JPH04249795A - Handling procedure preparing - Google Patents
Handling procedure preparingInfo
- Publication number
- JPH04249795A JPH04249795A JP3000546A JP54691A JPH04249795A JP H04249795 A JPH04249795 A JP H04249795A JP 3000546 A JP3000546 A JP 3000546A JP 54691 A JP54691 A JP 54691A JP H04249795 A JPH04249795 A JP H04249795A
- Authority
- JP
- Japan
- Prior art keywords
- plant
- alarm
- abnormality
- knowledge
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
[発明の目的] [Purpose of the invention]
【0001】0001
【産業上の利用分野】本発明は、原子力プラント、火力
発電プラント、化学プラント等の大規模プラントの異常
発生時の処置作成装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for preparing measures to be taken when an abnormality occurs in large-scale plants such as nuclear power plants, thermal power plants, and chemical plants.
【0002】0002
【従来の技術】大規模プラントに異常が発生した場合、
その影響は複数の信号の過渡変化として観測されること
が多く、その変化が大きい場合には複数の警報が発生す
る。プラントの運転員は、これら複数の発生警報からプ
ラントの状態を迅速に判断し、適切な処置をとることが
要求されるが、異常の規模が大きい場合や過渡現象の伝
播が速い場合には、運転員にかかる負担は過大なものに
なり、誤判断を招く可能性がある。このため異常時にお
ける運転員の状況判断を支援することを目的とした警報
処理システムの開発が行われている。この警報処理シス
テムとしては、従来より異常の原因警報と最新発生警報
の判定、将来発生警報の予測を行うものが開発されてい
るが、これらには重要警報に対する処置マニュアルの表
示機能がなかった。[Prior art] When an abnormality occurs in a large-scale plant,
Its effects are often observed as transient changes in multiple signals, and if the changes are large, multiple alarms are generated. Plant operators are required to quickly judge the status of the plant from these multiple alarms and take appropriate measures, but when the scale of the abnormality is large or the propagation of transient phenomena is rapid, The burden placed on the operator becomes excessive and may lead to erroneous judgments. For this reason, an alarm processing system is being developed with the aim of assisting operators in determining the situation in the event of an abnormality. As such alarm processing systems, systems have been developed that determine the cause of an abnormality and the latest alarm, and predict future alarms, but these systems do not have a function to display a manual for handling important alarms.
【0003】0003
【発明が解決しようとする課題】このように従来では、
警報処理システムにより原因警報が判定されていても、
起因事象により後の対応操作が異なる場合があり、した
がって運転員はプラントの構造や設計に関する知識と自
己の経験的知識を基に、その後の事象経過から警報処理
システムより得られた結果が正しいか否かを確認した上
で異常原因を判定し、適切な処置を選択しなければなら
ず、誤判断の可能性を残していた。また、従来の警報処
理システムには予め想定した警報発生の順序を異常事象
毎にデータベースとして保存しておき、発生した警報の
シーケンスと前記データベースとを比較することにより
異常原因を判定するものも開発されているが、全事象を
想定することは困難であり予想外の事象が発生した場合
に対応できないこと、更にデータベースの作成、管理面
のコストが大きいという問題があった。[Problem to be solved by the invention] In this way, conventionally,
Even if the cause alarm is determined by the alarm processing system,
Subsequent response operations may differ depending on the initiating event, so operators must use their knowledge of the structure and design of the plant and their own experiential knowledge to determine whether the results obtained from the alarm processing system are correct based on the course of the subsequent event. After confirming whether or not the error occurred, the cause of the abnormality had to be determined and an appropriate treatment had to be selected, leaving the possibility of misjudgment. In addition, we have also developed a conventional alarm processing system that stores the pre-assumed order of alarm occurrences as a database for each abnormal event, and determines the cause of the abnormality by comparing the sequence of alarms that occur with the database. However, there are problems in that it is difficult to anticipate all possible events and cannot respond when unexpected events occur, and the cost of creating and managing the database is high.
