Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0415844B2 - - Google Patents
[go: Go Back, main page]

JPH0415844B2 - - Google Patents

Info

Publication number
JPH0415844B2
JPH0415844B2 JP24298084A JP24298084A JPH0415844B2 JP H0415844 B2 JPH0415844 B2 JP H0415844B2 JP 24298084 A JP24298084 A JP 24298084A JP 24298084 A JP24298084 A JP 24298084A JP H0415844 B2 JPH0415844 B2 JP H0415844B2
Authority
JP
Japan
Prior art keywords
steel bridge
horizontal beam
bridge
frame
suspended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP24298084A
Other languages
Japanese (ja)
Other versions
JPS61122313A (en
Inventor
Tetsuo Okada
Isamu Goto
Shinichiro Sano
Junji Iizaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Motors Ltd
Original Assignee
Kawasaki Jukogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Jukogyo KK filed Critical Kawasaki Jukogyo KK
Priority to JP24298084A priority Critical patent/JPS61122313A/en
Publication of JPS61122313A publication Critical patent/JPS61122313A/en
Publication of JPH0415844B2 publication Critical patent/JPH0415844B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、鋼橋のケレン、塗り替え塗装などの
保守、目視チエツクなどの点検を行う橋梁自動塗
装懸架装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to an automatic bridge painting suspension system that performs maintenance such as cleaning and repainting of steel bridges, and inspections such as visual checks.

[発明の技術的背景] 現状の鋼橋のケレンや塗り替え塗装作業におい
ては、橋梁の全スパンにわたつて吊足場を施し、
これら足場の側面、および、下面をシートなどに
より全域の養生を行つて、ケレンや塗り替え塗装
などが行われている。このため、塗り替え塗装や
ケレン施工毎に足場の架設、足場の撤去が必要と
なり、多くの労力と費用を要するとともに、長時
日を要しきわめて非能率的であり、加えて、高所
作業に伴う人的災害が完全に防ぎ得ないなどの課
題があつた。
[Technical Background of the Invention] In the current process of cleaning and repainting steel bridges, suspended scaffolding is installed over the entire span of the bridge.
The sides and bottom surfaces of these scaffolds are covered with sheets, etc., and then cleaned and repainted. For this reason, it is necessary to erect and remove scaffolding every time repainting or cleaning is carried out, which requires a lot of labor and money, takes a long time, and is extremely inefficient. There were issues such as the accompanying human disasters that could not be completely prevented.

[従来技術とその課題] このような課題を解消するために、第1図で示
すような、鋼橋路肩に設置された走行台車16上
に、伸縮、および、回動可能な支持アーム17を
装備し、該支持アーム17に、この支持アーム1
7が鋼橋外方に回動し、鋼橋外方に張り出された
先端に対し昇降可能な垂直ロツド18を設け、こ
の垂直ロツド18の下端に、少くとも、180°水平
旋回可能に軸着した関節ビーム(図示略)に、ケ
レン、塗装工具を有するロボツト装置をとりつけ
た装置が開発されている。
[Prior art and its problems] In order to solve these problems, a support arm 17 that is extendable and rotatable is installed on a traveling bogie 16 installed on the shoulder of a steel bridge, as shown in FIG. This support arm 1 is equipped with the support arm 17.
7 rotates outward of the steel bridge, and a vertical rod 18 is provided which can be raised and lowered from the tip extending outward of the steel bridge, and a shaft is attached to the lower end of this vertical rod 18 so as to be able to rotate horizontally by at least 180 degrees. A device has been developed in which a robotic device with a coating tool is attached to a jointed beam (not shown) attached to the surface.

