficult to transport.

○ニ シース内に複数本の鋼線類をからめずに挿通
するのは極めて困難な作業である。
○D It is extremely difficult to insert multiple steel wires into a sheath without getting them entangled.

以上のような問題点を解消するために本件出願
人が特願昭57−209000号(特開昭59−98974号)
において開示した緊張材の架設工法は、端部にイ
ンデツクス孔を有するアンカーヘツドを固着した
固定シースをタワーTとデツキD等に対向して設
置し、該固定シース間に架設シースを架け渡し、
その後アンカーヘツドの相対応するインデツクス
孔間に、上方のアンカーヘツドからシース内を降
下せしめるようにして挿通し、該シース内にて鋼
線類を緊張材を架設するものである。
In order to solve the above problems, the applicant filed Japanese Patent Application No. 57-209000 (Japanese Unexamined Patent Publication No. 59-98974).
The method of constructing tendons disclosed in 2003-11 discloses that a fixed sheath to which an anchor head having an index hole is fixed at the end is installed facing the tower T, deck D, etc., and the construction sheath is spanned between the fixed sheaths.
Thereafter, the sheath is inserted between the corresponding index holes of the anchor head by descending from the upper anchor head into the sheath, and the steel wire tension member is installed within the sheath.

しかしこのような工法においては上方の固定シ
ース及び架設シースを降下してきた鋼線類を下方
の固定シース内に挿通し、その下端部のアンカー
ヘツドの所定のインデツクス孔に挿通せしめるの
は困難な作業である。
However, in this construction method, it is difficult to insert the steel wires that have descended from the upper fixed sheath and erection sheath into the lower fixed sheath and into the designated index holes of the anchor head at the lower end. It is.

すなわちシース内での鋼線類相互のからみを失
くせしめるために、上方のアンカーヘツドと下方
のアンカーヘツドのインデツクス孔を正確に対応
せしめて、鋼線類を挿通し、緊張する必要がある
が、下方の固定シース内へ上方から降下せしめ
て、下端部にあるアンカーヘツドの多数のインデ
ツクス孔のうち任意のインデツクス孔に挿通する
のは、極めて難しい作業である。
In other words, in order to prevent the steel wires from becoming entangled with each other within the sheath, it is necessary to align the index holes of the upper and lower anchor heads accurately, insert the steel wires, and apply tension. It is extremely difficult to lower the anchor from above into the lower fixed sheath and insert it into any one of the many index holes in the anchor head at the lower end.

〔発明の目的〕[Purpose of the invention]

この発明は以上のような問題点を解決するため
になされたもので、まずシースのみを架設し、そ
の後上方のアンカーヘツドのインデツクス孔に鋼
線類を挿通し、シース内を挿通せしめた鋼線類
を、下方の固定シース内へ挿通せしめ、容易且つ
正確にシース端部のアンカーヘツドの所定のイン
デツクス孔へ挿通せしめることが可能な緊張材架
設工法を提供することを目的とする。
This invention was made to solve the above-mentioned problems. First, only the sheath is installed, and then the steel wires are inserted into the index hole of the upper anchor head, and the steel wires are inserted through the sheath. It is an object of the present invention to provide a tendon construction method that allows a tension material to be inserted into a lower fixed sheath and into a predetermined index hole of an anchor head at the end of the sheath easily and accurately.

〔発明の構成〕[Structure of the invention]

この発明には、端部にインデツクス孔を有する
アンカーヘツドを設置した固定シース2個を一定
間隔離して対向して設置し、該固定シース間に架
設シースを架け渡し、その後アンカーヘツドの相
対応するインデツクス孔間に上方のアンカーヘツ
ドから下方のアンカーヘツドにかけて鋼線類を挿
通し、該シース内にて鋼線類を緊張することによ
つて緊張材を架設する工法であつて、下方の固定
シースと架設シース下端間に〓間を設けておいて
下方の固定シース内にアンカーヘツドのインデツ
クス孔を挿通せしめたリードロープ先端のリード
キヤツプを位置せしめ、上方のアンカーヘツドか
ら挿通せしめてきた鋼線類を上記〓間において該
リードキヤツプに嵌着し、該リードロープの案内
によつてリードキヤツプに嵌着した鋼線類をイン
デツクス孔に誘導せしめることを特徴とする。
In this invention, two fixed sheaths each having an anchor head having an index hole at each end are installed facing each other with a certain distance between them, a construction sheath is spanned between the fixed sheaths, and then the anchor heads are connected to each other. A construction method in which steel wires are inserted between the index holes from the upper anchor head to the lower anchor head, and tension members are erected by tensioning the steel wires within the sheath, and the lower fixed sheath The lead cap at the end of the lead rope is inserted through the index hole of the anchor head into the lower fixed sheath with a space provided between the lower end of the sheath and the lower end of the erection sheath, and the steel wire is inserted from the upper anchor head. is fitted into the lead cap between the ends, and the steel wires fitted into the lead cap are guided into the index hole by the guide of the lead rope.

