JPH0431787B2 - - Google Patents
Info
- Publication number
- JPH0431787B2 JPH0431787B2 JP25475889A JP25475889A JPH0431787B2 JP H0431787 B2 JPH0431787 B2 JP H0431787B2 JP 25475889 A JP25475889 A JP 25475889A JP 25475889 A JP25475889 A JP 25475889A JP H0431787 B2 JPH0431787 B2 JP H0431787B2
- Authority
- JP
- Japan
- Prior art keywords
- welding
- torch
- heat input
- workpiece
- temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Arc Welding In General (AREA)
Description
【発明の詳細な説明】
「産業上の利用分野」
本発明は、鋼材の溶接方法に係り、特に、被溶
接物のビード下割れの発生を抑えるとともに、被
溶接物内に形成される硬化域を除去するものであ
る。Detailed Description of the Invention [Field of Industrial Application] The present invention relates to a method of welding steel materials, and in particular, suppresses the occurrence of under-bead cracking in a workpiece and suppresses hardened areas formed within the workpiece. It is intended to remove.
「従来の技術」
一般に、厚肉の炭素鋼や低合金鋼等の被溶接物
を溶接する場合、第1図に示すように、溶接時に
形成されるビードBの下部に水素が入り込んで、
被溶接物C内にビード下割れXが生じ易く、ま
た、ビードBの下部近傍に硬化域Yが形成され易
い。``Prior Art'' Generally, when welding objects such as thick-walled carbon steel or low-alloy steel, hydrogen enters the lower part of the bead B formed during welding, as shown in Figure 1.
Under-bead cracks X are likely to occur in the workpiece C to be welded, and a hardened region Y is likely to be formed near the bottom of the bead B.
そして、ビード下割れXが発生した状態や硬化
域Yが形成された状態になると、被溶接物Cの靱
性がその溶接部分で低下してしまうため、その対
策が必要となる。 When the under-bead crack X occurs or the hardened region Y is formed, the toughness of the welded object C decreases at the welded portion, and therefore countermeasures are required.
従来、その対策法の一つとして、被溶接物Cを
溶接前に予熱しておいて、溶接作業の終了後に後
熱を付与することや、焼き戻し等の熱処理を施す
ことが実施されている。 Conventionally, one of the countermeasures has been to preheat the welded object C before welding, and then apply postheat after the welding work is completed, or perform heat treatment such as tempering. .
「発明が解決しようとする課題」
しかしながら、このような従来方法にあつて
は、次のような改善すべき課題が残されている。"Problems to be Solved by the Invention" However, with such conventional methods, the following problems remain to be improved.
即ち、前述の予熱及び後熱処理は、被溶接物C
の冷却速度を遅くしてビードBと被溶接物Cとの
間の水素を放出することを目的としているが、予
熱、溶接及び後熱等の各処理が個別の熱源によつ
て行なわれるものであるために、各処理を実施す
る間に、被溶接物Cの温度が降下してしまい、水
素を十分に放出するには至つていない。さらに、
これらの各処理に焼き戻し処理を付加する場合で
あると、全体として溶接作業が繁雑なものとな
り、全体の作業時間も長くなり易い。 That is, the above-mentioned preheating and post-heat treatment are performed on the welded object C.
The purpose is to slow the cooling rate of the bead B and release the hydrogen between the bead B and the workpiece C, but each process such as preheating, welding, and postheating is performed by an individual heat source. As a result, the temperature of the welded object C drops during each process, and hydrogen is not sufficiently released. moreover,
If a tempering process is added to each of these processes, the welding process as a whole becomes complicated and the overall working time tends to be long.
一方、ビード下割れXの発生を防止する他の方
法として、水素発生量の少ない溶接棒(溶加材)
を用いることも検討されているが、ビード下割れ
Xの発生量を減少させる効果が認められるもの
の、その発生を完全に防止するに至つていない。 On the other hand, as another method to prevent the occurrence of under-bead cracking
The use of under-bead cracks X has also been considered, but although it has been found to be effective in reducing the amount of under-bead cracking X, the occurrence has not yet been completely prevented.
