- construction
- concrete
- shaft
- boxes
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【発明の詳細な説明】
《産業上の利用分野》
この発明は、地下にコンクリート版を造成する
工法に関し、特にコンクリート版の造成工区の上
部地盤を開削することなく造成を行えるようにし
た工法に関する。[Detailed Description of the Invention] <<Industrial Application Field>> The present invention relates to a construction method for constructing a concrete slab underground, and particularly relates to a construction method that enables construction of a concrete slab without excavating the upper ground of the construction area. .
《従来の技術》
例えば、地下コンクリートの老朽化に伴ない、
このトンネルを壊さずにそのままの状態で使用
し、しかもトンネルの補強工事を行うための工法
として、最も簡単には第7図に示すように、既存
トンネル1の両側部を地下連続壁2で囲い、その
状態で既存トンネル1の上部を開削してコンクリ
ート頂版3を造成し、既存トンネル1を包囲した
後、コンクリート頂版3上に土砂を埋め戻しする
ものがある。[Conventional technology] For example, as underground concrete ages,
In order to use this tunnel as it is without destroying it, and to carry out tunnel reinforcement work, the simplest method is to surround both sides of the existing tunnel 1 with underground continuous walls 2, as shown in Figure 7. In this state, the upper part of the existing tunnel 1 is excavated to create a concrete top slab 3, and after surrounding the existing tunnel 1, the concrete top slab 3 is backfilled with earth and sand.
《発明が解決しようとする問題点》
しかし、この工法では工事期間中はその上部地
盤を工事用に占有しなければならないし、市街地
などでこの工事を行うためには、地上部における
既存建物との関係や、既存トンネル1の上部の地
中内に配置されているガス管や上下水道管、電話
ケーブルの埋設管など種々の地下埋設物を考慮し
なければならない。特に繁華街において老朽化が
進んでいる地下鉄のトンネルなどではその上部の
埋設物が錯雑に配置され、どの位置にあるかも解
らないし、既存建物がトンネル上部の地表面に位
置している場合もありうる。したがつて、実質的
にはこの種の工法は、上部地盤を工事用に一定期
間占有できる土地以外は採用できなかつた。[Problems to be solved by the invention] However, with this construction method, the upper ground must be occupied for construction purposes during the construction period, and in order to carry out this construction in urban areas, it is necessary to It is necessary to take into account various underground objects such as gas pipes, water and sewage pipes, and telephone cable pipes that are placed underground above the existing tunnel 1. Particularly in subway tunnels, which are aging rapidly in downtown areas, the buried objects above them are arranged in a complicated manner, making it difficult to know where they are located, and in some cases, existing buildings are located on the ground surface above the tunnel. sell. Therefore, in practice, this type of construction method could only be used on land where the upper ground could be occupied for a certain period of time for construction purposes.
この発明は以上の背景に基づきなされたもので
あり、コンクリート版の造成工区の上部地盤を開
削することなく地下作業のみによつてコンクリー
ト版を造成できるようにすることを目的とする。 This invention has been made based on the above background, and it is an object of the present invention to enable the construction of concrete slabs only by underground work without excavating the upper ground of the construction area for concrete slabs.
《問題点を解決するための手段》
前記目的を達成するため、この発明は、地下コ
ンクリート版の造成工区の少なくとも一側部に沿
つて導坑を掘削し、次いで前記導坑を発進側とし
たその長さ方向に直交する一つの工区に複数の中
空函体を順次圧入して密接状に並列配置した後、
先行工区と隣接する後行工区に函体を順次圧入し
て密接状に並列配置することにより前記造成工区
内をマトリツクス状の函体部によつて形成し、こ
の函体部の内部に鉄筋を配筋した後コンクリート
を打設する地下コンクリート版の造成工法であつ
て、前記函体は、圧入方向の前後側壁に開口を有
すると共に、左右側壁のうち一方の側壁に開口を
有し、かつ、他方の側壁に網状板を設けてなるこ
とにより、同一工区内および隣接する工区内の函
体同士を相互に連通し、前記コンクリート版を一
体化することを特徴とする。<Means for Solving the Problems> In order to achieve the above-mentioned object, the present invention involves excavating a guide shaft along at least one side of an underground concrete slab construction area, and then using the guide shaft as a starting side. After sequentially press-fitting multiple hollow boxes into one section perpendicular to the length direction and arranging them closely in parallel,
By sequentially press-fitting the boxes into the preceding work area and the subsequent work area and arranging them closely in parallel, the inside of the construction work area is formed by a matrix-shaped box part, and reinforcing bars are installed inside this box part. A construction method for an underground concrete slab in which concrete is poured after reinforcing, wherein the box has an opening in the front and rear side walls in the press-fitting direction, and has an opening in one of the left and right side walls, and By providing a net-like plate on the other side wall, boxes in the same construction section and adjacent construction sections are communicated with each other, and the concrete slabs are integrated.