〔実施例〕〔Example〕

以下図に示す斜張橋における一実施例に基づき
この発明を詳細に説明する。
The present invention will be described in detail below based on an embodiment of a cable-stayed bridge shown in the drawings.

〔〕 シース連結 シース1,1′としては鋼線類の防錆のために
耐候性の良好な合成樹脂製の円筒状部材を使用す
るが、その他ステンレス製鋼管等が採用可能であ
る。架設シース1は長尺のものを運搬するのは極
めて困難であり、一定の長さを有するシースを複
数本連結して架設に使用されている。
[] Sheath Connection As the sheaths 1 and 1', cylindrical members made of synthetic resin with good weather resistance are used to prevent rust of steel wires, but other materials such as stainless steel pipes can be used. It is extremely difficult to transport a long construction sheath 1, so a plurality of sheaths each having a certain length are connected together and used for construction.

〔〕 タワー、デツキへの定着孔の形成 タワーT及びデツキDへ各々相対応して定着孔
2,2が各々貫通して形成されている。定着孔
2,2は架設する斜材Lの数だけタワーTの上下
方向及びデツキDの長手方向に適宜間隔離して形
成されている。タワーT及びデツキDに相対応し
て形成された定着孔2,2は各中心線が同一直線
上にあるように穿孔されている。
[] Formation of Fixing Holes in Tower and Deck Fixing holes 2, 2 are formed through the tower T and deck D in correspondence with each other. The fixing holes 2, 2 are formed at appropriate intervals in the vertical direction of the tower T and in the longitudinal direction of the deck D by the number of diagonal members L to be installed. The fixing holes 2, 2 formed in correspondence with the tower T and the deck D are bored so that their respective center lines are on the same straight line.

タワーT及びデツキDの斜材L架設側とは反対
側の面は定着孔2,2の中心線と直角に交叉する
よう座が形成されている。定着孔2,2内には端
部にフランジを有する鋼管パイプ21,21が埋
設されている。各定着孔2,2の斜材Lを架設す
る側と反対側には円筒状のソケツト22,22が
各々取付けられている。特にデツキDの定着孔2
に取付けられたソケツト22は調整ナツト23が
外周に螺合されており、ソケツト22の定着孔2
中心線方向の位置調整が可能となつている。
A seat is formed on the opposite side of the tower T and deck D from the side where the diagonal member L is installed so as to intersect the center line of the fixing holes 2, 2 at right angles. Steel pipes 21, 21 having flanges at their ends are buried in the fixing holes 2, 2. A cylindrical socket 22, 22 is attached to the side of each fixing hole 2, 2 opposite to the side on which the diagonal member L is installed. Especially the fixing hole 2 of Detsuki D.
An adjustment nut 23 is screwed onto the outer periphery of the socket 22 attached to the socket 22, and the fixing hole 2 of the socket 22
Position adjustment in the center line direction is possible.

該ソケツト22,22の斜材Lを架設する側と
反対側にはアンカーヘツド3,3が各々固着され
ている。アンカーヘツド3,3は第6図に示すよ
うに円盤状であり、その表面を貫通して挿通する
鋼線の数αだけインデツクス孔a1,a2,a3
……aαが穿孔されている。各インデツクス孔a
1……aαは各々適宜間隔離して形成されており、
タワーT側に取付ける上端部アンカーヘツド3と
デツキDに取付ける下端部アンカーヘツド3とは
各インデツクス孔a1……aαが各々相対応し、
対応するインデツクス孔の中心線は定着孔2,2
の中心線と平行となるように穿孔されている。
Anchor heads 3, 3 are fixed to the sides of the sockets 22, 22 opposite to the side on which the diagonal member L is installed. The anchor heads 3, 3 are disk-shaped as shown in FIG. 6, and have index holes a1, a2, a3 corresponding to the number α of steel wires to be inserted through the surface thereof.
...aα is perforated. Each index hole a
1...aα is formed with appropriate isolation,
The upper end anchor head 3 to be attached to the tower T side and the lower end anchor head 3 to be attached to the deck D have index holes a1...aα corresponding to each other,
The center line of the corresponding index hole is the fixing hole 2, 2
The holes are parallel to the center line of the hole.