本発明は、このような事情に鑑みてなされたも
ので、
() 被溶接物内にビード下割れが発生するこ
とを防止すること。 The present invention has been made in view of the above circumstances, and has the following objects: (1) To prevent under-bead cracks from occurring in a workpiece to be welded.
() 被溶接物内の硬化域を除去すること。() To remove the hardened area within the workpiece.
() これらの処理を溶接作業の実施工程と同
時に、簡便な設備で行なうこと。() These treatments should be carried out using simple equipment at the same time as the welding process.
等を目的とするものである。The purpose is to
「課題を解決するための手段」
かかる課題を解決する手段として、予熱トー
チ、溶接トーチ及び後熱トーチを溶接方向に間隔
を空けて被溶接物に対向配置させ、ガス被覆中で
前記各トーチからアークを発生させるとともに、
溶接トーチで溶加材を溶融状態とすることによ
り、被溶接物の溶接を行なう方法であつて、溶接
トーチの入熱量より後熱トーチの入熱量を大きく
し、かつ、各トーチの間隔を溶接条件と関連づけ
てそれぞれ設定するものである。"Means for Solving the Problem" As a means for solving the problem, a preheating torch, a welding torch, and a postheating torch are arranged facing the workpiece at intervals in the welding direction, and each of the torches is Along with generating an arc,
A method of welding objects to be welded by melting the filler metal with a welding torch, in which the heat input of the post-heating torch is greater than the heat input of the welding torch, and the interval between each torch is These settings are set in association with the conditions.
「作用」
各トーチの間隔が、各トーチの入熱量や被溶接
物の温度等の条件を考慮してそれぞれ設定されて
いると、予熱処理によつて必要温度まで高められ
た被溶接物が、高温状態に保持されたまま溶接及
び後熱処理されて、水素の入り込みを少なくし、
かつ、入り込んだ水素の追い出し効果を大きくし
てビード割れの発生を少なくする。"Function" If the distance between each torch is set in consideration of conditions such as the heat input of each torch and the temperature of the workpiece, the workpiece that has been heated to the required temperature by preheating will Welding and post-heat treatment are performed while being maintained at high temperatures to reduce hydrogen intrusion.
In addition, the effect of expelling the trapped hydrogen is increased to reduce the occurrence of bead cracking.
そして、後熱処理時の入熱量を溶接処理時より
大きくすることによつて、被溶接物がマルテンサ
イト変態する現象を抑制して、ビード割れの発生
を防止する。 By making the amount of heat input during the post-heat treatment larger than that during the welding process, the phenomenon of martensitic transformation of the welded object is suppressed, and the occurrence of bead cracking is prevented.
また、各トーチによる加熱は、それぞれのアー
ク発生によつてなされるために、三つのトーチを
有する溶接機を使用することにより、他の設備を
要することなく、予熱、溶接及び後熱処理が連続
した一連の工程順に実施される。 In addition, since heating by each torch is achieved by the generation of individual arcs, by using a welding machine with three torches, preheating, welding, and post-heat treatment can be performed continuously without the need for other equipment. It is carried out in a series of steps.
「実施例」
以下、第2図ないし第4図に基づいて、本発明
に係る鋼材の溶接方法の一実施例を説明する。"Example" Hereinafter, an example of the method for welding steel materials according to the present invention will be described based on FIGS. 2 to 4.
第2図及び第3図は、本発明の方法を実施する
ために好適な溶接機1の例を示しており、不活性
ガス噴射用のノズル2とアーク発生用の電極3と
を備えた3個のトーチ4(予熱トーチ4a・溶接
トーチ4b・後熱トーチ4c)を溶接方向に間隔
を空けて設け、溶接トーチ4bに、これによつて
発生させられるアーク中に溶加材5を供給する溶
加材供給手段6を設けた基本構成である。 FIGS. 2 and 3 show an example of a welding machine 1 suitable for implementing the method of the present invention. torches 4 (preheating torch 4a, welding torch 4b, postheating torch 4c) are provided at intervals in the welding direction, and filler metal 5 is supplied to the welding torches 4b into the arc generated thereby. This is a basic configuration in which a filler metal supply means 6 is provided.