この装置によれば、水平な関節ビームの旋回に
より定位置で広範域のケレン、塗装作業がなしう
る特長は認められるが、鋼橋床版上に大型走行台
車を長期にわたつて設置しておくことは、交通を
阻害するという不都合があるし、保守、点検の進
行に伴い、支持アームが地覆に植設せるランプポ
ストや標識ポストなどに当接して装置の進行が阻
止されうることから、その都度上記装置を走行台
車16上に回収し、ランプポストや標識ポストを
避けた位置まで走行台車16を移動させ、再び装
置を設備しなければならないという煩雑さがあ
り、このことは施工に要する時日を延ばすことに
なるなどの課題を抱えている。
This device has the advantage of being able to clean and paint over a wide area in a fixed position by rotating the horizontally articulated beam, but it also has the advantage of being able to perform cleaning and painting work over a wide area in a fixed position. This has the disadvantage of obstructing traffic, and as maintenance and inspection progress, the support arm may come into contact with lamp posts, sign posts, etc. installed in the ground, and the progress of the equipment may be blocked. Each time, the above-mentioned device must be collected onto the traveling trolley 16, the traveling trolley 16 must be moved to a position that avoids the lamp post or sign post, and the device must be installed again, which is complicated. There are issues such as having to postpone the date and time.

本発明の目的は、このような実情に鑑みなされ
たもので、簡単な而も合理的手段、詳しくは、保
守点検装置を、鋼橋の地覆部に係脱自在に吊設さ
れる垂直吊り材を備え、かつ、下部に鋼橋の長手
方向にそう水平の案内レールをもつ複数の盛替え
型枠体と、枠体の案内レール間に係脱自在に橋架
吊設され、かつ、移動可能なロボツト装置を搭載
し水平ビームによつて構成したことにより、従来
技術の課題を解消せしめ、床版上面を走行台車な
どによつて塞いで交通を阻害することなく、ラン
プポストや標識ポストなどをうまくかわして進行
しうる装置を提供し、鋼橋の保守点検効率の向上
を図らんとするものである。
The object of the present invention has been made in view of the above circumstances, and it is an object of the present invention to provide a simple yet rational means, in particular, a vertical suspension system that allows maintenance and inspection equipment to be releasably suspended from the ground covering of a steel bridge. A plurality of replacement formwork bodies each having a guide rail horizontally extending in the longitudinal direction of the steel bridge at the bottom thereof are suspended from the bridge in a detachable manner between the guide rails of the frame bodies, and are movable. Equipped with a robotic device and configured with a horizontal beam, it solves the problems of conventional technology and allows lamp posts, sign posts, etc. The aim is to improve the efficiency of maintenance and inspection of steel bridges by providing a device that can be successfully dodged and advanced.

[考案が解決しようとする課題] 従来技術の課題を解決する本発明の構成は、鋼
橋の地覆部に係脱自在に吊設される垂直吊り材を
備え、かつ、下部に鋼橋の長手方向にそう水平の
案内レールをもつ複数の盛替え型枠体と、地覆の
左右に吊設された上記盛替え型枠体の案内レール
間に着脱可能に橋架吊設され、かつ、移動可能な
ロボツト装置を搭載した水平ビーム、とからな
り、作業済み盛替え型枠体の作業下手側への盛替
えにより、連続的に鋼橋の保守、点検を行うよう
にしたものである。
[Problems to be solved by the invention] The structure of the present invention that solves the problems of the prior art includes a vertical hanging member that is releasably suspended from the ground cover of a steel bridge, and a vertical suspension member that is attached to the lower part of the steel bridge. The bridge is removably suspended between a plurality of replacement formwork bodies having horizontal guide rails in the longitudinal direction and the guide rails of the replacement formwork bodies suspended on the left and right sides of the ground cover, and is movable. It consists of a horizontal beam equipped with a robot device capable of carrying out continuous maintenance and inspection of the steel bridge by transferring the reassembled formwork to the lower side of the work.

[実施例] 次に、図面について本発明の実施例の詳細を説
明する。
[Example] Next, details of an example of the present invention will be described with reference to the drawings.

第1図は作業状態の一部切欠正面図、第2図は
同上側面図、第3図はロボツト装置の正面図であ
る。
FIG. 1 is a partially cutaway front view of the robot device in a working state, FIG. 2 is a side view of the same, and FIG. 3 is a front view of the robot device.