ソケツト22,22の斜材Lの架設する側には
各々短尺の固定シース1′,1′が連結されて各鋼
管パイプ21,21内に挿入され、また斜材Lの
架設する側へ固定シース1′,1′の一端が突出せ
しめられており、架設シース1のデツキD側の端
部外周にはシース外筒管14が嵌合されており、
架設シース1端部と固定シース1′端部を連結す
るとき両端部外周に該シース外筒管14を嵌合し
て両者を連結する。シース外筒管14の固定はシ
ース外筒管14の両端を加熱してシース1,1′
に溶着すること等によつて行なう。
Short fixed sheaths 1', 1' are connected to the sides of the sockets 22, 22 where the diagonal member L is installed, respectively, and inserted into the respective steel pipes 21, 21, and the fixed sheaths 1', 1' are connected to the side where the diagonal member L is installed, respectively, and inserted into the respective steel pipes 21, 21. One end of the construction sheath 1 on the side of the deck D is fitted with a sheath outer cylinder tube 14,
When connecting the end of the construction sheath 1 and the end of the fixed sheath 1', the sheath outer tube 14 is fitted around the outer periphery of both ends to connect them. The sheath outer tube 14 is fixed by heating both ends of the sheath outer tube 14 to secure the sheaths 1 and 1'.
This is done by welding to the

タワーT側に取付けた固定シース1′の下端に
は外周にフランジが形成されており、デツキD側
に取付けた固定シース1′の外周には鍔を有する
円筒状のシール材24が嵌合されて鋼管パイプ2
1との〓間がシールされている。
A flange is formed on the outer periphery of the lower end of the fixed sheath 1' attached to the tower T side, and a cylindrical sealing material 24 having a flange is fitted to the outer periphery of the fixed sheath 1' attached to the deck D side. steel pipe 2
The space between 1 and 1 is sealed.

〔〕 シース設置 既述のように連結された架設シース1をタワー
T及びデツキD間に架け渡す。架設シース1はタ
ワーTに隣接して立設されたクレーンによつて一
端を吊り上げタワーTの定着孔2付近にまで引き
寄せ固定シース1′の端部近くに位置せしめる。
この架設シース1の一端をタワーT上方に一端を
固定したロープ25の他端に鋼製で環状のベルト
26等を介して吊下げておく。
[] Sheath Installation The construction sheath 1 connected as described above is installed between the tower T and the deck D. One end of the construction sheath 1 is lifted up by a crane erected adjacent to the tower T and pulled to the vicinity of the fixing hole 2 of the tower T, and is positioned near the end of the fixed sheath 1'.
One end of this construction sheath 1 is suspended from the other end of a rope 25 whose one end is fixed above the tower T via a steel annular belt 26 or the like.

架設シース1の他端は人力等によつてデツキD
のタワーTの定着孔2に対応する定着孔2付近に
引き寄せて、固定シース1′の端部近くに位置せ
しめる。この固定シース1′のデツキD側の端部
もデツキDに一端を固定したロープの他端にベル
ト等を介して仮設しておく。また架設シース1の
デツキ側の端部外周には架設シース外筒管14を
嵌合させておく。
The other end of the construction sheath 1 is attached to the deck D by human power, etc.
The fixing hole 2 of the tower T is drawn near the fixing hole 2 corresponding to the fixing hole 2 of the tower T, and the fixing sheath 1' is positioned near the end of the fixing sheath 1'. The end of the fixed sheath 1' on the deck D side is also temporarily attached to the other end of the rope, one end of which is fixed to the deck D, via a belt or the like. Moreover, the construction sheath outer cylindrical tube 14 is fitted to the outer periphery of the deck-side end of the construction sheath 1.