《作用》
以上の工法では、導坑を掘削するのに必要な地
表面の作業面積を確保できれば、その後はすべて
地中内での作業によつて地下コンクリート板を造
成できる。《Operation》 With the above construction method, if the necessary work area on the ground surface to excavate the shaft can be secured, then the underground concrete plate can be created by doing all the work underground.
しかも、複数の函体を圧入することによりなる
マトリツクス状の函体部内に鉄筋を配筋した後コ
ンクリートを打設すれば、一体化したコンクリー
ト版を得ることができる。 In addition, by arranging reinforcing bars in a matrix-shaped box part formed by press-fitting a plurality of boxes and then pouring concrete, an integrated concrete slab can be obtained.
《実施例》
以下、この発明を既存トンネルの防護工法に適
用した場合の一実施例を第1図〜第6図を用いて
詳細に説明する。<<Example>> Hereinafter, an example in which the present invention is applied to a protection construction method for an existing tunnel will be described in detail with reference to FIGS. 1 to 6.
図において、10は市街地における老朽化した
既存トンネルを示し、実施例ではこの既存トンネ
ル10の外周の所定区間を防護工事する場合を例
示している。 In the figure, reference numeral 10 indicates a dilapidated existing tunnel in an urban area, and in the embodiment, a case where a predetermined section on the outer periphery of this existing tunnel 10 is to be protected is illustrated.
同図に示す工法は、コンクリート版の構築前
に、既存トンネル10の両側に一対の発進竪坑1
2を掘削する。 The construction method shown in the figure is to install a pair of starting shafts 1 on both sides of the existing tunnel 10 before constructing the concrete slab.
Drill 2.
発進竪坑12は、既存トンネル10内の地下鉄
軌道の側方に発進竪坑12を掘削する余地があれ
ばその部分に発進竪坑12を設ければよいが、発
進竪坑12は必ずしも既存トンネル10内に設け
る必要はなく、地上に掘削可能な場所があれば、
そこを選択することもできる。 If there is room to excavate the starting shaft 12 on the side of the subway track within the existing tunnel 10, the starting shaft 12 may be provided in that part, but the starting shaft 12 is not necessarily provided within the existing tunnel 10. It is not necessary, if there is a place above ground where it is possible to excavate,
You can also choose there.
各発進竪坑12が所定深度まで構築されると、
竪坑12からはそれぞれトンネル工法によつて導
坑14a,14b,14cが三段積み重ねた状態
で既存トンネル10の両側部に沿つて掘削され
る。 When each starting shaft 12 is constructed to a predetermined depth,
From the shaft 12, guide shafts 14a, 14b, and 14c are excavated along both sides of the existing tunnel 10 in a three-tier stacked state using the tunnel construction method.
導坑14a〜14cは既存トンネル10の高さ
に応じて掘削作業が可能な幅および高さに設定さ
れ、またその掘削方法としては手堀り方式やロツ
クボルト工法を併用する機械方式などが採用され
る。 The guide shafts 14a to 14c are set to a width and height that allows excavation work according to the height of the existing tunnel 10, and the excavation method is a hand digging method or a mechanical method using a lock bolt method. Ru.
本実施例では、導坑14a〜14cの断面形状
が矩形状であつて、H形鋼を矩形状に組み合わせ
た支保工16を掘削方向に沿つて適宜間隔に配列
してある。 In this embodiment, the cross-sectional shape of the shafts 14a to 14c is rectangular, and shoring structures 16 made of rectangular combinations of H-beams are arranged at appropriate intervals along the excavation direction.