また、溶接機1は、被溶接物Cの溶接線Wに沿
つて設けられた走行レール7及び走行台車8を備
え、走行台車8には、各トーチ4を支持する支持
機構9と、トーチ4に電流を供給する電流供給手
段10と、前記ノズル2に不活性ガスを供給する
ガス供給手段11とが搭載されている。 The welding machine 1 also includes a traveling rail 7 and a traveling truck 8 provided along the welding line W of the workpiece C, and the traveling truck 8 includes a support mechanism 9 that supports each torch 4, and a supporting mechanism 9 for supporting each torch 4. A current supply means 10 for supplying current to the nozzle 2 and a gas supply means 11 for supplying an inert gas to the nozzle 2 are mounted.
前記支持機構9は、各トーチ4を後に詳述する
間隔で支持する支持枠12と、支持枠12に取り
付けられた昇降板13と、昇降板13に取り付け
られた送り螺子14と、送り螺子14を回転駆動
することにより昇降板13をトーチ4とともに昇
降させる電動モータ15とによつて構成されてい
る。 The support mechanism 9 includes a support frame 12 that supports each torch 4 at intervals described in detail later, an elevating plate 13 attached to the supporting frame 12, a feed screw 14 attached to the elevating plate 13, and a feed screw 14. The electric motor 15 rotates and drives the elevating plate 13 up and down together with the torch 4.
前記溶加材供給手段6は、走行台車8に取り付
けられた溶加材巻回ボビン16と、支持枠12を
貫通して設けられた溶接トーチ4bの先端近傍に
突出させられるガイド筒17と、昇降板13に取
り付けられて溶加材巻回ボビン16から引き出さ
れた溶加材5をガイド筒17を挿通させて溶接ト
ーチ4bの先端に送り込む給送ローラ18と、給
送ローラ18を回転駆動する電動モータ19とに
よつて構成されている。 The filler material supplying means 6 includes a filler material winding bobbin 16 attached to the traveling carriage 8, a guide tube 17 protruding near the tip of the welding torch 4b provided through the support frame 12, A feed roller 18 is attached to the lifting plate 13 and feeds the filler metal 5 pulled out from the filler metal winding bobbin 16 through the guide cylinder 17 to the tip of the welding torch 4b, and the feed roller 18 is rotationally driven. It is configured by an electric motor 19 that operates.
前記電流供給手段10は、走行台車8に取り付
けた電源コントローラ20と、各トーチ4と被溶
接物Cとの間に電流を供給するための給電ケーブ
ル21とによつて構成されており、電源コントロ
ーラ20により、各トーチ4への電流を調整して
溶接入熱量を設定するものである。 The current supply means 10 includes a power supply controller 20 attached to the traveling cart 8 and a power supply cable 21 for supplying current between each torch 4 and the workpiece C. 20 is used to adjust the current to each torch 4 and set the amount of welding heat input.
前記ガス供給手段11は、走行台車8に取り付
けまたは別置きされたボンベ22と、ボンベ22
から支持枠12を介して各トーチ4のノズル2へ
不活性ガスを供給する供給ホース23とによつて
構成されている。 The gas supply means 11 includes a cylinder 22 attached to the traveling truck 8 or placed separately;
and a supply hose 23 that supplies inert gas to the nozzle 2 of each torch 4 via the support frame 12.
前記支持枠12は、各トーチ4内のガス案内孔
と連通して、不活性ガスを各ノズル2に分配する
ものとされている。 The support frame 12 communicates with gas guide holes in each torch 4 and distributes inert gas to each nozzle 2.
ここで、各トーチ4a,4b,4cの相互間隔
について説明すると、各トーチ4a,4b,4c
の相互間隔は、入熱量や被溶接物Cの温度(任意
のトーチ毎における加熱前の温度=初期温度、及
び加熱後冷却中の温度=設定温度)等を考慮して
決定される。 Here, to explain the mutual spacing between each torch 4a, 4b, 4c, each torch 4a, 4b, 4c
The mutual spacing is determined in consideration of the amount of heat input, the temperature of the object to be welded C (temperature before heating = initial temperature for each arbitrary torch, and temperature during cooling after heating = set temperature), etc.