Aは鋼橋であつて、該鋼橋Aは、舗装された床
版1、地覆1a、高欄2、主桁3などによつて構
成されている。4は、上端に上記地覆1aに係合
される係止部4aを形成し、かつ、流体シリンダ
機構5、または、ピニオン、ラツク機構などによ
つて伸縮可能とした垂直吊り材で、該垂直吊り材
4は第2図から明らかなように、2本一組によつ
て構成され、この各垂直吊り材4の下端は、鋼橋
Aの長手方向に沿い、かつ、両垂直吊り材4間の
間隔より長尺の案内レール6の上面に結合されて
いる。そして、この案内レール6は第1図に示す
ように、I型鋼によつて形成してある。
A is a steel bridge, and the steel bridge A is composed of paved deck slabs 1, ground covering 1a, handrails 2, main girders 3, and the like. Reference numeral 4 denotes a vertical hanging member which has a locking portion 4a at its upper end that is engaged with the ground covering 1a, and is extendable and retractable by a fluid cylinder mechanism 5, a pinion, a rack mechanism, etc. As is clear from FIG. 2, the suspension members 4 are composed of a set of two, and the lower end of each vertical suspension member 4 is located along the longitudinal direction of the steel bridge A and between both vertical suspension members 4. The guide rail 6 is connected to the upper surface of the guide rail 6, which is longer than the distance between the guide rails 6 and 6. As shown in FIG. 1, the guide rail 6 is made of I-beam steel.

上記各垂直吊り材4の下部には、主桁3の下部
フランジ3aの内側縁に係合する鈎部7aを備
え、而も、流体シリンダ機構、または、ピニオ
ン、ラツク機構(図示略)などによつて水平方向
に移動する係止ロツド7が設けてあり、また、こ
の係止ロツド7の中途部上面には、上記下部フラ
ンジ3aの外側縁に係脱自在となしたストツパー
8が設けてあり、このストツパー8は、上記係止
ロツド7の長手軸線方向に対して移動調整可能に
設けられている。そして、主桁3の下部フランジ
3aに係合する上記鈎部7aとストツパー8によ
り垂直吊り材4の揺動が防止されるようにしてあ
る。以上の構造により盛替え型枠体B(以下枠対
と略称する)は構成される。尚、上記地覆1aに
対して各垂直吊り材4を揺動しないように結合す
れば、上記鈎部7aをもつ係止ロツド7、ストツ
パー8からなる揺れ防止機構は不要である。
The lower part of each vertical hanging member 4 is provided with a hook portion 7a that engages with the inner edge of the lower flange 3a of the main girder 3, and is also provided with a hook portion 7a that engages with the inner edge of the lower flange 3a of the main girder 3. Therefore, a locking rod 7 that moves in the horizontal direction is provided, and a stopper 8 that can be freely engaged and detached from the outer edge of the lower flange 3a is provided on the upper surface of the midway portion of the locking rod 7. , this stopper 8 is provided so as to be movable and adjustable in the longitudinal axis direction of the locking rod 7. The hook portion 7a and the stopper 8, which engage with the lower flange 3a of the main girder 3, prevent the vertical hanging member 4 from swinging. The refill form frame body B (hereinafter abbreviated as a frame pair) is constructed with the above structure. Incidentally, if each vertical hanging member 4 is connected to the ground cover 1a so as not to swing, the anti-sway mechanism consisting of the locking rod 7 having the hook portion 7a and the stopper 8 is unnecessary.