【0004】本発明は、上記課題を鑑みてなされたもの
であり、警報が多発するような大規模プラントの異常発
生時に、運転員の状況判断を適切に支援する異常時処置
作成装置を提供することを目的とする。[発明の構成]
The present invention has been made in view of the above-mentioned problems, and it is an object of the present invention to provide an abnormality treatment creation device that appropriately supports operators in determining the situation when an abnormality occurs in a large-scale plant where alarms occur frequently. The purpose is to [Structure of the invention]
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
に、本発明に係る異常時処置作成装置は、大規模プラン
トの異常時における処置に関する知識をプラントの安全
性を確保するための知識データおよびプラントの運用に
必要な機能を維持するための知識データに分けて警報毎
にまとめた知識データベースと、プラントから得られる
プラントデータを入力する信号入力手段と、この信号入
力手段から入力されたプラントデータを前記知識データ
ベースの異常発生の有無を判定する条件および予測警報
を基にプラントの異常を検知しプラント信号データを作
成する状態監視手段と、この状態監視手段によりプラン
トの異常を検知された際に前記知識データベースを基に
プラント信号データをネットワーク状に接続し警報の因
果関係を判定し前記予測警報を作成し警報シーケンスの
動作監視を行う診断手段と、この診断手段で得られた結
果よりプラント状態を把握しプラントの安全性を確保す
る処置およびプラントの運用に必要な機能を維持する処
置を決定する対応処置決定手段と、この対応処置決定手
段により決定された結果および前記診断手段により得ら
れる警報シーケンスの動作監視結果を出力する出力手段
を備えたことを特徴とする。[Means for Solving the Problems] In order to achieve the above object, an abnormality treatment creation device according to the present invention converts knowledge regarding treatment in an abnormality in a large-scale plant into knowledge data for ensuring plant safety. and a knowledge database that is divided into knowledge data for maintaining functions necessary for plant operation and summarized for each alarm, a signal input means for inputting plant data obtained from the plant, and a plant input from this signal input means. a condition monitoring means for detecting an abnormality in the plant and creating plant signal data based on the conditions for determining whether an abnormality has occurred in the knowledge database and a predictive warning; and when an abnormality in the plant is detected by the condition monitoring means a diagnostic means that connects plant signal data in a network based on the knowledge database, determines the cause-and-effect relationship of alarms, creates the predictive alarm, and monitors the operation of the alarm sequence; a countermeasure determining means for grasping the condition and determining a countermeasure to ensure the safety of the plant and a procedure to maintain the functions necessary for the operation of the plant, and a result determined by the countermeasure determining means and a result obtained by the diagnostic means. The present invention is characterized by comprising an output means for outputting the result of monitoring the operation of the alarm sequence.
【0006】[0006]
【作用】この様に構成された異常時処置作成装置におい
ては、知識データベースに大規模プラントの異常時にお
ける処置に関する知識を、警報毎にまとめたプラントの
安全性を確保する知識データと、更に警報の発生原因や
発生結果といった警報の発生条件毎にまとめたプラント
の運用に必要な機能を維持するための知識データとに分
けたので、異常発生の際に、この知識データベースを基
に、信号入力手段により入力されたプラントのデータを
、状態監視手段で知識データベースおよび予測警報によ
りプラントの異常発生の有無を判定し異常を検知し、ま
たプラント信号データを作成する。この異常の検知によ
り、診断手段では、前記知識データベースに基づいてプ
ラント信号データをネットワーク状に接続し、警報の因
果関係を判定し、また警報シーケンスの動作監視を行い
予測警報を作成する。この診断手段で得られた結果より
対応処置決定手段では、プラント状態を把握し、プラン
トの安全性を確保する処置と、プラントの運用に必要な
機能を維持する処置を決定し、これらの結果を出力手段
にて運転員に対して出力する。[Operation] In the abnormality treatment creation device configured in this way, the knowledge database includes knowledge regarding the treatment in the event of an abnormality in a large-scale plant, knowledge data for ensuring plant safety summarized for each alarm, and knowledge data for ensuring plant safety that is compiled for each alarm. Knowledge data for maintaining the functions necessary for plant operation are summarized for each alarm generation condition, such as the cause and result of the occurrence of the alarm.In the event of an abnormality, signal input can be performed based on this knowledge database. Based on the plant data inputted by the means, the condition monitoring means determines whether or not an abnormality has occurred in the plant based on the knowledge database and predictive warning, detects the abnormality, and creates plant signal data. Upon detection of this abnormality, the diagnostic means connects the plant signal data into a network based on the knowledge database, determines the cause and effect of the alarm, monitors the operation of the alarm sequence, and creates a predictive alarm. Based on the results obtained by this diagnostic means, the response decision means grasps the plant status, determines measures to ensure plant safety, and measures to maintain functions necessary for plant operation, and uses these results. It is output to the operator using the output means.
【0007】[0007]
【実施例】以下、図面を参照しながら、本発明の一実施
例を説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.