半無限固体をその表面を移動する点熱源によつ
て加熱した際に、半無限固体が温度θまで冷却さ
れるのに要する時間(T)は、次式で示される。 When a semi-infinite solid is heated by a point heat source moving on its surface, the time (T) required for the semi-infinite solid to cool down to temperature θ is expressed by the following equation.
T=1/2πk(ηQ/Cρ)1/θ−θ0……(1)
ただし
k:熱拡散率
η:溶接効率
Q:単位長さ当たりの入熱
C:比熱
ρ:密度
θ:設定温度(温度)
θ0:初期温度
低合金鋼の溶接を行なう場合について以下説明
する。 T=1/2πk(ηQ/Cρ)1/θ−θ 0 …(1) where k: thermal diffusivity η: welding efficiency Q: heat input per unit length C: specific heat ρ: density θ: set temperature (Temperature) θ 0 : Initial temperature The case of welding low alloy steel will be explained below.
そして、隣り合う任意のトーチの相互間隔L
は、前記(1)式と溶接速度vとによつて、次式によ
り設定される。 Then, the mutual distance L between any adjacent torches
is set by the following formula using the above formula (1) and the welding speed v.
L=vT
=v×1/2πk(ηQ/Cρ)1/θ−θ0 ……(2)
<トーチ間隔の計算例>
前記(2)式に以下の条件を代入して、相互間隔L
(トーチ4a,4bの間隔Lx、トーチ4b,4c
の間隔Ly)を求めた。 L=vT =v×1/2πk(ηQ/Cρ)1/θ−θ 0 ...(2) <Example of calculation of torch spacing> Substitute the following conditions into equation (2) above to calculate the mutual spacing L
(distance Lx between torches 4a and 4b, torches 4b and 4c
The interval Ly) was calculated.
代入条件
k=0.146(cm2/sec)、
C=0.128(cal/g℃)、
ρ=7.79(g/cm3)、
η=0.5、
v=10(cm/min)、
θ=300(℃)
Q=20(kJ/cm):予熱トーチ4aによる入熱
量
θ0=25(℃):予熱トーチ4aによる入熱時の初
期温度
及びQ=10(kJ/cm):溶接トーチ4bによる
入熱量
θ0=200(℃):溶接トーチ4bによる入熱時の
初期温度
これらの諸条件により、
Lx≒1.6(cm)、Ly≒2.2(cm)が得られる。 Substitution conditions k=0.146 (cm 2 /sec), C=0.128 (cal/g℃), ρ=7.79 (g/cm 3 ), η=0.5, v=10 (cm/min), θ=300 (℃) ) Q = 20 (kJ/cm): Amount of heat input by preheating torch 4a θ 0 = 25 (℃): Initial temperature at the time of heat input by preheating torch 4a and Q = 10 (kJ/cm): Amount of heat input by welding torch 4b θ 0 =200 (°C): Initial temperature during heat input by welding torch 4b With these conditions, Lx≒1.6 (cm) and Ly≒2.2 (cm) are obtained.
上記についてさらに補足説明すると、予熱トー
チ4aによる入熱前の基準温度は、被溶接物が常
温に保持されていたとしても25℃、溶接トーチー
4bによる入熱前の基準温度は、予熱トーチ4a
によつて加熱された後、徐々に放熱により低下す
るものの表面部分で300℃(ただし、本発明者の
研究及び経験によれば、次の加熱時に実質的に有
効に作用する温度は、局部的表面温度の3分の2
程度である。 To further explain the above, the reference temperature before heat input by the preheating torch 4a is 25°C even if the workpiece to be welded is kept at room temperature, and the reference temperature before heat input by the welding torch 4b is 25°C.
After being heated by 2/3 of surface temperature
That's about it.