各導坑14a〜14cの一側部は既存トンネル
10の側壁に面しているので、少くとも上部およ
び他側部は吹き付けコンクリートによつて掘削壁
面を補強する。 Since one side of each shaft 14a to 14c faces the side wall of the existing tunnel 10, the excavated wall surface is reinforced with shotcrete at least on the upper part and the other side.
最下段の導坑14aの掘削後、導坑14aの下
方には場所打ち杭工法によつて補強杭18が掘削
方向に沿つて適宜間隔に構築され、防護壁の鉛直
支持力および側部土圧に対する水平支持力を補強
する。 After excavating the lowermost guide shaft 14a, reinforcing piles 18 are constructed below the guide shaft 14a at appropriate intervals along the excavation direction using the cast-in-place pile construction method, thereby increasing the vertical bearing capacity of the protective wall and the lateral earth pressure. Reinforce the horizontal support capacity against.
次いで、この導坑14aの内部には既存トンネ
ル10の側面から若干間隔をあけて、後述する推
進工法で構築される頂版の厚みにほぼ相当する壁
厚を備えた下段防護壁19aが、型枠を導坑14
aに沿つて設置して、鉄筋を組み立てた後、コン
クリートを打設して形成される。 Next, inside this shaft 14a, a lower protective wall 19a is installed at a slight distance from the side of the existing tunnel 10, and has a wall thickness that is approximately equivalent to the thickness of the top slab constructed by the propulsion method described later. Draw frame 14
It is formed by installing concrete along line a, assembling reinforcing bars, and then pouring concrete.
そして、下段防護壁19aが構築されると、型
枠を撤去して防護壁19aと導坑14aとの間に
気泡コンクリート等が充填される。 After the lower protective wall 19a is constructed, the formwork is removed and aerated concrete or the like is filled between the protective wall 19a and the guide shaft 14a.
充填が終了すると、第2段目の導坑14bが掘
削され、掘削後に下段防護壁19aの上部に中段
防護壁19bを構築して、前記と同様に気泡コン
クリート等が充填される。 When the filling is completed, the second-stage guide shaft 14b is excavated, and after the excavation, a middle-stage protection wall 19b is constructed on top of the lower-stage protection wall 19a, and filled with aerated concrete or the like in the same manner as described above.
次いで最上段の導坑14cが掘削される。この
導坑14cの高さは既存トンネル10の上部より
突出しており、導坑14cの完成後は上部突出部
分の側面に既存トンネル10の上部長手方向に直
交して既存トンネル10を挟む一方の導坑14c
から他方の導坑14cに向けて推進工法によつて
中空函体30の圧入作業が行なわれる。 Next, the uppermost shaft 14c is excavated. The height of this guide shaft 14c protrudes from the upper part of the existing tunnel 10, and after completion of the guide shaft 14c, the side surface of the upper protruding part is perpendicular to the upper longitudinal direction of the existing tunnel 10, and one side of the existing tunnel 10 is sandwiched between the two sides. Shaft 14c
From there, the hollow box 30 is press-fitted into the other guide shaft 14c by a thrusting method.
中空函体30の推進に先立つて、発進側の一方
の導坑14c内には、掘削土砂の運搬軌条20、
中空函体30の運搬軌条24が敷設される。上記
運搬軌条24上には中空函体30を運搬する台車
26と、この台車26から受承した中空函体30
を推進位置にセツトする発進台車27が配置され
る。 Prior to the propulsion of the hollow box 30, in one of the guide shafts 14c on the starting side, a transport rail 20 for excavated earth and sand,
A transport rail 24 for the hollow box 30 is laid. On the transport rail 24 is a cart 26 for transporting the hollow box 30, and a hollow box 30 received from the cart 26.
A starting trolley 27 is arranged to set the vehicle in the propulsion position.