9は、左右の地覆1aに吊架された枠体Bの案
内レール6間に移動可能に橋架吊設された自走型
の水平ビームで、この水平ビーム9の両端部上面
には、上記I型鋼からなる案内レール6の下部フ
ランジ上に乗載され、かつ、この案内レール6の
ウエブを挟むようにした左右一対の転輪9aが設
けてある。また、上記水平ビーム9は伸縮可能、
または、折りたたみ可能に構成され、運搬時に小
型化されるようにしてある。
Reference numeral 9 denotes a self-propelled horizontal beam movably suspended between the guide rails 6 of the frame B suspended from the left and right ground coverings 1a. A pair of left and right wheels 9a are provided which ride on the lower flange of the guide rail 6 made of I-shaped steel and sandwich the web of the guide rail 6. In addition, the horizontal beam 9 is expandable and retractable,
Alternatively, it is configured to be foldable so that it can be miniaturized during transportation.

そして、この水平ビーム9の上部には、第3図
に示すようなロボツト装置Cが移動可能に搭載さ
れている。
A robot device C as shown in FIG. 3 is movably mounted on the upper part of this horizontal beam 9.

次に、上記ロボツト装置Cの構成を第3図につ
いて説明する。10は、一端を上記水平ビーム9
上を走行する台板11上に垂直に固定、もしく
は、傾倒可能にとりつけたシリンダ機構のアーム
で、該アーム10には、ロツド構造の伸縮アーム
12が回動可能に連着してある。また、この伸縮
アーム12の外側端には、多関節構造からなるリ
ンク構造のリンクアーム13,14を傾倒、およ
び、回動可能に連結する。そして、最先端のリン
クアーム14の先端には、首振り構造からなるケ
レン工具、塗装のスプレーガン、または、スプレ
ーノズルなどの工具15がとりつけられている。
ロボツト装置Cは以上のように構成されている。
Next, the configuration of the robot device C will be explained with reference to FIG. 10 connects one end to the horizontal beam 9
This is an arm of a cylinder mechanism that is vertically fixed or tiltably mounted on a base plate 11 running above, and a rod-structured telescopic arm 12 is rotatably connected to the arm 10. Furthermore, link arms 13 and 14 having a multi-jointed link structure are connected to the outer end of the telescoping arm 12 so as to be tiltable and rotatable. A tool 15 such as a swinging tool, a paint spray gun, or a spray nozzle is attached to the tip of the most advanced link arm 14.
The robot device C is constructed as described above.

また、上記ロボツト装置Cの移動位置決め制御
は、手動でも全自動でも任意であり、全自動の場
合には、鋼橋の全体線形座標データ、橋桁部材デ
ータ、あるいは、設計図などからの直接読み込み
指令データを作成するソフトウエアにより位置決
め制御を行うものである。
Furthermore, the movement and positioning control of the robot device C can be either manual or fully automatic, and in the case of fully automatic, it is possible to control the movement and positioning of the robot device C by directly reading commands from the overall linear coordinate data of the steel bridge, bridge girder member data, or design drawings. Positioning control is performed using software that creates data.

次に、上述した本発明装置、詳しくは、枠体
B、および、水平ビームを、鋼橋Aにセツトし、
盛替えする作業について説明する。
Next, the above-described device of the present invention, specifically the frame B and the horizontal beam, are set on the steel bridge A,
We will explain the work of reordering.

上記枠体Bは、垂直吊り材4と係合ロツド7が
縮小された状態でレツカー車などにより現場まで
運行される。レツカー車によつて吊り上げられた
枠体Bを鋼橋Aの外側方に誘導し降下する。そし
て、先ず垂直吊り材4の係止部4aを第1図のよ
うに地覆1aに係合固定したのち、垂直吊り材4
を所定の長さだけ伸長して上記係合ロツド7を主
桁3の下部フランジ3aに対応させる。次いで係
合ロツド7を伸長して第1図のように下部フラン
ジ3aの内側縁に係合させるとともに、ストツパ
ー8をスライド調整して下部フランジ3aの外側
縁に係合することにより枠体Bは鋼橋Aにセツト
され、枠体Bのセツト後レツカー車と枠体Bの結
合関係を解除する。このようにして複数の枠体B
を第2図のようにとりつける。
The frame B is transported to the site by a tow truck or the like with the vertical hanging members 4 and engagement rods 7 reduced. The frame body B lifted by the truck is guided to the outside of the steel bridge A and lowered. First, the locking part 4a of the vertical hanging member 4 is engaged and fixed to the ground covering 1a as shown in FIG.
is extended by a predetermined length so that the engaging rod 7 corresponds to the lower flange 3a of the main girder 3. Next, the engaging rod 7 is extended to engage the inner edge of the lower flange 3a as shown in FIG. 1, and the stopper 8 is slid and adjusted to engage the outer edge of the lower flange 3a. It is set on the steel bridge A, and after the frame B is set, the connection between the tow truck and the frame B is released. In this way, multiple frames B
Attach as shown in Figure 2.