低合金鋼でかつ予熱工程と溶接工程とを連続し
て実施する場合には、約200℃の有効温度が必要
であるため、これらを勘案して表面温度を設定す
る)とされ、後熱トーチ4cによる入熱前にの基
準温度は、溶接トーチ4bによつて加熱された部
分の温度が200℃(溶接トーチ4bの入熱によつ
てその熱が被溶接物に伝達され、表層近傍が当然
常温より高くなつているので前述の温度300℃よ
りも低くてもよい。)とされる。 When using low-alloy steel and performing the preheating process and welding process consecutively, an effective temperature of approximately 200°C is required, so the surface temperature should be set taking this into account). The reference temperature before heat input by welding torch 4c is 200℃ at the part heated by welding torch 4b (the heat is transferred to the workpiece by the heat input from welding torch 4b, and the temperature near the surface layer is naturally 200℃). (Since the temperature is higher than room temperature, it may be lower than the aforementioned temperature of 300°C.)
このように、各トーチ4の相互間隔を設定し、
また支持機構9を駆動して各トーチ4を昇降させ
ることによつて、ノズル2を被溶接物Cの溶接線
W上に適宜間隔で対向配置した後、ガス供給手段
11により各ノズル2へ不活性ガスを供給し、各
ノズル2の先端と被溶接物Cとの間を不活性ガス
によつて被覆するとともに、電流供給手段10に
より各ノズル2の電極3と、被溶接物Cとの間に
電流を流してアークを発生させることによつて溶
接が開始される。 In this way, the mutual spacing of each torch 4 is set,
Further, by driving the support mechanism 9 to raise and lower each torch 4, the nozzles 2 are arranged facing each other at appropriate intervals on the welding line W of the workpiece C, and then the gas supply means 11 is used to inject each nozzle 2 into the welding line W of the workpiece C. Activated gas is supplied to cover the space between the tip of each nozzle 2 and the workpiece C with inert gas, and the current supply means 10 is used to cover the space between the electrode 3 of each nozzle 2 and the workpiece C to be welded. Welding is initiated by passing a current through and generating an arc.
そして、溶接開始状態から、溶加材供給手段6
を駆動して溶接トーチ4bの電極3と被溶接物C
との間に、溶加材5を供給するとともに、走行台
車8を第3図の矢印方向へ走行させることによつ
て、第4図a〜第4図cに示すように、溶接線W
に沿つて溶接が行なわれる。 Then, from the welding start state, the filler metal supply means 6
is driven to connect the electrode 3 of the welding torch 4b and the workpiece C.
By supplying the filler metal 5 between the welding line W and moving the carriage 8 in the direction of the arrow in FIG. 3, as shown in FIGS.
Welding is performed along the
即ち、第4図aに示すように、矢印の溶接方向
の前方に位置する予熱トーチ4aの発生アークに
より被溶接物Cが予熱され、次いで、予熱された
被溶接物Cの上に、溶接トーチ4bで溶加材5が
溶解させられることによつて、第4図bに示すよ
うに、ビードBが形成され、さらに、第4図cに
示すように、後熱トーチ4cの発生アークにより
ビードB及び被溶接物Cに後熱が与えられる。こ
れらの工程が順次繰り返されることによつて、溶
接線Wの全長にわたつて溶接が実施される。 That is, as shown in FIG. 4a, the workpiece C to be welded is preheated by the arc generated by the preheating torch 4a located forward in the welding direction of the arrow, and then the welding torch is placed on the preheated workpiece C. By melting the filler metal 5 at 4b, a bead B is formed as shown in FIG. 4b, and further, as shown in FIG. Postheat is applied to B and the object to be welded C. By sequentially repeating these steps, welding is performed over the entire length of the weld line W.
このような溶接作業における予熱、溶接及び後
熱工程は、各トーチ4を順次溶接方向に移動させ
る連続した一連の工程で行なわれるため、各処理
後における被溶接物Cの温度降下を抑えて、例え
ば、被溶接物Cを200℃以上の高温度に維持して
冷却を遅らせ、溶接ビードBの下に入り込んだ水
素の拡散時間を十分に確保して、ビード下割れX
の発生を防止することができる。また、冷却速度
を遅らせることにより、例えば900℃以上の高温
とされた被溶接物Cがマルテンサイト変態するこ
とを阻止でき、組織的な面からビード下割れXの
発生を防止することができる。 The preheating, welding, and postheating processes in such welding work are performed in a continuous series of steps in which each torch 4 is sequentially moved in the welding direction, so that the temperature drop of the welded object C after each process is suppressed. For example, by maintaining the workpiece C at a high temperature of 200°C or higher to delay cooling, and ensuring sufficient time for the hydrogen that has entered under the weld bead B to diffuse,
can be prevented from occurring. Furthermore, by slowing the cooling rate, it is possible to prevent the welded object C, which has been heated to a high temperature of, for example, 900° C. or higher, from undergoing martensitic transformation, and it is possible to prevent the occurrence of under-bead cracks X from a structural standpoint.