そして、掘削土砂の運搬軌条20上には推進ジ
ヤツキ22の設置用台車32を配置し、これを土
砂の搬送台車34の最前部に接続し、バツテリ機
関車36で牽引するようにする。また、導坑14
cの天井面にはホイストクレーン38の案内軌条
40を固定し、前記台車32に一端を接続し、他
端を搬送台車34上に位置するベルトコンベア4
2を吊り下げるホイストクレーン38を設けてお
く。さらに、前記中空函体30の運搬用台車26
もバツテリ台車36に接続し、これに牽引されて
移動できるようにしておく。 A cart 32 for installing the propulsion jack 22 is arranged on the excavated earth and sand transport rail 20, connected to the front end of the earth and sand transport cart 34, and pulled by a battery locomotive 36. In addition, the guide shaft 14
A guide rail 40 of a hoist crane 38 is fixed to the ceiling surface of c, and a belt conveyor 4 is connected at one end to the trolley 32 and the other end is located on the transport trolley 34.
A hoist crane 38 for hoisting 2 is provided. Furthermore, a carriage 26 for transporting the hollow box 30
is also connected to the battery trolley 36 so that it can be moved by being towed by this.
以上の準備作業後、発進側の導坑14cにおけ
る防護工区の最先端位置に推進ジヤツキ22を固
定し、この推進ジヤツキ22の加圧力によつて、
運搬台車26を経て発進台車27に移しかえた先
端に刃口30aを設けた矩形状の中空函体30を
既存トンネル10の天板上に直交して圧入しつつ
その内部の土砂を掘削し、掘削された土砂をベル
トコンベア42を介して搬送台車34側に排出す
る。 After the above preparation work, the propulsion jack 22 is fixed at the most extreme position of the protected area in the starting side shaft 14c, and by the pressing force of this propulsion jack 22,
A rectangular hollow box 30 with a cutting edge 30a provided at the tip, which was transferred via the transport cart 26 to the starting cart 27, is press-fitted orthogonally onto the top plate of the existing tunnel 10 while excavating the earth and sand inside it. The excavated earth and sand is discharged to the transport vehicle 34 side via the belt conveyor 42.
最初の中空函体30の圧入完了後は、これの後
端部を鋼製のカラーで接合した状態で、次の中空
函体30を継ぎ足しつつ推進ジヤツキ22で圧入
および入力による土砂の掘削作業を繰り返す。 After the press-fitting of the first hollow box 30 is completed, the rear end of this hollow box 30 is joined with a steel collar, and while the next hollow box 30 is added, the pushing jack 22 is used to press-fit and excavate earth and sand by inputting. repeat.
以上の作業により、最先端部の中空函体30は
他方の導坑14cに到着する。その後はこの中空
函体30の刃口30aを取り外し、これを一方の
導坑14c側に搬送し、次の推進作業用に繰り返
し使用する。 Through the above operations, the hollow box 30 at the leading end reaches the other guide shaft 14c. Thereafter, the cutting edge 30a of this hollow box 30 is removed, and it is transported to one of the guide shafts 14c and used repeatedly for the next propulsion operation.
最初の工区に使われる中空函体30は、いずれ
も前後が開口し、四方を側板で囲んだ矩形状をな
す鋼管であつて、従来の推進工法と変わりがない
構造のものが用いられる。 The hollow boxes 30 used in the first construction section are rectangular steel pipes that are open at the front and back and surrounded by side plates on all sides, and have a structure similar to that of conventional propulsion construction methods.
次にこの工区に隣接する工区を推進するための
中空函体は先のものに刃口30aを装着すること
は同じであるが、中空函体自体は特殊形状となつ
ている。 Next, the hollow box for promoting the work section adjacent to this work section is the same as the previous one except that it has a cutting edge 30a, but the hollow box itself has a special shape.
すなわち、第5図a〜dに示すように、中空函
体50は天板50a、及び底板50bは前記と同
様の鋼板製であるが、圧入方向の前後側壁と、左
右側壁のうち一方の側壁とが開口したコ字形断面
をなし、左右側壁のうち他方の側壁はラスなどの
金網板(網状板)50cにより構成されている。
また、両側部の上下はアングル板52で補強され
ているとともに、各アングル板52の側面には互
いに逆向の鉤形フツク部54が側面に突出状態で
一体化され、隣接する工区の各中空函体50同士
が鉤形に係合しあつた状態で接合されるようにな
つており、隣接工区の中空函体50同士が繋がれ
た状態で密接配置できる。 That is, as shown in FIGS. 5a to 5d, the hollow box 50 has a top plate 50a and a bottom plate 50b made of steel plates similar to those described above, but the front and rear side walls in the press-fitting direction and one of the left and right side walls. It has a U-shaped cross section with openings, and the other of the left and right side walls is constituted by a wire mesh plate (mesh plate) 50c such as lath.