【0008】図1に本発明の一実施例に係る異常時処置
装置の機能構成図を示す。図1において、異常時処置装
置Aは、プラント1より警報、機器のon/off状態
等のプロセス信号を入力する信号入力手段2と、知識デ
ータベース3と予測警報4を基にプラントの異常を検知
しプラント信号データを作成する状態監視手段5と、一
度、状態監視手段5によりプラントの異常を検知したな
らば、知識データベース3を用いて発生警報をネットワ
ーク状に接続し警報因果関係を判定し、また次に発生す
る警報を予測し予測警報4を作成し、警報シーケンスの
動作監視を行う診断手段6と、診断手段6で得られた結
果よりプラント状態を把握し、プラントの安全性を確保
する処置と、プラントの運用に必要な機能を維持する処
置を決定する対応処置決定手段7と、これらの結果を運
転員8に出力する出力手段9から構成されている。ここ
で、知識データベース3では、原子力プラント等の大規
模プラントの異常時における処置に関する知識を、(a
)プラントの安全性を確保するもの(b)プラントの運
用に必要な機能を維持するためのものFIG. 1 shows a functional configuration diagram of an abnormality treatment device according to an embodiment of the present invention. In FIG. 1, the abnormality treatment device A detects abnormalities in the plant based on a signal input means 2 that inputs process signals such as alarms and on/off status of equipment from the plant 1, a knowledge database 3, and a predictive alarm 4. and once an abnormality in the plant is detected by the condition monitoring means 5, the knowledge database 3 is used to connect the generated alarms in a network to determine the cause and effect relationship of the alarms. Diagnostic means 6 predicts the next alarm to occur, creates a predictive alarm 4, monitors the operation of the alarm sequence, and grasps the plant status from the results obtained by the diagnostic means 6 to ensure plant safety. It is comprised of a corresponding action determining means 7 that determines the action and the action that maintains the functions necessary for plant operation, and an output means 9 that outputs these results to the operator 8. Here, in the knowledge database 3, knowledge regarding measures to be taken in the event of an abnormality in a large-scale plant such as a nuclear power plant is stored as (a
) Items that ensure plant safety (b) Items that maintain the functions necessary for plant operation
【0009】に分けて、(a)については警報毎に、(
b)については更に警報の発生原因や発生結果といった
警報の発生条件毎にまとめておき、これらを警報名称や
異常発生の判定条件に関する知識と、警報の発生があら
かじめプラントに設けられている安全保護系、プラント
インターロック機構、あるいは物理的因果関係によるも
のか否かを示す条件毎の発生種別と、前記条件による警
報シーケンスの動作/不動作がプラントに与える影響の
大小を表した発生条件毎の重要度と共に警報毎にまとめ
、知識データベースとして登録、保存している。For (a), for each alarm, (
Regarding b), we further summarize each alarm generation condition such as the cause and result of the alarm generation, and combine these with knowledge of the alarm name and the conditions for determining abnormality occurrence, and the safety protection that has been installed in the plant in advance. The type of occurrence for each condition, indicating whether it is due to system, plant interlock mechanism, or physical causal relationship, and the magnitude of the effect that activation/non-operation of the alarm sequence will have on the plant due to the conditions. The information is summarized for each alarm along with its importance level, and is registered and saved as a knowledge database.
【0010】この知識データベースにおける、(a)プ
ラントの安全性を確保する処置、(b)プラントの運用
に必要な機能を維持するための処置には、プラント設計
時に決められた一連の警報シーケンス通りに動作した(
正常動作)時のものばかりでなく、異常動作時のものも
含まれる。このような処置の例として、(a)の安全性
を確保するものに関しては、原子力プラントの冷却材ポ
ンプトリップ時において、この冷却材ポンプの補助系で
あるポニーモータが正常に動作した場合には、ポニーモ
ータによる崩壊熱の除去を確認するといったことが相当
し、ポニーモータがポンプスティック等により正常に動
作しなかった場合には、自然循環による崩壊熱の除去を
確認するといったことが相当する。また、(b)の運用
に必要な機能を維持する処置としては、冷却材ポンプを
駆動させている電動発電機に潤滑油を供給する油冷却系
統の油循環ポンプトリップ時において、非常用油ポンプ
の自動起動に成功した場合には、油圧、軸受け温度等の
監視といったことが相当し、前記非常用油ポンプの自動
起動に失敗した場合には、手動による起動操作といった
ことが相当する。In this knowledge database, (a) measures to ensure plant safety, and (b) measures to maintain functions necessary for plant operation, follow a series of alarm sequences determined at the time of plant design. It worked (
This includes not only those during normal operation, but also those during abnormal operation. As an example of such measures, regarding (a) to ensure safety, if the pony motor, which is an auxiliary system for the coolant pump, operates normally during a coolant pump trip in a nuclear power plant, This corresponds to confirming that decay heat is removed by the pony motor, and if the pony motor does not operate normally due to a pump stick or the like, it corresponds to confirming that decay heat is removed by natural circulation. In addition, as a measure to maintain the functions necessary for operation (b), when the oil circulation pump of the oil cooling system that supplies lubricating oil to the motor generator that drives the coolant pump trips, the emergency oil pump If the automatic start of the emergency oil pump is successful, this corresponds to monitoring of oil pressure, bearing temperature, etc., and if the automatic start of the emergency oil pump fails, it corresponds to a manual start operation.
【0011】そこでこのような処置を、(a)について
は警報毎に、(b)については警報の動作/不動作がプ
ラントに与える影響の大小を表した重要度と共に、発生
条件毎にまとめておき、プラント異常時において前記知
識データベースを用いて、警報の進展経路を同定し、警
報の動作/不動作に対して安全性を確保する処置と運用
に必要な機能を確保する処置を、並行して運転員に提供
するものである。[0011] Therefore, for (a), such measures are summarized for each alarm, and for (b), they are summarized for each occurrence condition along with the importance level that indicates the magnitude of the impact that alarm operation/non-operation has on the plant. Then, in the event of a plant abnormality, the knowledge database is used to identify the progress path of the alarm, and take measures to ensure safety against activation/non-operation of the alarm and measures to ensure the functions necessary for operation in parallel. The information shall be provided to the operator.