さらに、後熱トーチ4cによる入熱量を溶接ト
ーチ4bによる入熱量よりも大きくする意味につ
いて以下説明する。 Furthermore, the meaning of making the amount of heat input by the post-heating torch 4c larger than the amount of heat input by the welding torch 4b will be explained below.
一般の溶接作業では、溶接ビードを複数層重畳
させることによつて、溶接部が形成される。この
場合にあつて、1層目の溶接ビードを形成するこ
とによつて、被溶接物Cの一部に硬化域Y(第1
図参照)を形成されたとしても、2層目の溶接ビ
ードを形成するときの入熱で、硬化域Yを加熱し
て焼戻して軟化状態にし得る可能性がある。 In a typical welding operation, a weld is formed by overlapping multiple layers of weld beads. In this case, by forming the first layer of weld beads, a hardened region Y (first
(see figure), there is a possibility that the hardened region Y may be heated and tempered to a softened state by the heat input when forming the second layer weld bead.
そこで、予熱トーチ、溶接トーチによる入熱に
加えて、後熱トーチの入熱量を溶接トーチによる
入熱量よりも大きくするとともに調整を行なつ
て、上述の条件を満足する状態を作成する。 Therefore, in addition to the heat input from the preheating torch and the welding torch, the heat input from the postheating torch is made larger than the heat input from the welding torch, and adjustments are made to create a state that satisfies the above-mentioned conditions.
例えば、低合金鋼において、 予熱時入熱量20(kJ/cm)、 溶接時入熱量10(kJ/cm)、 後熱時入熱量11〜13(kJ/cm) というような運用がなされる。 For example, in low alloy steel, Heat input during preheating 20 (kJ/cm), Heat input during welding 10 (kJ/cm), Heat input during post-heating 11-13 (kJ/cm) This is how it is operated.
前の溶接ビードの上に次の溶接ビードを重畳さ
せる場合には、前の溶接ビード形成による溶接箇
所の温度が次の溶接時までに低下してしまうの
で、これらの条件の入熱を繰り返すことになる。 When superimposing the next weld bead on top of the previous weld bead, the temperature of the welding area due to the formation of the previous weld bead will drop by the time of the next welding, so heat input under these conditions must be repeated. become.
このような各入熱を行なうことによつて、硬化
域Yを除去することができる。 By performing each of these heat inputs, the hardened region Y can be removed.
なお、溶接機1の実施例では、予熱、溶接、熱
処理を行なう各トーチ4a,4b,4cをそれぞ
れ1個としたが、複数としてもよい。また<トー
チ間隔の計算例>で示した入熱量及びトーチ間隔
は、被溶接物Cや溶加材5の材質等により変更可
能である。さらに、被溶接物Cの形状は、平板状
に限られるものではなく、管の周溶接にも適用可
能である。 In the embodiment of the welding machine 1, the number of each torch 4a, 4b, 4c for preheating, welding, and heat treatment is one, but it may be plural. Further, the heat input amount and the torch spacing shown in <Calculation example of torch spacing> can be changed depending on the materials of the workpiece C and the filler metal 5, etc. Furthermore, the shape of the object to be welded C is not limited to a flat plate shape, and can also be applied to circumferential welding of a pipe.