In addition, the upper and lower sides of both sides are reinforced with angle plates 52, and hook-shaped hooks 54 in opposite directions are integrated into the sides of each angle plate 52 and protrude from the sides, so that each hollow box in the adjacent work area can be The bodies 50 are joined together in a hook-shaped engagement, and the hollow boxes 50 in adjacent construction sections can be closely arranged in a connected state.
なお、推進作業完了後フツク部54の係合面内
部にコーキング材56を充填することによつて、
各中空函体50同士の接合面は完全にシールさ
れ、水密状態を保つことができる。またフツク部
54の係合だけでは係合が弱いので、前記と同様
に一推進作業完了ごとに先後行の中空函体50の
アングル板52同士をボルトBによつて結合すれ
ば各中空函体50同士は縦横に結合し、強固な結
合となる。 Note that by filling the inside of the engagement surface of the hook portion 54 with caulking material 56 after the propulsion work is completed,
The joint surfaces of each hollow box 50 are completely sealed, and a watertight state can be maintained. In addition, since the engagement is weak if only the hook portion 54 is engaged, if the angle plates 52 of the preceding and following hollow boxes 50 are connected with each other with bolts B each time one propulsion operation is completed, each hollow box 50 are connected vertically and horizontally, forming a strong connection.
以上の中空函体50を用いた推進作業は最初の
工区と全く同様の作業が行われ、以下同様の手順
を各導坑14cの長さ方向に沿つて順次繰り返
し、防護工区全体に中空函体50を配置すれば、
同一工区における函体50,50間が前後方向の
開口によつて連通すると共に、各先行工区に隣接
する後行工区は互いに金網板50cと開口とを通
じて横方向に連通することにより、縦横マトリツ
クス状に密接配置した函体50,50,…(函体
部)内を前後左右に一体的に連通することがで
き、後述するように函体50,50,…内にコン
クリートを打設してなる頂版62を平板状に一体
化することができ、強度の高い頂版62を得るこ
とができる。 The above-mentioned propulsion work using the hollow boxes 50 is performed in exactly the same way as in the first section, and the same procedure is repeated sequentially along the length direction of each shaft 14c, and the hollow boxes are installed in the entire protection section. If you place 50,
The boxes 50, 50 in the same construction section communicate with each other through the openings in the front and rear directions, and the subsequent construction sections adjacent to each preceding construction section communicate with each other in the horizontal direction through the wire mesh plate 50c and the openings, thereby forming a vertical and horizontal matrix. The insides of the boxes 50, 50, ... (box parts) that are closely arranged can be integrally communicated in the front, back, left, and right directions, and as will be described later, concrete is poured inside the boxes 50, 50, .... The top plate 62 can be integrated into a flat plate shape, and the top plate 62 with high strength can be obtained.
なお、最終工区では一番最初の工区と同様の中
空函体30の群を用いて、推進作業を行い、防護
工区と非防護区域とを完全に隔離する。 In the final construction section, the same group of hollow boxes 30 as in the first construction section are used for propulsion work to completely isolate the protected construction section from the non-protected area.
したがつて、推進作業が終了した状態では、天
板50aを頂面とし、底板50bを底面とし、工
区の最先端と後端の中空函体30の外側部を両内
側壁とする平板状の一つの空間を各中空函体50
で囲われた内部に形成する。 Therefore, in the state where the propulsion work is completed, a flat plate is formed with the top plate 50a as the top surface, the bottom plate 50b as the bottom surface, and the outer parts of the hollow box 30 at the leading edge and the rear end of the construction area as both inner walls. Each hollow box 50 fills one space.
Formed inside surrounded by.