【0012】従って、前述のように成立した条件に対し
て、設計通りに警報が正しく動作した場合には正常時の
処置が、そうでない場合には異常時の処置が提供される
ことになる。[0012] Therefore, for the conditions established as described above, if the alarm operates correctly as designed, a normal treatment is provided, and if not, an abnormal treatment is provided.
【0013】また、上記の処置が、成立条件に関係なく
同じ場合には、すべての条件にわたって同じ処置情報を
登録しておくか、あるいは成立条件と無関係に警報の動
作/不動作に対して提供される共通領域を設け、そこに
登録しておく、といったことを行う。[0013] In addition, if the above-mentioned measures are the same regardless of the conditions that occur, the same treatment information should be registered for all conditions, or the information should be provided for activation/non-operation of the alarm regardless of the conditions that occur. Create a common area where the information will be used and register it there.
【0014】ここで、図2を用いて知識データベースの
具体的な構成について説明する。図2に知識データベー
スの構成例を示す。知識データベースに登録された知識
データ20は、プラントの警報毎にまとめられている。
この知識データ20は警報名称21、属性データ22、
発生条件データ23から主に構成されている。属性デー
タ22には、警報発生に対する異常発生条件及びプラン
トの設計時に決定される一連の警報シーケンスの動作あ
るいは不動作に対するプラント安全面の処置に関する安
全性を確保する処置の知識が記憶されている。また、発
生条件データ23には、発生条件毎データ24に発生原
因と発生結果等の発生種別、警報発生の遅れ時間、警報
の発生がプラントの運転に与える影響の大小を表わした
発生条件別の重要度、プラントの設計時に決定される一
連の警報シーケンスの動作あるいは不動作に対するプラ
ント運用面の処置に関する知識がまとめられ記憶されて
いる。[0014] Here, the specific structure of the knowledge database will be explained using FIG. Figure 2 shows an example of the structure of the knowledge database. The knowledge data 20 registered in the knowledge database is organized for each plant alarm. This knowledge data 20 includes an alarm name 21, attribute data 22,
It mainly consists of occurrence condition data 23. The attribute data 22 stores knowledge of measures to ensure safety regarding abnormality occurrence conditions for alarm generation and plant safety measures for operation or non-operation of a series of alarm sequences determined at the time of plant design. In addition, the occurrence condition data 23 includes data 24 for each occurrence condition that indicates the type of occurrence such as the cause and result of the occurrence, the delay time of alarm occurrence, and the magnitude of the influence that the occurrence of the alarm has on the operation of the plant. Knowledge regarding the degree of importance and plant operation measures to be taken in response to the activation or non-activation of a series of alarm sequences determined at the time of plant design is compiled and stored.
【0015】次に、プラント安全面の処置と運用面の処
置に関する知識について説明する。安全面の処置に関す
る知識には、プラントの安全性を確保するためのもので
、例えば、冷却材ポンプトリップ時のポニーモータによ
る崩壊熱除去の確認や、アイソレーションの発生による
隔離弁自動閉鎖失敗時の手動閉鎖操作といったような、
発生事象に関わらず必ず実施しなければならないものが
相当する。Next, knowledge regarding plant safety measures and operational measures will be explained. Knowledge about safety measures includes ensuring plant safety, such as checking decay heat removal by a pony motor when a coolant pump trips, and checking when isolation valves fail to close automatically due to isolation. such as manual closing operation of
This corresponds to something that must be carried out regardless of the event that occurs.
【0016】また、プラント運用面の処置に関する知識
は、プラントの運用に必要な機能を維持するためのもの
で、例えば、「冷却材ポンプトリップ」警報を発生させ
た条件が、ポンプ動力源の電源設備異常、あるいは上流
側設備の電源異常に伴う電源断によるものであるならば
、前記電源設備の点検が相当し、更に警報レベルでの原
因判定より異常原因である電源設備が判明しているなら
ば、その電源設備からポンプ動力源までの電源ラインの
点検、といった原因の究明に関する処置が相当する。
また冷却材ポンプを駆動させている電動発電機に、潤滑
油を供給している油冷却系の非常用油ポンプ自動起動失
敗時の手動起動や、スクラム後の早期再起動に向けての
炉容器水位の確保といったといった正常状態への復帰/
回復操作に関する処置も、プラント運用面の処置に関す
る知識に相当する。この様な知識データベースを備えた
本発明の実施例に係る異常時処置装置の処理方法につい
て図3に処理フローチャートを示し、説明する。[0016]Furthermore, knowledge regarding plant operation measures is for maintaining the functions necessary for plant operation.For example, if the condition that caused the "coolant pump trip" alarm was caused by the power source of the pump power source. If the cause is an equipment abnormality or a power outage due to a power abnormality in upstream equipment, it is appropriate to inspect the power equipment mentioned above, and if the power equipment that is the cause of the abnormality has been identified by determining the cause at the alarm level. For example, this corresponds to measures related to investigating the cause, such as inspecting the power line from the power supply equipment to the pump power source. In addition, the emergency oil pump of the oil cooling system, which supplies lubricating oil to the motor generator that drives the coolant pump, can be manually started when automatic startup fails, and the furnace vessel can be used for early restart after a scram. Return to normal conditions such as securing water level/
Measures related to recovery operations also correspond to knowledge regarding measures related to plant operation. A processing method of the abnormality handling device according to the embodiment of the present invention, which is equipped with such a knowledge database, will be described with reference to a processing flowchart shown in FIG.