また、水平ビーム9は、上述したように、鋼橋
Aの路肩上に走行設置される走行台車16に搭載
せる回動、伸縮可能な支持アーム17の先端に、
ピニオンラツク機構18aなどにより昇降する垂
直ロツド18をとりつけ、この垂直ロツド18の
下端に、ギア機構19などにより回動する回動部
20を設け、この回動部20を上記水平ビーム9
の一端に着脱可能にとりつけるようにしたもので
ある。また、垂直ロツド18の上部は、上記支持
アーム17の先端部に形成された回動部17aに
対して移動自在となつている。
Further, as described above, the horizontal beam 9 is attached to the tip of the rotatable and extendable support arm 17 that is mounted on the traveling trolley 16 that runs and is installed on the shoulder of the steel bridge A.
A vertical rod 18 that is raised and lowered by a pinion rack mechanism 18a or the like is attached, and a rotating part 20 that is rotated by a gear mechanism 19 or the like is provided at the lower end of this vertical rod 18. This rotating part 20 is connected to the horizontal beam 9.
It is designed to be removably attached to one end of the holder. Further, the upper part of the vertical rod 18 is movable relative to a rotating part 17a formed at the tip of the support arm 17.

本発明の水平ビーム9を、鋼橋Aにとりつけた
盛替え型の枠体Bに対して装備、回収する作用に
ついて説明する。縮小、または、下りたたまれた
水平ビーム9の一端を垂直ロツド18の回動部2
0に結着したものを走行台車16に搭載して現場
に搬送する。そして、支持アーム17を上方に延
ばすとともに、これを約90°外向きに回動してビ
ーム類を鋼橋Aの外側方に位置させ、支持アーム
17の回動部17aを回動して垂直ロツド18を
図で示すように垂直姿勢とし、この垂直ロツド1
8を下降させる。
The operation of installing and recovering the horizontal beam 9 of the present invention on a replacement frame B attached to a steel bridge A will be explained. One end of the horizontal beam 9 that has been reduced or folded down is connected to the rotating part 2 of the vertical rod 18.
The material bound to zero is loaded onto a traveling trolley 16 and transported to the site. Then, extend the support arm 17 upward and rotate it outward by about 90 degrees to position the beams on the outside of the steel bridge A, and rotate the rotating part 17a of the support arm 17 to vertically The rod 18 is placed in a vertical position as shown in the figure, and this vertical rod 1
Lower 8.

次に、垂直ロツド18の他端に設けたギア機構
19によつて回動部20を約90°回動して水平ビ
ーム9を鋼橋Aの下側に介入させるとともに、こ
の水平ビーム9を伸長させ、この水平ビーム9の
両端に設けた転輪9aを、既に設置されている枠
体Bの案内レール6端に位置合わせする。
Next, the gear mechanism 19 provided at the other end of the vertical rod 18 rotates the rotating part 20 by about 90 degrees to insert the horizontal beam 9 under the steel bridge A. The rollers 9a provided at both ends of the horizontal beam 9 are aligned with the ends of the guide rails 6 of the frame B which have already been installed.