「発明の効果」
以上説明したように、本発明に係る鋼材の溶接
方法は、予熱トーチ、溶接トーチ及び後熱トーチ
を溶接方向に間隔を空けて配置して、各トーチで
アークを発生させることにより、予熱、溶接及び
後熱処理をするのに加えて、溶接トーチの入熱量
より後熱トーチの入熱量を大きくすることと、各
トーチの間隔を溶接条件と関連づけて設定するこ
ととを行なうものであるから、
予熱トーチ、溶接トーチ及び後熱トーチの相
互間隔を、溶接条件、被溶接物の表面に付与し
たい温度に基づいて設定し、一連の溶接作業時
に各トーチの間隔を保持したまま溶接作業を行
なうものであるため、予熱トーチ及び溶接トー
チで発生させた熱によつて、被溶接物の溶接対
象箇所が、予熱処理から後熱処理の開始前まで
高温状態に保持され、さらに後熱処理が加わる
ことになるので、被溶接物に水素が入り込む現
象を抑制して、ビード割れの発生を少なくする
ことができる。"Effects of the Invention" As explained above, the method for welding steel materials according to the present invention involves arranging a preheating torch, a welding torch, and a postheating torch at intervals in the welding direction, and generating an arc with each torch. In addition to preheating, welding, and post-heat treatment, the method also involves making the heat input of the post-heating torch larger than the heat input of the welding torch, and setting the interval between each torch in relation to the welding conditions. Therefore, the mutual spacing between the preheating torch, welding torch, and postheating torch is set based on the welding conditions and the temperature desired to be applied to the surface of the workpiece, and welding is performed while maintaining the spacing between each torch during a series of welding operations. Because the work is carried out, the heat generated by the preheating torch and welding torch keeps the welding target part of the workpiece at a high temperature from the preheating treatment to the start of the postheating treatment. Therefore, it is possible to suppress the phenomenon that hydrogen enters the workpiece to be welded and to reduce the occurrence of bead cracking.
予熱ないし後熱処理までの各工程中の高温状
態の保持と、後熱処理時の入熱量を溶接処理時
より大きくすることとによつて、被溶接物がマ
ルテンサイト変態する現象を抑制して被溶接物
内に形成される硬化域を、焼き戻し温度に加熱
して除去し、靱性低下を防止してビード割れの
発生防止効果を高めることができる。 By maintaining a high temperature state during each process from preheating to post-heat treatment, and by increasing the amount of heat input during post-heat treatment compared to the welding process, the phenomenon of martensitic transformation of the welded object is suppressed and the workpiece is welded. The hardened region formed inside the product can be removed by heating to the tempering temperature, thereby preventing a decrease in toughness and increasing the effect of preventing bead cracking.
予熱、溶接及び後熱処理を溶接作業の実施工
程と同時に行なうことにより、溶接機以外の格
別な設備を要することなく、簡便に実施するこ
とができる。 By performing preheating, welding, and post-heat treatment simultaneously with the welding process, the process can be easily performed without requiring any special equipment other than a welding machine.
等の効果が得られる。Effects such as this can be obtained.
第1図は一般の溶接時において溶接部に発生し
たビード下割れや硬化域を示す概略図、第2図な
いし第4図は本発明に係る鋼材の溶接方法の一実
施例を示すもので、第2図は本発明の方法を実施
するために好適な溶接機の例を示す側面図、第3
図はその正面図、第4図は各トーチによる処理状
態の概略図である。
B……ビード、C……被溶接物、X……ビード
下割れ、Y……硬化域、W……溶接線、1……溶
接機、2……ノズル、3……電極、4(4a,4
b,4c)……トーチ、5……溶加材、6……溶
加材供給手段、7……走行レール、8……走行台
車、9……支持機構、10……電流供給手段、1
1……ガス供給手段。
FIG. 1 is a schematic diagram showing under-bead cracks and hardened areas that occur in the weld during general welding, and FIGS. 2 to 4 show an example of the method for welding steel materials according to the present invention. FIG. 2 is a side view showing an example of a welding machine suitable for carrying out the method of the present invention;
The figure is a front view thereof, and FIG. 4 is a schematic diagram of the processing state by each torch. B...bead, C...work to be welded, ,4
b, 4c)...torch, 5...melt material, 6...melt material supply means, 7...travel rail, 8...traveling trolley, 9...support mechanism, 10...current supply means, 1
1...Gas supply means.