【0017】異常時処置装置は、一定時間間隔で起動さ
れ、プラントからプラントの警報信号、機器の状態信号
、プロセス信号が信号入力手段2により信号入力100
される。状態監視手段5では、知識データベース3に登
録されている各信号の異常発生の有無を判定する条件に
関する知識を基に、入力された警報信号や機器の状態信
号、プロセス信号からプラントの異常発生つまり新警報
発生の有無130を調べ、各信号の値を判定結果と共に
プラント信号データ4として保存する。また、前回の診
断周期以前に、診断手段6において予測された予測警報
9の発生を調べる。これは予測警報9の遅れ時間のカウ
ントダウンを行い、所定時間経過後の警報発生の有無1
10を調べる。ここで予測通りに警報が発生していなか
ったならばシーケンス異常と判定し、後述の出力処理手
段にて表示するシーケンス異常表示データのセットを行
う。The abnormality handling device is activated at regular time intervals, and receives plant alarm signals, equipment status signals, and process signals from the plant through the signal input means 2 at a signal input 100.
be done. The condition monitoring means 5 uses input alarm signals, equipment status signals, and process signals to determine whether an abnormality has occurred in the plant or not based on the knowledge of the conditions for determining whether an abnormality has occurred in each signal registered in the knowledge database 3. The presence or absence of a new alarm 130 is checked, and the value of each signal is saved as plant signal data 4 together with the determination result. Furthermore, the occurrence of the predictive alarm 9 predicted by the diagnostic means 6 before the previous diagnostic cycle is checked. This counts down the delay time of the predictive alarm 9, and determines whether or not the alarm will occur after a predetermined time has passed.
Check 10. Here, if the alarm has not occurred as predicted, it is determined that the sequence is abnormal, and sequence abnormality display data to be displayed by the output processing means described later is set.
【0018】診断手段6は、前記状態監視手段5におい
て異常が検知された場合に起動される。ここでは知識デ
ータベース3に登録されている警報の発生原因、発生結
果に関する知識を基に、プラント信号データ中の発生警
報の進展経路をネットワーク状に作成し、警報進展経路
の同定140を行い、警報の因果関係を判定する。これ
により経路の最上流警報を原因警報として原因警報の判
定150を行う。次に、次発生警報の予測150を行う
。これは、2つの警報A1、A2が発生した時この2つ
の警報間の因果関係には、例えば、警報A1として「冷
却材ポンプトリップ」発生すれば警報A2の「原子炉ス
クラム」が発生するといったように、警報A1の発生が
安全保護系あるいはプラント・インターロック機構の正
常なシーケンス動作により100%の確率で警報A2を
発生させる場合と、警報A1として「冷却材流量低」が
発生しても、警報A2の「冷却材流量低低」が発生する
とは限らないといったように物理的な因果関係で結ばれ
ている場合の2つのタイプがあり、前者のタイプでは警
報A1の発生後、所定の遅れ時間が経過しても警報A2
が発生しない場合にはシーケンス異常となる。そこで、
知識データベースにいずれのタイプであるか、更にシー
ケンス動作による場合はその遅れ時間も含めて登録して
おき、新たに発生した警報からシーケンス動作により発
生する警報A2の有無を調べ、あった場合にはそれを予
測警報と判定し、遅れ時間と共に登録する。そして前述
のように次の診断周期以降は状態監視手段5にて所定時
間経過後の予測警報発生の有無を調べる。The diagnostic means 6 is activated when an abnormality is detected in the condition monitoring means 5. Here, based on the knowledge regarding the causes and results of alarm occurrences registered in the knowledge database 3, the progress path of the alarm occurrence in the plant signal data is created in a network form, the alarm progress path is identified 140, and the Determine the causal relationship between As a result, the cause alarm determination 150 is performed with the most upstream alarm on the route as the cause alarm. Next, prediction 150 of the next alarm is performed. This means that when two alarms A1 and A2 occur, the causal relationship between these two alarms is such that, for example, if a "coolant pump trip" occurs as alarm A1, a "reactor scram" as alarm A2 occurs. As shown in the figure, there are two cases in which the occurrence of alarm A1 causes alarm A2 to occur with a 100% probability due to the normal sequence operation of the safety protection system or plant interlock mechanism, and one in which alarm A2 occurs with a 100% probability even if "low coolant flow rate" occurs as alarm A1. There are two types of cases in which there is a physical cause-and-effect relationship, such as ``low/low coolant flow rate'' of alarm A2 does not necessarily occur, and in the former type, after the occurrence of alarm A1, a predetermined Alarm A2 even after the delay time has elapsed
If this does not occur, a sequence error occurs. Therefore,
Register the type of alarm in the knowledge database, including the delay time if it is caused by a sequence operation, and check whether there is an alarm A2 generated by the sequence operation from the newly generated alarm, and if there is, This is determined to be a predictive warning and is registered along with the delay time. As described above, from the next diagnostic cycle onwards, the condition monitoring means 5 checks whether a predictive alarm has occurred after a predetermined period of time has elapsed.