位置が適合したところでこの転輪9aを案内レ
ール6に乗載し、水平ビーム9を両案内レール6
間に橋架吊設せしめ、案内レール6端に抜け止め
ストツパー(図示略)を止着したのち、水平ビー
ム9端と垂直ロツド18の回動部20との固着関
係を解き、垂直ロツド18、支持アーム17を上
記とは逆の手順で走行台車16上に戻す。架設が
済んだ走行台車16は現場から離れる。
Once the position is suitable, this roller 9a is placed on the guide rail 6, and the horizontal beam 9 is placed on both guide rails 6.
After suspending the bridge between them and fixing a stopper (not shown) to the end of the guide rail 6, the fixed relationship between the end of the horizontal beam 9 and the rotating part 20 of the vertical rod 18 is released, and the vertical rod 18 and support are removed. Return the arm 17 onto the traveling carriage 16 by reversing the procedure described above. The traveling cart 16 that has been erected leaves the site.

また、本発明の水平ビーム9を撤去する場合に
は、走行台車16を回収現場に設置し、垂直ロツ
ド18の回動部20を水平ビーム9の一端に結合
し、これを支持した状態で転輪9aを案内レール
6から抜去したのち、上記設置手順とは逆の手順
で走行台車16に回収搭載し搬出するものであ
る。
In addition, when removing the horizontal beam 9 of the present invention, the traveling trolley 16 is installed at the recovery site, the rotating part 20 of the vertical rod 18 is connected to one end of the horizontal beam 9, and the horizontal beam 9 is supported while being rolled. After the wheel 9a is removed from the guide rail 6, it is collected and mounted on the traveling trolley 16 in the reverse order of the above-mentioned installation procedure, and then carried out.

また、上記説明では、本発明の水平ビーム9が
走行台車により搬入、搬出されるようにしたが、
枠体Bと共に恒久設備として鋼橋にセツトしてお
くこともできる。この場合には、水平ビーム9
は、伸縮、または折りたたみ可能な構造とする必
要はない。
In addition, in the above explanation, the horizontal beam 9 of the present invention is carried in and out by a traveling trolley, but
It can also be set together with frame B on a steel bridge as a permanent installation. In this case, the horizontal beam 9
does not need to be a stretchable or collapsible structure.

また、本発明の装置には、特に図示してない
が、ケレンの時のサビ、塵埃、塗装時のミストの
飛散防止設備を設けることは当然であり、また水
平ビームには、自動作業の前後に行う作業者によ
る目視チエツク検査などに必要な安全で、かつ、
設備に必要な歩廊、手すり、タラツプなどを付設
するものである。
Although not particularly shown in the drawings, the apparatus of the present invention is naturally equipped with equipment to prevent scattering of rust, dust, and mist during cleaning, and the horizontal beam is equipped with equipment before and after automatic work. Safe and necessary for visual inspection by workers, etc.
This involves adding the necessary walkways, handrails, ramps, etc. to the facility.