まず、タワーT側の架設シース1の上端をタワ
ーT側の固定シース1′の端部に連結し、架設シ
ース1の下端側にシース外筒管14が嵌合した状
態で架設シース1をデツキD側の固定シース1′
に近づけて配置し両シース間に〓間を設けてお
く。
First, the upper end of the construction sheath 1 on the tower T side is connected to the end of the fixed sheath 1' on the tower T side, and the construction sheath 1 is installed on the deck with the sheath outer tube 14 fitted to the lower end of the construction sheath 1. Fixed sheath 1' on D side
Place it close to the sheath and leave a gap between both sheaths.

このようにして、タワーT及びデツキD間の架
設シース1の架け渡しが行われる。
In this way, the construction sheath 1 is constructed between the tower T and the deck D.

〔〕 鋼線の送出 タワーTとデツキD間に設置したシース1内に
斜材Lの緊張を受け持つための鋼製4若しくは鋼
より線等の鋼線類を所要本数送出する。実施例で
は鋼線4を使用し、この鋼線4を巻いたリールを
デツキD等上に載置して該リールから鋼線4を連
続して所要長さに切断しない状態で送り出す。
[] Sending out steel wires A required number of steel wires such as steel wires 4 or steel stranded wires to handle the tension of the diagonal member L are sent out into the sheath 1 installed between the tower T and the deck D. In the embodiment, a steel wire 4 is used, a reel wound with the steel wire 4 is placed on a deck D, etc., and the steel wire 4 is continuously fed out from the reel without being cut to a required length.

〔V〕 シース内への鋼線の挿通 シース1′,1′の間にリールから送り出した鋼
線4を挿通する。まず鋼線4をタワーT側の定着
孔2付近まで上昇させておき、次いで上端部アン
カーヘツド3のインデツクス孔a1……aαから
挿入して架設シース1内に降下せしめるようにし
て挿通する。
[V] Inserting the steel wire into the sheath The steel wire 4 fed from the reel is inserted between the sheaths 1' and 1'. First, the steel wire 4 is raised to the vicinity of the fixing hole 2 on the tower T side, and then inserted through the index holes a1...aα of the upper end anchor head 3 and lowered into the construction sheath 1.

インデツクス孔a1……aαには各孔に順に挿
通するが、挿入する順序は様々な態様が考えるこ
とができる。実施例では第6図に示すようなイン
デツクス孔a1……aαのうち最上部に位置する
孔a1から挿通して順にその下方にある孔a2,
a3……というように挿通せしめ、最下部に位置
するインデツクス孔aαに最後に挿通せしめる。
The index holes a1, . In the embodiment, the index holes a1, . . . aα shown in FIG.
a3..., and finally insert it into the index hole aα located at the bottom.

上端部アンカーヘツド3のインデツクス孔a1
に挿入された鋼線4は架設シース1内周面底部を
伝つて降下して下端部アンカーヘツド3の対応す
るインデツクス孔a1に挿通せしめて緊張すれば
鋼線4は架設シース1内最上部に全長が位置せし
められて、後続の鋼線4がシース1内周面底部を
伝つて降下するのに支障となることなく、また既
に緊張して設置した鋼線4と後続の鋼線4がから
み合うようなことがない。
Index hole a1 of upper end anchor head 3
The steel wire 4 inserted into the construction sheath 1 descends along the bottom of the inner circumferential surface of the construction sheath 1 and is inserted into the corresponding index hole a1 of the lower end anchor head 3. When the steel wire 4 is tensed, the steel wire 4 moves to the top of the construction sheath 1. The entire length is positioned so that the following steel wire 4 can descend along the bottom of the inner peripheral surface of the sheath 1 without any hindrance, and the steel wire 4 that has already been placed under tension is entangled with the following steel wire 4. Nothing seems to fit.