【0019】知識データベースには、前述のように、プ
ラントの警報毎の名称、発生原因と発生結果、警報の発
生がプラントの運転に与える影響の大小を表わした発生
条件別の重要度や異常判定条件、プラントの設計時に決
定される一連の警報シーケンスの動作あるいは不動作に
対するプラント安全面の処置に関する知識と、プラント
運用面の処置に関する知識が記憶されている。As mentioned above, the knowledge database includes the name of each alarm in the plant, the cause and result of the alarm, and the importance level and abnormality judgment for each occurrence condition indicating the magnitude of the influence that the occurrence of the alarm has on the operation of the plant. Knowledge regarding plant safety measures for conditions, operation or non-operation of a series of alarm sequences determined at the time of plant design, and knowledge regarding plant operation measures are stored.
【0020】対応処置決定手段7では、状態監視手段5
において判定されたシーケンス異常の警報と、診断手段
6において同定した警報進展経路や判定した原因警報よ
り、前記知識データベース3を基に対応処置の決定、つ
まり、安全性を確保する処置の決定170及び運用に必
要な機能を維持する処置の決定180を行う。これらは
、発生警報あるいはシーケンス異常警報より動的に決定
されるもので、プラントの安全面に関するものは警報毎
に、運用面に関するものは成立条件毎に提供される。
特に後者は、前記原因究明や正常状態への復帰/回復操
作というように、その内容が多岐にわたるため、警報の
動作/不動作がプラントに与える影響の大小を表した条
件毎の重要度を用いて、前記同定経路の中で最も高い重
要度をもつ条件に対する処置を提供する。出力処理手段
8では、対応処置や原因警報等の診断結果の表示190
という出力処理を行う。In the countermeasure determining means 7, the condition monitoring means 5
Based on the sequence abnormality alarm determined in step 170, the alarm progression path identified in the diagnostic means 6, and the determined cause alarm, a corresponding action is determined based on the knowledge database 3, that is, a action to ensure safety is determined 170; A decision 180 is made on measures to maintain the functions necessary for operation. These are dynamically determined from occurrence alarms or sequence abnormality alarms, and those related to plant safety are provided for each alarm, and those related to operation are provided for each established condition. In particular, the latter involves a wide variety of tasks, such as investigation of the cause and return/recovery operations to normal conditions, so we use importance levels for each condition that represent the magnitude of the impact that activation/non-activation of the alarm will have on the plant. and provide treatment for the condition with the highest importance among the identified pathways. The output processing means 8 displays diagnostic results 190 such as countermeasures and cause warnings.
This output process is performed.
【0021】ここで、原子力プラントにおいて「冷却材
ポンプトリップ」警報が発生した場合、異常時処置作成
装置により決定され運転員に提供される処置ガイドにつ
いて以下に説明する。[0021] Here, when a "coolant pump trip" alarm occurs in a nuclear power plant, a treatment guide determined by the abnormality treatment preparation device and provided to the operator will be described below.
【0022】冷却材ポンプの流量制御系に何等かの異常
が発生し、 「冷却材ポンプ回転数低」警報が発生し
、流量低下による冷却材ポンプの損傷を防ぐ目的で「冷
却材ポンプトリップ」警報も発生したと仮定する。この
とき、冷却材ポンプがトリップしたため、ポニーモータ
による崩壊熱除去が行われる。[0022] When some kind of abnormality occurs in the flow rate control system of the coolant pump, a ``coolant pump rotation speed low'' alarm occurs, and a ``coolant pump trip'' is issued to prevent damage to the coolant pump due to a drop in flow rate. Assume that an alarm also occurs. At this time, since the coolant pump tripped, the decay heat was removed by the pony motor.