以上のように推進作業が終了した後、中空函体
30,50の部分と導坑14c,14cとが連通
した後は、各機材を撤去し、既存トンネル10の
天井面上部に形成された函体部内部に縦横に鉄筋
を配筋し、コンクリートを打設すれば鉄筋コンク
リート製の頂版62の造成が完了する。その後、
導坑14c内に、第2段目の導坑14b内に形成
された中段防護壁19bと、頂版62の両端とを
連結するL字形の上段防護壁19cを鉄筋コンク
リートで構築した後、導坑14c内の空隙に気泡
コンクリートを充填すれば、既存トンネル10の
両側面および頂部を鉄筋コンクリート製の防護壁
60と頂版62とで囲んで工事を終了する。 After the propulsion work is completed as described above and the hollow boxes 30 and 50 are communicated with the guide shafts 14c and 14c, each piece of equipment is removed and the box formed on the upper part of the ceiling of the existing tunnel 10 is removed. By arranging reinforcing bars vertically and horizontally inside the body and pouring concrete, construction of the reinforced concrete top slab 62 is completed. after that,
After constructing an L-shaped upper protection wall 19c in the shaft 14c with reinforced concrete, which connects the middle protection wall 19b formed in the second stage shaft 14b and both ends of the top plate 62, the shaft is opened. Once the void in the tunnel 14c is filled with aerated concrete, both sides and the top of the existing tunnel 10 are surrounded by a protective wall 60 and a top slab 62 made of reinforced concrete, and the construction is completed.
なお、この実施例では既存トンネル10の両側
部に防護壁を構築するため、導坑12a〜12c
を三段重ね状態に形成したが、既存地下構造物の
高さや、作業性を考慮して一段であつてもいい
し、それ以上であつてもよい。 In addition, in this embodiment, in order to construct protective walls on both sides of the existing tunnel 10, the guide shafts 12a to 12c are
Although they are formed in three stacked layers, they may be one layer or more depending on the height of the existing underground structure and workability.
また、この実施例では既存トンネル10の上部
にのみ防護用のコンクリート製頂版62を設けた
が、既存トンネル10の底面側にも防護版を設け
るようにしても良い。この場合には、最下段の導
坑14aの側面を推進工法によつて開削し、他端
側に貫通させる。 Further, in this embodiment, the protective concrete top plate 62 is provided only on the top of the existing tunnel 10, but a protective plate may also be provided on the bottom side of the existing tunnel 10. In this case, the side surface of the lowermost guide shaft 14a is excavated by the propulsion method, and the other end is penetrated.
しかし、この場合には既存トンネル10の重量
を支える必要があり、前記実施例のように広範囲
を一つの空間とすることは出来ない場合もあるの
で、その場合には何か所かに分断した状態で推進
作業を行い、コンクリートを打設した後次の工区
の推進作業を繰り返すことが必要である。 However, in this case, it is necessary to support the weight of the existing tunnel 10, and it may not be possible to make a wide area into one space as in the above embodiment, so in that case, it is necessary to support the weight of the existing tunnel 10. It is necessary to carry out the propulsion work in this state, and repeat the propulsion work for the next section after concrete is poured.
さらに、上記実施例で示した断面コ字形の中空
函体50の一側部開口は、着脱可能な鋼板で構成
しておき、中空函体50の圧入後にこれを除去す
るようにしてもよい。 Further, one side opening of the hollow box 50 having a U-shaped cross section shown in the above embodiment may be made of a removable steel plate, and may be removed after the hollow box 50 is press-fitted.
さらにまた、他方の金網板50cに替えて、適
宜個所に孔部を穿設した孔あき板で構成してもよ
く、鉄筋が空間部内で縦横に配筋でき、打設コン
クリートによつて、一体のコンクリート防護版が
出来るだけの開口部が開いていればよい。 Furthermore, instead of the other wire mesh plate 50c, it may be constructed with a perforated plate with holes drilled at appropriate locations, so that reinforcing bars can be arranged vertically and horizontally within the space, and can be integrated into one piece by pouring concrete. The opening should be wide enough to accommodate the concrete protective plate.