〔〕 下方アンカーヘツドへの挿通 デツキD側の固定シース1′下端部のアンカー
ヘツド3のインデツクス孔a1……aαに、固定
シース1′内にて鋼線を挿通するのは困難である
ため第7図に示すようなリードロープ81先端に
鞘状のリードキヤツプ8を取付けた部材を使用す
る。すなわちリードロープ81をデツキD側のア
ンカーヘツド3のインデツクス孔a1……aαに
挿通して固定シース1′内にあらかじめ位置せし
めておきリードキヤツプ8は固定シース1′の上
方に突出せしめ、リードロープ81他端は下端部
アンカーヘツド3下方に突出せしめておく。
[] Insertion into the lower anchor head It is difficult to insert the steel wire into the index holes a1...aα of the anchor head 3 at the lower end of the fixed sheath 1' on the deck D side within the fixed sheath 1'. A member having a sheath-shaped lead cap 8 attached to the tip of a lead rope 81 as shown in FIG. 7 is used. That is, the lead rope 81 is inserted into the index holes a1...aα of the anchor head 3 on the deck D side and positioned in the fixed sheath 1' in advance, and the lead cap 8 is made to protrude above the fixed sheath 1'. The other end of 81 is made to protrude below the lower end anchor head 3.

架設シース1の下端とデツキ側の固定シース
1′との〓間を利用し、鋼線4の先端をリードキ
ヤツプ8に嵌着して鋼線4を再び送り出すととも
にリードロープ81を下方に引いて、鋼線4が確
実に各アンカーヘツド3のインデツクス孔a1…
…aαに挿通するようにする。鋼線4の挿通後は
シース外筒管14の両端をシース1,1′に溶着
する。
Using the space between the lower end of the construction sheath 1 and the fixed sheath 1' on the deck side, the tip of the steel wire 4 is fitted into the lead cap 8, and the steel wire 4 is fed out again, while the lead rope 81 is pulled downward. , the steel wire 4 is securely inserted into the index hole a1 of each anchor head 3...
...Insert it into aα. After the steel wire 4 is inserted, both ends of the sheath outer tube 14 are welded to the sheaths 1 and 1'.

〔〕 鋼線の緊張 以上のようにシース1内に挿通した鋼線4を緊
張する。鋼線4の緊張には油圧ジヤツキ等を使用
し、鋼線4の端部を把持して緊張する。
[] Tensioning the steel wire Tension the steel wire 4 inserted into the sheath 1 as described above. A hydraulic jack or the like is used to tension the steel wire 4, and the end of the steel wire 4 is grasped and tensioned.

全鋼線4挿通後、もう一度全鋼線4を緊張し
て、緊張材の架設を完了する。
After all the steel wires 4 have been inserted, all the steel wires 4 are tensioned again to complete the erection of the tension members.

〔発明の効果〕〔Effect of the invention〕

この発明は以上のような構成を有するため、架
設シース内を降下してきた鋼線等を架設シースと
固定シースの端部間の〓間を利用してリードロー
プ先端のリードキヤツプに嵌着して、容易且つ確
実にアンカーヘツドのインデツクス孔内に挿通す
ることが可能である。
Since the present invention has the above-described configuration, the steel wire, etc. that has descended within the construction sheath is fitted into the lead cap at the tip of the lead rope using the gap between the ends of the construction sheath and the fixed sheath. It can be easily and reliably inserted into the index hole of the anchor head.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は斜張橋の一実施例の正面図、第2図は
タワー及びデツキに緊張材を架け渡した状態の説
明図、第3図はタワーに形成した定着孔の縦断面
図、第4図はデデツキに形成した定着孔の縦断面
図、第5図は緊張材の横断面図、第6図はアンカ
ーヘツドの平面図、第7図はリードキヤツプに嵌
合した鋼線をシースに挿通する状態の縦断面図で
ある。 T……タワー、D……デツキ、L……斜材、1
……架設シース、1′…固定シース、2……定着
孔、3……アンカーヘツド、4……鋼線、8……
リードキヤツプ、81……リードロープ。
Fig. 1 is a front view of an embodiment of a cable-stayed bridge, Fig. 2 is an explanatory diagram of a state in which tension members are strung across the tower and deck, Fig. 3 is a longitudinal cross-sectional view of the fixing hole formed in the tower, and Fig. Figure 4 is a longitudinal cross-sectional view of the fixing hole formed in the lead cap, Figure 5 is a cross-sectional view of the tendon, Figure 6 is a plan view of the anchor head, and Figure 7 is a sheath of the steel wire fitted to the lead cap. FIG. T...Tower, D...Deck, L...Diagonal material, 1
...Erection sheath, 1'... Fixed sheath, 2... Fixing hole, 3... Anchor head, 4... Steel wire, 8...
Lead cap, 81...lead rope.