【0023】異常時処置作成装置では、先ず、信号入力
手段で、プラントより「冷却材ポンプ回転数低」警報、
「冷却材ポンプトリップ」警報の警報データが入力され
る。状態監視手段で、これらの警報が、新警報であるか
予測警報であるかの判断をされ、プラント信号データが
作成される。次に、診断手段では、知識データベースの
知識データを基にプラント信号データ、「冷却材ポンプ
トリップ」および「冷却材ポンプ回転数低」をネットワ
ーク上に接続し、原因警報の判断を行う。更に、対応決
定手段にて、知識データベースに登録された警報「冷却
材ポンプトリップ」の安全性を確保する処置として、前
記ポニーモータの自動起動確認、更に崩壊熱除去の確認
、といった処置を運転員に提供する。[0023] In the abnormality treatment creation device, first, the signal input means receives a "coolant pump rotation speed low" alarm from the plant;
Alarm data for a "coolant pump trip" alarm is input. The condition monitoring means determines whether these alarms are new alarms or predicted alarms, and creates plant signal data. Next, the diagnostic means connects the plant signal data, "coolant pump trip" and "coolant pump rotation speed low" to the network based on the knowledge data in the knowledge database, and determines the cause of the alarm. Furthermore, the response decision means asks the operator to take measures to ensure the safety of the warning "coolant pump trip" registered in the knowledge database, such as confirming the automatic startup of the pony motor and confirming decay heat removal. Provided to.
【0024】ここで、「冷材流量制御系異常」警報が発
生しており、診断手段で、原因警報として判定されたな
らば、知識データベースに登録された警報「冷却材流量
制御系異常」の発生条件別データのプラントの運用に必
要な機能を維持するための処置、冷却材流量制御系の調
査等の処置ガイドも提供する。[0024] Here, if the "refrigerant flow control system abnormality" alarm has occurred and the diagnostic means determines that it is the cause alarm, then the alarm "coolant flow control system abnormality" registered in the knowledge database will be checked. We also provide treatment guides for maintaining the functions necessary for plant operation based on data for each occurrence condition, and investigation of the coolant flow control system.
【0025】更に、前記「冷却材ポンプトリップ」警報
の発生後、「冷却材ポンプ回転数低低」警報も発生した
と仮定する。 この場合には、前記「冷却材ポンプ回
転数低低」警報が発生しており、ポンプスティックの可
能性があるため、ポンプ軸受け部の保護機構によりポニ
ーモータによる崩壊熱除去の操作は行われない。 こ
こで、前述と同様に状態監視手段、診断手段で知識デー
タベースを基に処理され、最終的に、対応処置決定手段
では知識データベースに登録された知識データを基に、
自然循環による崩壊熱除去の確認といったプラントの安
全性を確保する処置ガイドと、発生条件データによるポ
ニーモータの停止確認とポンプ軸受け部の調査といった
プラントの運用に必要な機能を維持するための処置ガイ
ドを運転員に提供する。Furthermore, it is assumed that after the occurrence of the above-mentioned "coolant pump trip" alarm, a "coolant pump rotational speed low/low" alarm is also generated. In this case, the above-mentioned "coolant pump rotation speed low/low" alarm has occurred, and the pump bearing may be stuck, so the pony motor will not remove the decay heat due to the protection mechanism of the pump bearing. . Here, as described above, the condition monitoring means and the diagnosis means perform processing based on the knowledge database, and finally, the countermeasure determining means performs processing based on the knowledge data registered in the knowledge database.
A guide to measures to ensure plant safety, such as confirming the removal of decay heat through natural circulation, and a guide to maintaining functions necessary for plant operation, such as confirming the stoppage of the pony motor based on generation condition data and investigating pump bearings. provided to the operator.
【0026】従って、異常時の警報が発生した際、知識
データベースを基に対応処置の決定が行われ、プラント
の安全性を確保する処置とプラントの運用に必要な機能
を維持する処置が運転員に提供されるため、運転員の処
置対策を支援することができ、運転員の状況判断をより
確実にし、誤操作の可能性を低減させ、更には、復旧に
費やす時間の短縮ができるなどの効果を奏する。[0026] Therefore, when an abnormality alarm occurs, the response measures are determined based on the knowledge database, and operators are required to take measures to ensure plant safety and maintain functions necessary for plant operation. Since the information is provided to the operator, it can support the operator's countermeasures, make the operator's judgment of the situation more reliable, reduce the possibility of erroneous operation, and even shorten the time spent on recovery. play.
【0027】[0027]
【発明の効果】上述したように、本発明によれば、プラ
ントの安全性を確保する処置と、プラントの運用に必要
な機能を維持する処置を決定し運転員の処置対策を支援
することができるので、運転員の状況判断がより確実性
を増し誤操作の可能性が低下すること、更に復旧に費や
す時間の短縮ができる等の効果を奏する。[Effects of the Invention] As described above, according to the present invention, it is possible to determine measures to ensure plant safety and maintain functions necessary for plant operation, and to support operators in taking measures. As a result, the operator's judgment of the situation becomes more reliable, the possibility of erroneous operation is reduced, and the time spent on recovery can be shortened.
【図1】本発明の実施例に係る異常時処置作成装置の機
能構成図FIG. 1 is a functional configuration diagram of an abnormality procedure creation device according to an embodiment of the present invention.
【図2】本発明の実施例に係る異常時処置作成装置の知
識データベースの構成例[Fig. 2] An example of the configuration of the knowledge database of the abnormality treatment creation device according to the embodiment of the present invention.
【図3】本発明の実施例に係る異常時処置作成装置の処
理フローチャートFIG. 3 is a processing flowchart of the abnormality procedure creation device according to the embodiment of the present invention.