さらにこの発明は、前記既存トンネルの防護工
法の如き老朽化した地下構造物を構築するのに際
して、上部地盤を地下コンクリート版の造成工事
のために占有できない場合一般に適合できる。ま
た、導坑は必ずしも造成工区の両側部に形成する
必要はなく、少なくとも造成工区の一側部に沿つ
て形成すれば、この導坑を発進側として多数の中
空函体をその工区に向けて横に密接した状態で圧
入できる。 Furthermore, the present invention is generally applicable to cases where the upper ground cannot be occupied for construction of an underground concrete slab when constructing an aging underground structure such as the above-mentioned existing tunnel protection method. In addition, the guide shaft does not necessarily need to be formed on both sides of the construction section, but if it is formed along at least one side of the construction section, the guide shaft can be used as the starting side and a large number of hollow boxes can be directed toward that section. Can be press-fitted sideways.
《効果》
以上実施例によつて詳細に説明したように、こ
の発明の地下コンクリート版の造成工法にあつて
は、地表面を開削することなく造成を行うことが
でき、大多数の作業部分は地中であるため、工事
に必要な地表側の作業面積を最小限に止どめるこ
とができ、地表面近くの地下埋設物や、既存建物
の基礎に干渉されることなく作業を進捗できる。<<Effects>> As explained in detail using the examples above, in the method of constructing an underground concrete slab of the present invention, construction can be carried out without excavating the ground surface, and most of the working parts are Because it is underground, the surface area required for construction can be kept to a minimum, allowing work to proceed without interference from underground objects near the ground surface or the foundations of existing buildings. .
したがつて、この発明工法では、市街地などの
ように地表面を造成のために占有できず、しか
も、地表近くに既存埋設物がある場所などでも無
関係に地下コンクリート版を造成でき、特に市街
地における地下の再開発工事、あるいは老朽化し
た構造物の補強や防護工事に有用な工法を提供で
きる。 Therefore, with this invented method, it is not possible to occupy the ground surface for construction as in urban areas, and moreover, underground concrete slabs can be created independently even in places where there are existing buried structures near the ground surface, and it is especially useful in urban areas. It can provide a useful construction method for underground redevelopment work or reinforcement and protection work for aging structures.
しかも、複数の函体を圧入することによりなる
マトリツクス状の函体部内に鉄筋を配筋した後コ
ンクリートを打設することにより、一体化した強
度の高いコンクリート版を得ることができる。 Moreover, by arranging reinforcing bars in a matrix-shaped box part formed by press-fitting a plurality of boxes and then pouring concrete, an integrated concrete slab with high strength can be obtained.
第1図はこの発明工法を示す平断面図、第2図
は同側断面図、第3図は同正断面図、第4図は推
進工程を示す正断面図、第5図aは推進工法に用
いる中空函体を示す斜視図、同bは断面図、同c
は隣接工区同士の中空函体の結合状態を示す部分
断面図、同dは同結合状態の部分平面図、第6図
は防護構造の完成状態を示す正断面図、第7図は
一般の地下連続壁工法によつて既存トンネルの防
護を行う場合を示す正断面図である。
14c…導坑、28…推進ジヤツキ、30…中
空函体、50…中空函体、50c…金網板(網状
板)、60…防護壁、62…頂版(コンクリート
版)。
Figure 1 is a plan sectional view showing this invention method, Figure 2 is a side sectional view, Figure 3 is a front sectional view, Figure 4 is a front sectional view showing the propulsion process, and Figure 5a is the propulsion method. A perspective view showing a hollow box used for
is a partial cross-sectional view showing the state in which the hollow boxes are connected between adjacent construction sections, d is a partial plan view of the same combined state, Figure 6 is a front cross-sectional view showing the completed state of the protective structure, and Figure 7 is a general underground view. FIG. 2 is a front cross-sectional view showing a case where an existing tunnel is protected by the continuous wall construction method. 14c... Guide shaft, 28... Propulsion jack, 30... Hollow box, 50... Hollow box, 50c... Wire mesh plate (mesh plate), 60... Protective wall, 62... Top plate (concrete plate).