Claims (1)

【特許請求の範囲】[Claims] 1 端部にインデツクス孔を有するアンカーヘツ
ドを設置した固定シース2個を一定間隔離して対
向して設置し、該固定シース間に架設シースを架
け渡し、その後アンカーヘツドの相対応するイン
デツクス孔間に上方のアンカーヘツドから下方の
アンカーヘツドにかけて鋼線類を挿通し、該シー
ス内にて鋼線類を緊張することによつて緊張材を
架設する工法であつて、下方の固定シースと架設
シース下端間に〓間を設けておいて下方の固定シ
ース内にアンカーヘツドのインデツクス孔を挿通
せしめたリードロープ先端のリードキヤツプを位
置せしめ、上方のアンカーヘツドから挿通せしめ
てきた鋼線類を上記〓間において該リードキヤツ
プに嵌着し、該リードロープの案内によつてリー
ドキヤツプに嵌着した鋼線類をインデツクス孔に
誘導せしめることを特徴とする緊張材の架設工
法。
1. Two fixed sheaths each equipped with an anchor head having an index hole at the end are installed facing each other with a certain distance between them, a construction sheath is placed between the fixed sheaths, and then a construction sheath is placed between the corresponding index holes of the anchor head. A construction method in which steel wires are inserted from the upper anchor head to the lower anchor head, and tension members are erected by tensioning the steel wires within the sheath, and the lower fixed sheath and the lower end of the erecting sheath are Place the lead cap at the end of the lead rope, which has been inserted through the index hole of the anchor head, into the lower fixing sheath with a space in between, and then insert the steel wires that have been inserted from the upper anchor head into the above-mentioned space. 1. A method for constructing tendons, characterized in that the steel wires are fitted into the lead cap and guided by the lead rope into the index hole.
JP20704683A 1983-11-04 1983-11-04 Construction of tensile material Granted JPS59109604A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20704683A JPS59109604A (en) 1983-11-04 1983-11-04 Construction of tensile material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20704683A JPS59109604A (en) 1983-11-04 1983-11-04 Construction of tensile material

Publications (2)

Publication Number Publication Date
JPS59109604A JPS59109604A (en) 1984-06-25
JPH0411683B2 true JPH0411683B2 (en) 1992-03-02

Family

ID=16533305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20704683A Granted JPS59109604A (en) 1983-11-04 1983-11-04 Construction of tensile material

Country Status (1)

Country Link
JP (1) JPS59109604A (en)

Also Published As

Publication number Publication date
JPS59109604A (en) 1984-06-25

Similar Documents

Publication Publication Date Title
CN111794522A (en) Construction method of large-span high-altitude steel structure
US20180291642A1 (en) Method of erecting a tethered wind turbine tower
JP3501170B2 (en) Method and apparatus for erection of multi-strand cable stayed cable
CN117248452B (en) A construction method for epoxy steel strand stay cables of long-span cable-stayed bridges
US4203267A (en) Multiple strand tower guy assembly
CN116949934A (en) Construction method for first section of through-type lattice beam of steel tube concrete arch bridge
JPH0411683B2 (en)
CN210368667U (en) Construction formwork for bridge construction joint
KR101703110B1 (en) Structure and method of constructing pier for pedestrian bridge without welding
JPH048562B2 (en)
JPH048561B2 (en)
JPS5998910A (en) Construction of tension material
JPS5998911A (en) Construction of tension material
JPS5998912A (en) How to check entanglement of steel wire, etc. in tension material
JPH0333766Y2 (en)
CN114908675B (en) Hollow thin-wall high pier construction method
JP2004107951A (en) Diagonal cable suspending method and its device
JPH01142108A (en) Method of erecting diagonal brace cable in obliquely stretched bridge
CN110565523A (en) Suspension bridge main push-towing rope preforming strand manufacturing and saddle entering system
JP3136233B2 (en) Assembling unit for building columnar structures
JPH0434171Y2 (en)
DE10005912A1 (en) Method for mounting a protective net for installing or dismantling HV lines between pylons, requires the supporting cables being drawn and tensioned between the cantilevers of the pylons under the HV lines being installed
JPH0711123B2 (en) Construction method of diagonal cable in cable-stayed bridge
JPH045083B2 (en)
JP2764334B2 (en) Lift slab construction method