[作用の説明] 次に、本発明の作用について説明する。第2図
に示すように、左右の地覆1aに少くとも2個以
上の枠体Bをレツカー車などでセツトし、両案内
レール6を同一軸線上に互いに突き合わせてお
く。第2図の矢印で示すように、水平ビーム9を
移動させながらケレンや塗装作業などを行わせ、
紙面右側の案内レール6から紙面左側の案内レー
ル6に水平ビームが移動すると、右側の枠体Bは
用済みとなる。この状態でレツカー車を鋼橋A上
に導入し、用済みの枠体Bをレツカー車に吊架的
に連結した状態で、係止ロツド7のストツパー8
を外側方に移動させるとともに係止ロツド7の鈎
部7aを内側方に移動させて枠体Bと主桁3のロ
ツクを解き、更に、垂直吊り材4の係止部4aを
地覆1aから外したのち、枠体Bを鋼橋Aからと
り外す。次いで、取り外した枠体Bをレツカー車
にて第2図における左側枠体Bの作業下に移動さ
せ、上述の取付け手段によつて地覆1aに架設設
置するとともに既設の枠体Bに並設する。この作
業を順次繰り返し行うものである。尚、枠体Bが
2個以上あれば、用済み枠体Bの盛替え作業には
ゆとりが生ずることは勿論である。
[Description of Effect] Next, the effect of the present invention will be explained. As shown in FIG. 2, at least two or more frames B are set on the left and right ground coverings 1a using a tow truck or the like, and both guide rails 6 are butted against each other on the same axis. As shown by the arrow in Fig. 2, the horizontal beam 9 is moved while cleaning and painting work is performed.
When the horizontal beam moves from the guide rail 6 on the right side of the page to the guide rail 6 on the left side of the page, the frame B on the right side becomes obsolete. In this state, the tow truck is introduced onto the steel bridge A, and with the used frame B connected to the tow truck in a suspended manner, the stopper 8 of the locking rod 7 is
At the same time, the hooks 7a of the locking rods 7 are moved inward to unlock the frame B and the main girder 3, and then the locking portions 4a of the vertical hanging members 4 are removed from the ground cover 1a. After removing it, remove frame B from steel bridge A. Next, the removed frame B is moved to the working area of the left frame B in Fig. 2 using a tow truck, and is installed on the ground cover 1a using the above-mentioned attachment means, and is installed in parallel to the existing frame B. do. This work is repeated in sequence. It goes without saying that if there are two or more frames B, there will be more time to replace the used frames B.

また地覆1aに、ランプポストや標識ポストが
あり、枠体B間に余分な空間が生じ、相隣れる枠
体B間に間隙が生じた場合には、レツカー車など
を用いて、この間隙に補助レール(図示略)をと
りつけ、作業が中断されないようにする。
In addition, if there is a lamp post or a sign post on the ground cover 1a, and an extra space is created between the frame bodies B, and a gap is created between adjacent frame bodies B, use a tow truck or the like to remove this gap. Attach an auxiliary rail (not shown) to ensure that work is not interrupted.

[発明の効果] 上述のように本発明の構成によれば、次のよう
な効果が得られる。
[Effects of the Invention] As described above, according to the configuration of the present invention, the following effects can be obtained.

(a) 鋼橋の地覆部を利用し、この地覆にそつて複
数の枠体を連続的に設け、該枠体の案内レール
にそつて水平ビームを移動させながら保守点検
査業が連続的になし得られ、而も、用済み枠体
を作業下手側に盛替えするので作業に切れ目が
なく、また、この盛替え作業時以外に床版をレ
ツカー車などで塞ぐことがないので、交通を阻
害することがない。
(a) Utilizing the ground cover of a steel bridge, multiple frames are successively installed along this ground cover, and maintenance point inspection work is performed continuously while moving the horizontal beam along the guide rail of the frame. In addition, since the used frame is transferred to the lower side of the work, there is no break in the work, and the floor slab is not blocked with a retoucher or the like except during this replacement work. It does not obstruct traffic.

(b) 加えて、地覆にあるランプポストや標識ポス
トなども容易にかわすことができ、保守点検作
業効率の向上が、簡単な設備と操作によつてな
しうる。
(b) In addition, lamp posts and sign posts on the ground can be easily avoided, and maintenance and inspection work efficiency can be improved with simple equipment and operation.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は一部切欠正面図、第2図は同上側面
図、第3図はロボツト装置の正面図である。 4……垂直吊り材、4a……係止部、5……流
体シリンダ機構、6……案内レール、7……係止
ロツド、7a……鈎部、8……ストツパー、9…
…水平ビーム、9a……転輪、A……鋼橋、B…
…盛替え型枠体、C……ロボツト装置。
FIG. 1 is a partially cutaway front view, FIG. 2 is a side view of the same, and FIG. 3 is a front view of the robot device. 4... Vertical hanging member, 4a... Locking portion, 5... Fluid cylinder mechanism, 6... Guide rail, 7... Locking rod, 7a... Hook portion, 8... Stopper, 9...
...Horizontal beam, 9a...Rolling wheels, A...Steel bridge, B...
... Replacement formwork body, C... Robotic device.