Claims (1)
一側部に沿つて導坑を掘削し、次いで前記導坑を
発進側としてその長さ方向に直交する一つの工区
に複数の中空函体を順次圧入して密接状に並列配
置した後、先行工区と隣接する後行工区に函体を
順次圧入して密接状に並列配置することにより前
記造成工区をマトリツクス状の函体部によつて形
成し、この函体部の内部に鉄筋を配筋した後コン
クリートを打設する地下コンクリート版の造成工
法であつて、 前記函体は、圧入方向の前後側壁に開口を有す
ると共に、左右側壁のうち一方の側壁に開口を有
し、かつ、他方の側壁に網状板を設けてなること
により、同一工区内および隣接する工区内の函体
同士を相互に連通し、前記コンクリート版を一体
化することを特徴とする地下コンクリート版の造
成工法。[Scope of Claims] 1. A shaft is excavated along at least one side of a construction section for an underground concrete slab, and then a plurality of hollow boxes are excavated in one section perpendicular to the length direction of the shaft, with the shaft as the starting side. After the bodies are successively press-fitted and arranged closely in parallel, the boxes are successively press-fitted into the preceding work area and the subsequent work area and arranged closely in parallel, thereby forming the construction area into a matrix-like box part. This is a method of constructing an underground concrete slab in which concrete is poured after arranging reinforcing bars inside the box, and the box has openings on the front and rear walls in the press-fitting direction, and has openings on the left and right side walls. By having an opening in one side wall and providing a mesh plate in the other side wall, the boxes in the same work area and in adjacent work areas are interconnected and the concrete slabs are integrated. A construction method for underground concrete slabs that is characterized by:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1392487A JPS63184695A (en) | 1987-01-26 | 1987-01-26 | Method of creation construction of underground concrete block |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1392487A JPS63184695A (en) | 1987-01-26 | 1987-01-26 | Method of creation construction of underground concrete block |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63184695A JPS63184695A (en) | 1988-07-30 |
| JPH0416599B2 true JPH0416599B2 (en) | 1992-03-24 |
Family
ID=11846730
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1392487A Granted JPS63184695A (en) | 1987-01-26 | 1987-01-26 | Method of creation construction of underground concrete block |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63184695A (en) |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS536777B2 (en) * | 1972-06-14 | 1978-03-11 | ||
| JPS59195996A (en) * | 1983-04-20 | 1984-11-07 | 日本国有鉄道 | Tunnel construction method |
| JPS6195199A (en) * | 1984-10-16 | 1986-05-13 | 財団法人鉄道総合技術研究所 | Traverse structure under road foundation |
-
1987
- 1987-01-26 JP JP1392487A patent/JPS63184695A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63184695A (en) | 1988-07-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2000352296A (en) | Method o constructing passage just under underground structure | |
| JP2979044B2 (en) | Large-scale underground structures and their construction methods | |
| JP4153456B2 (en) | Construction method of steel element / concrete type underground structure | |
| JPH07331997A (en) | Constructing method of rock cavern | |
| JPH0416599B2 (en) | ||
| US4880334A (en) | Tunnel construction apparatus and method | |
| JP2656892B2 (en) | Underground structure construction method and continuous underground wall construction method | |
| JPH06306853A (en) | Construction of underground structure | |
| JPS584094A (en) | Method of constructing low road cross | |
| JPH0721196B2 (en) | Reverse construction method of underground structure | |
| JP4096106B2 (en) | Underpass structure and construction method | |
| JPH0355640B2 (en) | ||
| JPS6117696A (en) | Construction of underground head | |
| JPH0416598B2 (en) | ||
| JP3511145B2 (en) | How to build underground structures | |
| JP2004316125A (en) | Construction method of large section tunnel and shield section excavator with irregular section | |
| JP2004132124A (en) | Pneumatic caisson and pneumatic caisson method | |
| JP7204228B2 (en) | Underground beam construction method | |
| JP2004225399A (en) | Tunnel construction method | |
| JPS6024249B2 (en) | How to build a basement | |
| JPS63201295A (en) | Method of protective construction of existing tunnel | |
| JP2026035935A (en) | Open shield construction method and U-shaped concrete open channel for the open shield construction method | |
| JPH0723084U (en) | Concrete box for underground structure | |
| JPH05140940A (en) | Soil retaining method for deep drilling | |
| JP2024029411A (en) | Construction method of underground structures using open shield machine |