1・・・ 知識データベース、2・・・ プラント、3
・・・ 信号入力手段
4・・・ プラント信号データ、5・・・ 状態監視手
段、6・・・診断手段
7・・・ 予測警報、8・・・ 対応処置決定手段、9
・・・ 出力処理手段1... Knowledge database, 2... Plant, 3
... Signal input means 4 ... Plant signal data, 5 ... Condition monitoring means, 6 ... Diagnosis means 7 ... Prediction alarm, 8 ... Corresponding action determining means, 9
... Output processing means
Claims (1)
する知識をプラントの安全性を確保するための知識デー
タおよびプラントの運用に必要な機能を維持するための
知識データに分けて警報毎にまとめた知識データベース
と、プラントから得られるプラントデータを入力する信
号入力手段と、この信号入力手段から入力されたプラン
トデータを前記知識データベースの異常発生の有無を判
定する条件および予測警報を基にプラントの異常を検知
しプラント信号データを作成する状態監視手段と、この
状態監視手段によりプラントの異常を検知された際に前
記知識データベースを基にプラント信号データをネット
ワーク状に接続し警報の因果関係を判定し前記予測警報
を作成し警報シーケンスの動作監視を行う診断手段と、
この診断手段で得られた結果よりプラント状態を把握し
プラントの安全性を確保する処置およびプラントの運用
に必要な機能を維持する処置を決定する対応処置決定手
段と、この対応処置決定手段により決定された結果およ
び前記診断手段により得られる警報シーケンスの動作監
視結果を出力する出力手段を備えたことを特徴とする異
常時処置作成装置。[Claim 1] Knowledge regarding measures to be taken in the event of an abnormality in a large-scale plant is divided into knowledge data for ensuring plant safety and knowledge data for maintaining functions necessary for plant operation, and summarized for each alarm. A knowledge database, a signal input means for inputting plant data obtained from the plant, and the plant data inputted from the signal input means are used to detect abnormalities in the plant based on conditions for determining the presence or absence of an abnormality in the knowledge database and predictive warnings. a condition monitoring means for detecting and creating plant signal data; and when an abnormality in the plant is detected by the condition monitoring means, the plant signal data is connected in a network based on the knowledge database to determine the causal relationship of the alarm. diagnostic means for creating the predictive alarm and monitoring the operation of the alarm sequence;
A response action determining means that grasps the plant status from the results obtained by this diagnostic means and determines actions to ensure plant safety and maintain functions necessary for plant operation; 1. An abnormality treatment creation device, comprising: an output means for outputting the results of the diagnosis and the results of monitoring the operation of the alarm sequence obtained by the diagnosis means.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3000546A JPH04249795A (en) | 1991-01-08 | 1991-01-08 | Handling procedure preparing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3000546A JPH04249795A (en) | 1991-01-08 | 1991-01-08 | Handling procedure preparing |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH04249795A true JPH04249795A (en) | 1992-09-04 |
Family
ID=11476732
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3000546A Pending JPH04249795A (en) | 1991-01-08 | 1991-01-08 | Handling procedure preparing |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH04249795A (en) |
-
1991
- 1991-01-08 JP JP3000546A patent/JPH04249795A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0077080A2 (en) | Method of operating power plants | |
| JPS58120195A (en) | Method of monitoring atomic power plant | |
| WO2023197462A1 (en) | Monitoring method and system for accident working condition of nuclear power plant set | |
| JP3394817B2 (en) | Plant diagnostic equipment | |
| JP6201038B2 (en) | Plant accident operation support equipment | |
| JPH04249795A (en) | Handling procedure preparing | |
| GB2536567A (en) | System for supporting operation during plant accidents and method for supporting operation during plant accidents | |
| JP2922374B2 (en) | Nuclear power plant accident response support system | |
| JP3379304B2 (en) | Plant abnormality monitoring method and abnormality monitoring device | |
| KR101089835B1 (en) | Self Logic Testing Apparatus and Method of Digital Reactor Protection System | |
| JPH1153664A (en) | Safety support device for plant or machinery | |
| JPH065487B2 (en) | Plant operation guidance system | |
| JP2656264B2 (en) | Alarm processing diagnostic device | |
| JPH02224096A (en) | Operation supporting system in abnormal time of plant | |
| JPH01216218A (en) | Diagnostic device for shaft vibration abnormality | |
| JPH0524521B2 (en) | ||
| JPH02224001A (en) | Abnormality cause decision device | |
| JPH0392799A (en) | Abnormal-time operation support system of plant | |
| JPH06201892A (en) | Nuclear power plant accident management support system | |
| JPH04121622A (en) | Plant operation supporting method and device as well as data display method | |
| JPS61259302A (en) | Abnormal time disposing deciding device for plant | |
| JPS63158696A (en) | Monitor | |
| JPH07294695A (en) | Plant diagnosis method and apparatus | |
| JP2025012534A (en) | Plant Management Systems | |
| JPS6093520A (en) | Abnormality diagnosing device of plant operation |