Claims (1)

【特許請求の範囲】 1 鋼橋の地覆部に係脱自在に吊設される垂直吊
り材を備え、かつ、下部に鋼橋の長手方向にそう
水平の案内レールをもつ複数の盛替え型枠体と、 地覆の左右に吊設された上記盛替え型枠体の案
内レール間に着脱可能に橋架吊設され、かつ、移
動可能なロボツト装置を搭載した水平ビーム、 とからなり、作業済み盛替え型枠体の作業下手側
への盛替えにより、連続的に鋼橋の保守、点検を
行うようにしたことを特徴とする橋梁自動塗装懸
架装置。
[Scope of Claims] 1. A plurality of replacement types that are equipped with vertical hanging members that are removably suspended from the ground part of a steel bridge, and that have horizontal guide rails in the longitudinal direction of the steel bridge at the bottom. It consists of a frame body and a horizontal beam that is removably suspended from the bridge between the guide rails of the replacement formwork body suspended on the left and right sides of the ground cover, and is equipped with a movable robotic device. This automatic bridge painting suspension system is characterized in that maintenance and inspection of a steel bridge can be continuously performed by repositioning the completed repositioning formwork to the lower side of the work.
JP24298084A 1984-11-16 1984-11-16 Automatic painting mount apparatus of bridge Granted JPS61122313A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24298084A JPS61122313A (en) 1984-11-16 1984-11-16 Automatic painting mount apparatus of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24298084A JPS61122313A (en) 1984-11-16 1984-11-16 Automatic painting mount apparatus of bridge

Publications (2)

Publication Number Publication Date
JPS61122313A JPS61122313A (en) 1986-06-10
JPH0415844B2 true JPH0415844B2 (en) 1992-03-19

Family

ID=17097099

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24298084A Granted JPS61122313A (en) 1984-11-16 1984-11-16 Automatic painting mount apparatus of bridge

Country Status (1)

Country Link
JP (1) JPS61122313A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0646530Y2 (en) * 1988-04-08 1994-11-30 川崎重工業株式会社 Keren coating equipment for bridge girder materials
JPH084766B2 (en) * 1991-06-11 1996-01-24 建設省九州地方建設局長 Structure painting robot
JP4516135B2 (en) 2008-03-14 2010-08-04 愛三工業株式会社 Electromagnetic PCV valve heating device

Also Published As

Publication number Publication date
JPS61122313A (en) 1986-06-10

Similar Documents

Publication Publication Date Title
US5992565A (en) Lifting scaffold assembly
JPS5929450B2 (en) Vehicle-mounted inspection and maintenance equipment
JP3765096B2 (en) Bridge construction replacement method
JPH04504289A (en) Underbridge inspection equipment
JPH0415844B2 (en)
JP2004150228A (en) Movable scaffold for maintaining bridge
CN110777681A (en) Whole hole roof beam trades a equipment
US3608670A (en) Scaffold tender
JPH03110208A (en) Mobile scaffold device for bridge and assembling method for same
CN217536662U (en) Guardrail flange plate construction moving trolley in bridge floor
JPS61122315A (en) Automatic painting mount apparatus of bridge
JPS6223468A (en) Automatic painting and maintenance apparatus for bridge
CA2133003A1 (en) Mobile work station
JPH0412323B2 (en)
JP2991713B1 (en) Method and apparatus for coating suspended monorail track girder
JPH0415843B2 (en)
JPH0437902B2 (en)
JPS61122310A (en) Automatic painting mount apparatus of bridge
JPH0545725B2 (en)
JPH0415842B2 (en)
JPH0545724B2 (en)
JPS626006A (en) Bridge repair work vehicle and its construction method
JPH0447751B2 (en)
JPS6365761B2 (en)
JPH0529099Y2 (en)