Claims (1)
接方向に間隔を空けて被溶接物に対向配置させ、
ガス被覆中で前記各トーチからアークを発生させ
るとともに、溶接トーチで溶加材を溶融状態とす
ることにより、被溶接物の溶接を行なう方法であ
つて、溶接トーチの入熱量より後熱トーチの入熱
量を大きくし、かつ、任意トーチの間隔(L)が
次式の関係を有することを特徴とする鋼材の溶接
方法。 L=v×1/2πk(ηQ/Cρ)1/θ−θ0 ただし v:溶接速度 k:熱拡散率 η:溶接効率 Q:単位長さ当たりの入熱 C:比熱 ρ:密度 θ:設定温度 θ0:初期温度[Claims] 1. A preheating torch, a welding torch, and a postheating torch are arranged facing the workpiece at intervals in the welding direction,
This is a method of welding workpieces by generating an arc from each of the torches in a gas-covered environment and melting the filler metal with a welding torch. A method for welding steel materials, characterized in that the amount of heat input is increased and the interval (L) between arbitrary torches has the following relationship. L=v×1/2πk(ηQ/Cρ)1/θ−θ 0where v: Welding speed k: Thermal diffusivity η: Welding efficiency Q: Heat input per unit length C: Specific heat ρ: Density θ: Setting Temperature θ 0 : Initial temperature
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25475889A JPH02142677A (en) | 1989-09-29 | 1989-09-29 | How to weld steel materials |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25475889A JPH02142677A (en) | 1989-09-29 | 1989-09-29 | How to weld steel materials |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02142677A JPH02142677A (en) | 1990-05-31 |
| JPH0431787B2 true JPH0431787B2 (en) | 1992-05-27 |
Family
ID=17269473
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25475889A Granted JPH02142677A (en) | 1989-09-29 | 1989-09-29 | How to weld steel materials |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH02142677A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102007031950A1 (en) * | 2006-12-22 | 2008-06-26 | Sms Demag Ag | Method and apparatus for welding |
| CN102632317A (en) * | 2012-04-23 | 2012-08-15 | 湖南华菱湘潭钢铁有限公司 | Shielded metal arc welding method for high-strength hardened and tempered steel |
-
1989
- 1989-09-29 JP JP25475889A patent/JPH02142677A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02142677A (en) | 1990-05-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5646646B2 (en) | Welding method and welding apparatus | |
| US10888944B2 (en) | Method and system of using consumable with weld puddle | |
| JP3934251B2 (en) | TIG welding method and apparatus | |
| CN104625412B (en) | Copper alloy laser-cold metal transition compound heat source material increase manufacturing method | |
| CN105458470A (en) | Material increase manufacturing method for titanium alloy shape part by using double-arc hybrid heat source | |
| JP3025975B2 (en) | Plate overlay | |
| JPH04501234A (en) | Welding coated metal | |
| KR101112015B1 (en) | Method and apparatus for the heat treatment of welds | |
| JPH0431787B2 (en) | ||
| KR100993986B1 (en) | Mesh core welding device capable of post-heat treatment and welding method using the same | |
| JP2022143413A (en) | Welding equipment and welding method | |
| JP2016194132A (en) | Method for quenching steel sheet | |
| JP3090496B2 (en) | Method and apparatus for joining hot rolled material and continuous hot rolling equipment | |
| JP2734306B2 (en) | One-side automatic Uranami welding method | |
| CN218946600U (en) | Submerged arc welding device for welding and repairing copper gasket | |
| KR20140028308A (en) | Apparatus for improving surface of cast strip and surface improving method thereof | |
| JPS62176696A (en) | Metal cutting method using laser beam | |
| JP2003103382A (en) | Setting method for laser beam irradiation position | |
| JPH05329636A (en) | Method for continuously cutting steel material | |
| JPH0428475B2 (en) | ||
| JP6884365B2 (en) | Thermal cutting method | |
| JP4423823B2 (en) | Billet scarfing method | |
| SU506478A1 (en) | Method of multi-electrode welding | |
| JPS59159268A (en) | Method and device for plasma scarfing | |
| JPS60211018A (en) | Shaft member remelting treatment equipment |